This Statement of Work (SOW) details the refurbishment of 96 Weapons Handling Dolly Assemblies for Norfolk Naval Shipyard (NNSY). The project requires the contractor to pick up the dolly assemblies, overhaul and restore them in accordance with NAVSEA drawings 709-4403696 and 709-4403697, including discarding and replacing software and mandatory material items, repairing/replacing damaged components, and applying Cadmium plating and plastisol coating.

The period of performance is from 9/22/2025 through 7/22/2026, with equipment to be returned to NNSY no later than 8/5/2026 to support Combat Systems Testing. Work will be performed at the contractor's facility, with the assemblies picked up from and returned to NNSY Building 276. Security clearance information must be submitted with the proposal, and all associated documents are classified as confidential or below. The contractor must perform operational tests on all moving parts and coordinate delivery with NNSY Code 292.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Refurbish Weapon Handling Dolly Assembly

Section A: Scope

1. Objective:

Inspect, disassemble, restore, reassemble and plate Weapons Handling Dolly Assembly. Refurbished Weapons Handling Dolly Assemblies will be utilized by during weapons handling evolution.

2. Background/Introduction

Weapon Handling Dolly Assembly require refurbishment to meet the inspection requirements of NAVSEA Drawing 709-4403696 REV M Weapons Stowage and Handling Dolly Assembly and NAVSEA Drawing 709- 4403697 REV R Weapons Stowage & Handling Dolly Details. The current certification is expired. The Dolly Assembly require refurbishment before they are able to be placed under load for their use in weapons handling evolutions.

3. Limitations of Work

None.

Section B: Applicable Documents

4. Documentation:

4.1. NAVSEA DWG# 709-4403696 Rev P (Weapon Stowage & Handling Dolly Assembly)

4.2. NAVSEA DWG# 709-4403697 Rev R (Weapons Stowage & Handling Dolly Details)

4.3. TM SG420-BU-MMA-010 Rev 02 Weapons Shipping, Handling, and Stowage Equipment

Section C: Requirements

5. Scope of Work:

NNSY requires services to be provided to overhaul, restore, and plate Weapons Handling Dolly Assembly (QTY 96) IAW References 4.1 through 4.3 for the .

6. Contractor Responsibilities:

6.1. Contractor shall pick up (QTY 96) Weapons Handling Dolly Assemblies from NNSY.

6.2. Contractor shall overhaul and restore (QTY 96) Weapons Handling Dolly Assy’s IAW requirements of references 4.1 through 4.4.

6.2.1. Contractor shall discard and replace all software and mandatory material items IAW requirements of references 4.1 through 4.3.

6.2.2. Contractor shall repair/replace damaged components as required for satisfactory operation IAW references 4.1 through 4.3.

6.2.3. Contractor shall provide Cadmium plate and plastisol coat to components as required by references 4.1 and 4.2

6.3. Contractor shall perform operational test of all moving parts.

6.4. Contractor shall deliver (QTY 96) Weapons Handling Dolly Assemblies to NNSY Code 292. Call Code

292 to arrange delivery to NNSY.

7. NNSY Responsibilities:

NNSY will be responsible to supply Weapons Handling Dolly Assemblies (QTY 96) and assist in coordinating delivery to ship when completed.

8. Government Furnished Property:

(QTY 96) Weapons Handling Dolly Assemblies

9. Security Requirements:

All Documents listed in Section 4 of this Statement of Work and deliverable items associated with this task are confidential or below. Security Clearance information shall be submitted with the contractor’s proposal.

10. Delivery Terms/Shipping/Transportation

Contractor to pick up GFE and deliver upon completion.

11. Place of Performance/Delivery Location:

Work shall be performed at the Contractors Facility. The Weapons Handling Dolly Assemblies (QTY 96) shall be picked up and returned to NNSY Bldg 276 by the Contractor.

12. Period of Performance (PoP)/ Completion Date/ Delivery Date:

The POP is 9/22/2025 through 7/22/2026. Equipment will need to be returned to NNSY no later than 8/5/2026 to support project schedule for Combat Systems Testing. The Contractor will check in with the NNSY POC prior to and upon completion of work.

Section D: Contact Information

13. Technical POC: