About this file

This is a construction drawing set detailing HVAC equipment replacement work at Building 1317 on Patrick Space Force Base in Melbourne, Florida. The drawings show mechanical and electrical plans for replacing four fan coil units (FCUs) on floors 2-5, as well as replacing an air handling unit (AHU) and makeup air unit (MAU) on the 6th floor.

The drawing set includes demolition and new installation plans showing removal of existing HVAC equipment and installation of new units manufactured by Trane. Detailed mechanical drawings indicate chilled water piping modifications, ductwork changes, and control system connections. Electrical drawings show power connections and circuit breaker requirements for the new equipment. The drawings also include general notes regarding hazardous materials handling, as barium-containing materials were identified on the 4th floor. Equipment schedules specify Trane model numbers FCBB080/120 for the FCUs and models UCCAD06/CSAA003 for the larger units. The work is being managed by the USSF 45th Civil Engineer Squadron under contract FA2521-18-D-0002.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE R

O

AD

A1A

ACCESS ROAD

REDSTONE ROAD

RECREATION ROAD

U N

KN

O

W N

CONTROL ROAD

UNKNOWN

CONTROL ROAD

UNKNOWN

U N

KN

O

W N

ACCESS ROAD

ACCESS ROAD

PEQUOT TRAIL

ACCESS R

OAD

FO

RE

CA

ST

L

AN

E

ATLAS AVENUE

FA

LC

O N

AV

EN

UE

SOUTH TECH ROAD

COUGAR RUN

SANDOLLAR COVE

ENDEAVOR ROAD

ACCESS ROAD

TI

TA

N

RO

AD

PORPOISE COVE

TU

SK

EG

EE

A

IR

M

EN

D

RI

VE

UN

KN

O W

N

SP

AC

EL

IF

T

AV

EN

UE

O M

AL

LE

Y

DR

ACCESS ROAD

NORTH DRIVE

N C

O C

LU

B SO

U

TH

PAR

KIN

G

UTE TRAIL

SEQUOIA TRAIL

JAGUAR AVENUE

DUSKY RUN

PHARMACY DRIVE

ACCESS ROAD

PANTHER RUN

DE

LT

A

DR

IV

E

SHOSHONI TRAIL

C

AN

IN

E

D R

IV

E

JUPITER STREET

ACCESS ROAD THUNDER LANE

THOR STREET

EDWARD H. WHITE II

JUPITER STREET

CHALLENGER STREET

MATADOR STREET

BREAKERS LANE

PERSHING PLACE

RE

SC

UE

R

O

AD

RELAY STATION ROAD

MACE ROAD

SATURN ROAD

6TH HOLE SUNSET BLVD

GR

EE

NS

KE

EP

ER

L

AN

E

STATE ROAD 404

STATE ROAD 404 (ONRAMP)

AC

CE

SS

R

O

AD

AC

C

ESS R

O

AD

H

ABITAT R

U N

C O

N

TR

O L

R O

AD

RI

VE

RS

ID

E

TR

AI

L

R

IVER

SID

E TR

AIL

UNKNOWN

UN

KN

O W

N

SO

U

TH

P

AT

R

IC

K

D R

IV

E

ACCESS ROAD

ACCESS ROAD

SCHOOL AVENUE

SC

H

O O

L AVEN

U

E

C O

N

TR

O L

R O

AD

C

O N

TR

O

L R

O

AD

W

ES

T

TE

C H

R O

AD

JUPITER STREET

M

AINTENANCE ROAD

COYOTE RUN

COYOTE RUN

ACCESS ROAD

IROQUIS TRAIL

IROQUIS TRAIL

BEAR RUN

BEAR RUN

ALLIGATOR RUN

ALLIGATOR RUN

U N

KN

O

W N

MINUTEMAN STREET

RE

SC

UE

R

O

AD

R

ES

C U

E R

O

AD

R

EE

F C

O U

R T

UNKNOWN

CONTROL ROAD

CONTROL ROAD

SO

U

TH

P

AT

R

IC

K

D R

IV

E

SO

U

TH

PATR

IC

K D

R

IVE

ANVIL ROAD

ANVIL ROAD

ACCCESS ROAD

RESCUE ROAD

R

ES

C U

E R

O

AD

AC

C

ES

S

R O

AD

AC

C

ES

S

R O

AD

AC

CE

SS

R

O

AD

AC

C

ES

S

R O

AD

U N

KN

O

W N

C O

N

TR

O L

R O

AD

BASE OPERATIONS:

COMMUNICATIONS:

PROJECT MANAGER:

CHIEF, ENGINEERING FLIGHT:

USER:

SAFETY:

SECURITY FORCES:

ATO:

OTHER:

ENVIRONMENTAL:

FIRE:

A P P R O V E D

SHXT 21-1001

REPLACE HVAC B1317 ATC

PATRICK SPACE FORCE BASE (PSFB)

MELBOURNE, FLORIDA

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit o

A

R

C

H

I T

E

S

AA

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

S.R. A1A

PINEDA CAUSEWAY

SOUTH GATE (PERSONNEL ONLY)

TRUCK DELIVERY ONLY

EAST GATE (PERSONNEL ONLY)

BUILDING 535-45TH CES

BUILDING 423-CONTRACTING OFFICER

TALLAHASSEE

JACKSONVILLE

ORLANDO

TAMPA PATRICK SPACE FORCE BASE

MIAMI

ATLANTIC OCEAN

GOLF COURSE

BANANA RIVER

STATE OF FLORIDA

SCALE: N.T.S.

C O

N

TR

O L

R O

AD

PROJECT LOCATION

(B1317 ATC)

PERMIT(S)/ENVIRONMENTAL AND SLD 45 ACTIONS

REQUIRED PRIOR TO CONSTRUCTION

ERP/STORMWATER

ERP/WETLANDS/DREDGE & FILL

FDEP/DRINKING WATER

FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL

SURVEY/WILDLIFE

SLD 45 RISK ASSESSMENT

NONE

FDEP/IND. WASTE WATER

IRP

FDEP/FUEL TANK

NOI/SWPPP

ASBESTOS

HEAVY METALS

YES NO

LEAD

PCB

NOT

VERIFIEDHAZARDOUS MATERIALS

NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT

IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN

ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL

UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.

G-001

C O

VE

R

S H

EE

T

SHEET INDEX

SHEET NUMBER SHEET TITLE REVISION

G-001 COVER SHEET

M-001 MECHANICAL GENERAL NOTES

MD-101 2ND & 3RD FLOOR MECHANICAL DEMOLITION PLANS

MD-102 4TH & 5TH FLOOR MECHANICAL DEMOLITION PLANS

MD-103 6TH FLOOR MECHANICAL DEMOLITION PLAN

M-104 2ND & 3RD FLOOR MECHANICAL FLOOR PLANS

M-105 4TH & 5TH FLOOR MECHANICAL PLANS

M-106 6TH FLOOR MECHANICAL PLAN

M-501 MECHANICAL DETAILS

M-701 MECHANICAL SCHEDULES

E-001 ELECTRICAL GENERAL NOTES

ED-101 2ND & 3RD FLOOR ELECTRICAL DEMOLITION PLANS

ED-102 4TH & 5TH FLOOR ELECTRICAL DEMOLITION PLANS

ED-103 6TH FLOOR ELECTRICAL DEMOLITION PLAN

E-104 2ND & 3RD FLOOR ELECTRICAL INSTALLATION PLAN

E-105 4TH & 5TH FLOOR ELECTRICAL INSTALLATION PLANS

E-106 6TH FLOOR ELECTRICAL INSTALLATION PLAN

E-701 PANEL SCHEDULES

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

IEEE C2 NATIONAL ELECTRICAL SAFETY CODE

NFPA 70E STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

SMACNA SHEET METAL & AIR CONDITIONING CONTRACTORS’ NATIONAL ASSOCIATION

UFC 4-010-01 DESIGN:DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, WITH CHANGE 1, 19 AUGUST 2020

UFC 3-401-01 MECHANICAL ENGINEERING, WITH CHANGE 1, 1 OCTOBER 2015

UFC 3-400-02 ENGINEERING WEATHER DATA, 20 SEPTEMBER 2018

UFC 3-410-01 HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS, WITH CHANGE , 8 JULY 2021

(IBC), 2018 INTERNATIONAL BUILDING CODE

(IMC), 2018 INTERNATIONAL MECHANICAL CODE NFPA STANDARD 90A-2015 INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS

ASHRAE STANDARD 62.1-2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

ASHRAE STANDARD 90.1-2013 ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS

MIL-HDBK-1013/1A DESIGN GUIDELINES FOR PHYSICAL SECURITY OF FACILITIES

ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AND

AIR CONDITIONING ENGINEERS

BTU BRITISH THERMAL UNIT

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CRAC COMPUTER ROOM AIR CONDITIONING UNIT

CRAH COMPUTER ROOM AIR HANDLING UNIT

DX DIRECT EXPANSION

ETR EXISTING TO REMAIN

FLA FULL LOAD AMPERAGE

HR HOUR

HVAC HEATING, VENTILATION, AIR CONDITIONING

HZ HERTZ

MCA MINIMUM CIRCUIT AMPACITY

MFG MANUFACTURER

MOP MAXIMUM OVERCURRENT PROTECTION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

PH PHASE

QTY QUANTITY

RLA RATED LOAD AMPS

SAG SUPPLY AIR GRILLE

UFC UNIFIED FACILITIES CRITERIA

ABBREVIATIONS: SYMBOLS:

FLAG NOTE NUMBER

NEW PIPING

EXISTING PIPING

NEW MECHANICAL EQUIPMENT

EXISTING MECHANICAL EQUIPMENT

DEMOLITION

UNIT REMOTE THERMOSTAT

FLOOR MOUNTED SUPPLY DIFFUSER

POINT OF CONNECTION

POINT OF DISCONNECTION

CODES & STANDARDS:

MECHANICAL GENERAL NOTES:

1. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR

APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE

ADDITIONAL REMOVALS AND REPLACEMENTS OF UNSATISFACTORY WORK.

2. PROVIDE LOCKOUT/TAGOUT PROGRAM TO ENSURE ALL IMPACTED ELECTRICAL

INFRASTRUCTURE IS DE-ENERGIZED PRIOR TO CONSTRUCTION.

3. DO NOT ROUTE ANY NEW WET PIPING ABOVE ELECTRICAL EQUIPMENT.

4. ALL WORK TO CONFORM TO UFC 3-410-01 AND UFC 3-401-01.

5. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF ACTUAL

CONDITIONS. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO

STARTING WORK.

6. COORDINATE ALL MECHANICAL WORK AND EQUIPMENT WITH STRUCTURAL

MEMBERS, ELECTRICAL WORK AND FIXTURES, ALL OTHER TRADES AND ALL

EXISTING CONDITIONS.

7. PROVIDE INSULATED TRAPPED CONDENSATION DRAIN PIPING, WITH AIR GAPS,

FROM COOLING COIL DRAIN PANS TO FLOOR DRAIN, ROOF DRAIN, OR OTHER

TERMINATION.

8. PROVIDE ALL HVAC AND PLUMBING EQUIPMENT AS PER MANUFACTURER

REQUIREMENTS AND DIVISION 23 SPECIFICATIONS FOR THIS PROJECT.

9. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE

FIELD.

10. COORDINATE FINAL EQUIPMENT/FIXTURE LOCATIONS WITH THE GENERAL

CONTRACTOR. LOCATIONS AS INDICATED ON THE DRAWINGS ARE

APPROXIMATE AND MUST BE FIELD VERIFIED.

11. CONDENSATE IS PUMPED. REFER TO MANUFACTURERS INSTALLATION

INSTRUCTIONS FOR CONNECTION REQUIREMENTS.

12. PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DEVICES NECESSARY

TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS IN ACCORDANCE WITH

THE INTENT OF THE CONTRACT DRAWINGS. FULLY TEST, CLEAN, AND LEAVE

SYSTEMS IN A COMPLETE AND OPERATIONAL STATUS.

13. ALL MATERIALS MUST BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER

WITH THE COORDINATION OF ALL INVOLVED TRADES.

14. PROVIDE NEW, U.L. LISTED MATERIALS AND EQUIPMENT. INSTALL IN

ACCORDANCE WITH MANUFACTURER MAINTENANCE CLEARANCES.

15. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE CONTRACT

DRAWINGS AND SPECIFICATIONS ARE TO ESTABLISH THE SPECIFIED

STANDARD OF QUALITY AND TO PROVIDE THE REQUIRED TYPE(S), SIZE(S), AND

CONFIGURATION.

16. USE PLASTIC COATED TYPE HANGERS FOR ALL COPPER PIPING.

17. SEAL OPENINGS AND PROTECT PIPES ACCORDING TO SPECIFICATIONS WHERE

PIPING IS ROUTED THRU A WALL OR FLOOR.

18. REFER TO ELECTRICAL SHEETS E-104, E-105, E-106 FOR NEW HVAC

ELECTRICAL SUPPLY INFORMATION.

19. PROVIDE ADEQUATE CONTAINMENT FOR DUST PRODUCING WORK. PREVENT

DUST MIGRATION FROM OCCUPIED SPACES AND ADJACENT WORK AREAS.

THIS INCLUDES BUT IS NOT LIMITED TO DRILLING, SAW CUTTING AND

DEMOLITION ACTIVITIES. PROTECT ALL EXISTING EQUIPMENT TO REMAIN FROM

DAMAGE, DUST AND MOISTURE.

20. IF ANY REMAINING SERVICES, PIPES, DUCTS, DUCT INSULATION OR

EQUIPMENT ARE DAMAGED IN APPEARANCE, OR BECOMES UNSERVICEABLE

DUE TO CONTRACTOR OPERATIONS, THE CONTRACTOR SHALL REPLACE WITH

NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY.

21. COORDINATE WITH THE CONTRACTING OFFICER FOR SCHEDULING SHUT

DOWNS, OUTAGES, CAPPING, OR ANY DISCONTINUATION OF UTILITY SERVICES

BEFORE PERFORMING ANY WORK.

22. COORDINATE WITH THE CONTRACTING OFFICER FOR ALL TEMPORARY

PARTITIONS AND MEANS OF EGRESS RESULTING FROM DEMOLITION

OPERATIONS.

23. COORDINATE WITH THE CONTRACTING OFFICER ALL DEMOLITION THAT

AFFECTS OCCUPIED PORTIONS OF THE FACILITY.

24. COORDINATE WITH THE CONTRACTING OFFICER ON MEANS OF PROTECTION

FOR ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE REMOVAL FROM THE

FACILITY.

25. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE

FIELD.

M

EC

H

AN

IC

AL

G

EN

ER

AL

N O

TE

S

M-001

T

26. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN EXISTING CONDITIONS

AND DRAWINGS BEFORE PROCEEDING WITH DEMOLITION.

27. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT AS INDICATED. USE

METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS

AND AS FOLLOWS:

A. HOLES IN WALLS AND FLOORS MUST BE CUT NEATLY WITH STRAIGHT AND PLUMB EDGES.

PROCEED WITH DEMOLITION SYSTEMATICALLY; NEATLY CUT OPENINGS AND HOLES

PLUMB; AND SQUARE TRUE TO DIMENSIONS REQUIRED. USE CUTTING METHODS LEAST

LIKELY TO DAMAGE NEW CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS

DESIGNED FOR SAWING OR GRINDING. THE CONTRACTOR MUST MINIMIZE HAMMERING

AND CHOPPING TO REDUCE DISTURBANCE TO ADJACENT SURFACES. TEMPORARILY

COVER OPENINGS.

B. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES TO

AVOID MARRING EXISTING FINISHED SURFACES.

C. DO NOT USE CUTTING TORCHES OR GRINDING EQUIPMENT UNTIL WORK AREA IS CLEARED

OF FLAMMABLE MATERIALS. AT CONCEALED SPACES, SUCH AS DUCT INTERIORS AND PIPE

INTERIORS, VERIFY CONDITIONS AND CONTENTS OF HIDDEN SPACE BEFORE STARTING

FLAME-CUTTING OR GRINDING OPERATIONS. OBTAIN ALL REQUIRED BURN PERMITS

BEFORE ANY OF THIS WORK IS PERFORMED.

D. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES AND GRINDING.

E. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR UNSUITABLE

MATERIAL AND PROMPTLY DISPOSE OF OFF-SITE.

F. DEMOLISHED MATERIAL AT ALL ELEVATIONS ABOVE FINISHED FLOOR MUST BE LOWERED

TO GROUND BY METHODS SUITABLE TO AVOID FREE FALL AND PREVENT GROUND IMPACT

AND DUST GENERATION.

G. AT ALL ELEVATIONS ABOVE FINISHED FLOOR, LOCATE DEMOLISHED EQUIPMENT, DEBRIS

AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS ON SUPPORTING WALLS,

FLOORS, ROOFS OR FRAMING.

28. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.

29. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF PROPERTY AND LEGALLY DISPOSE OF

DEBRIS.

30. CLEAN REMAINING AND ADJACENT SPACES AND STRUCTURES OF DUST, DIRT, AND DEBRIS

CAUSED BY DEMOLITION OPERATIONS.

31. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR APPROVALS DO

NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE ADDITIONAL REMOVALS AND

REPLACEMENTS OF UNSATISFACTORY WORK.

32. WHERE PIPING IS REMOVED THROUGH A WALL OR FLOOR, THE REMAINING OPENINGS WILL BE

PATCHED AND SEALED.

33. REMOVE ALL PIPE SUPPORTS ASSOCIATED WITH ALL REMOVED PIPING.

34. DOCUMENT CONDITION OF EXISTING HVAC EQUIPMENT AND ASSOCIATED COMPONENTS

PRIOR TO CONSTRUCTION. FIELD MEASURE CAPACITIES AND FLOW RATES OF EXISTING AHU'S.

