This document outlines the requirements for dry docking and preservation work on the United States Coast Guard Cutter STURGEON BAY. The scope of work includes removing all existing coatings from underwater body surfaces and recoating with a new coating system, as well as preservation tasks on other areas such as the freeboard, appendages, tanks, sea valves, rudder, and anchor chain. Surface preparation may be accomplished using either high-pressure water jetting or abrasive blasting. The contractor must adhere to specifications for environmental protection, welding, and coatings, and protect equipment from contamination during work. Inspections are required for post-surface preparation cleaning and critical coated surfaces. The solicitation number for this opportunity is 70Z08521QP45B5500 and was issued by the Department of Homeland Security United States Coast Guard.

View the file

Other files

File Type Posted
Amendment 0003 USCGC STURGEON BAY DD.pdf PDF
Rev02 Attachment 1 SOS.xls XLS spreadsheet
Rev01 Attachment 1 SOS.xls XLS spreadsheet
Amendment 0002 USCGC STURGEON BAY DD.pdf PDF
Amendment A0001 USCGC STURGEON BAY.pdf PDF
Attachment 1 SOS.xls XLS spreadsheet
Attachment 3 Past Performance Information Form P45B55.doc DOC document
JOTFOC - WARTSILA SHAFT SEAL 13April.pdf PDF
S1.12 Combined Synopsis Sol STURGEON BAY DD.doc DOC document
Attachment 4 Request for Clarification P45B55.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC STURGEON BAY (WTGB 109)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2021

Developed By: Johnny B Thomas (Rev-3, 07 Aug 2020)

TABLE OF CONTENTS

ivRevisions Record vConsolidated List of References ixConsolidated List of Government-furnished Property xConsolidated List of Critical Inspection Items xiPrincipal Characteristics - Tug, IceBreaking

1General Requirements

10WORK ITEM 1: U/W Body, Preserve (100%)

14WORK ITEM 2: Hull Plating Freeboard, Preserve “100%”

17WORK ITEM 3: Bubbler Channels, Inspect

19WORK ITEM 4: Appendages (U/W), Leak Test

22WORK ITEM 5: Propulsion Shaft Rope Guards, Inspect

24WORK ITEM 6: Chain Locker(s), Clean and Inspect

26WORK ITEM 7: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect

30WORK ITEM 8: Tanks (MP Fuel Service), Clean and Inspect

34WORK ITEM 9: Tanks (Ballast), Clean and Inspect

37WORK ITEM 10: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew

41WORK ITEM 11: Propulsion Shafting; Remove, Inspect, and Reinstall

46WORK ITEM 12: Propulsion Shaft Bearings (External), Check Clearances

49WORK ITEM 13: Propeller, Remove, Inspect, and Reinstall

53WORK ITEM 14: Circuit Breakers (60 Hz), Inspect and Test

56WORK ITEM 15: Sea Valves and Waster Pieces, Overhaul Or Renew

62WORK ITEM 16: Sea Strainers - Simplex (All Sizes), Clean and Inspect

65WORK ITEM 17: Rudder Assembly, Remove, Inspect And Reinstall

70WORK ITEM 18: Rudder(s), Preserve (“100%”)

72WORK ITEM 19: Anchor Chain(s) and Ground Tackle, Inspect and Repair

80WORK ITEM 20: Chain Locker, Preserve 100%

82WORK ITEM 21: Tanks, Dirty Oil and Waste, Preserve, 100%, 85WORK ITEM 22: Tanks, Dirty Oil and Waste, Preserve, Partial, 88WORK ITEM 23: Cathodic Protection, Zinc Anodes, Renew, 91WORK ITEM 24: Drydock

95WORK ITEM 25: Temporary Services, Provide - Tender

98WORK ITEM 26: Sea Trial Performance, Support, Provide

102WORK ITEM 27: Flex Hose Assemblies, Renew

105WORK ITEM 28: Hull and Structural Plating -{Insert Plate Size (i.e. 1/2” or 5/16”, etc.) Steel Plate, Renew

