Attachment 2 - SXHT 21-1001 Drawings.pdf
PDF 4 MB Posted
- Attached to
- Replace FCU & AHU B1317 Federal contract opportunity
- Solicitation number
- FA252125B0001
About this file
This is a construction drawing set detailing HVAC equipment replacement work at Building 1317 on Patrick Space Force Base in Melbourne, Florida. The drawings show mechanical and electrical plans for replacing four fan coil units (FCUs) on floors 2-5, as well as replacing an air handling unit (AHU) and makeup air unit (MAU) on the 6th floor.
The drawing set includes demolition and new installation plans showing removal of existing HVAC equipment and installation of new units manufactured by Trane. Detailed mechanical drawings indicate chilled water piping modifications, ductwork changes, and control system connections. Electrical drawings show power connections and circuit breaker requirements for the new equipment. The drawings also include general notes regarding hazardous materials handling, as barium-containing materials were identified on the 4th floor. Equipment schedules specify Trane model numbers FCBB080/120 for the FCUs and models UCCAD06/CSAA003 for the larger units. The work is being managed by the USSF 45th Civil Engineer Squadron under contract FA2521-18-D-0002.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE R
O
AD
A1A
ACCESS ROAD
REDSTONE ROAD
RECREATION ROAD
U N
KN
O
W N
CONTROL ROAD
UNKNOWN
CONTROL ROAD
UNKNOWN
U N
KN
O
W N
ACCESS ROAD
ACCESS ROAD
PEQUOT TRAIL
ACCESS R
OAD
FO
RE
CA
ST
L
AN
E
ATLAS AVENUE
FA
LC
O N
AV
EN
UE
SOUTH TECH ROAD
COUGAR RUN
SANDOLLAR COVE
ENDEAVOR ROAD
ACCESS ROAD
TI
TA
N
RO
AD
PORPOISE COVE
TU
SK
EG
EE
A
IR
M
EN
D
RI
VE
UN
KN
O W
N
SP
AC
EL
IF
T
AV
EN
UE
O M
AL
LE
Y
DR
ACCESS ROAD
NORTH DRIVE
N C
O C
LU
B SO
U
TH
PAR
KIN
G
UTE TRAIL
SEQUOIA TRAIL
JAGUAR AVENUE
DUSKY RUN
PHARMACY DRIVE
ACCESS ROAD
PANTHER RUN
DE
LT
A
DR
IV
E
SHOSHONI TRAIL
C
AN
IN
E
D R
IV
E
JUPITER STREET
ACCESS ROAD THUNDER LANE
THOR STREET
EDWARD H. WHITE II
JUPITER STREET
CHALLENGER STREET
MATADOR STREET
BREAKERS LANE
PERSHING PLACE
RE
SC
UE
R
O
AD
RELAY STATION ROAD
MACE ROAD
SATURN ROAD
6TH HOLE SUNSET BLVD
GR
EE
NS
KE
EP
ER
L
AN
E
STATE ROAD 404
STATE ROAD 404 (ONRAMP)
AC
CE
SS
R
O
AD
AC
C
ESS R
O
AD
H
ABITAT R
U N
C O
N
TR
O L
R O
AD
RI
VE
RS
ID
E
TR
AI
L
R
IVER
SID
E TR
AIL
UNKNOWN
UN
KN
O W
N
SO
U
TH
P
AT
R
IC
K
D R
IV
E
ACCESS ROAD
ACCESS ROAD
SCHOOL AVENUE
SC
H
O O
L AVEN
U
E
C O
N
TR
O L
R O
AD
C
O N
TR
O
L R
O
AD
W
ES
T
TE
C H
R O
AD
JUPITER STREET
M
AINTENANCE ROAD
COYOTE RUN
COYOTE RUN
ACCESS ROAD
IROQUIS TRAIL
IROQUIS TRAIL
BEAR RUN
BEAR RUN
ALLIGATOR RUN
ALLIGATOR RUN
U N
KN
O
W N
MINUTEMAN STREET
RE
SC
UE
R
O
AD
R
ES
C U
E R
O
AD
R
EE
F C
O U
R T
UNKNOWN
CONTROL ROAD
CONTROL ROAD
SO
U
TH
P
AT
R
IC
K
D R
IV
E
SO
U
TH
PATR
IC
K D
R
IVE
ANVIL ROAD
ANVIL ROAD
ACCCESS ROAD
RESCUE ROAD
R
ES
C U
E R
O
AD
AC
C
ES
S
R O
AD
AC
C
ES
S
R O
AD
AC
CE
SS
R
O
AD
AC
C
ES
S
R O
AD
U N
KN
O
W N
C O
N
TR
O L
R O
AD
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A P P R O V E D
SHXT 21-1001
REPLACE HVAC B1317 ATC
PATRICK SPACE FORCE BASE (PSFB)
MELBOURNE, FLORIDA
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit o
A
R
C
H
I T
E
S
AA
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
S.R. A1A
PINEDA CAUSEWAY
SOUTH GATE (PERSONNEL ONLY)
TRUCK DELIVERY ONLY
EAST GATE (PERSONNEL ONLY)
BUILDING 535-45TH CES
BUILDING 423-CONTRACTING OFFICER
TALLAHASSEE
JACKSONVILLE
ORLANDO
TAMPA PATRICK SPACE FORCE BASE
MIAMI
ATLANTIC OCEAN
GOLF COURSE
BANANA RIVER
STATE OF FLORIDA
SCALE: N.T.S.
C O
N
TR
O L
R O
AD
PROJECT LOCATION
(B1317 ATC)
PERMIT(S)/ENVIRONMENTAL AND SLD 45 ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
SLD 45 RISK ASSESSMENT
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIEDHAZARDOUS MATERIALS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
G-001
C O
VE
R
S H
EE
T
SHEET INDEX
SHEET NUMBER SHEET TITLE REVISION
G-001 COVER SHEET
M-001 MECHANICAL GENERAL NOTES
MD-101 2ND & 3RD FLOOR MECHANICAL DEMOLITION PLANS
MD-102 4TH & 5TH FLOOR MECHANICAL DEMOLITION PLANS
MD-103 6TH FLOOR MECHANICAL DEMOLITION PLAN
M-104 2ND & 3RD FLOOR MECHANICAL FLOOR PLANS
M-105 4TH & 5TH FLOOR MECHANICAL PLANS
M-106 6TH FLOOR MECHANICAL PLAN
M-501 MECHANICAL DETAILS
M-701 MECHANICAL SCHEDULES
E-001 ELECTRICAL GENERAL NOTES
ED-101 2ND & 3RD FLOOR ELECTRICAL DEMOLITION PLANS
ED-102 4TH & 5TH FLOOR ELECTRICAL DEMOLITION PLANS
ED-103 6TH FLOOR ELECTRICAL DEMOLITION PLAN
E-104 2ND & 3RD FLOOR ELECTRICAL INSTALLATION PLAN
E-105 4TH & 5TH FLOOR ELECTRICAL INSTALLATION PLANS
E-106 6TH FLOOR ELECTRICAL INSTALLATION PLAN
E-701 PANEL SCHEDULES
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
IEEE C2 NATIONAL ELECTRICAL SAFETY CODE
NFPA 70E STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
SMACNA SHEET METAL & AIR CONDITIONING CONTRACTORS’ NATIONAL ASSOCIATION
UFC 4-010-01 DESIGN:DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 1, 19 AUGUST 2020
UFC 3-401-01 MECHANICAL ENGINEERING, WITH CHANGE 1, 1 OCTOBER 2015
UFC 3-400-02 ENGINEERING WEATHER DATA, 20 SEPTEMBER 2018
UFC 3-410-01 HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS, WITH CHANGE , 8 JULY 2021
(IBC), 2018 INTERNATIONAL BUILDING CODE
(IMC), 2018 INTERNATIONAL MECHANICAL CODE NFPA STANDARD 90A-2015 INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS
ASHRAE STANDARD 62.1-2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
ASHRAE STANDARD 90.1-2013 ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS
MIL-HDBK-1013/1A DESIGN GUIDELINES FOR PHYSICAL SECURITY OF FACILITIES
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AND
AIR CONDITIONING ENGINEERS
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRAH COMPUTER ROOM AIR HANDLING UNIT
DX DIRECT EXPANSION
ETR EXISTING TO REMAIN
FLA FULL LOAD AMPERAGE
HR HOUR
HVAC HEATING, VENTILATION, AIR CONDITIONING
HZ HERTZ
MCA MINIMUM CIRCUIT AMPACITY
MFG MANUFACTURER
MOP MAXIMUM OVERCURRENT PROTECTION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PH PHASE
QTY QUANTITY
RLA RATED LOAD AMPS
SAG SUPPLY AIR GRILLE
UFC UNIFIED FACILITIES CRITERIA
ABBREVIATIONS: SYMBOLS:
FLAG NOTE NUMBER
NEW PIPING
EXISTING PIPING
NEW MECHANICAL EQUIPMENT
EXISTING MECHANICAL EQUIPMENT
DEMOLITION
UNIT REMOTE THERMOSTAT
FLOOR MOUNTED SUPPLY DIFFUSER
POINT OF CONNECTION
POINT OF DISCONNECTION
CODES & STANDARDS:
MECHANICAL GENERAL NOTES:
1. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR
APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE
ADDITIONAL REMOVALS AND REPLACEMENTS OF UNSATISFACTORY WORK.
2. PROVIDE LOCKOUT/TAGOUT PROGRAM TO ENSURE ALL IMPACTED ELECTRICAL
INFRASTRUCTURE IS DE-ENERGIZED PRIOR TO CONSTRUCTION.
3. DO NOT ROUTE ANY NEW WET PIPING ABOVE ELECTRICAL EQUIPMENT.
4. ALL WORK TO CONFORM TO UFC 3-410-01 AND UFC 3-401-01.
5. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF ACTUAL
CONDITIONS. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
STARTING WORK.
6. COORDINATE ALL MECHANICAL WORK AND EQUIPMENT WITH STRUCTURAL
MEMBERS, ELECTRICAL WORK AND FIXTURES, ALL OTHER TRADES AND ALL
EXISTING CONDITIONS.
7. PROVIDE INSULATED TRAPPED CONDENSATION DRAIN PIPING, WITH AIR GAPS,
FROM COOLING COIL DRAIN PANS TO FLOOR DRAIN, ROOF DRAIN, OR OTHER
TERMINATION.
8. PROVIDE ALL HVAC AND PLUMBING EQUIPMENT AS PER MANUFACTURER
REQUIREMENTS AND DIVISION 23 SPECIFICATIONS FOR THIS PROJECT.
9. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE
FIELD.
10. COORDINATE FINAL EQUIPMENT/FIXTURE LOCATIONS WITH THE GENERAL
CONTRACTOR. LOCATIONS AS INDICATED ON THE DRAWINGS ARE
APPROXIMATE AND MUST BE FIELD VERIFIED.
11. CONDENSATE IS PUMPED. REFER TO MANUFACTURERS INSTALLATION
INSTRUCTIONS FOR CONNECTION REQUIREMENTS.
12. PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DEVICES NECESSARY
TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS IN ACCORDANCE WITH
THE INTENT OF THE CONTRACT DRAWINGS. FULLY TEST, CLEAN, AND LEAVE
SYSTEMS IN A COMPLETE AND OPERATIONAL STATUS.
13. ALL MATERIALS MUST BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER
WITH THE COORDINATION OF ALL INVOLVED TRADES.
14. PROVIDE NEW, U.L. LISTED MATERIALS AND EQUIPMENT. INSTALL IN
ACCORDANCE WITH MANUFACTURER MAINTENANCE CLEARANCES.
15. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE CONTRACT
DRAWINGS AND SPECIFICATIONS ARE TO ESTABLISH THE SPECIFIED
STANDARD OF QUALITY AND TO PROVIDE THE REQUIRED TYPE(S), SIZE(S), AND
CONFIGURATION.
16. USE PLASTIC COATED TYPE HANGERS FOR ALL COPPER PIPING.
17. SEAL OPENINGS AND PROTECT PIPES ACCORDING TO SPECIFICATIONS WHERE
PIPING IS ROUTED THRU A WALL OR FLOOR.
18. REFER TO ELECTRICAL SHEETS E-104, E-105, E-106 FOR NEW HVAC
ELECTRICAL SUPPLY INFORMATION.
19. PROVIDE ADEQUATE CONTAINMENT FOR DUST PRODUCING WORK. PREVENT
DUST MIGRATION FROM OCCUPIED SPACES AND ADJACENT WORK AREAS.
THIS INCLUDES BUT IS NOT LIMITED TO DRILLING, SAW CUTTING AND
DEMOLITION ACTIVITIES. PROTECT ALL EXISTING EQUIPMENT TO REMAIN FROM
DAMAGE, DUST AND MOISTURE.
20. IF ANY REMAINING SERVICES, PIPES, DUCTS, DUCT INSULATION OR
EQUIPMENT ARE DAMAGED IN APPEARANCE, OR BECOMES UNSERVICEABLE
DUE TO CONTRACTOR OPERATIONS, THE CONTRACTOR SHALL REPLACE WITH
NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY.
21. COORDINATE WITH THE CONTRACTING OFFICER FOR SCHEDULING SHUT
DOWNS, OUTAGES, CAPPING, OR ANY DISCONTINUATION OF UTILITY SERVICES
BEFORE PERFORMING ANY WORK.
22. COORDINATE WITH THE CONTRACTING OFFICER FOR ALL TEMPORARY
PARTITIONS AND MEANS OF EGRESS RESULTING FROM DEMOLITION
OPERATIONS.
23. COORDINATE WITH THE CONTRACTING OFFICER ALL DEMOLITION THAT
AFFECTS OCCUPIED PORTIONS OF THE FACILITY.
24. COORDINATE WITH THE CONTRACTING OFFICER ON MEANS OF PROTECTION
FOR ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE REMOVAL FROM THE
FACILITY.
25. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE
FIELD.
M
EC
H
AN
IC
AL
G
EN
ER
AL
N O
TE
S
M-001
T
26. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN EXISTING CONDITIONS
AND DRAWINGS BEFORE PROCEEDING WITH DEMOLITION.
27. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT AS INDICATED. USE
METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS
AND AS FOLLOWS:
A. HOLES IN WALLS AND FLOORS MUST BE CUT NEATLY WITH STRAIGHT AND PLUMB EDGES.
PROCEED WITH DEMOLITION SYSTEMATICALLY; NEATLY CUT OPENINGS AND HOLES
PLUMB; AND SQUARE TRUE TO DIMENSIONS REQUIRED. USE CUTTING METHODS LEAST
LIKELY TO DAMAGE NEW CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS
DESIGNED FOR SAWING OR GRINDING. THE CONTRACTOR MUST MINIMIZE HAMMERING
AND CHOPPING TO REDUCE DISTURBANCE TO ADJACENT SURFACES. TEMPORARILY
COVER OPENINGS.
B. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES TO
AVOID MARRING EXISTING FINISHED SURFACES.
C. DO NOT USE CUTTING TORCHES OR GRINDING EQUIPMENT UNTIL WORK AREA IS CLEARED
OF FLAMMABLE MATERIALS. AT CONCEALED SPACES, SUCH AS DUCT INTERIORS AND PIPE
INTERIORS, VERIFY CONDITIONS AND CONTENTS OF HIDDEN SPACE BEFORE STARTING
FLAME-CUTTING OR GRINDING OPERATIONS. OBTAIN ALL REQUIRED BURN PERMITS
BEFORE ANY OF THIS WORK IS PERFORMED.
D. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES AND GRINDING.
E. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR UNSUITABLE
MATERIAL AND PROMPTLY DISPOSE OF OFF-SITE.
F. DEMOLISHED MATERIAL AT ALL ELEVATIONS ABOVE FINISHED FLOOR MUST BE LOWERED
TO GROUND BY METHODS SUITABLE TO AVOID FREE FALL AND PREVENT GROUND IMPACT
AND DUST GENERATION.
G. AT ALL ELEVATIONS ABOVE FINISHED FLOOR, LOCATE DEMOLISHED EQUIPMENT, DEBRIS
AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS ON SUPPORTING WALLS,
FLOORS, ROOFS OR FRAMING.
28. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.
29. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF PROPERTY AND LEGALLY DISPOSE OF
DEBRIS.
30. CLEAN REMAINING AND ADJACENT SPACES AND STRUCTURES OF DUST, DIRT, AND DEBRIS
CAUSED BY DEMOLITION OPERATIONS.
31. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR APPROVALS DO
NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE ADDITIONAL REMOVALS AND
REPLACEMENTS OF UNSATISFACTORY WORK.
32. WHERE PIPING IS REMOVED THROUGH A WALL OR FLOOR, THE REMAINING OPENINGS WILL BE
PATCHED AND SEALED.
33. REMOVE ALL PIPE SUPPORTS ASSOCIATED WITH ALL REMOVED PIPING.
34. DOCUMENT CONDITION OF EXISTING HVAC EQUIPMENT AND ASSOCIATED COMPONENTS
PRIOR TO CONSTRUCTION. FIELD MEASURE CAPACITIES AND FLOW RATES OF EXISTING AHU'S.
REPORT DATA TO CONTRACTING OFFICER TO VERIFY THE PERFORMANCE REQUIREMENTS
CAN BE ACHIEVED.
35. CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR REPLACEMENT OF UP TO 5% OF THE
SUPPLY AIR DUCTWORK SHOWN AND UP TO 10% OF THE SUPPLY AIR DUCTWORK INSULATION
AS NECESSARY TO REPAIR ISOLATED AREAS WHERE DUCT AND/OR INSULATION MAY HAVE
BEEN DAMAGED PRIOR TO CONTRACT. INSULATION REMOVAL WILL BE PERFORMED IN
ACCORDANCE WITH ASBESTOS HANDLING SPECIFICATIONS.
36. PROVIDE ACCESS DOORS IN NEW DUCTWORK TO SERVICE DEVICES WITHIN DUCTS NOT
OTHERWISE ACCESSIBLE THROUGH GRILLES/DIFFUSERS OR OPEN DUCT.
37. DUCT WILL BE FABRICATED PER SMACNA=HVAC DUCT CONSTRUCTION
STANDARDS-METAL AND FLEXIBLE.
38. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE FIELD.
39. FIRESTOP/SMOKESTOP ALL NEW PIPE PENETRATIONS THROUGH FIRE/SMOKE RATED
ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE ASSEMBLY.
40. FOR NEW CONNECTION PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW FOR
TUBE/COIL REMOVAL/REINSTALLATION.
41. FOR NEW CONNECTION PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW FOR
TUBE/COIL REMOVAL/REINSTALLATION.
42. ALL MECHANICAL PENETRATIONS THROUGH PRESSURE BOUNDARIES WILL BE CAULKED AND
SEALED TO MINIMIZE LOSS OF SPACE PRESSURIZATION.
43. FIRE DAMPER WILL BE PROVIDED AT ALL POINTS WHERE THE DUCTWORK
PENETRATES A FIRE BARRIER OF MORE THAN A ONE-HOUR RATING UNLESS OTHERWISE
INDICATED ON THE DRAWINGS.
44. ALL STEEL SHAPES (FABRICATIONS) WILL CONFORM TO ASTM-A-3C AND ALL SHARP EDGES
WILL BE ROUNDED. ALL BURRS WILL BE REMOVED.
45. HANGERS FOR ALL COPPER PIPING WILL BE PLASTIC-COATED TYPE.
46. FIELD VERIFY ALL EXISTING PIPE SIZES AND LOCATIONS. NEW TO EXISTING
CONNECTIONS WILL BE MADE USING THE SAME PIPE SIZE AS EXISTING (UNLESS NOTED
OTHERWISE).
47. WHERE PIPING IS ROUTED THROUGH A WALL OR FLOOR, THE OPENINGS MUST BE SEALED AND
THE PIPES PROTECTED ACCORDING TO THE SPECIFICATIONS
GENERAL NOTES - ENVIRONMENTAL:
1. HAZARDOUS MATERIALS ARE PRESENT WITHIN BUILDING 1317. COATINGS
CONTAINING HAZARDOUS CONSTITUENTS HAVE BEEN IDENTIFIED WITHIN THE
IMMEDIATE VICINITY OF WORK. ABATEMENT AND ENCAPSULATION OF
HAZARDOUS MATERIALS MAY BE REQUIRED AS PART OF THE CONSTRUCTION.
ENVIRONMENTAL SAMPLING WAS PERFORMED BY SUNRISE SYSTEMS OF
BREVARD, INC. A COPY OF THE REPORT CAN BE PROVIDED TO THE
CONTRACTOR AT REQUEST FROM THE CONTRACTING OFFICER.
2. DISPOSE OF ALL MATERIALS IN ACCORDANCE WITH THE CONTRACT CLAUSES
AND SPECIFICATION SECTION 01 57 19 AND ALL OTHER CONTRACT CLAUSES.
3. ANY DISTURBANCE, HANDLING, STORAGE, TRANSPORTATION OR DISPOSAL OF
HAZARDOUS MATERIALS MUST BE IN ACCORDANCE WITH THE APPROVED
REMOVAL, DISPOSAL PLAN AND SPECIFICATION SECTION 01 57 19.
4. PERFORM ALL WORK IN A MANNER THAT MINIMIZES DAMAGE TO EXISTING
HAZARDOUS MATERIALS IDENTIFIED IN THESE DRAWINGS.
5. HAZARDOUS MATERIALS SHOWN ON DRAWINGS ARE NOT ALL INCLUSIVE.
SUSPECT MATERIALS/COATINGS THAT ARE NOT IDENTIFIED SPECIFICALLY IN
THESE PROJECT DRAWINGS AND SPECIFICATIONS MUST BE EITHER
SAMPLED/ANALYZED BY THE CONTRACTOR OR ASSUMED WORST CASE.
6. SUBMIT ALL PLANS TO THE CONTRACTING OFFICER FOR REVIEW, REVISED BY
THE CONTRACTOR WHERE REQUIRED, AND RESUBMITTED FOR APPROVAL.
COMMENCEMENT OF WORK WILL NOT BE PERMITTED UNTIL EACH PLAN IS
GIVEN FINAL APPROVAL.
GENERAL NOTES - HEAVY METAL COATINGS:
1. SUBMIT A COPY OF THE NOTIFICATION OF COMMENCEMENT OF ABATEMENT
TO THE CONTRACTING OFFICER 20 DAYS PRIOR TO COATING REMOVAL
OPERATIONS (IF APPLICABLE).
2. PERFORM WELDING, CUTTING OR HOT WORK ON GALVANIZED STEEL OR
SURFACES WITH PRESERVATIVE COATING IN ACCORDANCE WITH FEDERAL
REGULATIONS 29 CFR 1926.55, 29 CFR 1926.353 AND 29 CFR 1926.354.
3. TREAT ANY COATING CONTAINING A DETECTABLE LIMIT OF BARIUM, CADMIUM,
CHROMIUM (TOTAL), CHROMIUM (HEXAVALENT), LEAD, ZINC, MERCURY OR
PCBs AS COATING CONTAINING HAZARDOUS CONSTITUENTS.
4. PERFORM ANY DISTURBANCE OF COATINGS CONTAINING HAZARDOUS
CONSTITUENTS IN ACCORDANCE WITH THE APPROVED HEAVY METAL AND PCB
WASTE MANAGEMENT AND COMPLIANCE PLANS AND SPECIFICATION 01 57 19.
GENERAL NOTES:
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
2N D
R D
F
LO
O R
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
S
MD-101
1. DEMOLISH FAN COIL UNIT 1 (FCU-1). LEAVE EXISTING PIPING IN PLACE AND
PREPARE FOR CONNECTION TO NEW FCU.
2. DEMOLISH FAN COIL UNIT 2 (FCU-2). LEAVE EXISTING PIPING IN PLACE AND
PREPARE FOR CONNECTION TO NEW FCU.
FLAG NOTES:
3/4" CHWS&R,
1" COND.
DRAIN
12x12 C.D.
80 CFM 6"
NK. 1 WAY.
FCU-1
3/4" CHWS&R TO FCU-1,
1" COND. DRAIN UP TO
FCU-2 ON THIRD FLOOR
8x6
10x8 DUCT UP
8x6
EF-4A WITH
BACKDRAFT DAMPER
44X12 LOUVER MTD.
DIRECTLY ABOVE
WINDOW LOUVER NO. 2-1
10x6
EF-4A WITH
BACKDRAFT DAMPER
10x6 SIDEWALL
REGISTER, 60 CFM.
8x4 DOWN TO
FIRST FLOOR
3/4" CHWS&R,
1" COND.
DRAIN
12x12 C.D.
80 CFM 6"
NK. 1 WAY.
FCU-2
3/4" CHWS&R TO FCU-2,
1" COND. DRAIN UP TO
FCU-3 ON FOURTH
FLOOR
8x4
10x10
MOTORIZED DAMPER
DM-2
44x18 LOUVER
F-5 WITH FACTORY
INSULATED HOUSING
10x6 SIDWALL
REGISTER, 60 CFM
34x6 TAP INTO 24x6
DUCT
34x6 SAG
24x6
SCALE:
3RD FLOOR MECHANICAL DEMOLITION PLAN
3/8" = 1'-0"
SCALE:
2ND FLOOR MECHANICAL DEMOLITION PLAN
3/8" = 1'-0"
N
N
1. REFER TO GENERAL NOTES, ABBREVIATIONS, AND LEGENDS ON M-001.
2. REFER TO SCHEDULES ON SHEET M-601 FOR EQUIPMENT AND DIFFUSER
DETAILS.
3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND
CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET
MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY
ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET
INTO INDIVIDUAL SHEETS.
4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING
TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.
5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVE FROM
THE BUILDING. QUARTERLY WASTE REPORT TO BE SENT IN THE CONTRACTING
OFFICER MONTHLY.
6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.
IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.
7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING
DEMOLITION.
8. TEMPORARY COOLING WILL BE PROVIDED FOR ALL AREAS WITH SENSITIVE
ELECTRONIC EQUIPMENT. TEMPORARY COOLING CAPACITY MUST BE
EQUIVALENT OR BETTER THAN THE UNITS BEING REMOVED.
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
4T H
TH
F
LO
O
R M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O N
P
LA
N S
MD-102
1. DEMOLISH FAN COIL UNIT 3 (FCU-3. LEAVE EXISTING PIPING IN PLACE AND
PREPARE FOR CONNECTION TO NEW FCU.
2. DEMOLISH FAN COIL UNIT 4 (FCU-4). LEAVE EXISTING PIPING IN PLACE AND
PREPARE FOR CONNECTION TO NEW FCU.
3. BARIUM WAS FOUND IN A DETECTABLE AMOUNT AT THE FOURTH FLOOR WALL
ADJACENT TO EXISTING FCU-3. ABIDE BY OSHA REQUIREMENTS AND THE
REQUIREMENTS OF SPECIFICATION 01 57 19 FOR WORKER PROTECTION IF
DISTURBING THIS AREA OR UNTIL MONITORING DATA PROVES A HAZARD DOES
NOT EXIST.
FLAG NOTES:
3/4" CHWS&R,
1" COND.
DRAIN
FCU-3
3/4" CHWS&R TO FCU-3,
1" COND. DRAIN UP TO
FCU-4 ON FIFTH FLOOR
8x4
12x10
FIRE DAMPER
44x36 LOUVER NO. 4-1
20x14 DUCT TO SAG
10x6 SIDWALL
REGISTER, 60 CFM.
12x12 C.D.80 CFM
6" NK
FCU-4 3/4" CHWS&R TO FCU-4
8x4
12x12
10x5 UP TO ROOM
ABOVE
FIRE DAMPER
8x6 10x8 SIDWALL
REGISTER, 180 CFM.
12x12 C.D. 80 CFM
6" NK
EF-6
3/4" CHWS&R
MOTORIZED
DAMPER DM-1
24x24 EXHAUST GRILL
86x24 LOUVER IN
TILTED PANEL
LOUVER NO. 5-1
SCALE:
5TH FLOOR MECHANICAL DEMOLITION PLAN
3/8" = 1'-0"
SCALE:
4TH FLOOR MECHANICAL DEMOLITION PLAN
3/8" = 1'-0"
GENERAL NOTES:
1. REFER TO GENERAL NOTES, ABBREVIATIONS, AND LEGEND ON SHEET M-001.
2. REFER TO SCHEDULES ON SHEET M-601 FOR EQUIPMENT AND DIFFUSER
DETAILS.
3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND
CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET
MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY
ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET
INTO INDIVIDUAL SHEETS.
4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING
TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.
5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVE FROM
THE BUILDING.
6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.
IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.
7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING
DEMOLITION.
8. TEMPORARY COOLING WILL BE PROVIDED FOR ALL AREAS WITH SENSITIVE
ELECTRONIC EQUIPMENT. TEMPORARY COOLING CAPACITY MUST BE
EQUIVALENT OR BETTER THAN THE UNITS BEING REMOVED.
N
1. REFER TO GENERAL NOTES, ABBREVIATIONS, AND LEGEND ON SHEET M-001.
2. REFER TO SCHEDULES ON SHEET M-601 FOR EQUIPMENT AND DIFFUSER
DETAILS.
3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND
CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET
MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY
ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET
INTO INDIVIDUAL SHEETS.
4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING
TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.
5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVE FROM
THE BUILDING.
6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.
IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.
7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING
DEMOLITION.
8. TEMPORARY COOLING WILL BE PROVIDED FOR ALL AREAS WITH SENSITIVE
ELECTRONIC EQUIPMENT. TEMPORARY COOLING CAPACITY MUST BE
EQUIVALENT OR BETTER THAN THE UNITS BEING REMOVED.
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
6T H
F
LO
O R
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
MD-103
FLAG NOTES:
R/A
AHU-1
TEMPERATURE
CONTROL PANEL
12x12
STAIR
PRESSURIZATION
CONTROL BOX
EXISTING 26x14
METAL DUCTWORK
TO REMAIN
SCALE:
6TH FLOOR MECHANICAL DEMOLITION PLAN
3/8" = 1'-0"
EF-8
44x36 LOUVER IN
TILTED PANEL
LOUVER NO. 6-1
12x36 TO 25x14
TRANSITION
2" CHWS&R
12x36
28"W X 36" D X 36" L
PLENUM
48x44 LOUVER IN
TILTED PANEL
LOUVER NO. 6-2
MAU-1
EF-7
48x24 LOUVER IN
TILTED PANEL
LOUVER NO. 6-3
UH-4
12x12
S/A R/A
R/A
N
1. DEMOLISH EXISTING AHU-1 AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN,
DUCTWORK, CONTROLS AND WIRING.
2. DEMOLISH EXISTING MAU-1 AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN,
DUCTWORK, CONTROLS AND WIRING.
3. DEMOLISH ALL EXISTING SUPPLY AND RETURN DUCTWORK TO POINTS
INDICATED. PREPARE EXISTING DUCTWORK TO REMAIN FOR CONNECTION TO
NEW DUCTWORK.
4. DEMOLISH ALL EXISTING CHILLED WATER SUPPLY AND RETURN PIPING,
CONDENSATE PIPING, AND ALL ASSOCIATED INSULATION AND SUPPORTS TO
POINT INDICATED. PREPARE EXISTING TO REMAIN PIPE FOR CONNECTION TO
NEW PIPING.
5. DEMOLISH EXISTING DUCTWORK AND PIPING UP TO THE EXTERIOR WALLS OF
THE ROOM AS SHOWN. REPAIR ANY DAMAGE TO EXISTING TO REMAIN
DUCTWORK AND PIPING AND PREPARE FOR NEW CONNECTIONS.
6. DISCONECT EXISTING CONTROL SYSTEMS FROM BOTH AHUS. PREPARE
CONTROL SYSTEMS FOR CONNECTION TO NEW AHUS.
DETAILS.
3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND
CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET
MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY
ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET
INTO INDIVIDUAL SHEETS.
3. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING
TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.
4. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVED FROM
THE BUILDING.
5. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.
IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.
6. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING
DEMOLITION.
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
2N D
R D
F
LO
O R
M
EC
H
AN
IC
AL
F
LO
O R
P
LA
N S
M-104
1. INSTALL NEW FAN COIL UNIT 1 (FCU-1). CONNECT TO EXISTING PIPING AND
PROVIDE NEW THERMOSTAT FOR LOCAL CONTROL.
2. INSTALL NEW FAN COIL UNIT 1 (FCU-2). CONNECT TO EXISTING PIPING AND
PROVIDE NEW THERMOSTAT FOR LOCAL CONTROL.
FLAG NOTES:
3/4" CHWS&R,
1" COND.
DRAIN
12x12 C.D.
80 CFM 6"
NK. 1 WAY.
FCU-1
3/4" CHWS&R TO FCU-1,
1" COND. DRAIN UP TO
FCU-2 ON THIRD FLOOR
8x6
10x8 DUCT UP
8x6
EF-4A WITH
BACKDRAFT DAMPER
44x12 LOUVER MTD.
DIRECTLY ABOVE
WINDOW LOUVER NO. 2-1
10x6
EF-4A WITH
BACKDRAFT DAMPER
10x6 SIDWALL
REGISTER, 60 CFM.
8x4 DOWN TO
FIRST FLOOR
3/4" CHWS&R,
1" COND.
DRAIN
12x12 C.D.
80 CFM 6"
NK. 1 WAY.
FCU-2
3/4" CHWS&R TO FCU-2, 1"
COND. DRAIN UP TO
FCU-3 ON FOURTH FLOOR
8x4
10x10
MOTORIZED DAMPER
DM-2
44x18 LOUVER
F-5 WITH FACTORY
INSULATED HOUSING
10x6 SIDWALL
REGISTER, 60 CFM.
34x6 TAP INTO 24x6
DUCT.
34x6 SAG
24x6
SCALE:
3RD FLOOR MECHANICAL PLAN
3/8" = 1'-0"
SCALE:
2ND FLOOR MECHANICAL PLAN
3/8" = 1'-0"
N
N
N
DETAILS.
3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND
CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET
MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY
ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET
INTO INDIVIDUAL SHEETS.
4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING
TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.
5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVED FROM
THE BUILDING.
6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.
IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.
7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING
DEMOLITION.
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
4T H
TH
F
LO
O
R M
EC
H
AN
IC
AL
P
LA
N
S
M-105
1. INSTALL NEW FAN COIL UNIT 3 (FCU-3). CONNECT TO EXISTING PIPING AND
PROVIDE NEW THERMOSTAT FOR LOCAL CONTROL.
2. INSTALL NEW FAN COIL UNIT 4 (FCU-4). CONNECT TO EXISTING PIPING AND
PROVIDE NEW THERMOSTAT FOR LOCAL CONTROL.
FLAG NOTES:
3/4" CHWS&R,
1" COND.
DRAIN
FCU-3
3/4" CHWS&R TO FCU-3,
1" COND. DRAIN UP TO
FCU-4 ON FIFTH FLOOR
8x4
12x10
FIRE DAMPER
44x36 LOUVER NO. 4-1
20x14 DUCT TO S.A.G
10x6 SIDWALL
REGISTER, 60 CFM.
12x12 C.D.80 CFM
6" NK
FCU-4
3/4" CHWS&R TO FCU-4
8x4
12x12 10x5 UP TO ROOM
ABOVE
FIRE DAMPER
8x6
10x8 SIDWALL
REGISTER, 180 CFM.
12x12 C.D. 80 CFM
6" NK
EF-6
3/4" CHWS&R
MOTORIZED
DAMPER DM-1
24x24 EXHAUST
GRILL
86x24 LOUVER IN
TILTED PANEL
LOUVER NO. 5-1
SCALE:
5TH FLOOR MECHANICAL PLAN
3/8" = 1'-0"
SCALE:
4TH FLOOR MECHANICAL PLAN
3/8" = 1'-0"
N
N
T
T
1" COND DRAIN DOWN
TO FOURTH FLOOR
DETAILS.
3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND
CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET
MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY
ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET
INTO INDIVIDUAL SHEETS.
4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING
TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.
5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVED FROM
THE BUILDING.
6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.
IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.
7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING
DEMOLITION.
SPECIFIC NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
6T H
F
LO
O R
M
EC
H
AN
IC
AL
P
LA
N
M-106
1. INSTALL NEW AHU-1 AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN,
DUCTWORK, CONTROLS AND WIRING.
2. INSTALL NEW MAU-1 AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN,
DUCTWORK, CONTROLS AND WIRING.
3. INSTALL NEW SUPPLY AND RETURN DUCTWORK TO POINTS INDICATED.
CONNECT TO EXISTING TO REMAIN DUCTWORK AND LOUVERS. PROVIDE NEW
SUPPORTS AND INSULATION PER THE SPECIFICATIONS AND DETAILS ON
SHEET M-501.
4. INSTALL NEW CHILLED WATER SUPPLY AND RETURN PIPING, CONDENSATE
PIPING, AND ALL ASSOCIATED INSULATION AND SUPPORTS. CONNECT TO
EXISTING PIPING TO REMAIN AT POINTS INDICATED.
5. INSTALL NEW DUCTWORK AND PIPING UP TO THE EXTERIOR WALLS OF THE
ROOM AS SHOWN. PATCH ANY REMAINING HOLES AND FIRE STOP ANY
PENETRATIONS THROUGH 1-HOUR FIRE BARRIERS AFTER CONNECTION.
6. LABEL ALL DUCTWORK, EQUIPMENT, AND PIPING WITH TYPE AND DIRECTION
OF FLOW EVERY 10 FEET.
7. FAN DISCHARGE MOUNTED HEATER SECTION. TO BE PROVIDED BY AHU
MANUFACTURER. SEE SHEET M-601 FOR DETAILS.
8. CONNECT THE NEW AHU-1 AND MAU-1 TO THE EXISTING CONTROL SYSTEMS.
AHU-1 WILL CONNECT TO THE EXISTING AHU-1 SYSTEM, AND MAU-1 WILL
CONNECT TO THE EXISTING AHU-2 SYSTEM. CONNECT THE CONTROLS TO
MAINTAIN THE PREVIOUS SYSTEM'S OPERATION SCHEME AND CONTROL
POINTS.
FLAG NOTES:
R/A
AHU-1
TEMPERATURE
CONTROL PANEL
12x12
STAIR
PRESSURIZATION
CONTROL BOX
26x14
SCALE:
6TH FLOOR MECHANICAL PLAN
3/8" = 1'-0"
EF-8
44x36 LOUVER IN
TILTED PANEL
LOUVER NO. 6-1
2" CHWS&R
12x36
28"Wx36"Dx36"L
PLENUM
48x44 LOUVER IN
TILTED PANEL
LOUVER NO. 6-2
EF-7
48x24 LOUVER IN
TILTED PANEL
LOUVER NO. 6-3
UH-4
12x12
S/A R/A
R/A
N
MAU-1
TYP.
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
M-501
M
EC
H
AN
IC
AL
D
ET
AI
LS
SCALE:
TYPICAL HVAC HANGER SUPPORT DETAIL
N.T.S.
SCALE:
THERMOSTAT MOUNTING DETAIL
N.T.S. SCALE:
TYPICAL PIPE SUPPORT DETAIL
N.T.S. SCALE:
CONDENSATE PIPE SUPPORT DETAIL
N.T.S.
PIPE INSULATION
INSULATION SHIELD REQUIRED
FOR INSULATED PIPE
(TOP & BOTTOM) MIN 6" LONG
PIPE SADDLE W/ U-BOLT
(TOLCO FIG 318A OR
APPROVED EQUAL)
3"
CONCRETE FLOOR
THREADED PIPE STAND W/
WELDED BASE PLATE
(TOLCO FIG316T) SECURED TO
SLAB W/ 1/2" HILTI KWIK BOLT
NEW PIPING WITH
INSULATION. PROVIDE
POLYISOCYANURATE
INSULATION (DOW TRYMER
1800) TO EXTEND 2" LONGER
THAN PIPE SHIELD
CENTERLINE OF
THERMOSTAT
CONTROL
MOUNTING HEIGHT
VA
R
IE
S�
3/8" HILTI KWIK BOLT TZ
WITH 3" MIN EMBEDMENT
3/8" THREADED HANGER ROD
NUT & BACKNUT
PIPE HANGER
CONDENSATE PIPING
PIPE INSULATION SHIELD
SEE MECHANICAL SPECIFICATION
ATTACH TO STRUCTURE
WITH BEAM CLAMP
1/4"∅ THREADED STEEL ROD
DUCT INSULATION (TYP)
RECTANGULAR DUCT
P1000 UNISTRUT
1/4" THREADED STEEL ROD
WASHER (TYP)
P1000 UNISTRUT
NUT (TYP)
CONTROL BOX
FRONT VIEW
SCALE:
FAN COIL DETAIL
N.T.S.
48" AFF
FINISHED FLOOR
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
D .M
IL
LE
R
J.
M
EN
ZI
ES
P
.E
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
M-701
M
EC
H
AN
IC
AL
S C
H
ED
U
LE
S
AHU UNIT SCHEDULE
MARK FAN CFM
COOLING CAP. ENT AIR °F LVG AIR °F COOLING COIL ELECTRICAL
MANUFACTURER MODELSENS MBH TOTAL MBH DB WB DB WB ENT CW °F LVG CW °F VOLTS/PHASE HEAT KW
AHU-1 2600 65.13 69.02 77.5 63.6 54.7 54.6 44 60.88 208/3 17 TRANE UCCAD06
MAU-1 820 33.19 73.17 91.2 79.5 55 54.9 44 54 208/3 12 TRANE CSAA003
NOTES:
1. AHU-1 ELECTRIC HEATING COIL IS PROVIDED BY THE AHU MANUFACTURER AND FLANGE MOUNTED TO THE OUTLET OF THE FAN.
2. MAU-1 ELECTRIC HEATING COIL IS A SEPARATE UNIT SECTION PROVIDED BY THE AHU MANUFACTURER AND MOUNTED DIRECTLY ON TOP OF THE FAN SECTION. IT
REQUIRES A SECOND POWER SOURCE AS NOTED ON THE ELECTRICAL SHEETS.