REPORT DATA TO CONTRACTING OFFICER TO VERIFY THE PERFORMANCE REQUIREMENTS

CAN BE ACHIEVED.

35. CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR REPLACEMENT OF UP TO 5% OF THE

SUPPLY AIR DUCTWORK SHOWN AND UP TO 10% OF THE SUPPLY AIR DUCTWORK INSULATION

AS NECESSARY TO REPAIR ISOLATED AREAS WHERE DUCT AND/OR INSULATION MAY HAVE

BEEN DAMAGED PRIOR TO CONTRACT. INSULATION REMOVAL WILL BE PERFORMED IN

ACCORDANCE WITH ASBESTOS HANDLING SPECIFICATIONS.

36. PROVIDE ACCESS DOORS IN NEW DUCTWORK TO SERVICE DEVICES WITHIN DUCTS NOT

OTHERWISE ACCESSIBLE THROUGH GRILLES/DIFFUSERS OR OPEN DUCT.

37. DUCT WILL BE FABRICATED PER SMACNA=HVAC DUCT CONSTRUCTION

STANDARDS-METAL AND FLEXIBLE.

38. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE FIELD.

39. FIRESTOP/SMOKESTOP ALL NEW PIPE PENETRATIONS THROUGH FIRE/SMOKE RATED

ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE ASSEMBLY.

40. FOR NEW CONNECTION PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW FOR

TUBE/COIL REMOVAL/REINSTALLATION.

41. FOR NEW CONNECTION PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW FOR

TUBE/COIL REMOVAL/REINSTALLATION.

42. ALL MECHANICAL PENETRATIONS THROUGH PRESSURE BOUNDARIES WILL BE CAULKED AND

SEALED TO MINIMIZE LOSS OF SPACE PRESSURIZATION.

43. FIRE DAMPER WILL BE PROVIDED AT ALL POINTS WHERE THE DUCTWORK

PENETRATES A FIRE BARRIER OF MORE THAN A ONE-HOUR RATING UNLESS OTHERWISE

INDICATED ON THE DRAWINGS.

44. ALL STEEL SHAPES (FABRICATIONS) WILL CONFORM TO ASTM-A-3C AND ALL SHARP EDGES

WILL BE ROUNDED. ALL BURRS WILL BE REMOVED.

45. HANGERS FOR ALL COPPER PIPING WILL BE PLASTIC-COATED TYPE.

46. FIELD VERIFY ALL EXISTING PIPE SIZES AND LOCATIONS. NEW TO EXISTING

CONNECTIONS WILL BE MADE USING THE SAME PIPE SIZE AS EXISTING (UNLESS NOTED

OTHERWISE).

47. WHERE PIPING IS ROUTED THROUGH A WALL OR FLOOR, THE OPENINGS MUST BE SEALED AND

THE PIPES PROTECTED ACCORDING TO THE SPECIFICATIONS

GENERAL NOTES - ENVIRONMENTAL:

1. HAZARDOUS MATERIALS ARE PRESENT WITHIN BUILDING 1317. COATINGS

CONTAINING HAZARDOUS CONSTITUENTS HAVE BEEN IDENTIFIED WITHIN THE

IMMEDIATE VICINITY OF WORK. ABATEMENT AND ENCAPSULATION OF

HAZARDOUS MATERIALS MAY BE REQUIRED AS PART OF THE CONSTRUCTION.

ENVIRONMENTAL SAMPLING WAS PERFORMED BY SUNRISE SYSTEMS OF

BREVARD, INC. A COPY OF THE REPORT CAN BE PROVIDED TO THE

CONTRACTOR AT REQUEST FROM THE CONTRACTING OFFICER.

2. DISPOSE OF ALL MATERIALS IN ACCORDANCE WITH THE CONTRACT CLAUSES

AND SPECIFICATION SECTION 01 57 19 AND ALL OTHER CONTRACT CLAUSES.

3. ANY DISTURBANCE, HANDLING, STORAGE, TRANSPORTATION OR DISPOSAL OF

HAZARDOUS MATERIALS MUST BE IN ACCORDANCE WITH THE APPROVED

REMOVAL, DISPOSAL PLAN AND SPECIFICATION SECTION 01 57 19.

4. PERFORM ALL WORK IN A MANNER THAT MINIMIZES DAMAGE TO EXISTING

HAZARDOUS MATERIALS IDENTIFIED IN THESE DRAWINGS.

5. HAZARDOUS MATERIALS SHOWN ON DRAWINGS ARE NOT ALL INCLUSIVE.

SUSPECT MATERIALS/COATINGS THAT ARE NOT IDENTIFIED SPECIFICALLY IN

THESE PROJECT DRAWINGS AND SPECIFICATIONS MUST BE EITHER

SAMPLED/ANALYZED BY THE CONTRACTOR OR ASSUMED WORST CASE.

6. SUBMIT ALL PLANS TO THE CONTRACTING OFFICER FOR REVIEW, REVISED BY

THE CONTRACTOR WHERE REQUIRED, AND RESUBMITTED FOR APPROVAL.

COMMENCEMENT OF WORK WILL NOT BE PERMITTED UNTIL EACH PLAN IS

GIVEN FINAL APPROVAL.

GENERAL NOTES - HEAVY METAL COATINGS:

1. SUBMIT A COPY OF THE NOTIFICATION OF COMMENCEMENT OF ABATEMENT

TO THE CONTRACTING OFFICER 20 DAYS PRIOR TO COATING REMOVAL

OPERATIONS (IF APPLICABLE).

2. PERFORM WELDING, CUTTING OR HOT WORK ON GALVANIZED STEEL OR

SURFACES WITH PRESERVATIVE COATING IN ACCORDANCE WITH FEDERAL

REGULATIONS 29 CFR 1926.55, 29 CFR 1926.353 AND 29 CFR 1926.354.

3. TREAT ANY COATING CONTAINING A DETECTABLE LIMIT OF BARIUM, CADMIUM,

CHROMIUM (TOTAL), CHROMIUM (HEXAVALENT), LEAD, ZINC, MERCURY OR

PCBs AS COATING CONTAINING HAZARDOUS CONSTITUENTS.

4. PERFORM ANY DISTURBANCE OF COATINGS CONTAINING HAZARDOUS

CONSTITUENTS IN ACCORDANCE WITH THE APPROVED HEAVY METAL AND PCB

WASTE MANAGEMENT AND COMPLIANCE PLANS AND SPECIFICATION 01 57 19.

GENERAL NOTES:

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

2N D

R D

F

LO

O R

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

S

MD-101

1. DEMOLISH FAN COIL UNIT 1 (FCU-1). LEAVE EXISTING PIPING IN PLACE AND

PREPARE FOR CONNECTION TO NEW FCU.

2. DEMOLISH FAN COIL UNIT 2 (FCU-2). LEAVE EXISTING PIPING IN PLACE AND

PREPARE FOR CONNECTION TO NEW FCU.

FLAG NOTES:

3/4" CHWS&R,

1" COND.

DRAIN

12x12 C.D.

80 CFM 6"

NK. 1 WAY.

FCU-1

3/4" CHWS&R TO FCU-1,

1" COND. DRAIN UP TO

FCU-2 ON THIRD FLOOR

8x6

10x8 DUCT UP

8x6

EF-4A WITH

BACKDRAFT DAMPER

44X12 LOUVER MTD.

DIRECTLY ABOVE

WINDOW LOUVER NO. 2-1

10x6

EF-4A WITH

BACKDRAFT DAMPER

10x6 SIDEWALL

REGISTER, 60 CFM.

8x4 DOWN TO

FIRST FLOOR

3/4" CHWS&R,

1" COND.

DRAIN

12x12 C.D.

80 CFM 6"

NK. 1 WAY.

FCU-2

3/4" CHWS&R TO FCU-2,

1" COND. DRAIN UP TO

FCU-3 ON FOURTH

FLOOR

8x4

10x10

MOTORIZED DAMPER

DM-2

44x18 LOUVER

F-5 WITH FACTORY

INSULATED HOUSING

10x6 SIDWALL

REGISTER, 60 CFM

34x6 TAP INTO 24x6

DUCT

34x6 SAG

24x6

SCALE:

3RD FLOOR MECHANICAL DEMOLITION PLAN

3/8" = 1'-0"

SCALE:

2ND FLOOR MECHANICAL DEMOLITION PLAN

3/8" = 1'-0"

N

N

1. REFER TO GENERAL NOTES, ABBREVIATIONS, AND LEGENDS ON M-001.

2. REFER TO SCHEDULES ON SHEET M-601 FOR EQUIPMENT AND DIFFUSER

DETAILS.

3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND

CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET

MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY

ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET

INTO INDIVIDUAL SHEETS.

4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING

TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.

5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVE FROM

THE BUILDING. QUARTERLY WASTE REPORT TO BE SENT IN THE CONTRACTING

OFFICER MONTHLY.

6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.

IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.

7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING

DEMOLITION.

8. TEMPORARY COOLING WILL BE PROVIDED FOR ALL AREAS WITH SENSITIVE

ELECTRONIC EQUIPMENT. TEMPORARY COOLING CAPACITY MUST BE

EQUIVALENT OR BETTER THAN THE UNITS BEING REMOVED.

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

4T H

TH

F

LO

O

R M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O N

P

LA

N S

MD-102

1. DEMOLISH FAN COIL UNIT 3 (FCU-3. LEAVE EXISTING PIPING IN PLACE AND

PREPARE FOR CONNECTION TO NEW FCU.

2. DEMOLISH FAN COIL UNIT 4 (FCU-4). LEAVE EXISTING PIPING IN PLACE AND

PREPARE FOR CONNECTION TO NEW FCU.

3. BARIUM WAS FOUND IN A DETECTABLE AMOUNT AT THE FOURTH FLOOR WALL

ADJACENT TO EXISTING FCU-3. ABIDE BY OSHA REQUIREMENTS AND THE

REQUIREMENTS OF SPECIFICATION 01 57 19 FOR WORKER PROTECTION IF

DISTURBING THIS AREA OR UNTIL MONITORING DATA PROVES A HAZARD DOES

NOT EXIST.

FLAG NOTES:

3/4" CHWS&R,

1" COND.

DRAIN

FCU-3

3/4" CHWS&R TO FCU-3,

1" COND. DRAIN UP TO

FCU-4 ON FIFTH FLOOR

8x4

12x10

FIRE DAMPER

44x36 LOUVER NO. 4-1

20x14 DUCT TO SAG

10x6 SIDWALL

REGISTER, 60 CFM.

12x12 C.D.80 CFM

6" NK

FCU-4 3/4" CHWS&R TO FCU-4

8x4

12x12

10x5 UP TO ROOM

ABOVE

FIRE DAMPER

8x6 10x8 SIDWALL

REGISTER, 180 CFM.

12x12 C.D. 80 CFM

6" NK

EF-6

3/4" CHWS&R

MOTORIZED

DAMPER DM-1

24x24 EXHAUST GRILL

86x24 LOUVER IN

TILTED PANEL

LOUVER NO. 5-1

SCALE:

5TH FLOOR MECHANICAL DEMOLITION PLAN

3/8" = 1'-0"

SCALE:

4TH FLOOR MECHANICAL DEMOLITION PLAN

3/8" = 1'-0"

GENERAL NOTES:

1. REFER TO GENERAL NOTES, ABBREVIATIONS, AND LEGEND ON SHEET M-001.

2. REFER TO SCHEDULES ON SHEET M-601 FOR EQUIPMENT AND DIFFUSER

DETAILS.

3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND

CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET

MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY

ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET

INTO INDIVIDUAL SHEETS.

4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING

TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.

5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVE FROM

THE BUILDING.

6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.

IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.

7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING

DEMOLITION.

8. TEMPORARY COOLING WILL BE PROVIDED FOR ALL AREAS WITH SENSITIVE

ELECTRONIC EQUIPMENT. TEMPORARY COOLING CAPACITY MUST BE

EQUIVALENT OR BETTER THAN THE UNITS BEING REMOVED.

N

1. REFER TO GENERAL NOTES, ABBREVIATIONS, AND LEGEND ON SHEET M-001.

2. REFER TO SCHEDULES ON SHEET M-601 FOR EQUIPMENT AND DIFFUSER

DETAILS.

3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND

CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET

MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY

ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET

INTO INDIVIDUAL SHEETS.

4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING

TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.

5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVE FROM

THE BUILDING.

6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.

IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.

7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING

DEMOLITION.

8. TEMPORARY COOLING WILL BE PROVIDED FOR ALL AREAS WITH SENSITIVE

ELECTRONIC EQUIPMENT. TEMPORARY COOLING CAPACITY MUST BE

EQUIVALENT OR BETTER THAN THE UNITS BEING REMOVED.

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

6T H

F

LO

O R

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

MD-103

FLAG NOTES:

R/A

AHU-1

TEMPERATURE

CONTROL PANEL

12x12

STAIR

PRESSURIZATION

CONTROL BOX

EXISTING 26x14

METAL DUCTWORK

TO REMAIN

SCALE:

6TH FLOOR MECHANICAL DEMOLITION PLAN

3/8" = 1'-0"

EF-8

44x36 LOUVER IN

TILTED PANEL

LOUVER NO. 6-1

12x36 TO 25x14

TRANSITION

2" CHWS&R

12x36

28"W X 36" D X 36" L

PLENUM

48x44 LOUVER IN

TILTED PANEL

LOUVER NO. 6-2

MAU-1

EF-7

48x24 LOUVER IN

TILTED PANEL

LOUVER NO. 6-3

UH-4

12x12

S/A R/A

R/A

N

1. DEMOLISH EXISTING AHU-1 AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN,

DUCTWORK, CONTROLS AND WIRING.

2. DEMOLISH EXISTING MAU-1 AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN,

DUCTWORK, CONTROLS AND WIRING.

3. DEMOLISH ALL EXISTING SUPPLY AND RETURN DUCTWORK TO POINTS

INDICATED. PREPARE EXISTING DUCTWORK TO REMAIN FOR CONNECTION TO

NEW DUCTWORK.

4. DEMOLISH ALL EXISTING CHILLED WATER SUPPLY AND RETURN PIPING,

CONDENSATE PIPING, AND ALL ASSOCIATED INSULATION AND SUPPORTS TO

POINT INDICATED. PREPARE EXISTING TO REMAIN PIPE FOR CONNECTION TO

NEW PIPING.

5. DEMOLISH EXISTING DUCTWORK AND PIPING UP TO THE EXTERIOR WALLS OF

THE ROOM AS SHOWN. REPAIR ANY DAMAGE TO EXISTING TO REMAIN

DUCTWORK AND PIPING AND PREPARE FOR NEW CONNECTIONS.

6. DISCONECT EXISTING CONTROL SYSTEMS FROM BOTH AHUS. PREPARE

CONTROL SYSTEMS FOR CONNECTION TO NEW AHUS.

DETAILS.

3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND

CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET

MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY

ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET

INTO INDIVIDUAL SHEETS.

3. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING

TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.

4. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVED FROM

THE BUILDING.

5. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.

IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.

6. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING

DEMOLITION.

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

2N D

R D

F

LO

O R

M

EC

H

AN

IC

AL

F

LO

O R

P

LA

N S

M-104

1. INSTALL NEW FAN COIL UNIT 1 (FCU-1). CONNECT TO EXISTING PIPING AND

PROVIDE NEW THERMOSTAT FOR LOCAL CONTROL.

2. INSTALL NEW FAN COIL UNIT 1 (FCU-2). CONNECT TO EXISTING PIPING AND

PROVIDE NEW THERMOSTAT FOR LOCAL CONTROL.

FLAG NOTES:

3/4" CHWS&R,

1" COND.

DRAIN

12x12 C.D.

80 CFM 6"

NK. 1 WAY.

FCU-1

3/4" CHWS&R TO FCU-1,

1" COND. DRAIN UP TO

FCU-2 ON THIRD FLOOR

8x6

10x8 DUCT UP

8x6

EF-4A WITH

BACKDRAFT DAMPER

44x12 LOUVER MTD.

DIRECTLY ABOVE

WINDOW LOUVER NO. 2-1

10x6

EF-4A WITH

BACKDRAFT DAMPER

10x6 SIDWALL

REGISTER, 60 CFM.

8x4 DOWN TO

FIRST FLOOR

3/4" CHWS&R,

1" COND.

DRAIN

12x12 C.D.

80 CFM 6"

NK. 1 WAY.

FCU-2

3/4" CHWS&R TO FCU-2, 1"

COND. DRAIN UP TO

FCU-3 ON FOURTH FLOOR

8x4

10x10

MOTORIZED DAMPER

DM-2

44x18 LOUVER

F-5 WITH FACTORY

INSULATED HOUSING

10x6 SIDWALL

REGISTER, 60 CFM.

34x6 TAP INTO 24x6

DUCT.

34x6 SAG

24x6

SCALE:

3RD FLOOR MECHANICAL PLAN

3/8" = 1'-0"

SCALE:

2ND FLOOR MECHANICAL PLAN

3/8" = 1'-0"

N

N

N

DETAILS.

3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND

CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET

MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY

ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET

INTO INDIVIDUAL SHEETS.

4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING

TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.

5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVED FROM

THE BUILDING.

6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.

IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.

7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING

DEMOLITION.

