Rev02 Attachment 1 SOS.xls
XLS spreadsheet 55 KB Posted
- Solicitation number
- 70Z08521QP45B5500
About this file
This document contains a pricing schedule for dry docking the United States Coast Guard Cutter STURGEON BAY. The schedule lists over forty line items for work including inspecting and preserving various parts of the cutter's hull, tanks, propulsion system and electrical components. Pricing and labor hours are not provided. The solicitation number and opportunity description indicate the Department of Homeland Security United States Coast Guard is seeking these dry dock services. An assumed composite labor rate and formulas for calculating costs are included in an appendix.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003 USCGC STURGEON BAY DD.pdf | ||
| Rev01 Attachment 1 SOS.xls | XLS spreadsheet | |
| Amendment 0002 USCGC STURGEON BAY DD.pdf | ||
| Amendment A0001 USCGC STURGEON BAY.pdf | ||
| Attachment 1 SOS.xls | XLS spreadsheet | |
| Attachment 3 Past Performance Information Form P45B55.doc | DOC document | |
| JOTFOC - WARTSILA SHAFT SEAL 13April.pdf | ||
| S1.12 Combined Synopsis Sol STURGEON BAY DD.doc | DOC document | |
| Attachment 4 Request for Clarification P45B55.docx | DOCX document | |
| Attachment 2 STURGEON BAY (WTGB 140) DD FQ2 JBT 21R0.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| REV-02 | PRICING SCHEDULE FOR: | ||||
| USCGC STURGEON BAY (WTGB-140) DRYDOCK AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | U/W Body, Preserve (100%) | $0.00 | JOB | 1 | $0.00 |
| D-002 | Hull Plating Freeboard, Preserve “100%” | $0.00 | JOB | 1 | $0.00 |
| D-003 | Bubbler Channels, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-004 | Appendages (U/W), Leak Test | $0.00 | JOB | 1 | $0.00 |
| D-005 | Propulsion Shaft Rope Guards, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-006 | Chain Locker(s), Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-007 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | $0.00 | JOB | 1 | $0.00 |
| D-008 | Tanks (MP Fuel Service), Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-009 | Tanks (Ballast), Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-010 | Propulsion Shaft Seals, Mechanical Overhaul/Inflatable Renew | $0.00 | JOB | 1 | $0.00 |
| D-011 | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-012 | Propulsion Shaft Bearings (External), Check Clearances | $0.00 | JOB | 1 | $0.00 |
| D-013 | Propeller, Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-014 | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | JOB | 1 | $0.00 |
| D-015 | Sea Valves and Waster Pieces, Overhaul Or Renew | $0.00 | JOB | 1 | $0.00 |
| D-016 | Sea Strainers - Simplex (All Sizes), Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-017 | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | JOB | 1 | $0.00 |
| O-018 | Rudder(s), Preserve (“100%”) | $0.00 | JOB | 1 | $0.00 |
| D-019 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | $0.00 | JOB | 1 | $0.00 |
| O-020 | Chain Locker, Preserve 100% | $0.00 | JOB | 1 | $0.00 |
| O-021 | Tanks, Dirty Oil and Waste, Preserve, 100%, | $0.00 | JOB | 1 | $0.00 |
| O-022 | Tanks, Dirty Oil and Waste, Preserve, Partial, | $0.00 | JOB | 1 | $0.00 |
| D-023 | Cathodic Protection, Zinc Anodes, Renew, | $0.00 | JOB | 1 | $0.00 |
| D-024 | Drydock | $0.00 | JOB | 1 | $0.00 |
| D-025 | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 |
| D-026 | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 |
| D-027 | Flex Hose Assemblies, Renew | $0.00 | JOB | 1 | $0.00 |
| O-028 | Hull and Structural Plating -{Insert Plate Size (i.e. 1/2” or 5/16”, etc.) Steel Plate, Renew | $0.00 | EA | 1 | $0.00 |
| D-029 | Tank (Water Mist), Clean And Inspect | $0.00 | JOB | 1 | $0.00 |
| D-030 | Tanks, Dirty Oil and Waste, Clean and Inspect | $0.00 | JOB | 1 | $0.00 |
| D-031 | Rudder Stock Bearings Clearances, Check | $0.00 | JOB | 1 | $0.00 |
| O-032 | Rudder Stock Bearings (Upper And Lower), Renew | $0.00 | JOB | 1 | $0.00 |
| O-033 | Chain Lockers, Preserve – Partial | $0.00 | JOB | 1 | $0.00 |
| O-034 | Tank (Water Mist), Preserve (Partial) | $0.00 | JOB | 1 | $0.00 |
| D-035 | Hull Plating (Side Scan), Ultrasonic Testing | $0.00 | JOB | 1 | $0.00 |
| O-036 | Appendages (U/W) - Internal, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-037 | Gun Mount Foundation, Install | $0.00 | JOB | 1 | $0.00 |
| D-038 | Fan Room, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-039 | Air Reducing Station, Renew | $0.00 | JOB | 1 | $0.00 |
| D-040 | Multiple System Valves, Overhaul or Renew | $0.00 | JOB | 1 | $0.00 |
| D-041 | Steering Actuators, Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-042 | Water Mist Tank Low Level Switch, Relocate | $0.00 | JOB | 1 | $0.00 |
| D-043 | Vent Fans and Motors, Overhaul (Non-Machinery Spaces) | $0.00 | JOB | 1 | $0.00 |
| O-00A | Composite Labor Rate | $0.00 | Hour | 460 | $0.00 |
| D-00B | GFP Report | EA | NSP | ||
| O-00Z | Laydays | $0.00 | Day | 5 | 0 |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(7/6/2020) Draft-2 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |