Attachment 2 - Technical Acceptability - Miller ProHeat 35.pdf
PDF 298 KB Posted
- Attached to
- Combined Synopsis/Solicitation - Miller ProHeat 35 Federal contract opportunity
- Solicitation number
- FA910122QB056
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - FA910122QB056 Price Sheet.xlsx | XLSX spreadsheet | |
| Attachment 1 - Miller ProHeat 35 Specification.pdf | ||
| Attachment 3 - Draft Award with Provisions and Clauses.pdf | ||
| Attachment 3a - Draft Award with Provisions and Clauses - Changes.pdf | ||
| Combined Synopsis and Solicitation - Miller ProHeat 35_signed.pdf | ||
| single_source_justification ProHeat 35_signed_Redacted.pdf | ||
| Attachment 3 - Draft Award with Provisions and Clauses.pdf | ||
| Attachment 1 - Miller ProHeat 35 Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Day Month 2022
MEMORANDUM FOR RECORD
SUBJECT: Technical Acceptability – Miller ProHeat 35
Evaluation Process:
The Government will evaluate quotes on a lowest price technically acceptable (LPTA) basis. First, The Contracting Officer shall validate complete quotes, if items are missing then the quote will be considered incomplete and may not be evaluated further. Then the quote(s) will be evaluated for technical acceptability in order of lowest total price to highest total price. Once a quote has been determined to be technically acceptable, then the Government may stop evaluating other offeror(s).
Complete Quote:
The evaluation rating is based on the information being provided or not provided.
Evaluation (Information Provided)
Acceptable Acceptable Acceptable Acceptable
Item Pricing each CLIN and Total Price in USD Delivery Timeframe Valid Quote - 30 Days Unique Entity ID (UEI) Provided Technical Requirement Specifications Provided Acceptable
Not Acceptable Not Acceptable Not Acceptable Not Acceptable Not Acceptable
Technical Requirement Specifications:
All specification elements must be evaluated with a pass rating be technically acceptable.
Evaluation Pass Fail
Item All specification elements
Detailed Information:
Provide details on acceptable/not acceptable and pass/fail.
Reviewer(s):
Name Name Position Position
File details come from the government source that posted it. Updated .