107WORK ITEM 29: Tank (Water Mist), Clean And Inspect

110WORK ITEM 30: Tanks, Dirty Oil and Waste, Clean and Inspect

113WORK ITEM 31: Rudder Stock Bearings Clearances, Check

117WORK ITEM 32: Rudder Stock Bearings (Upper And Lower), Renew

120WORK ITEM 33: Chain Lockers, Preserve – Partial

122WORK ITEM 34: Tank (Water Mist), Preserve (Partial)

125WORK ITEM 35: Hull Plating (Side Scan), Ultrasonic Testing

129WORK ITEM 36: Appendages (U/W) - Internal, Preserve

131WORK ITEM 37: Gun Mount Foundation, Install

133WORK ITEM 38: Fan Room, Preserve

135WORK ITEM 39: Air Reducing Station, Renew

138WORK ITEM 40: Multiple System Valves, Overhaul or Renew

143WORK ITEM 41: Steering Actuators, Overhaul

146WORK ITEM 42: Water Mist Tank Low Level Switch, Relocate

150WORK ITEM 43: Vent Fans and Motors, Overhaul (Non-Machinery Spaces)

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 101 WTGB 514-005, Rev D, Heat, Vent and A/C Diag.

Coast Guard Drawing 140 WTGB 111-001, Rev -, Shell Expansion Coast Guard Drawing 140 WTGB 114-001, Rev -, Bubbler Structure Coast Guard Drawing 140 WTGB 114-003, Rev A, Rudder Guard Coast Guard Drawing 140 WTGB 116-001, Rev A, Longitudinal Framing and Side Girder Coast Guard Drawing 140 WTGB 117-001, Rev -, Transverse Frames Coast Guard Drawing 140 WTGB 120-001, Rev -, Structural Bulkheads Coast Guard Drawing 140 WTGB 123-002, Rev D, Structural Mods Incidental to Water Mist Tank 4-24-1-W

Coast Guard Drawing 140 WTGB 149-001, Rev -, Tank Tops and Flats Coast Guard Drawing 140 WTGB 192-001, Rev -, Compartment Testing Diagram Coast Guard Drawing 140 WTGB 243-002, Rev B, Propulsion Shafting Arrangement Coast Guard Drawing 140 WTGB 245-002, Rev A, Propeller & Offsets 140 Ft WYTM Cutter (All) Coast Guard Drawing 140 WTGB 245-003, Rev -, One Single Blade 140 Ft WYTM Cutter Alum Patt Coast Guard Drawing 140 WTGB 256-001, Rev A, Sea Water Cooling System Diagram Coast Guard Drawing 140 WTGB 261-001, Rev-, Fuel Oil System Diagram Coast Guard Drawing 140 WTGB 261-002, Rev-, Fuel Oil Service System A&D

Coast Guard Drawing 140 WTGB 262-001, Rev -, Lube Oil System Diagram Coast Guard Drawing 140 WTGB 262-002, Rev -, Lube Oil System, A&D Coast Guard Drawing 140 WTGB 320-006, Rev K, Power System One Line Diagram

Coast Guard Drawing 140 WTGB 514-001, Rev A, HVAC Diagram Incidental to Chill Water Install

Coast Guard Drawing 140 WTGB 521-002, Rev -, Firemain System, Arrangements and Details Coast Guard Drawing 140 WTGB 521-003, Rev A, Firemain, System Diagram Coast Guard Drawing 140 WTGB 529-002, Rev -, Bilge and Clean Ballast, System Diagram Coast Guard Drawing 140 WTGB 529-004, Rev -, Bilge and Ballast, Arrangements and Details Coast Guard Drawing 140 WTGB 533-003, Rev A, Potable Water System Diagram

Coast Guard Drawing 140 WTGB 551-001, Rev -, Compressed Air System Diagram

Coast Guard Drawing 140 WTGB 551-004, Rev -, Compressed Air System A&D

Coast Guard Drawing 140 WTGB 555-002, Rev E, Water Mist System Installation A&D

Coast Guard Drawing 140 WTGB 555-004, Rev C, Water Mist System Diagram

Coast Guard Drawing 140 WTGB-555-006, Rev. E, Water Mist System Electrical Wiring Diagram

Coast Guard Drawing 140 WTGB 561-004, Rev H, Hydraulic Steering System Arrangement Jastram

Coast Guard Drawing 140 WTGB 561-005, Rev B, Hydraulic Steering System Diagram

Coast Guard Drawing 140 WTGB 562-001, Rev A, Rudder

Coast Guard Drawing 140 WTGB 562-002, Rev E, Rudder Stock Bearing Details

Coast Guard Drawing 140 WTGB 581-001, Rev -, Anchor Handling A & D

Coast Guard Drawing 140 WTGB 612-002, Rev. A, Forward Bridge Handrail Mods

Coast Guard Drawing 140 WTGB 633-001, Rev -, Cathodic Protection Coast Guard Drawing 140 WTGB 711-001, Rev. -, Gun Mount Foundations

Coast Guard Drawing 140 WTGB 801-001, Rev B, Outboard Profile

Coast Guard Drawing 140 WTGB 801-003, Rev -, Booklet of General Plans

Coast Guard Drawing 140 WTGB 801-004, Rev -, General Arrangement Below Main Deck

Coast Guard Drawing 140 WTGB 801-008, Rev -, Docking Plan Coast Guard Drawing 140 WTGB 801-009, Rev -, Curves of Form Coast Guard Drawing 140 WTGB 839-002, Rev -, Lines and Offsets Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Commandant Instruction (COMDTINST) M9000.6 (series), Naval Engineering Manual Coast Guard Maintenance Procedure Card (MPC) WTGB-140_R-A-13370, Water Mist Water Storage Tank INSP/CLN Coast Guard Technical Publication (TP) 3478, 03-APR-01, Manufacturer's Instruction Book-SWBS Group(s) 324 Coast Guard Technical Publication (TP) 3482, SWBS 561, Steering System, Installation and Maintenance Coast Guard Technical Publication (TP) 4593C, 25-JAN-08, Seal, Shaft - Type F.S.E Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 0740, (SFLC Std Spec 0740) 2018 Edition, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3041, (SFLC Std Spec 3041) 2018 Edition, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042, (SFLC Std Spec 3042) 2018 Edition, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2018, Dry-docking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2018, Temporary Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary Hull Accesses

OTHER REFERENCES

American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016 American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and Welding End ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN) ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-Petrolatum Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and Alloy Steel International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2018 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required MIL-DTL-23549, Sep 2016, Grease, General Purpose MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Nov 2011, Chapter 16, Cofferdams Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) AMS-G-6032, August 2012, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2016, Solvent Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

10
N
Wartsila FSE H76463-01 Major Overhaul Kit PN: WLP001419-001
NSN: 2010-01-540-3303
1 ea.
22,217.10
11
Y
**Propeller shaft
NSN: 2010-01-089-8123 PN: 101 WYTM-243-001 PIECE 1
1 ea.
7,874.50
13
Y
**Propeller
NSN: 2010-01-078-8216
1 ea.
42,842.00
17
Y
**Rudder
NSN: 2040-01-115-3498
1 ea.
186,806.00
17
Y
**Rudder Stock
NSN: 2040-01-115-5203 PN: 10251-562-241-PIECE-1
1 ea.
56,742.00
24
Y
*Transducer Cover Plate
N/A
1 ea.
50.00
32
N
**Rubber Stave Bearing
NSN: 2010-01-118-1008 PN: L-1214-1512X10 (Johnson Rubber Co)
1 ea.
3,753.00
32
N
**Pintle Bearing
NSN: 2010-01-F17-4974 PN: F113075055 (Thordon)
1 ea.
4,000.00
32
N
**Upper Roller Bearing
NSN: 3110-01-165-1405 PN: JHM840449-JHM840410 (Timken)
2 ea.
494.63
41
Y
**Steering Actuators
NSN: 3040-01-099-2843
2 ea.
5,330.65

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item
Title
1
U/W Body, Preserve (100%)
3
Bubbler Channels, Inspect
4
Appendages (U/W), Leak Test
7
Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect
8
Voids (Non-Accessible), Leak Test
9
Tanks (MP Fuel Service), Clean and Inspect
11
Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew
12
Propulsion Shafting; Remove, Inspect, and Reinstall
13
Propulsion Shaft Bearings (External), Check Clearances
18
Sea Strainers - Simplex (All Sizes), Clean and Inspect
19
Rudder Assembly, Remove, Inspect And Reinstall
21
Anchor Chain(s) and Ground Tackle, Inspect and Repair
37
Hull Plating (Side Scan), Ultrasonic Testing

Principal Characteristics - Tug, IceBreaking 140’ WTGB (TUG, Icebreaking)

Physical

Length overall
140' 0"
Length between perpendiculars
130' 0"
Breadth, extreme
37' 7-1/4"
Depth, molded
18' 2-3/8"
Frame spacing
1' 6"
Full load (Winter) draft (at )
12' 1-1/2"
Full load (winter) displacement
687 Long tons (LT)

Full load (winter) center of gravity

Above base (kg)
13' 1"
Full load trimming moment (forward)
75.6 Ft-LT
Min. operating condition draft (at )
11' 6-3/8"
Min. operating condition displacement
640 Long tons

Min. operating condition center of gravity

Above base (kg)
13' 4-1/4"

Min. operating condition trimming moment

Forward
76.8 Ft-LT
Height of vessel above DWL
Approx. 62' 0"

Machinery

Main Propulsion

Engine Type
Diesel-electric
Number of units:
2
Total shaft horsepower:
2500

Propeller

Number of propellers
1
Number of blades
4
Diameter of propeller
8' 6"
Pitch
Fixed

NOTE

Stability values above are for representative tug. Draft and longitudinal lever values provided above are for tugs in fresh water. Longitudinal lever values are provided to adjust tug's design drag of 1.0 feet by the stern.

00000_0220_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212) General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

Coast Guard Drawings None Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Other References None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for is not applicable. Dry-dock will be accomplished at a Contractor Operated (Non USCG) Facility.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:

None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean
SSPC-SP-10/NACE No. 2
(
SSPC-SP WJ-1/NACE WJ-1
(
SSPC-SP WJ-2/NACE WJ-2
(
SSPC-SP WJ-3/NACE WJ-3
(
SSPC-SP WJ-4/NACE WJ-4
(
SSPC-SP-3
(
SSPC-SP-11
(
SSPC-SP-11 (inaccessible area)
(
Brush-blasting (non-metallic substrate)
(

Abrasive Manufacturer:

Abrasive Sieve Size:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean
SSPC-SP-10/NACE No. 2
(
SSPC-SP WJ-1/NACE WJ-1
(
SSPC-SP WJ-2/NACE WJ-2
(
SSPC-SP WJ-3/NACE WJ-3
(
SSPC-SP WJ-4/NACE WJ-4
(
SSPC-SP-3
(
SSPC-SP-11
(
SSPC-SP-11 (inaccessible area)
(
Brush-blasting (non-metallic substrate)
(

Abrasive Manufacturer:

Abrasive Sieve Size:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

Date
Test Locations
Conductivity (Microsiemens/CM)
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

63130_0320_FLT

REC_63130_100Percent_FLT_140’WTGB (109 CGC STURGEON BAY) Salt Water (0519) WORK ITEM 1: U/W Body, Preserve (100%)

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve U/W body surfaces.

