Attachment_2-Statement_of_Work(SOW)_BANWR_Bailey_PV_revised.pdf
PDF 162 KB Posted
- Attached to
- Design Build Service Photovoltaic
- Solicitation number
- 140FC126R0007
About this file
This is a Statement of Work for photovoltaic system revisions at the Bailey House on the Buenos Aires National Wildlife Refuge in Arizona.
The base scope of work (Task 1) requires design, documentation, and construction of revisions to an existing 8-kW roof-mounted PV system installed in 2016 that has not been grid-connected. Required revisions include verifying proper grounding of the PV array and components, relocating the AC disconnect within 10 feet of the main service panel, adding a solar output meter within 10 feet of the main service panel, providing updated component labeling per local code and utility requirements, preparing and submitting the interconnection application to the utility, scheduling and attending required utility inspections, and providing utility approvals to the Project Leader. Four optional line items are available: Task 2 (Option A) addresses rooftop cable management including DC string wiring integrity checks, connector replacement for code compliance, and cable tidying using UV-resistant cable ties; Task 3 (Option B) involves designing and installing a 10 kWh multi-modal battery system with utility application and staff training; Task 4 (Option C) includes setting up a Sunny Portal monitoring app for PV production tracking and staff training; and Task 5 (Option D) requires relocating the PV array from the roof to a ground-mounted support system with design engineering, panel relocation, roof repairs, and below-grade conduit runs.
The work location is 35560 South Sasabe Road, Tucson, Arizona 85736, approximately 60 miles south of Tucson on paved roads. The project must be completed within 90 calendar days of Notice-To-Proceed, with work performed Monday through Friday, 8:00 a.m. to 4:30 p.m., unless otherwise prearranged. Deliverables include an initial project schedule (due within 15 days of NTP), product submittals in PDF format (10 calendar days for review), 50% and 95% construction drawings stamped by an Arizona-licensed electrical engineer (10 business days for review each), completed installation, project inspection with punch list, as-constructed drawings in PDF and CAD formats, video of staff training, and closeout items including warranty letters and maintenance manuals. Work must comply with current editions of the IBC, National Electrical Code, NFPA 101 Life Safety Code, OSHA standards, and local utility requirements. Inspections will be performed by Trico and Refuge staff. The contractor must provide 24-hour notice before taking the entire power supply system offline, provide seven days' notice before arrival on-site, and maintain a current installer form on file with Trico. Government-furnished materials include power availability at the site; no restroom facilities will be provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bailey House PV System Revisions Page 1 of 4 Buenos Aires NWR
STATEMENT OF WORK
Photovoltaic System Revisions Design & Build
Buenos Aires National Wildlife Refuge US Fish and Wildlife Service, Region 2
February 25, 2026
1. ABOUT THE REFUGE
Established in 1985, the Buenos Aires National Wildlife Refuge was created under the authority of the Endangered Species Act. Spanning the 117,464-acre refuge are several distinct groups of plants and animals known as biotic communities, that are dependent on each other. Visitors will enjoy the semi-desert grasslands that blend into the cottonwoods and willow that line riverbanks and wetlands within the refuge. Settled in amongst the grasslands and wetlands is a beautiful sycamore-shaded canyon of extraordinary diversity. Brown Canyon is home to 200-million-year-old volcanic rocks that support a distinct variety of plants and animals that have evolved within this amazing sky island ecosystem.
Open to the public, visitors can enjoy wildlife watching and photography, hunting, fishing, wildlife photography and special wildlife-related events.
2. PURPOSE AND SCOPE
In 2016, a roof-mounted photo-voltaic system was installed at one of the staff residences. This 8-kW system has not been connected to the local electrical grid.
This goal of this scope of work is to make all necessary revisions to fulfill the requirements of the utility’s interconnection agreement. An optional line item for a battery is also included here (pending funding availability).
3. TASK 1 - BASE BID: Design, Document And Construct The Required Revisions To The Existing System
3.1. Verify that the PV array and its components are properly grounded.
3.2. The AC disconnect shall be located within 10’ of the main service panel.
3.3. A solar output (production) meter shall be added and located with 10’ of the main service panel.
3.4. Provide updated labeling for all components of the photo-voltaic system, per local code and utility requirements.
3.5. Prepare and submit the interconnection application for approval. Respond to utility company questions and corrections.
3.6. Schedule and attend the required inspection(s) by the utility.
3.7. Provide utility approvals to the Project Leader after the inspection(s).
Bailey House PV System Revisions Page 2 of 4
4. TASK 2 - OPTION ITEM A: Rooftop Cable Management
4.1. Check integrity of DC string wiring and test quick connectors. Provide written report of findings and replace all faulty units.
4.2. Replace all connectors not compliant with current codes. This includes connectors at the junction boxes.
4.3. Tidy cabling under PV panels so all wiring is code-compliant, safely secured, properly supported, and no plug connector or wire touches the roof surface.
Note: use UV-resistant black Nylon 12 (PA12) or stainless-steel cable ties.
5. TASK 3 - OPTION ITEM B: Design, Document and Install a multi-modal 10 kWh
Battery to provide power to the house after sundown.
5.1. Include utility application process with this Option.
5.2. Include FWS staff training regarding the use and maintenance of the battery system.
6. TASK 4 - OPTION ITEM C: Set up Monitoring App through Sunny Portal to track PV system production via government smart phone. Include training of on-site staff in the use of the app.
7. TASK 5 - OPTION ITEM D: Relocate the Photovoltaic Array to the Ground.
7.1. The Contractor shall design, engineer and construct a ground-mounted support system for the photovoltaic panels currently mounted on the roof of the house.
7.2. The Contractor shall relocate the existing PV panels from the roof to the ground-mounted support system and provide all the necessary connections.
7.3. Note: use UV-resistant black Nylon 12 (PA12) or stainless-steel cable ties.
7.4. Contractor to include and repairs to the roof that may be necessary to provide a water-tight envelope after the removal of the PV panels.
7.5. Any conduit runs from the ground-mounted array shall be below grade as permissible by code.
7.6. This task will be in lieu of Task 2 and includes replacement of any faulty wiring, connectors are otherwise damaged/worn parts that are currently part of the array.
7.7. This task includes design review with FWS for approval of the design.
7.8. Adhere to OSHA/local standards, utility requirements and applicable codes.
8. MEETINGS
8.1. Meetings are anticipated to include, but are not limited to, an in-person overall kickoff meeting at the location, a ‘punch-list’ walk and a final completion site visit.
8.2. The Contractor may include additional meeting time with FWS managers on site or virtually, as necessary, to complete the work of this project.
Bailey House PV System Revisions Page 3 of 4
9. PLACE, DELIVERY, AND PERIOD OF PERFORMANCE
9.1. The work may occur any time of year. All work shall be completed within 90 calendar days of the Notice-To-Proceed.
9.2. All work is located at the Bailey House on the Buenos Aires National Wildlife
Refuge, approximately 60 miles south of Tucson, AZ. The address is 35560 South Sasabe Road, Tucson, AZ 85736. The project is accessible on paved roads.
9.3. Prevention of harm to person, research, plants, animals and property from fire, electrical hazards or structural deficiencies shall be a priority consideration in all design, construction, and system operation.
10. DELIVERABLES
10.1. Initial project schedule within 15 days of NTP being issued.
10.2. Product submittals for all equipment to be installed in pdf format. Allow 10 calendar days for FWS review and approval of all submittals.
10.3. 50% and 95% construction drawings and calculations for FWS review and approval. Final drawings shall be stamped and signed by an electrical engineer licensed in the State of Arizona. Allow 10 business days for FWS review and approval of each submittal.
10.4. Completed installation/construction.
10.5. Project inspection (‘punch’ walk) with FWS staff, ‘punch’ list and correction of any deficiencies.
10.6. As-constructed drawings in pdf and CAD format.
10.7. Video of staff training for general operation and emergency shutdowns.
10.8. Closeout items including warranty letters, user, and maintenance manuals.
11. INSPECTION AND ACCEPTANCE
11.1. The work shall also be done in accordance with all applicable federal, state and local codes including the most current edition of the IBC, National Electrical Code (NEC), NFPA 101 Life Safety Code, and any other applicable disciplines of the International Code Council, as well as with accepted general industry standards.
11.2. The work shall be accepted when all the work is completed as described here within and in accordance with any contract documents. Work will be inspected to assure compliance with the contract documents, but quality control and adherence to all contract requirements is the responsibility of the contractor, as further described in CFR 52.246-12, “Inspection of Construction”.
11.3. Inspections shall be performed by Trico and Refuge staff. Contractor shall have current installer form on file with Trico.
12. GOVERNMENT FURNISHED MATERIALS
12.1. Contractor may use power available at project site (no charge).
12.2. No restroom facilities will be available for contractor use.
Bailey House PV System Revisions Page 4 of 4
13. SPECIAL NOTICES AND INSTRUCTION
13.1. Contractor shall provide a minimum 24-hour notice of any period of time that the entire power supply system will be offline.
13.2. No plants or animals may be brought on to the Refuge. Likewise, no plants or animals may be removed from the Refuge.
13.3. Contractor-owned equipment and supplies may be stored at the Refuge.
Refuge staff will assist contractor in selecting an appropriate and secure location for items.
12. AVAILABILITY & ACCESS
12.1. Pre-bid Site Visit: a non-mandatory pre-bid site visit will be scheduled during the solicitation phase.
12.2. Unless approved by the Project Leader, the work week is Monday thru Friday, from 8:00 a.m. until 4:30 p.m., except on federal holidays. Work shall be performed during these hours unless otherwise prearranged with the Refuge.
12.3. Contractor shall notify the COR a minimum of seven (7) days prior to arrival on-site and/or needing access to the property.
14. TECHNICAL COORDINATORS
On-Site Doug Holt, Wildlife Biologist 520-9093-5471 roger_d_holt@fws.gov
Project Leader Rich Albers, Buenos Aires NWR Manager 609-335-0814 rich_albers@fws.gov
Contracting Officer’s Representative Caroline Kreiser, Project Manager IMD 916-215-6624 caroline_kreiser@fws.gov mailto:roger_d_holt@fws.gov mailto:rich_albers@fws.gov mailto:caroline_kreiser@fws.gov