This document is a Construction Cost Estimate Breakdown template for a task order to paint the interior of Building 1400A at Maxwell Air Force Base. The total proposed contract price is $0.00, with cost breakdowns for materials, labor, and other direct costs. The related federal contract opportunity is a competitive Total Woman-Owned Small Business Set-Aside solicitation for Painting IDIQ services at Maxwell AFB and Gunter Annex, Solicitation Number FA330024R0024. The solicitation includes a site visit on June 6, 2024, a deadline for questions on June 13, 2024, and a proposal submission deadline of June 24, 2024 at 12:00 PM CDT. The contract is for firm-fixed-price services with a high probability of adequate price competition.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
23-Mar-24400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Paint Interior$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Building 1400APNQS 24-2986Maxwell
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project ManagerMH$0.00
Lift/ScaffoldMO$0.00
Pickup/DisposalLot$0.00
DIVISION 2 (Site Work)
DIVISION 3 (CONCRETE
DIVISION 4 (MASONRY)
DIVISION 5 (METAL)
DIVISION 6 (WOOD AND PLASTICS)
DIVISION 7 (THERMAL AND MOISTURE PROTECTION)
DIVISION 8 (DOORS AND WINDOWS)
DIVISION 9 (FINISHES)$0.00$0.00
Paint Door Frames$3,282.70
Patch walls$0.00
Prepare Walls$0.00
Prime and Paint Walls (2 Coats)$0.00
Move furniture$0.00
DIVISION 10 (SPECIALTIES)$0.00$0.00$0.00
DIVISION 11 (EQUIPMENT)$0.00$0.00$0.00
DIVISION 12 (FURNISHINGS)$0.00$0.00$0.00
DIVISION 13 (SPECIAL CONSTRUCTION)$0.00$0.00$0.00
DIVISION 14 (CONVEYING SYSTEMS)$0.00$0.00$0.00
DIVISION 15 (MECHANICAL)$0.00$0.00$0.00
DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$3,282.70
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________ Gov't Coord___________________________________ image1.png