NOTES

1. The purpose of the preservation tasks covered by this item is to completely remove all existing coatings and recoat the U/W body surfaces with a new coating system.

2. U/W body surfaces are as defined in 4.1 (Definitions) and exclude areas covered by docking blocks, unless the vessel is fleeted for the express purpose of preserving blocked areas.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 140 WTGB 801-001, Rev B, Outboard Profile Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Other References The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

· 3.2.3 Post-surface preparation cleaning and inspection

3.1.2 Tech Rep. The Contractor shall refer to SFLC Std Spec 0000, paragraphs 3.2.4.2.1 (Painting contractor certification program requirement) and 3.2.4.2.2 (Coating Tech Rep), for applicable requirements.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. Specific areas/equipment/components to be protected include, but are not limited to:

· All scuppers and overboard discharges.

· Waterline area where U/W body coating system interfaces with freeboard coating system (unless freeboard surfaces are also being preserved).

· Fathometer transducer surfaces.

· Sea valve openings.

· Propeller shaft bearings and seals.

· Rudder bearings.

· Propellers.

· Zinc anodes (unless anodes are being renewed).

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

· Sea chest grating.

· Zinc anodes for Cathodic Protection System.

· Depth transducer and cover plate.

3.1.5 Initial inspection. Prior to removing the existing coating system, the Contractor shall inspect and verify whether all draft marks have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.

3.1.6 Water used in preparation and washing procedures. The Contractor shall ensure that water used in all surface preparation tasks, including pre-surface preparation wash and water jetting, is of sufficient purity and quality that it does not prevent the surface being cleaned from achieving the required degree of surface cleanliness or non-visible contamination criteria.

3.1.6.1 Ensure that surface preparation water does not contain sediments or other impurities that are destructive to the proper functioning of the cleaning equipment.

3.1.6.2 Ensure that all water used in any surface preparation or cleaning procedures is captured, contained, and all spent water disposed of in accordance with all Federal, state and local regulations.

3.1.7 Surface preparation optional methods. The Contractor has the option of using either high/ultrahigh pressure water jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.2 (Preservation requirements). The Contractor may add abrasives to the water jet stream, for one or both of the following reasons:

· Achieving greater productivity.

· Achieving the required surface profile.

NOTES

1. Existing coating system on the U/W body surfaces may have a nominal thickness in excess of that which was originally installed, because of “patch-coats” applied during past drydock availabilities.

2. Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.

3.2 Preservation requirements. The Contractor shall accomplish the following tasks:

3.2.1 Pre-surface preparation wash. Accomplish low-pressure (less than 5,000 psi) fresh water wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Refer to SSPC-SP 1, for guidance.

3.2.2 Surface preparation and coating application.

The Contractor shall accomplish the following tasks:

3.2.2.1 The Contractor shall prepare and coat the U/W hull surfaces with the system specified for “Underwater (U/W) Body and Boot-Top (U/W Body and Boot-Top, Icebreaker <235’, in Salt Water)”, in SFLC STD SPEC 6310, Appendix A (Cutter and Boat Exterior Painting Systems).

3.2.2.2 The Contractor shall coordinate U/W Body preservation with side scan/ultrasonic testing if side scan work item is included in availability. If included, the following paragraphs shall be applicable:

3.2.2.2.1 The contractor may elect to apply the anti-abrasion icebrraking coating in two coats rather than one to facilitate side scan procedure if approved by the COR. If selecting this option, the contractor must provide a written statement from the coating manufacturer approving the application of the icebreaking coating in two coats to the COR for approval during the Arrival Conference. Include details of incorporation of side scan procedure in the “Preservation Plan,” required by SFLC Std Spec 6310, paragraph 3.2.