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

4T H

TH

F

LO

O

R M

EC

H

AN

IC

AL

P

LA

N

S

M-105

1. INSTALL NEW FAN COIL UNIT 3 (FCU-3). CONNECT TO EXISTING PIPING AND

PROVIDE NEW THERMOSTAT FOR LOCAL CONTROL.

2. INSTALL NEW FAN COIL UNIT 4 (FCU-4). CONNECT TO EXISTING PIPING AND

PROVIDE NEW THERMOSTAT FOR LOCAL CONTROL.

FLAG NOTES:

3/4" CHWS&R,

1" COND.

DRAIN

FCU-3

3/4" CHWS&R TO FCU-3,

1" COND. DRAIN UP TO

FCU-4 ON FIFTH FLOOR

8x4

12x10

FIRE DAMPER

44x36 LOUVER NO. 4-1

20x14 DUCT TO S.A.G

10x6 SIDWALL

REGISTER, 60 CFM.

12x12 C.D.80 CFM

6" NK

FCU-4

3/4" CHWS&R TO FCU-4

8x4

12x12 10x5 UP TO ROOM

ABOVE

FIRE DAMPER

8x6

10x8 SIDWALL

REGISTER, 180 CFM.

12x12 C.D. 80 CFM

6" NK

EF-6

3/4" CHWS&R

MOTORIZED

DAMPER DM-1

24x24 EXHAUST

GRILL

86x24 LOUVER IN

TILTED PANEL

LOUVER NO. 5-1

SCALE:

5TH FLOOR MECHANICAL PLAN

3/8" = 1'-0"

SCALE:

4TH FLOOR MECHANICAL PLAN

3/8" = 1'-0"

N

N

T

T

1" COND DRAIN DOWN

TO FOURTH FLOOR

DETAILS.

3. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND

CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS SET

MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO SUITABLY

ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS DRAWING SET

INTO INDIVIDUAL SHEETS.

4. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT EXISTING

TO REMAIN ITEMS IN THE BUILDING DURING DEMOLITION AND CONSTRUCTION.

5. CONTRACTORS SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVED FROM

THE BUILDING.

6. PATCH ALL HOLES CREATED BY THE REMOVAL OF PIPING OR OTHER ITEMS.

IN−FILL UNUSED OPENINGS WITH SAME MATERIAL, U.N.O.

7. TEMPORARILY CAP ALL EXPOSED SUPPLY AND RETURN DUCTS DURING

DEMOLITION.

SPECIFIC NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

6T H

F

LO

O R

M

EC

H

AN

IC

AL

P

LA

N

M-106

1. INSTALL NEW AHU-1 AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN,

DUCTWORK, CONTROLS AND WIRING.

2. INSTALL NEW MAU-1 AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN,

DUCTWORK, CONTROLS AND WIRING.

3. INSTALL NEW SUPPLY AND RETURN DUCTWORK TO POINTS INDICATED.

CONNECT TO EXISTING TO REMAIN DUCTWORK AND LOUVERS. PROVIDE NEW

SUPPORTS AND INSULATION PER THE SPECIFICATIONS AND DETAILS ON

SHEET M-501.

4. INSTALL NEW CHILLED WATER SUPPLY AND RETURN PIPING, CONDENSATE

PIPING, AND ALL ASSOCIATED INSULATION AND SUPPORTS. CONNECT TO

EXISTING PIPING TO REMAIN AT POINTS INDICATED.

5. INSTALL NEW DUCTWORK AND PIPING UP TO THE EXTERIOR WALLS OF THE

ROOM AS SHOWN. PATCH ANY REMAINING HOLES AND FIRE STOP ANY

PENETRATIONS THROUGH 1-HOUR FIRE BARRIERS AFTER CONNECTION.

6. LABEL ALL DUCTWORK, EQUIPMENT, AND PIPING WITH TYPE AND DIRECTION

OF FLOW EVERY 10 FEET.

7. FAN DISCHARGE MOUNTED HEATER SECTION. TO BE PROVIDED BY AHU

MANUFACTURER. SEE SHEET M-601 FOR DETAILS.

8. CONNECT THE NEW AHU-1 AND MAU-1 TO THE EXISTING CONTROL SYSTEMS.

AHU-1 WILL CONNECT TO THE EXISTING AHU-1 SYSTEM, AND MAU-1 WILL

CONNECT TO THE EXISTING AHU-2 SYSTEM. CONNECT THE CONTROLS TO

MAINTAIN THE PREVIOUS SYSTEM'S OPERATION SCHEME AND CONTROL

POINTS.

FLAG NOTES:

R/A

AHU-1

TEMPERATURE

CONTROL PANEL

12x12

STAIR

PRESSURIZATION

CONTROL BOX

26x14

SCALE:

6TH FLOOR MECHANICAL PLAN

3/8" = 1'-0"

EF-8

44x36 LOUVER IN

TILTED PANEL

LOUVER NO. 6-1

2" CHWS&R

12x36

28"Wx36"Dx36"L

PLENUM

48x44 LOUVER IN

TILTED PANEL

LOUVER NO. 6-2

EF-7

48x24 LOUVER IN

TILTED PANEL

LOUVER NO. 6-3

UH-4

12x12

S/A R/A

R/A

N

MAU-1

TYP.

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

M-501

M

EC

H

AN

IC

AL

D

ET

AI

LS

SCALE:

TYPICAL HVAC HANGER SUPPORT DETAIL

N.T.S.

SCALE:

THERMOSTAT MOUNTING DETAIL

N.T.S. SCALE:

TYPICAL PIPE SUPPORT DETAIL

N.T.S. SCALE:

CONDENSATE PIPE SUPPORT DETAIL

N.T.S.

PIPE INSULATION

INSULATION SHIELD REQUIRED

FOR INSULATED PIPE

(TOP & BOTTOM) MIN 6" LONG

PIPE SADDLE W/ U-BOLT

(TOLCO FIG 318A OR

APPROVED EQUAL)

3"

CONCRETE FLOOR

THREADED PIPE STAND W/

WELDED BASE PLATE

(TOLCO FIG316T) SECURED TO

SLAB W/ 1/2" HILTI KWIK BOLT

NEW PIPING WITH

INSULATION. PROVIDE

POLYISOCYANURATE

INSULATION (DOW TRYMER

1800) TO EXTEND 2" LONGER

THAN PIPE SHIELD

CENTERLINE OF

THERMOSTAT

CONTROL

MOUNTING HEIGHT

VA

R

IE

S�

3/8" HILTI KWIK BOLT TZ

WITH 3" MIN EMBEDMENT

3/8" THREADED HANGER ROD

NUT & BACKNUT

PIPE HANGER

CONDENSATE PIPING

PIPE INSULATION SHIELD

SEE MECHANICAL SPECIFICATION

ATTACH TO STRUCTURE

WITH BEAM CLAMP

1/4"∅ THREADED STEEL ROD

DUCT INSULATION (TYP)

RECTANGULAR DUCT

P1000 UNISTRUT

1/4" THREADED STEEL ROD

WASHER (TYP)

P1000 UNISTRUT

NUT (TYP)

CONTROL BOX

FRONT VIEW

SCALE:

FAN COIL DETAIL

N.T.S.

48" AFF

FINISHED FLOOR

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

D .M

IL

LE

R

J.

M

EN

ZI

ES

P

.E

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

M-701

M

EC

H

AN

IC

AL

S C

H

ED

U

LE

S

AHU UNIT SCHEDULE

MARK FAN CFM

COOLING CAP. ENT AIR °F LVG AIR °F COOLING COIL ELECTRICAL

MANUFACTURER MODELSENS MBH TOTAL MBH DB WB DB WB ENT CW °F LVG CW °F VOLTS/PHASE HEAT KW

AHU-1 2600 65.13 69.02 77.5 63.6 54.7 54.6 44 60.88 208/3 17 TRANE UCCAD06

MAU-1 820 33.19 73.17 91.2 79.5 55 54.9 44 54 208/3 12 TRANE CSAA003

NOTES:

1. AHU-1 ELECTRIC HEATING COIL IS PROVIDED BY THE AHU MANUFACTURER AND FLANGE MOUNTED TO THE OUTLET OF THE FAN.

2. MAU-1 ELECTRIC HEATING COIL IS A SEPARATE UNIT SECTION PROVIDED BY THE AHU MANUFACTURER AND MOUNTED DIRECTLY ON TOP OF THE FAN SECTION. IT

REQUIRES A SECOND POWER SOURCE AS NOTED ON THE ELECTRICAL SHEETS.

FAN COIL UNIT SCHEDULE

MARK FAN CFM

COOLING CAP. ENT AIR °F LVG AIR °F ELECTRICAL

MANUFACTURER MODEL LOCATIONSENS MBH TOTAL MBH DB WB DB WB VOLTS/PHASE HEAT KW

FCU-1 800 15.24 17.88 80 67 62.53 60.06 208/1 4 TRANE FCBB080 2ND FLOOR

FCU-2 1200 23.89 30.22 80 67 61.73 59.12 208/1 4 TRANE FCBB120 3RD FLOOR

FCU-3 1200 23.89 30.22 80 67 61.73 59.12 208/1 4 TRANE FCBB120 4TH FLOOR

FCU-4 1200 23.89 30.22 80 67 61.73 59.12 208/1 4 TRANE FCBB120 5TH FLOOR

NOTES:

1. CAPACITIES BASED ON AN 80/67 F AIR ENTERING TEMPERATURE WITH 45 F CHILLED WATER ENTERING COIL @ 10 DEGREE DROP.

ELECTRICAL SYMBOL LEGEND: ABBREVIATIONS:

CIRCUIT HOME RUN

(PANEL NAME) - (CIRCUIT NUMBER)

DISCONNECT SWITCH, NON-FUSED HEAVY-DUTY

PANELBOARD

ITEMS TO BE DEMOLISHED

(XX)-(XXX)

1. ALL ELECTRICAL INSTALLATION WILL BE IN ACCORDANCE WITH ALL CODES

AND STANDARDS LISTED ON THIS SHEET.

2. ALL CONSTRUCTION WILL BE GOVERNED BY THE PLANS, SPECIFICATIONS, AND

ALL APPLICABLE BUILDING AND SAFETY CODES LAWS AND ORDINANCES.

3. CONTRACTOR MUST BE FAMILIAR WITH THE SITE, THE WORK REQUIRED, THE

CUSTOMER'S WORK PROCEDURES, AND ALL OTHER CONDITIONS THAT MAY

AFFECT THE SUCCESSFUL COMPLETION OF THE JOB PRIOR TO

COMMENCEMENT OF WORK.

4. FIELD LOCATE ALL EXISTING UTILITIES AS TO LOCATION AND ELEVATION.

NOTIFY THE CONTRACTING OFFICER OF ANY AND ALL CONFLICTS PRIOR TO

BEGINNING CONSTRUCTION.

5. LOCATIONS OF ALL ELECTRICAL EQUIPMENT ARE APPROXIMATE AND MAY BE

RELOCATED TO AN APPROVED LOCATION. CONTACT CONTRACTING OFFICER

PRIOR TO ANY FIELD CHANGES.

6. ALL SPECIFIC MATERIALS AND PRODUCTS IDENTIFIED IN THE PLANS ARE

INCLUDED AS THE BASIS OF DESIGN. CONTRACTOR MAY SUBMIT EQUIVALENT

PRODUCTS IN COMPLIANCE WITH THE PROJECT SPECIFICATIONS FOR

APPROVAL INSTEAD OF THOSE SPECIFIED.

7. SEAL ALL WALL PENETRATIONS RESULTING FROM NEW CONDUIT WITH UL

RATED FIRE SEALANT TO MATCH EXISTING WALL ASSEMBLY RATING.

8. ALL NEW INTERIOR CONDUIT MUST BE EMT UNLESS OTHERWISE NOTED.

9. ALL NEW CONDUIT MUST BE MINIMUM 3/4 INCH.

10. ALL NEW LOW VOLTAGE POWER CONDUCTORS MUST BE COPPER WITH

INSULATION TYPE THHN-THWN2 UNLESS SPECIFIED OTHERWISE.

11. REFER TO PANEL SCHEDULES INCLUDED IN THIS DRAWING SET FOR BRANCH

CIRCUIT, BREAKER, CONDUCTOR, AND CONDUIT INFORMATION.

12. ENSURE ALL MODIFIED PANELBOARDS RECEIVE NEW, TYPED PANEL

SCHEDULES REFLECTING AS-BUILT CONDITIONS. INSTALL PANEL SCHEDULES

ON THE INSIDE OF THE PANEL DOOR OR IN A SIMILAR CONSPICUOUS

LOCATION.

13. REPAIR ALL DAMAGE TO GALVANIZING ZINC COATING RESULTING FROM

CONSTRUCTION AND DEMOLITION ACTIVITIES USING COLD GALVANIZING

COMPOUND.

ELECTRICAL GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

EL

EC

TR

IC

AL

G

EN

ER

AL

N

O

TE

S

E-001

CODE COMPLIANCE CRITERIA:

29 CFR 1926/1910 OSHA STANDARDS FOR CONSTRUCTION

NFPA 70 NATIONAL ELECTRICAL CODE, 2020

NFPA 70E STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE, 2021

NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATION SYSTEMS, 2021

UFC 3-501-01 UNIFIED FACILITIES CRITERIA, ELECTRICAL ENGINEERING, WITH CHANGE 1, 2019

UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS, WITH CHANGE 2, 2021

1. DE-ENERGIZE ALL ITEMS TO BE DEMOLISHED OR REMOVED. PERFORM

LOCKOUT/TAGOUT IN ACCORDANCE WITH OSHA 29 CFR 1910.147 AND NFPA

70E.

2. CONTRACTOR MUST TAKE NECESSARY PRECAUTIONS AND PROVIDE

PROTECTION AS REQUIRED TO PRESERVE CONDITION OF EXISTING UTILITIES

EQUIPMENT, FURNISHINGS, AND SURFACES NOT INDICATED FOR REMOVAL. IT

IS THE CONTRACTOR'S RESPONSIBILITY TO WORK AROUND THE EXISTING

CONDITIONS TO ACCOMPLISH THE WORK.

3. COVER ALL OPENINGS OR PENETRATIONS IN ELECTRICAL ENCLOSURES

RESULTING FROM DEMOLITION ACTIVITIES WITH METAL PLUGS

MANUFACTURED FOR THAT PURPOSE.

4. SEAL ALL WALL PENETRATIONS RESULTING FROM DEMOLITION ACTIVITIES

WITH UL RATED FIRE SEALANT TO MATCH EXISTING WALL ASSEMBLY RATING.

5. SEAL ENDS OF RETAINED CONDUCTORS AND PROTECT FROM DAMAGE DURING

CONSTRUCTION ACTIVITIES.

ELECTRICAL GENERAL NOTES - DEMOLITION:

SPECIFIC NOTE

TYPICAL NOTE, APPLICABLE TO

ALL OCCURRENCES

(TYP)

A AMPERE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AG ABOVE GROUND

AHJ AUTHORITY HAVE JURISDICTION

APPROX APPROXIMATELY

AWG AMERICAN WIRE GAUGE

BLDG BUILDING

CB CIRCUIT BREAKER

CBL CABLE

CKT CIRCUIT

COMM COMMUNICATIONS

CU COPPER

DC CURRENT

DIA DIAMETER

DP DISTRIBUTION PANEL

D/S DISCONNECT SWITCH

EMT ELECTRICAL METALLIC TUBING

EPR ETHYLENE-PROPYLENE RUBBER

ETR EXISTING TO REMAIN

GND GROUND

GOVT GOVERNMENT

HZ HERTZ

JBOX JUNCTION BOX

KAIC THOUSAND AMPS INTERRUPTING CURRENT

KCMIL THOUSAND CIRCULAR MILLS

KV KILOVOLT

KVA KILOVOLT AMPERE

KW KILOWATT

LTG LIGHTS

MCB MAIN CIRCUIT BREAKER

MCB MAIN DISTRIBUTION PANEL

MLO MAIN LUG ONLY

N NEUTRAL

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION.

NTS NOT TO SCALE

OBS OBSTRUCTION

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

P POLE

PH PHASE

PNL PANEL

PVC POLYVINYL CHLORIDE

QTY QUANTITY

RGS RIGID GALVANIZED STEEL

SCH SCHEDULE

SST STAINLESS STEEL

THNN THERMOSPLASTIC HIGH HEAT RESISTANT NYLON

THWN-2 THERMOPLASTIC HEAT AND WATER RESISTANT NYLON

TYP TYPICAL

UL UNDERWRITER'S LABORATORIES

USSF UNITED STATES SPACE FORCE

V VOLT

VAC VOLTS ALTERNATING CURRENT

W WATT

XFMR TRANSFORMER

1. REFER TO GENERAL DEMOLITION NOTES ON SHEET E-001 FOR ADDITIONAL

DEMOLITION INFORMATION.

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

2N D

R D

F

LO

O R

E

LE

C

TR

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

S

ED-101

1. DEMOLISH TWO (2) 30A, 2P CIRCUIT BREAKERS IN "PANEL A" SUPPLYING

EXISTING "FCU-1" AND "FCU-2".

2. DEMOLISH "FCU-1" CONDUCTORS BACK TO "PANEL A". RETAIN AND PROTECT

EXISTING CONDUIT FOR INSTALLATION OF NEW "FCU-1".

3. DEMOLISH "FCU-2" CONDUCTORS BACK TO "PANEL A". RETAIN AND PROTECT

EXISTING CONDUIT FOR INSTALLATION OF NEW "FCU-2".

FLAG NOTES:

PANEL T1 (ETR)

PANEL A (ETR)

FCU-1

FCU-2

SCALE:

3RD FLOOR ELECTRICAL DEMOLITION PLAN

3/8" = 1'-0"

SCALE:

2ND FLOOR ELECTRICAL DEMOLITION PLAN

3/8" = 1'-0"

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

4T H

TH

F

LO

O

R E

LE

C

TR

IC

AL

D

EM

O

LI

TI

O N

P

LA

N S

ED-102

1. DEMOLISH TWO (2) 30A, 2P CIRCUIT BREAKERS IN "PANEL B" SUPPLYING

EXISTING "FCU-3" AND "FCU-4".

2. DEMOLISH "FCU-3" CONDUCTORS BACK TO "PANEL B". RETAIN AND PROTECT

EXISTING CONDUIT FOR INSTALLATION OF NEW "FCU-3".

3. DEMOLISH "FCU-4" CONDUCTORS BACK TO "PANEL B". RETAIN AND PROTECT

EXISTING CONDUIT FOR INSTALLATION OF NEW "FCU-4".

FLAG NOTES:

PANEL T2 (ETR)

PANEL B (ETR)

FCU-3

FCU-4

SCALE:

5TH FLOOR ELECTRICAL DEMOLITION PLAN

3/8" = 1'-0"

SCALE:

4TH FLOOR ELECTRICAL DEMOLITION PLAN

3/8" = 1'-0"

2. LABEL ALL CIRCUIT BREAKERS FOR DEMOLISHED CIRCUITS AS "SPARE" IN

UPDATED PANEL SCHEDULES.

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

6T H

F

LO

O R

E

LE

C

TR

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

ED-103

1. DEMOLISH TWO (2) CIRCUIT BREAKERS IN "PANEL C" SUPPLYING EXISTING

"AHU-2" AND "AHU-2 REHEAT".

2. DEMOLISH "AHU-2 REHEAT" CONDUCTORS AND CONDUIT BACK TO "PANEL C".

3. DEMOLISH "AHU-2" CONDUCTORS AND CONDUIT BACK TO "PANEL C" AND

DEMOLISH ASSOCIATED DISCONNECT SWITCH.

4. DEMOLISH "AHU-2 PREHEAT" CONDUCTORS AND CONDUIT BACK TO "PANEL C".

5. DEMOLISH "AHU-1 REHEAT" CONDUCTORS AND CONDUIT BACK TO "PANEL C".

6. DEMOLISH “AHU-1” CONDUCTORS AND CONDUIT BACK TO “PANEL C” AND

DEMOLISH ASSOCIATED DISCONNECT SWITCH.

FLAG NOTES:

AHU-2

AHU-1

EF 7 (ETR)

UH 4 (ETR)

EF 8 (ETR)

PANEL T3 (ETR)

PANEL C (ETR)

SCALE:

6TH FLOOR ELECTRICAL DEMOLITION PLAN

3/8" = 1'-0"

N

AHU-2 D/S

STRUT FRAME

AHU-1 D/S

1. REFER TO PANEL SCHEDULES ON SHEET E-701 FOR CIRCUIT BREAKER,

BRANCH CONDUCTOR, AND CONDUIT INFORMATION.

2. BASIS OF DESIGN FCU HAS INTEGRATED DISCONNECT SWITCH, REFER TO

MECHANICAL DRAWINGS FOR DETAILS. PROVIDE NEW DISCONNECT SWITCH

WITHIN LINE OF SIGHT OF FCU IN ACCORDANCE WITH NFPA 70 IF ALTERNATE

FCU IS INSTALLED.

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

2N D

R D

F

LO

O R

E

LE

C

TR

IC

AL

IN

ST

AL

LA

TI

O

N P

LA

N

E-104

1. INSTALL NEW 25A, 2P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL A" TO

SUPPLY NEW "FCU-1". ROUTE NEW CONDUCTORS FROM "PANEL A" TO NEW

"FCU-1" THROUGH RETAINED CONDUIT. EXTEND RETAINED CONDUIT SYSTEM

AS REQUIRED. MATCH EXISTING CONDUIT SIZE.

2. INSTALL NEW 25A, 2P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL A" TO

SUPPLY NEW "FCU-2". ROUTE NEW CONDUCTORS FROM "PANEL A" TO NEW

"FCU-2" THROUGH RETAINED CONDUIT. EXTEND RETAINED CONDUIT SYSTEM

AS REQUIRED. MATCH EXISTING CONDUIT SIZE.

FLAG NOTES:

EXISTING PANEL T-1

EXISTING PANEL A

NEW FCU-1

NEW FCU-2

SCALE:

3RD FLOOR ELECTRICAL INSTALLATION PLAN

3/8" = 1'-0"

SCALE:

2ND FLOOR ELECTRICAL INSTALLATION PLAN

3/8" = 1'-0"

N

N

(PANEL A) - (9,11)

(PANEL A) - (10,12)

2. BASIS OF DESIGN FCU HAS INTEGRATED DISCONNECT SWITCH, REFER TO

MECHANICAL DRAWINGS FOR DETAILS. PROVIDE NEW DISCONNECT SWITCH

WITHIN LINE OF SIGHT OF FCU IN ACCORDANCE WITH NFPA 70 IF ALTERNATE

FCU IS INSTALLED.

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

4T H

TH

F

LO

O

R E

LE

C

TR

IC

AL

IN

ST

AL

LA

TI

O N

P

LA

N S

E-105

1. INSTALL NEW 25A, 2P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL B" TO

SUPPLY NEW "FCU-3". ROUTE NEW CONDUCTORS FROM "PANEL B" TO NEW

"FCU-3" THROUGH RETAINED CONDUIT. EXTEND RETAINED CONDUIT SYSTEM

AS REQUIRED. MATCH EXISTING CONDUIT SIZE.

2. INSTALL NEW 25A, 2P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL B" TO

SUPPLY NEW "FCU-4". ROUTE NEW CONDUCTORS FROM "PANEL B" TO NEW

"FCU-4" THROUGH RETAINED CONDUIT. EXTEND RETAINED CONDUIT SYSTEM

AS REQUIRED. MATCH EXISTING CONDUIT SIZE.

FLAG NOTES:

EXISTING PANEL T2

NEW FCU-3

EXISTING PANEL B

NEW FCU-4

SCALE:

5TH FLOOR ELECTRICAL INSTALLATION PLAN

3/8" = 1'-0"

SCALE:

4TH FLOOR ELECTRICAL INSTALLATION PLAN

3/8" = 1'-0"

N

N

(PANEL B) - (22,24)

(PANEL B) - (2,4)

GENERAL NOTES:

A

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

SCALE IN FEET

GRAPHIC SCALE

0 1 2 4

3/8"=1'-0"

6T H

F

LO

O R

E

LE

C

TR

IC

AL

IN

ST

AL

LA

TI

O

N P

LA

N

E-106

FLAG NOTES:

NEW MAU-1

NEW AHU-1

EXISTING EF 7

EXISTING UH 4

EXISTING EF 8

EXISTING PANEL T3

EXISTING PANEL C

SCALE:

6TH FLOOR ELECTRICAL INSTALLATION PLAN

3/8" = 1'-0"

N

(PANEL C) - (14,16,18)(PANEL C) - (24,26,28)

(PANEL C) - (37,39,41)

1. INSTALL NEW 15A, 3P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL C" TO

SUPPLY NEW "MAU-1". ROUTE NEW CONDUIT AND CONDUCTORS FROM

"PANEL C" TO "MAU-1".

2. INSTALL NEW 50A, 3P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL C" TO

SUPPLY NEW "MAU-1 DUCT HEATER". ROUTE NEW CONDUIT AND

CONDUCTORS FROM "PANEL C" TO "MAU-1 DUCT HEATER".

3. INSTALL NEW 80A, 3P, 208VAC, 22 KAIC CIRCUIT BREAKER IN "PANEL C" TO

SUPPLY NEW "AHU-1". ROUTE NEW CONDUIT AND CONDUCTORS FROM

"PANEL C" TO "AHU-1".

NEW MAU-1

DUCT HEATER

B

2 3

C

D

1 2 3

4 5 6

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

N el so nE ng in ee ri ng C o.

rh od es b rit

D

AT

E:

AS

B

U

IL

T D

AT

E:

D

EL

IV

ER

Y N

O

PR

O

JE

C

T N

U M

BE

R

N

EL

SO

N

EN

G

IN

EE

R

IN

G

/0

3/

C .R

AW

LI

N G

S

M .S

M

IT

H

M .G

O N

ZA

LE

Z

SX

H

T

-1

SX

H

T

-1

R

EP

LA

C

E H

VA

C

B

A

TC

PA

N

EL

S

C H

ED

U

LE

S

E-701

1. LOAD INFORMATION FOR EXISTING EQUIPMENT IS BASED ON 1994 AS-BUILT

DOCUMENT.

2. NEW/MODIFIED CIRCUITS NOTED IN BOLD TEXT. PROVIDE NEW CIRCUIT

BREAKER, CONDUCTORS, AND CONDUITS AS INDICATED IN PANEL

SCHEDULES.

GENERAL NOTES:

PANEL ID: PANEL B

VOLTAGE: 208/120 VAC PHASE: 3 LOCATION: FIFTH FLOOR

BUS RATING: 100 A WIRES: 4 FED FROM: MDP

AIC RATING: 22 KA TYPE: MCB MCB RATING: 100 A

TR

IP

A M

PS

PO

LE

S

DESIGNATION

SE

TS

PH

A

SE

N

EU

TR

A

L

G R

O U

N D

C O

N D

U

IT

K

VA

C A

TE

G

O R

Y

C

IR

C U

IT

N

O

PH

A

SE

A

PH

A

SE

B

PH

A

SE

C

C

IR

C U

IT

N

O

C A

TE

G

O R

Y

K

VA

C O

N D

U

IT

G R

O U

N D

N

EU

TR

A

L

PH

A

SE

SE

TS DESIGNATION

PO

LE

S

TR

IP

A M

PS

100 3 MAIN BREAKER - - - - -

1 1.7 2 M 1.7 3/4" #10 #10 #10 1 FCU-4 2 25

3 1.7 4 M 1.7

5 0.4 6 R 0.4 RECPT RM. 504 1 20

20 1 GFI LEVEL 5 0.7 R 7 1.2 8 R 0.5 RECPT RM. 504 1 20

20 1 GFI LEVEL 5 BREAKROOM 0.7 R 9 1.1 10 R 0.4 RECPT RM. 401 1 20

20 1 RECPT RM. 501 0.7 R 11 0.9 12 L 0.2 RECPT RM. 404 1 20

- - SPACE 13 0.4 14 R 0.4 LIGHTS RM. 404 1 20

- - SPACE 15 0.2 16 R 0.2 RECPT RM. 404 1 20

20 1 LIGHTS RM. 504 0.7 L 17 0.7 18 RECPT RM. 404 1 20

20 1 EF-6 0.1 M 19 0.1 20 SPACE - -

20 1 SPARE 21 0.0 22 SPACE - -

20 1 SPARE 23 1.7 24 M 1.7 3/4" #10 #10 #10 1 FCU-3 2 25

- - SPACE 25 1.7 26 M 1.7

- - SPACE 27 0.0 28 SPACE - -

- - SPACE 29 0.0 30 SPACE - -

- - SPACE 31 0.0 32 SPACE - -

- - SPACE 33 0.0 34 SPACE - -

- - SPACE 35 0.0 36 SPACE - -

- - SPACE 37 0.0 38 SPACE - -

- - SPACE 39 0.0 40 SPACE - -

- - SPACE 41 0.0 42 SPACE - -

TOTAL PHASE CONNECTED LOAD: 5.1 3.0 3.7

PANEL DEMAND CALCULATIONS DEMAND LEGEND PANEL TOTALS

LOAD TYPE DEMAND FACTOR DEMAND LOAD LOAD TYPE REFERENCE TOTAL CONNECTED LOAD: 11.8 KVA

R RECEPTACLE < 10 KW 100% 4.0 KVA RECEPTACLES NEC 220.44 TOTAL DEMAND LOAD: 12.9 KVA

R RECEPTACLE > 10 KW 50% 0.0 KVA MOTORS NEC 220.50 TOTAL DEMAND CURRENT: 35.7 A

L LIGHTING 125% 1.1 KVA FIXED ELECTRIC SPACE HEAT NEC 220.51 SPARE LOAD CAPACITY: 64.26 %

G GENERAL EQUIPMENT 100% 0.0 KVA KITCHEN EQUIPMENT NEC 220.56

H HEAT 125% 0.0 KVA NONCOINCIDENT LOADS NEC 220.60

M MOTORS LESS LARGEST 100% 3.5 KVA

M LARGEST MOTOR 125% 4.3 KVA

NOTES:

PANEL A SCHEDULE PANEL B SCHEDULE

PANEL C SCHEDULE

PANEL ID: PANEL C

VOLTAGE: 208/120 VAC PHASE: 3 LOCATION: SIXTH FLOOR

BUS RATING: 225 A WIRES: 4 FED FROM: MDP

AIC RATING: 22 KA TYPE: MCB MCB RATING: 225 A

TR

IP

A M

PS

PO

LE

S

DESIGNATION

SE

TS

PH

A

SE

N

EU

TR

A

L

G R

O U

N D

C O

N D

U

IT

K

VA

C A

TE

G

O R

Y

C

IR

C U

IT

N

O

PH

A

SE

A

PH

A

SE

B

PH

A

SE

C

C

IR

C U

IT

N

O

C A

TE

G

O R

Y

K

VA

C O

N D

U

IT

G R

O U

N D

N

EU

TR

A

L

PH

A

SE

SE

TS DESIGNATION

PO

LE

S

TR

IP

A M

PS

20 1 RECPT RM. 605 0.9 R 1 1.1 2 M 0.2 EF-7 1 20

20 1 RECPT RM. 602 0.7 R 3 0.7 4 SPARE 1 20

20 1 SPARE 5 0.0 6 SPARE 1 20

20 1 SPARE 7 0.0 8 SPARE 1 20

20 1 SPARE 9 0.0 10 SPARE 1 20

20 3 SPARE

11 0.8 12 L 0.8 LIGHTS RM. 605 1 20

13 0.4 14 M 0.4

3/4" #12 - #12 1 MAU-1 3 1515 0.4 16 M 0.4

20 3 UH-4 #12 - #12 3/4"

1.7 H 17 2.1 18 M 0.4

1.7 H 19 1.7 20 SPARE 1 20

1.7 H 21 1.7 22 SPARE 1 20

20 SPARE 23 7.3 24 H 7.3

1-1/2" #8 - #3 1 AHU-1 W/ HEATER 3 8020 SPARE 25 7.3 26 H 7.3

20 EF-8 1.1 M 27 8.4 28 H 7.3

20 HAND DRYER 2.3 G 29 2.3 30 SPARE 1 20

20 AHU-1 CONTROL PANEL 0.5 G 31 0.5 32

SPARE 3 6020 UNKNOWN LOAD 1.1 G 33 1.1 34

20 SPARE 35 0.0 36

50 3 MAU-1 DUCT HEATER 1 #6 #6 #10 1"

4.0 H 37 5.8 38 H 1.8

INSTANT WATER HEATER 3 504.0 H 39 5.8 40 H 1.8

4.0 H 41 5.8 42 H 1.8

TOTAL PHASE CONNECTED LOAD: 16.8 18.1 18.3

PANEL DEMAND CALCULATIONS DEMAND LEGEND PANEL TOTALS

LOAD TYPE DEMAND FACTOR DEMAND LOAD LOAD TYPE REFERENCE TOTAL CONNECTED LOAD: 53.2 KVA

R RECEPTACLE < 10 KW 100% 1.6 KVA RECEPTACLES NEC 220.44 TOTAL DEMAND LOAD: 64.8 KVA

R RECEPTACLE > 10 KW 50% 0.0 KVA MOTORS NEC 220.50 TOTAL DEMAND CURRENT: 179.8 A

L LIGHTING 125% 1.0 KVA FIXED ELECTRIC SPACE HEAT NEC 220.51 SPARE LOAD CAPACITY: 20.09 %

G GENERAL EQUIPMENT 100% 3.9 KVA KITCHEN EQUIPMENT NEC 220.56

H HEAT 125% 55.5 KVA NONCOINCIDENT LOADS NEC 220.60

M MOTORS LESS LARGEST 100% 1.4 KVA

M LARGEST MOTOR 125% 1.4 KVA

NOTES:

PANEL ID: PANEL A

VOLTAGE: 208/120 VAC PHASE: 3 LOCATION: SIXTH FLOOR

BUS RATING: 100 A WIRES: 4 FED FROM: MDP

AIC RATING: 22 KA TYPE: MCB MCB RATING: 100 A

TR

IP

A M

PS

PO

LE

S

DESIGNATION

SE

TS

PH

A

SE

N

EU

TR

A

L

G R

O U

N D

C O

N D

U

IT

K

VA

C A

TE

G

O R

Y

C

IR

C U

IT

N

O

PH

A

SE

A

PH

A

SE

B

PH

A

SE

C

C

IR

C U

IT

N

O

C A

TE

G

O R

Y

K

VA

C O

N D

U

IT

G R

O U

N D

N

EU

TR

A

L

PH

A

SE

SE

TS DESIGNATION

PO

LE

S

TR

IP

A M

PS

100 3 MAIN BREAKER - - - - -

1 0.5 2 R 0.5 RECPT RM. 205 1 20

3 0.1 4 M 0.1 EF-4 1 20

5 0.4 6 R 0.4 RECPT RM. 202 1 20

20 1 RECPT RM. 205 - - - - - 0.5 R 7 1.0 8 R 0.5 RECPT RM. 305 1 20

25 2 FCU-1 1 #10 #10 #10 3/4" 1.7 M 9 3.4 10 M…