FAN COIL UNIT SCHEDULE
MARK FAN CFM
COOLING CAP. ENT AIR °F LVG AIR °F ELECTRICAL
MANUFACTURER MODEL LOCATIONSENS MBH TOTAL MBH DB WB DB WB VOLTS/PHASE HEAT KW
FCU-1 800 15.24 17.88 80 67 62.53 60.06 208/1 4 TRANE FCBB080 2ND FLOOR
FCU-2 1200 23.89 30.22 80 67 61.73 59.12 208/1 4 TRANE FCBB120 3RD FLOOR
FCU-3 1200 23.89 30.22 80 67 61.73 59.12 208/1 4 TRANE FCBB120 4TH FLOOR
FCU-4 1200 23.89 30.22 80 67 61.73 59.12 208/1 4 TRANE FCBB120 5TH FLOOR
NOTES:
1. CAPACITIES BASED ON AN 80/67 F AIR ENTERING TEMPERATURE WITH 45 F CHILLED WATER ENTERING COIL @ 10 DEGREE DROP.
ELECTRICAL SYMBOL LEGEND: ABBREVIATIONS:
CIRCUIT HOME RUN
(PANEL NAME) - (CIRCUIT NUMBER)
DISCONNECT SWITCH, NON-FUSED HEAVY-DUTY
PANELBOARD
ITEMS TO BE DEMOLISHED
(XX)-(XXX)
1. ALL ELECTRICAL INSTALLATION WILL BE IN ACCORDANCE WITH ALL CODES
AND STANDARDS LISTED ON THIS SHEET.
2. ALL CONSTRUCTION WILL BE GOVERNED BY THE PLANS, SPECIFICATIONS, AND
ALL APPLICABLE BUILDING AND SAFETY CODES LAWS AND ORDINANCES.
3. CONTRACTOR MUST BE FAMILIAR WITH THE SITE, THE WORK REQUIRED, THE
CUSTOMER'S WORK PROCEDURES, AND ALL OTHER CONDITIONS THAT MAY
AFFECT THE SUCCESSFUL COMPLETION OF THE JOB PRIOR TO
COMMENCEMENT OF WORK.
4. FIELD LOCATE ALL EXISTING UTILITIES AS TO LOCATION AND ELEVATION.
NOTIFY THE CONTRACTING OFFICER OF ANY AND ALL CONFLICTS PRIOR TO
BEGINNING CONSTRUCTION.
5. LOCATIONS OF ALL ELECTRICAL EQUIPMENT ARE APPROXIMATE AND MAY BE
RELOCATED TO AN APPROVED LOCATION. CONTACT CONTRACTING OFFICER
PRIOR TO ANY FIELD CHANGES.
6. ALL SPECIFIC MATERIALS AND PRODUCTS IDENTIFIED IN THE PLANS ARE
INCLUDED AS THE BASIS OF DESIGN. CONTRACTOR MAY SUBMIT EQUIVALENT
PRODUCTS IN COMPLIANCE WITH THE PROJECT SPECIFICATIONS FOR
APPROVAL INSTEAD OF THOSE SPECIFIED.
7. SEAL ALL WALL PENETRATIONS RESULTING FROM NEW CONDUIT WITH UL
RATED FIRE SEALANT TO MATCH EXISTING WALL ASSEMBLY RATING.
8. ALL NEW INTERIOR CONDUIT MUST BE EMT UNLESS OTHERWISE NOTED.
9. ALL NEW CONDUIT MUST BE MINIMUM 3/4 INCH.
10. ALL NEW LOW VOLTAGE POWER CONDUCTORS MUST BE COPPER WITH
INSULATION TYPE THHN-THWN2 UNLESS SPECIFIED OTHERWISE.
11. REFER TO PANEL SCHEDULES INCLUDED IN THIS DRAWING SET FOR BRANCH
CIRCUIT, BREAKER, CONDUCTOR, AND CONDUIT INFORMATION.
12. ENSURE ALL MODIFIED PANELBOARDS RECEIVE NEW, TYPED PANEL
SCHEDULES REFLECTING AS-BUILT CONDITIONS. INSTALL PANEL SCHEDULES
ON THE INSIDE OF THE PANEL DOOR OR IN A SIMILAR CONSPICUOUS
LOCATION.
13. REPAIR ALL DAMAGE TO GALVANIZING ZINC COATING RESULTING FROM
CONSTRUCTION AND DEMOLITION ACTIVITIES USING COLD GALVANIZING
COMPOUND.
ELECTRICAL GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
EL
EC
TR
IC
AL
G
EN
ER
AL
N
O
TE
S
E-001
CODE COMPLIANCE CRITERIA:
29 CFR 1926/1910 OSHA STANDARDS FOR CONSTRUCTION
NFPA 70 NATIONAL ELECTRICAL CODE, 2020
NFPA 70E STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE, 2021
NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATION SYSTEMS, 2021
UFC 3-501-01 UNIFIED FACILITIES CRITERIA, ELECTRICAL ENGINEERING, WITH CHANGE 1, 2019
UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS, WITH CHANGE 2, 2021
1. DE-ENERGIZE ALL ITEMS TO BE DEMOLISHED OR REMOVED. PERFORM
LOCKOUT/TAGOUT IN ACCORDANCE WITH OSHA 29 CFR 1910.147 AND NFPA
70E.
2. CONTRACTOR MUST TAKE NECESSARY PRECAUTIONS AND PROVIDE
PROTECTION AS REQUIRED TO PRESERVE CONDITION OF EXISTING UTILITIES
EQUIPMENT, FURNISHINGS, AND SURFACES NOT INDICATED FOR REMOVAL. IT
IS THE CONTRACTOR'S RESPONSIBILITY TO WORK AROUND THE EXISTING
CONDITIONS TO ACCOMPLISH THE WORK.
3. COVER ALL OPENINGS OR PENETRATIONS IN ELECTRICAL ENCLOSURES
RESULTING FROM DEMOLITION ACTIVITIES WITH METAL PLUGS
MANUFACTURED FOR THAT PURPOSE.
4. SEAL ALL WALL PENETRATIONS RESULTING FROM DEMOLITION ACTIVITIES
WITH UL RATED FIRE SEALANT TO MATCH EXISTING WALL ASSEMBLY RATING.
5. SEAL ENDS OF RETAINED CONDUCTORS AND PROTECT FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES.
ELECTRICAL GENERAL NOTES - DEMOLITION:
SPECIFIC NOTE
TYPICAL NOTE, APPLICABLE TO
ALL OCCURRENCES
(TYP)
A AMPERE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG ABOVE GROUND
AHJ AUTHORITY HAVE JURISDICTION
APPROX APPROXIMATELY
AWG AMERICAN WIRE GAUGE
BLDG BUILDING
CB CIRCUIT BREAKER
CBL CABLE
CKT CIRCUIT
COMM COMMUNICATIONS
CU COPPER
DC CURRENT
DIA DIAMETER
DP DISTRIBUTION PANEL
D/S DISCONNECT SWITCH
EMT ELECTRICAL METALLIC TUBING
EPR ETHYLENE-PROPYLENE RUBBER
ETR EXISTING TO REMAIN
GND GROUND
GOVT GOVERNMENT
HZ HERTZ
JBOX JUNCTION BOX
KAIC THOUSAND AMPS INTERRUPTING CURRENT
KCMIL THOUSAND CIRCULAR MILLS
KV KILOVOLT
KVA KILOVOLT AMPERE
KW KILOWATT
LTG LIGHTS
MCB MAIN CIRCUIT BREAKER
MCB MAIN DISTRIBUTION PANEL
MLO MAIN LUG ONLY
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION.
NTS NOT TO SCALE
OBS OBSTRUCTION
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
P POLE
PH PHASE
PNL PANEL
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RGS RIGID GALVANIZED STEEL
SCH SCHEDULE
SST STAINLESS STEEL
THNN THERMOSPLASTIC HIGH HEAT RESISTANT NYLON
THWN-2 THERMOPLASTIC HEAT AND WATER RESISTANT NYLON
TYP TYPICAL
UL UNDERWRITER'S LABORATORIES
USSF UNITED STATES SPACE FORCE
V VOLT
VAC VOLTS ALTERNATING CURRENT
W WATT
XFMR TRANSFORMER
1. REFER TO GENERAL DEMOLITION NOTES ON SHEET E-001 FOR ADDITIONAL
DEMOLITION INFORMATION.
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
2N D
R D
F
LO
O R
E
LE
C
TR
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
S
ED-101
1. DEMOLISH TWO (2) 30A, 2P CIRCUIT BREAKERS IN "PANEL A" SUPPLYING
EXISTING "FCU-1" AND "FCU-2".
2. DEMOLISH "FCU-1" CONDUCTORS BACK TO "PANEL A". RETAIN AND PROTECT
EXISTING CONDUIT FOR INSTALLATION OF NEW "FCU-1".
3. DEMOLISH "FCU-2" CONDUCTORS BACK TO "PANEL A". RETAIN AND PROTECT
EXISTING CONDUIT FOR INSTALLATION OF NEW "FCU-2".
FLAG NOTES:
PANEL T1 (ETR)
PANEL A (ETR)
FCU-1
FCU-2
SCALE:
3RD FLOOR ELECTRICAL DEMOLITION PLAN
3/8" = 1'-0"
SCALE:
2ND FLOOR ELECTRICAL DEMOLITION PLAN
3/8" = 1'-0"
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
4T H
TH
F
LO
O
R E
LE
C
TR
IC
AL
D
EM
O
LI
TI
O N
P
LA
N S
ED-102
1. DEMOLISH TWO (2) 30A, 2P CIRCUIT BREAKERS IN "PANEL B" SUPPLYING
EXISTING "FCU-3" AND "FCU-4".