3.2.2.2.2 If the two-coat option is approved by the COR, the side scan shall be performed over first coat. Second coat application shall follow completion of side scan. Total DFT of both coats shall meet listed DFT of single coat anti-abrasion icebreaker DFT in SFLC Std Spec 6310, Appendix A. Application of coats shall be in accordance with manufacturer’s overcoating intervals.

3.2.2.3 Ensure that the first AF coat is applied over the AC undercoating, while it is still tacky.

3.2.3 Post-surface preparation cleaning and inspection. After completion of surface preparation and prior to coating application, accomplish the following tasks and submit a CIR.

3.2.3.1 Perform a visual inspection of the prepared U/W body steel substrate.

3.2.3.2 Perform solvent cleaning of all prepared surfaces, in accordance with SSPC-SP 1. Capture, contain, and dispose of all wastes from solvent cleaning, in accordance with all Federal, state and local regulations.

NOTE

Lists of all authorized coating materials and suppliers are listed in SFLC Std Spec 6310, Appendix C (Cutter and Boat Authorized Coatings).

3.3 Draft mark painting. The Contractor shall paint all draft marks with two coats of a “Polysiloxane” or “Silicone Alkyd Enamel” coating, at 2.0-3.0 mils DFT, white (17925).

3.4 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces). Surfaces being preserved are considered “critical-coated surfaces”.

3.5 AF system protective measures – in the event of prolong atmospheric exposure. If the vessel will not be refloated within the immersion time as recommended by the coating system manufacturer, the Contractor shall employ suitable measures - including but not limited to keeping the coating system wet and away from direct sun light, to avoid film damage that may reduce or impact the final performance of the AF coating system when placed into service.

4. NOTES

4.1 Definitions.

4.1.1 U/W Body. The underwater body is defined as the areas from the bottom of the keel to the 13’ draft mark, above the design waterline (DWL), as shown on Coast Guard Drawing 140 WTGB 801-001, including rudders, fins, transducer hull rings, sea chests (including the sea chest inlet up to the final connection with the flange face at the sea chest isolation valve(s)), MDE scoops, bilge keel, all exposed bubbler channel surfaces, struts, skegs, gratings, and rope guards.

63140_0320_FLT

REC_63140_100Prcnt_FLT_140’ WTGB (109 CGC STURGEON BAY) Salt Water (1215) WORK ITEM 2: Hull Plating Freeboard, Preserve “100%”

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve 100% of the freeboard surfaces defined in 4.1 Definition of freeboard surfaces.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 140 WTGB 801-003, Rev -, Booklets of General Plans Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Other References None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 Apply protective measures as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection) to the following components, spaces and equipment:

· Areas where underwater body coating system interfaces with freeboard coating system (unless u/w body surfaces are also being preserved).

· Adjacent deck surfaces and deck fittings.

· Deck equipment.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

· None.

3.2 Initial inspection. Prior to removing the existing coating system, the Contractor shall inspect and verify whether or not all hull identification numbers and letters have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.

3.3 Surface preparation optional methods. The Contractor shall have the option of using either high/ultrahigh pressure water Jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.6 (Preservation requirements). The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:

· Achieving greater productivity.

· Achieving the required surface profile.

NOTE

Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.

3.4 Substrate inspection. After completing surface preparation and before coating application, the Contractor shall perform a visual inspection of the prepared substrate, and submit a CFR.

3.5 Pre-surface preparation wash. The Contractor shall accomplish low-pressure (less than 5,000 psi) fresh water wash of all affected surfaces, to remove soluble chlorides and other surface contaminants. Capture, contain, and dispose of wash water for proper disposal in accordance with all Federal, state and local regulations.

3.6 Preservation requirements. The Contractor shall accomplish the following tasks:

3.6.1 System particulars. Prepare and coat 100% of the freeboard surfaces as designated in paragraph 1.1 (Intent) with the system specified for “Freeboard/Superstructure/Mast (Freeboard/Superstructure)” in SFLC Std Spec 6310. Select the following:

· Select “Option II” system, for the applicable metal substrate.

· Black (17038), as the top/finish coat color..

3.6.2 Visual identification markings. The Contractor shall paint all distinctive visual safety and identification markings as follows:

3.6.2.1 Decals. Coast Guard Emblem decals may be substituted for painted emblems. Vinyl adhesive letters and numbers may also be substituted for painted letters and numbers - at the Contractor’s discretion.

3.6.2.2 Painted markings. Paint all distinctive visual identification markings, including the Coast Guard diagonal stripes, "U.S. COAST GUARD" legends, hull numbers, and draft marks in accordance with SFLC Std Spec 6310, and Coast Guard Drawings FL 2804-12 and FL 2804-22 as applicable.

NOTEs Surfaces being preserved are considered “critical-coated surfaces”.

Although there may be several possible procurement sources for the Coast Guard Emblem decals and vinyl adhesive letters and numbers, one known source is:

Brace Enterprises 10250 SE 138 Terrace Dunnellon, FL 34431 352-489-4442 / Fax: 352-489-4476 www.braceenterprise.com

3.6.3 Tear drop. Not applicable.

3.7 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).

4. NOTES

4.1 Definition of freeboard surfaces. For the purposes of this item the freeboard is defined as exterior steel hull surfaces from the waterline to the top of the bulwark, including lifeline stanchions, as shown on Coast Guard Drawing 101 WTGB 801-003.

11400_DCH_0814_140WTGB_IBCT

REC_11401_Bubbler_140WTGB_IBCT_140’ WTGB (109 CGC STURGEON BAY) Salt Water (0713) WORK ITEM 3: Bubbler Channels, Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect the bubbler channels.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 140 WTGB 114-001, Rev -, Bubbler Structure Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary Hull Accesses Other References None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

· 3.3 Channel inspection.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:

TYPE OF TANK
LOCATION
CAPACITY - 95%

(gallons)

Diesel Fuel
4-28-0-F
2,060
Diesel Fuel
4-28-1-F
3,864
Diesel Fuel
4-28-2-F
3,864
Diesel Fuel
4-38-0-F
2,737
Diesel Fuel
4-40-1-F
2,318
Diesel Fuel
4-40-2-F
2,318
Diesel Fuel
2-76-0-F
1,835
Diesel Overflow
4-34-0-F
418

3.1.5 Fluid removal. The Contractor shall remove up to 15,000 gallons of diesel fuel, and up to 1,000 gallons of waste oil and oily water to facilitate gas-freeing.

3.1.5.1 Fluid disposition. The Contractor shall dispose of all removed fluids in accordance with all applicable Federal, state, and local regulations. Refer to paragraph 4.1 (Tank content restoration).

3.2 Channel inspection. The Contractor shall perform visual inspection of all bubbler channels via boroscope, using Coast Guard Drawings 140 WTGB 114-01 as guidance. Submit A CIR.

3.3 Temporary access openings. Based on the results of the borescope inspection and upon authorization from the KO, the Contractor may cut shell inserts along the port and/or starboard hull, using existing insert plates shown on Coast Guard Drawing 140 WTGB 114-01, to facilitate complete inspection of all surfaces of the channels and conduct repairs. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.

3.4 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior bubbler channel surfaces using the system specified for “Underwater Water (U/W) Body and Boot-Top (U/W Body and Boot-Top, Icebreaker <235’)”, in Salt Water)”, in SFLC STD SPEC 6310, Appendix A (Cutter and Boat Exterior Painting Systems). Omit the antifouling top-coating for all interior surfaces.

4. NOTES

4.1 Tank content restoration. The ship’s forces will procure new fluids as needed and refill all tanks at the appropriate time.

11400_0320_FLT

REC_11400_UWAppndgs_FLT_140’ WTGB (ALL) (1017) WORK ITEM 4: Appendages (U/W), Leak Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .