Attachment_22_AFMC_260_First_Article_NSN_0803.pdf

PDF 90 KB Posted

Attached to
F-16 Fuel cell (Amendment 0004) Federal contract opportunity
Solicitation number
FA821224R0003
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a First Article Requirements form that details the requirements for a first article test of a F-16 fuel cell part with NSN 1560-01-224-0803WF. The first article quantity is 1 unit, which will be part of the production quantity. Special production facility requirements are specified, and contractor testing is required with a test report. Approved first articles will be forwarded to supply, while disapproved first articles will be returned to the contractor. First article approval may be waived under certain conditions, such as if the offeror has previously provided satisfactory production quantities of the same or similar article to the Air Force. The government intends to award a firm-fixed price contract for the production of these F-16 fuel cells under full and open competition, with a qualification requirement restricting award to a pre-qualified source.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Fuel cell (Amendment 0004), newest first.
File Type Posted
FA821224R00030004.pdf PDF
FA821224R00030003.pdf PDF
FA821224R00030002.pdf PDF
FA821224R00030001.pdf PDF
Attachment_4_Engineering_Data_Requirements_NSN_0803.pdf PDF
Attachment_11_IUID_NSN_9987.pdf PDF
Attachment_12_IUID_NSN_1246.pdf PDF
Attachment_14_Packaging_NSN_9987.pdf PDF
Attachment_26_Section_M.pdf PDF
Attachment_1_Engineering_Data_List_NSN_0803.pdf PDF
Attachment_3_Engineering_Data_List_NSN_1246.pdf PDF
Attachment_10_IUID_NSN_0803.pdf PDF
Attachment_13_Packaging_NSN_0803.pdf PDF
Attachment_16_SOW_NSN_0803.pdf PDF
Attachment_17_SOW_NSN_9987.pdf PDF
Attachment_20_QA_INSP_NSN_9987.pdf PDF
Attachment_23_AFMC_260_First_Article_NSN_9987.pdf PDF
Attachment_24_AFMC_260_First_Article_NSN_1246.pdf PDF
FA821224R0003.pdf PDF
Attachment_7_Item_Description_NSN_0803.pdf PDF
Attachment_9_Item_Description_NSN_1246.pdf PDF
Attachment_15_Packaging_NSN_1246.pdf PDF
Attachment_18_SOW_NSN_1246.pdf PDF
Attachment_19_QA_INSP_NSN_0803.pdf PDF
Attachment_27_MQR_ALL_NSNs.pdf PDF
Attachment_2_Engineering_Data_List_NSN_9987.pdf PDF
Attachment_5_Engineering_Data_Requirments_NSN_9987.pdf PDF
Attachment_6_Engineering_Data_Requirments_NSN_1246.pdf PDF
Attachment_8_Item_Description_NSN_9987.pdf PDF
Attachment_21_QA_INSP_NSN_1246.pdf PDF
Attachment_25_Section_L.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

20 JUL 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

81755 / 16VB004002-7

4. NSN

1560012240803WF

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM 1

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Conformance with drawings, mylars, and engineering instructions

B. The detailed technical requirements for First Article approval tests are contained in drawings, mylars, and engineering instructions

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

Number of days for government approval / disapproval days.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

Deliver concurrent with FA asset

(2) Government written notice of approval / disapproval due 90 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 270 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

See Block 12

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 90 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$10,000.0000

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 8Generated by PRPS using Jasper Reports on 05 Dec 2023

FIRST ARTICLE REQUIREMENTS 1. DATE

20 JUL 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles will be returned to the contractor

X will be retained by MXDEB pending disposition instructions from the contractor.

X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.

b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Slaughter, George PNAME: 06 JUL 2023DATE:

Deliver to:

809 MXSS/MXDEB

Bldg 849 Attn: Non-Accountable Bay Hill AFB, UT 84056-5713 Mark for First Article Do Not Post

First article will be waived for the OEM, Lockheed Martin, cage 81755. First article testing is necessary for this part due to critical dimensions. This part is structurally significant in a critical safety item and must therefore meet the drawing specs to ensure proper fit and function.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Slaughter, George P

416 SCMS/GUEAA

801-586-5444

586-5444

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

First Article Lab

809 MXSS/MXDEB

X

X

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 8Generated by PRPS using Jasper Reports on 05 Dec 2023

File details come from the government source that posted it. Updated .