This is a Statement of Work (SOW) for the removal and replacement of an ADA-compliant 16x60 mobile home trailer at the Family Campground at Barksdale AFB, LA. The work is being procured under solicitation FA460825QC007 by the 2d Force Support Squadron.
The contractor must remove a storm-damaged ADA trailer and install a new one in its place at Building 7678, including: disconnecting/reconnecting all utilities, removing/reinstalling A/C units, decks/stairs, and storm shelter, removing/disposing of siding and skirting, re-leveling the pad, and ensuring no aluminum wire is used in the installation. The new unit must maintain the same orientation with the front door facing the roadway. The project requires base access credentials, anti-terrorism training certification, safety plans, and accident reporting procedures. The work location is 6341 Range Road, Barksdale AFB, LA 71110. The damaged unit was rendered irreparable after a tree branch fell through the roof during a storm, and its replacement is necessary as the Family Campground is required to maintain at least one ADA-accessible trailer for patron use.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Recreational Lodging Unit #6 ADA Trailer
Removal/Replacement
Prepared by 2 FSS Barksdale AFB, LA
26 July 2024
FA460825QC007
Attachment 2
1. DESCRIPTION OF WORK:
1.1 Scope: Contractor will be removing and replacing one damaged ADA handicap compliant 16x60 Mobile Home at the Family Campground. Which will include:
1.1.1 Contractor will disconnect all utilities on damaged unit and reconnect all utilities on new unit.
1.1.2 Contractor will disconnect and remove A/C units from damaged unit and reinstall A/C units on the new unit
1.1.3 Contractor will remove front and back deck/stairs from existing unit and reattach to new unit
1.1.4 Contractor will remove and dispose of trailer siding and skirting on damaged unit and install siding and skirting on new unit.
1.1.5 Contractor will remove and dispose of existing damaged unit and related materials (16x60)
1.1.6 Contractor will install new ADA Compliant unit (16x60), With Front Door facing roadway.
1.1.7 Contractor will remove Storm Shelter on damaged unit and reinstall on new unit intergraded with the Front porch, same spot previously positioned.
1.1.8 Contractor will Re-level Unit Pad
1.1.9 Contractor will not use Aluminum wire in the installation.
1.2 Place of Performance: At the Barksdale Fam Camp address: 6341 Range Road, Barksdale AFB, LA 71110, Building Number 7678. ADA Trailer Labeled #6
2. BACKGROUND:
The Family Campground is required to have at a minimum one ADA accessible trailer available for patron use. The unit in question was damaged during a storm, when a tree branch fell through the roof in the front part of the trailer. Causing irreparable damage. The Trailer is equipped with a storm shelter integrated with the Front Porch. The unit has a door located on the front side with stairs and a handicapped entrance. New unit will be oriented in the same direction.
3. DISCUSSION: Contractor will remove and dispose of all materials related to the old unit and place and reinstall the New Unit in place of the damaged unit.
4. SECURITY REQUIREMENTS:
4.1. Visitor Passes: To receive a visitor, pass the contractor must complete a 2 SFS/SFA Form 74, and fax that form to the Contract Administrator. This form will be sent to the successful offer or upon request. This information will be reviewed and forwarded to the passing office.
If a pass is approved, the Commercial Visitor Control Center will issue a SFMIS AF Form 75 (Visitor Pass) to the contractor and his/her employees upon completion of screening process for the duration of the contact. The screening process takes time, and the contractor shall visit the Commercial Visitor Control Center prior to expecting base entry to receive required forms and instruction on the application process, to include estimated time of receiving the visitor pass. Although contractors will not be issued vehicles passes, vehicles
FA460825QC007
are subject to search while on the installation. Employee privately owned vehicles will not be allowed access to restricted/controlled areas without a free zone being established.
Company vehicles will be allowed access to restricted/controlled areas. All Contractor vehicles should have markings with the company name for quick identification of ownership and notification if they are involved in an incident. Conduct Requirements: The contractor shall ensure that his/her employees comply with all base traffic regulations and properly conduct themselves while on the base.
4.2. Retrieving Identification Media. The Contractor shall be responsible for retrieving all identification media including vehicle passes from employees who depart for any reason before the contract expires (e.g., terminate for cause, retirement, etc.)
4.3. The Contractor and contractor employees shall comply with base traffic regulations.
4.4. Weapons, Firearms, Ammunition. Contractor employees are prohibited from possessing weapons, firearms, and ammunition on themselves or within their contractor or privately owned vehicles while on base.
4.5. The Contractor shall be responsible for safeguarding all government property, and controlled forms provided for contractor use. At the end of each work period, Contractor shall secure all Government facilities, equipment, and materials.
4.6. Anti-Terrorism: All contractor employees requiring access to any Federally controlled facility and logical access to Federally controlled information systems except for "national security systems" as defined by 44 U.S.C. 3542(b)(2), should be certified in Level 1 Anti- Terrorism Training. The training is accessible from any computer with access to the World Wide Web and is available at https://atlevel1.dtic.mil/at. The contractor is responsible for ensuring that the training has been satisfactorily completed and that valid certificates of completion have been submitted to the Contracting Officers Representative (COR) with a copy furnished to the Contracting Officer. The Certificates are valid for one year; therefore, training shall be completed every year for the duration of the contract. Unit anti-terrorism managers will be responsible for organizing this level 1 training.
5. SAFETY:
5.1. The Contractor shall have a safety plan for their employees. The Contractor shall instruct each employee in the recognition and avoidance of unsafe conditions and regulations to his or her work environment to control or eliminate any hazards or other exposure to illness or injury. The Contractor shall provide their employees appropriate Personal Protective Equipment (PPE) and mandate proper wear.
6.2 Accident/Incident Reporting and Investigation. Contractor shall record and report to the Famcamp POC all available facts relating to each instance of accidental damage to Government property or injury to either Contractor or Government personnel. The Contractor shall secure the accident scene and wreckage until released by the accident investigative authority through the FamCamp POC. If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.
***************** END OF STATEMENT OF WORK *****************
FA460825QC007
| Statement of Work |
| Recreational Lodging Unit #6 ADA Trailer Removal/Replacement |
| Prepared by 2 FSS Barksdale AFB, LA |
| 26 July 2024 |
| 2. BACKGROUND: |
| 4. SECURITY REQUIREMENTS: |
| 5. SAFETY: |
File details come from the government source that posted it. Updated .