2. DEMOLISH "FCU-3" CONDUCTORS BACK TO "PANEL B". RETAIN AND PROTECT
EXISTING CONDUIT FOR INSTALLATION OF NEW "FCU-3".
3. DEMOLISH "FCU-4" CONDUCTORS BACK TO "PANEL B". RETAIN AND PROTECT
EXISTING CONDUIT FOR INSTALLATION OF NEW "FCU-4".
FLAG NOTES:
PANEL T2 (ETR)
PANEL B (ETR)
FCU-3
FCU-4
SCALE:
5TH FLOOR ELECTRICAL DEMOLITION PLAN
3/8" = 1'-0"
SCALE:
4TH FLOOR ELECTRICAL DEMOLITION PLAN
3/8" = 1'-0"
2. LABEL ALL CIRCUIT BREAKERS FOR DEMOLISHED CIRCUITS AS "SPARE" IN
UPDATED PANEL SCHEDULES.
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
6T H
F
LO
O R
E
LE
C
TR
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
ED-103
1. DEMOLISH TWO (2) CIRCUIT BREAKERS IN "PANEL C" SUPPLYING EXISTING
"AHU-2" AND "AHU-2 REHEAT".
2. DEMOLISH "AHU-2 REHEAT" CONDUCTORS AND CONDUIT BACK TO "PANEL C".
3. DEMOLISH "AHU-2" CONDUCTORS AND CONDUIT BACK TO "PANEL C" AND
DEMOLISH ASSOCIATED DISCONNECT SWITCH.
4. DEMOLISH "AHU-2 PREHEAT" CONDUCTORS AND CONDUIT BACK TO "PANEL C".
5. DEMOLISH "AHU-1 REHEAT" CONDUCTORS AND CONDUIT BACK TO "PANEL C".
6. DEMOLISH “AHU-1” CONDUCTORS AND CONDUIT BACK TO “PANEL C” AND
DEMOLISH ASSOCIATED DISCONNECT SWITCH.
FLAG NOTES:
AHU-2
AHU-1
EF 7 (ETR)
UH 4 (ETR)
EF 8 (ETR)
PANEL T3 (ETR)
PANEL C (ETR)
SCALE:
6TH FLOOR ELECTRICAL DEMOLITION PLAN
3/8" = 1'-0"
N
AHU-2 D/S
STRUT FRAME
AHU-1 D/S
1. REFER TO PANEL SCHEDULES ON SHEET E-701 FOR CIRCUIT BREAKER,
BRANCH CONDUCTOR, AND CONDUIT INFORMATION.
2. BASIS OF DESIGN FCU HAS INTEGRATED DISCONNECT SWITCH, REFER TO
MECHANICAL DRAWINGS FOR DETAILS. PROVIDE NEW DISCONNECT SWITCH
WITHIN LINE OF SIGHT OF FCU IN ACCORDANCE WITH NFPA 70 IF ALTERNATE
FCU IS INSTALLED.
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
2N D
R D
F
LO
O R
E
LE
C
TR
IC
AL
IN
ST
AL
LA
TI
O
N P
LA
N
E-104
1. INSTALL NEW 25A, 2P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL A" TO
SUPPLY NEW "FCU-1". ROUTE NEW CONDUCTORS FROM "PANEL A" TO NEW
"FCU-1" THROUGH RETAINED CONDUIT. EXTEND RETAINED CONDUIT SYSTEM
AS REQUIRED. MATCH EXISTING CONDUIT SIZE.
2. INSTALL NEW 25A, 2P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL A" TO
SUPPLY NEW "FCU-2". ROUTE NEW CONDUCTORS FROM "PANEL A" TO NEW
"FCU-2" THROUGH RETAINED CONDUIT. EXTEND RETAINED CONDUIT SYSTEM
AS REQUIRED. MATCH EXISTING CONDUIT SIZE.
FLAG NOTES:
EXISTING PANEL T-1
EXISTING PANEL A
NEW FCU-1
NEW FCU-2
SCALE:
3RD FLOOR ELECTRICAL INSTALLATION PLAN
3/8" = 1'-0"
SCALE:
2ND FLOOR ELECTRICAL INSTALLATION PLAN
3/8" = 1'-0"
N
N
(PANEL A) - (9,11)
(PANEL A) - (10,12)
2. BASIS OF DESIGN FCU HAS INTEGRATED DISCONNECT SWITCH, REFER TO
MECHANICAL DRAWINGS FOR DETAILS. PROVIDE NEW DISCONNECT SWITCH
WITHIN LINE OF SIGHT OF FCU IN ACCORDANCE WITH NFPA 70 IF ALTERNATE
FCU IS INSTALLED.
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
4T H
TH
F
LO
O
R E
LE
C
TR
IC
AL
IN
ST
AL
LA
TI
O N
P
LA
N S
E-105
1. INSTALL NEW 25A, 2P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL B" TO
SUPPLY NEW "FCU-3". ROUTE NEW CONDUCTORS FROM "PANEL B" TO NEW
"FCU-3" THROUGH RETAINED CONDUIT. EXTEND RETAINED CONDUIT SYSTEM
AS REQUIRED. MATCH EXISTING CONDUIT SIZE.
2. INSTALL NEW 25A, 2P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL B" TO
SUPPLY NEW "FCU-4". ROUTE NEW CONDUCTORS FROM "PANEL B" TO NEW
"FCU-4" THROUGH RETAINED CONDUIT. EXTEND RETAINED CONDUIT SYSTEM
AS REQUIRED. MATCH EXISTING CONDUIT SIZE.
FLAG NOTES:
EXISTING PANEL T2
NEW FCU-3
EXISTING PANEL B
NEW FCU-4
SCALE:
5TH FLOOR ELECTRICAL INSTALLATION PLAN
3/8" = 1'-0"
SCALE:
4TH FLOOR ELECTRICAL INSTALLATION PLAN
3/8" = 1'-0"
N
N
(PANEL B) - (22,24)
(PANEL B) - (2,4)
GENERAL NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
SCALE IN FEET
GRAPHIC SCALE
0 1 2 4
3/8"=1'-0"
6T H
F
LO
O R
E
LE
C
TR
IC
AL
IN
ST
AL
LA
TI
O
N P
LA
N
E-106
FLAG NOTES:
NEW MAU-1
NEW AHU-1
EXISTING EF 7
EXISTING UH 4
EXISTING EF 8
EXISTING PANEL T3
EXISTING PANEL C
SCALE:
6TH FLOOR ELECTRICAL INSTALLATION PLAN
3/8" = 1'-0"
N
(PANEL C) - (14,16,18)(PANEL C) - (24,26,28)
(PANEL C) - (37,39,41)
1. INSTALL NEW 15A, 3P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL C" TO
SUPPLY NEW "MAU-1". ROUTE NEW CONDUIT AND CONDUCTORS FROM
"PANEL C" TO "MAU-1".
2. INSTALL NEW 50A, 3P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL C" TO
SUPPLY NEW "MAU-1 DUCT HEATER". ROUTE NEW CONDUIT AND
CONDUCTORS FROM "PANEL C" TO "MAU-1 DUCT HEATER".
3. INSTALL NEW 80A, 3P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL C" TO
SUPPLY NEW "AHU-1". ROUTE NEW CONDUIT AND CONDUCTORS FROM
"PANEL C" TO "AHU-1".
NEW MAU-1
DUCT HEATER
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
SF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
N el so nE ng in ee ri ng C o.
rh od es b rit
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
PR
O
JE
C
T N
U M
BE
R
N
EL
SO
N
EN
G
IN
EE
R
IN
G
/0
3/
C .R
AW
LI
N G
S
M .S
M
IT
H
M .G
O N
ZA
LE
Z
SX
H
T
-1
SX
H
T
-1
R
EP
LA
C
E H
VA
C
B
A
TC
PA
N
EL
S
C H
ED
U
LE
S
E-701
1. LOAD INFORMATION FOR EXISTING EQUIPMENT IS BASED ON 1994 AS-BUILT
DOCUMENT.
2. NEW/MODIFIED CIRCUITS NOTED IN BOLD TEXT. PROVIDE NEW CIRCUIT
BREAKER, CONDUCTORS, AND CONDUITS AS INDICATED IN PANEL
SCHEDULES.
GENERAL NOTES:
PANEL ID: PANEL B
VOLTAGE: 208/120 VAC PHASE: 3 LOCATION: FIFTH FLOOR
BUS RATING: 100 A WIRES: 4 FED FROM: MDP
AIC RATING: 22 KA TYPE: MCB MCB RATING: 100 A
TR
IP
A M
PS
PO
LE
S
DESIGNATION
SE
TS
PH
A
SE
N
EU
TR
A
L
G R
O U
N D
C O
N D
U
IT
K
VA
C A
TE
G
O R
Y
C
IR
C U
IT
N
O
PH
A
SE
A
PH
A
SE
B
PH
A
SE
C
C
IR
C U
IT
N
O
C A
TE
G
O R
Y
K
VA
C O
N D
U
IT
G R
O U
N D
N
EU
TR
A
L
PH
A
SE
SE
TS DESIGNATION
PO
LE
S
TR
IP
A M
PS
100 3 MAIN BREAKER - - - - -
1 1.7 2 M 1.7 3/4" #10 #10 #10 1 FCU-4 2 25
3 1.7 4 M 1.7
5 0.4 6 R 0.4 RECPT RM. 504 1 20
20 1 GFI LEVEL 5 0.7 R 7 1.2 8 R 0.5 RECPT RM. 504 1 20
20 1 GFI LEVEL 5 BREAKROOM 0.7 R 9 1.1 10 R 0.4 RECPT RM. 401 1 20
20 1 RECPT RM. 501 0.7 R 11 0.9 12 L 0.2 RECPT RM. 404 1 20
- - SPACE 13 0.4 14 R 0.4 LIGHTS RM. 404 1 20
- - SPACE 15 0.2 16 R 0.2 RECPT RM. 404 1 20
20 1 LIGHTS RM. 504 0.7 L 17 0.7 18 RECPT RM. 404 1 20
20 1 EF-6 0.1 M 19 0.1 20 SPACE - -
20 1 SPARE 21 0.0 22 SPACE - -
20 1 SPARE 23 1.7 24 M 1.7 3/4" #10 #10 #10 1 FCU-3 2 25
- - SPACE 25 1.7 26 M 1.7
- - SPACE 27 0.0 28 SPACE - -
- - SPACE 29 0.0 30 SPACE - -
- - SPACE 31 0.0 32 SPACE - -
- - SPACE 33 0.0 34 SPACE - -
- - SPACE 35 0.0 36 SPACE - -
- - SPACE 37 0.0 38 SPACE - -
- - SPACE 39 0.0 40 SPACE - -
- - SPACE 41 0.0 42 SPACE - -
TOTAL PHASE CONNECTED LOAD: 5.1 3.0 3.7
PANEL DEMAND CALCULATIONS DEMAND LEGEND PANEL TOTALS
LOAD TYPE DEMAND FACTOR DEMAND LOAD LOAD TYPE REFERENCE TOTAL CONNECTED LOAD: 11.8 KVA
R RECEPTACLE < 10 KW 100% 4.0 KVA RECEPTACLES NEC 220.44 TOTAL DEMAND LOAD: 12.9 KVA
R RECEPTACLE > 10 KW 50% 0.0 KVA MOTORS NEC 220.50 TOTAL DEMAND CURRENT: 35.7 A
L LIGHTING 125% 1.1 KVA FIXED ELECTRIC SPACE HEAT NEC 220.51 SPARE LOAD CAPACITY: 64.26 %
G GENERAL EQUIPMENT 100% 0.0 KVA KITCHEN EQUIPMENT NEC 220.56
H HEAT 125% 0.0 KVA NONCOINCIDENT LOADS NEC 220.60
M MOTORS LESS LARGEST 100% 3.5 KVA
M LARGEST MOTOR 125% 4.3 KVA
NOTES:
PANEL A SCHEDULE PANEL B SCHEDULE
PANEL C SCHEDULE
PANEL ID: PANEL C
VOLTAGE: 208/120 VAC PHASE: 3 LOCATION: SIXTH FLOOR
BUS RATING: 225 A WIRES: 4 FED FROM: MDP
AIC RATING: 22 KA TYPE: MCB MCB RATING: 225 A
TR
IP
A M
PS
PO
LE
S
DESIGNATION
SE
TS
PH
A
SE
N
EU
TR
A
L
G R
O U
N D
C O
N D
U
IT
K
VA
C A
TE
G
O R
Y
C
IR
C U
IT
N
O
PH
A
SE
A
PH
A
SE
B
PH
A
SE
C
C
IR
C U
IT
N
O
C A
TE
G
O R
Y
K
VA
C O
N D
U
IT
G R
O U
N D
N
EU
TR
A
L
PH
A
SE
SE
TS DESIGNATION
PO
LE
S
TR
IP
A M
PS
20 1 RECPT RM. 605 0.9 R 1 1.1 2 M 0.2 EF-7 1 20
20 1 RECPT RM. 602 0.7 R 3 0.7 4 SPARE 1 20
20 1 SPARE 5 0.0 6 SPARE 1 20
20 1 SPARE 7 0.0 8 SPARE 1 20
20 1 SPARE 9 0.0 10 SPARE 1 20
20 3 SPARE
11 0.8 12 L 0.8 LIGHTS RM. 605 1 20
13 0.4 14 M 0.4
3/4" #12 - #12 1 MAU-1 3 1515 0.4 16 M 0.4
20 3 UH-4 #12 - #12 3/4"
1.7 H 17 2.1 18 M 0.4
1.7 H 19 1.7 20 SPARE 1 20
1.7 H 21 1.7 22 SPARE 1 20
20 SPARE 23 7.3 24 H 7.3
1-1/2" #8 - #3 1 AHU-1 W/ HEATER 3 8020 SPARE 25 7.3 26 H 7.3
20 EF-8 1.1 M 27 8.4 28 H 7.3
20 HAND DRYER 2.3 G 29 2.3 30 SPARE 1 20
20 AHU-1 CONTROL PANEL 0.5 G 31 0.5 32
SPARE 3 6020 UNKNOWN LOAD 1.1 G 33 1.1 34
20 SPARE 35 0.0 36
50 3 MAU-1 DUCT HEATER 1 #6 #6 #10 1"
4.0 H 37 5.8 38 H 1.8
INSTANT WATER HEATER 3 504.0 H 39 5.8 40 H 1.8
4.0 H 41 5.8 42 H 1.8
TOTAL PHASE CONNECTED LOAD: 16.8 18.1 18.3
PANEL DEMAND CALCULATIONS DEMAND LEGEND PANEL TOTALS
LOAD TYPE DEMAND FACTOR DEMAND LOAD LOAD TYPE REFERENCE TOTAL CONNECTED LOAD: 53.2 KVA
R RECEPTACLE < 10 KW 100% 1.6 KVA RECEPTACLES NEC 220.44 TOTAL DEMAND LOAD: 64.8 KVA
R RECEPTACLE > 10 KW 50% 0.0 KVA MOTORS NEC 220.50 TOTAL DEMAND CURRENT: 179.8 A
L LIGHTING 125% 1.0 KVA FIXED ELECTRIC SPACE HEAT NEC 220.51 SPARE LOAD CAPACITY: 20.09 %
G GENERAL EQUIPMENT 100% 3.9 KVA KITCHEN EQUIPMENT NEC 220.56
H HEAT 125% 55.5 KVA NONCOINCIDENT LOADS NEC 220.60
M MOTORS LESS LARGEST 100% 1.4 KVA
M LARGEST MOTOR 125% 1.4 KVA
NOTES:
PANEL ID: PANEL A
VOLTAGE: 208/120 VAC PHASE: 3 LOCATION: SIXTH FLOOR
BUS RATING: 100 A WIRES: 4 FED FROM: MDP
AIC RATING: 22 KA TYPE: MCB MCB RATING: 100 A
TR
IP
A M
PS
PO
LE
S
DESIGNATION
SE
TS
PH
A
SE
N
EU
TR
A
L
G R
O U
N D
C O
N D
U
IT
K
VA
C A
TE
G
O R
Y
C
IR
C U
IT
N
O
PH
A
SE
A
PH
A
SE
B
PH
A
SE
C
C
IR
C U
IT
N
O
C A
TE
G
O R
Y
K
VA
C O
N D
U
IT
G R
O U
N D
N
EU
TR
A
L
PH
A
SE
SE
TS DESIGNATION
PO
LE
S
TR
IP
A M
PS
100 3 MAIN BREAKER - - - - -
1 0.5 2 R 0.5 RECPT RM. 205 1 20
3 0.1 4 M 0.1 EF-4 1 20
5 0.4 6 R 0.4 RECPT RM. 202 1 20
20 1 RECPT RM. 205 - - - - - 0.5 R 7 1.0 8 R 0.5 RECPT RM. 305 1 20
25 2 FCU-1 1 #10 #10 #10 3/4" 1.7 M 9 3.4 10 M…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .