ATTACHMENT 10 - Task Order AF 3052 PNQS 24-2986 Paint Interior Bldg 1400A - AF3052.xlsx
XLSX spreadsheet 40 KB Posted
- Solicitation number
- FA330024R0024
About this file
This document is a Construction Cost Estimate Breakdown template for a task order to paint the interior of Building 1400A at Maxwell Air Force Base. The total proposed contract price is $0.00, with cost breakdowns for materials, labor, and other direct costs. The related federal contract opportunity is a competitive Total Woman-Owned Small Business Set-Aside solicitation for Painting IDIQ services at Maxwell AFB and Gunter Annex, Solicitation Number FA330024R0024. The solicitation includes a site visit on June 6, 2024, a deadline for questions on June 13, 2024, and a proposal submission deadline of June 24, 2024 at 12:00 PM CDT. The contract is for firm-fixed-price services with a high probability of adequate price competition.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 23-Mar-24 | 400 Cannon Street Maxwell Air Force Base Alabama | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Paint Interior | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Building 1400A | PNQS 24-2986 | Maxwell | ||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | MH | $0.00 | ||||||
| Lift/Scaffold | MO | $0.00 | ||||||
| Pickup/Disposal | Lot | $0.00 | ||||||
| DIVISION 2 (Site Work) | ||||||||
| DIVISION 3 (CONCRETE | ||||||||
| DIVISION 4 (MASONRY) | ||||||||
| DIVISION 5 (METAL) | ||||||||
| DIVISION 6 (WOOD AND PLASTICS) | ||||||||
| DIVISION 7 (THERMAL AND MOISTURE PROTECTION) | ||||||||
| DIVISION 8 (DOORS AND WINDOWS) | ||||||||
| DIVISION 9 (FINISHES) | $0.00 | $0.00 | ||||||
| Paint Door Frames | $3,282.70 | |||||||
| Patch walls | $0.00 | |||||||
| Prepare Walls | $0.00 | |||||||
| Prime and Paint Walls (2 Coats) | $0.00 | |||||||
| Move furniture | $0.00 | |||||||
| DIVISION 10 (SPECIALTIES) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 11 (EQUIPMENT) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 12 (FURNISHINGS) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 14 (CONVEYING SYSTEMS) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 15 (MECHANICAL) | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $3,282.70 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| Material Costs | $0.00 | $0.00 | ||||||
| Tax on Materials | 10% | $0.00 | $0.00 | |||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Labor Cost | $0.00 | $0.00 | ||||||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | |||||
| TOTAL LABOR COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
Signature: ______________________________________ Gov't Coord___________________________________ image1.png
File details come from the government source that posted it. Updated .