Attachment 2 Statement of Work.pdf

PDF 532 KB Posted

Attached to
Amendment 0001 Puerto Rico-191 Water System Reconstruction Federal contract opportunity
Solicitation number
12441923R0044
Issued by
Department of Agriculture Forest Service

About this file

This statement of work outlines the requirements for a federal contract to reconstruct the PR-191 water system in El Yunque National Forest, Puerto Rico. The project includes replacing waterlines from two existing wells to serve recreation areas, installing a new bypass line between the well systems, and extending distribution lines to additional sites. Key work comprises connecting new lines from the Palo Colorado and Caimitillo wells to their respective tanks, running a line from Palo Colorado tank to various recreation areas, and building a line from Sierra Palm to Yokahu Tower, including a new 10,000 gallon storage tank. The contractor must provide all labor, equipment, and materials to complete the work in accordance with drawings, specifications, and regulations. The contract will be awarded by the Department of Agriculture Forest Service, and the period of performance is defined in the solicitation schedule. The contractor is responsible for safety, traffic control, waste disposal, and protecting environmental and cultural resources throughout the project duration.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0001 Puerto Rico-191 Water System Reconstruction, newest first.
File Type Posted
Attachment 6 RFP Questions and Responses.pdf PDF
SF 30 RFP 12441923R0044 Amendment 0001.pdf PDF
Attachment 7 Site Visit Attendees 14-Aug-2023.pdf PDF
Attachment 1 Schedule of Items.xlsx XLSX spreadsheet
Attachment 3 Drawings.pdf PDF
Attachment 4 Specifications.pdf PDF
SF 1442 RFP 12441923R0044.pdf PDF
Attachment 5 Prior Experience Questionnaire.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 12441923R0044 Statement of Work

PR-191 Water System Project

SECTION C

PR-191 WATER SYSTEM PROJECT

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

A.1 GENERAL INFORMATION

A. Existing Recreational Areas Water System - The existing water distribution system is located within the jurisdiction and boundaries of the US Forest Service, El Yunque National Forest in Rio Grande PR.

B. The water well system at road PR191 serves the recreation areas of Palma de Sierra and Palo Colorado. This existing system is composed of two existing water wells and two existing water reserve tanks. The existing water well system is located along road PR191, starting from Yokahu tower (Km. 8.9 approx.) and ending approximately at Km 12.7.

The Palo Colorado water well is located at PR-9938 km .1, and the Caimitillo water well is located at PR-191 km 11.8. The tanks are found at two different locations, approximately 700 ft. from each other. The production rate of the existing Palo Colorado and Caimitillo water wells is around 20 gpm. The existing Caimitillo Water Tank is located along the Caimitillo trail, approximately 500 ft. from the trailhead at road PR191,

km. 11.7. The existing Palo Colorado water tank is located along the Baño de Oro trail, approximately 900 ft. from the trailhead at road PR191, Km. 12.2.

A.2 SCOPE OF CONTRACT

A. This project includes the reconstruction of the PR-191 main water distribution system.

The Contractor shall provide all personnel, equipment, transportation, supervision, supplies, and support equipment (vehicles), and incidentals to perform this work in accordance with terms, specifications, conditions, and provisions of this solicitation, the contract, laws, rules, and regulations.

1. New Palo Colorado Recreation Area Waterline - The proposed work includes a connection to the existing Palo Colorado well pumphouse and running a supply line to the Palo Colorado tank and then a distribution line from the Palo Colorado tank to Stone House, Bano de Oro, Bano Grande, and Palo Colorado.

2. New Bypass Waterline – The proposed works include a new distribution line from the Palo Colorado Water well system to the Caimitillo Water well system. There is an existing bypass line from the Palo Colorado system that connects to the Caimitillo system.

3. New Caimitillo Recreation Area Waterline - Work includes the connection to the existing Caimitillo well pumphouse and running a new water waterline to the Caimitillo tank. From the Camitillo water storage tank, a new distribution line will feed Caimitillo, Sierra Palm Recreation Area.

4. New Waterline to the Yokahu Tower - Works include a new waterline from the Sierra Palm Recreation Area to the Yocahu Tower (includes a new 10,000-gallon concrete storage tank for Yokahu Tower).

5. Refer to solicited specifications “Section 013300 - Submittal Procedures” for all project submittal requirements.

6. The contractor will be responsible for removal and legally discarding of existing native materials (excavations, topsoils, branches, leaves, wood etc) to the approved USFS Landfill. Any non-native materials (metals, steel, plastic etc) shall be disposed of in an approved landfill off National Forest’s Lands.

7. All work within the project shall include but not limited to installation of air release valves, water meter, waterline stream crossings, bridge anchors, pipe anchors, minor electrical repairs, valves, valve boxes, traffic control, erosion control, and other appurtenances to complete the work as shown on the drawings and indicated in the specifications.

8. The proposed new waterline shall be HDPE pipe with SDR as specified in the Schedule of Items and drawings.

9. The proposed metal is stainless steel.

10. The general intent is for the waterline to be above ground when running through the general forest areas and below ground where visible to the public running alongside the road and within administrative or recreation sites (roads, trail, curb and gutter areas etc).

11. Work shall include horizontal directional drilling in proposed areas, replacement of concrete gutters, and asphalt patching. Work includes demolition of existing above-ground pipe and non-used conduit that is visible to the public. The work is divided into a base bid item, and two option items and they are as described below.

A.3 BASE ITEMS AND OPTIONS DESCRIPTION

a. Base Item: The general intent is to complete all work that is above and including the valve at Sierra Palm for the distribution line that goes to the new Yokahu water storage tank. Specifically, it includes the work from the Palo Colorado well to the Palo Colorado tank, from the Caimitillo well to the Caimitillo tank, the bypass line that connects the two systems, and the distribution lines to Stone House, Bano de Oro, Bano Grande, Palo Colorado, and Sierra Palm.

b. Option 1: The general intent of the item is to complete all work below the valve near the Sierra Palm bridge to and including the valve below the new 10,000-gallon concrete water storage tank. The work includes the bypass around the new water storage tank with the pressure-reducing valve, the new water storage tank, and fencing.

c. Option 2: The general intent of the item is to complete all work below the valve at the new water storage tank to Yokahu Tower. Work includes a side lateral to the Big Tree site.

Quantities associated with these options are identified in the Schedule of Items.

A.4 PROJECT LOCATION

The project location is within the El Yunque National Forest, Rio Grande Municipality, Puerto Rico. It is located approximately 6 miles south of Palmer, Puerto Rico. The project may be accessed from PR-191.

All construction is within the El Yunque National Forest boundaries within the La Mina and Big Tree Trail’s Forest Recreation Area sites, and roadway and trails prisms. The solicited work and project location is within a remote rural/mountainous locations, steep, narrow, and brushy terrain.

The existing trail systems has an average existing width of 2’ – 3’. Some widths may vary on trails. Existing trail access treadway surface may be very narrow with a variety of finished surface which include but not limited to aggregate, asphalt, and concrete finished surfaces.

Some trails may include existing reinforced concrete stairs.

A vicinity and project location map are provided and enclosed in the attached solicitation drawings.

A.5 SITE INFORMATION AND LIMITATIONS

A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

a. PR-191 and recreation sites shall be open to the public during construction. The Contractor shall be responsible for signing and limiting public access to construction areas.

b. There is multiple ongoing construction in the PR 191 Recreation Areas. Therefore, project proximity, road usage, and project disturbance limits shall be limited to the footprint and routes as found in the solicited drawings. The contractor shall always maintain close coordination with the CO and COR as construction progresses.

Close attention to traffic ADT volume and road usage by other vendors are required by the contractor which shall also be reflected in the contractor’s Traffic Control Plan.

c. The El Yunque National Forest can receive rainfall of over 240 inches (6.1 m) per year. The contractor shall be responsible for always monitoring the local weather conditions during project duration. An unexpected or unanticipated rain shower can develop anytime without warning, which may impact the construction activities.

The contractor shall be responsible for protecting all of their stockpiled material from damages, corrosion, segregations, monitoring and enforcement of their erosion control mitigation measures, resource damage mitigation, and always protecting any concrete work during contract duration.

d. Rain showers can affect concrete activities which can compromise the concrete strength (f’c) and its finishing. Even if rain precipitation isn’t predicted, the contractor shall always be prepared to cover the concrete and/or stockpiles with a tarp, plastic sheeting, and any other approved method at all times. The contractor shall be sure to seal the edges of their materials to ensure rainwater can’t seep underneath which may impact the integrity of its properties and intentions.

Hurricane Season typically begins on June 1.

e. The contractor shall be responsible for any damage to existing structures that are not a part of the design or contract requirements for replacement and/or rehabilitation. Any damages occurred by the contractor may be repaired at no additional cost to the government.

f. The contractor shall sequence operations to always keep Palo Colorado or the Caimitillo water well system operational and shall coordinate system operational periods with the Contracting Officer.

g. No helicopter flights are allowed for this project.

A.6 OPERATIONAL HOURS

A. Normal Operational hours are approximately from 06:30 am to 5:30 PM Atlantic Standard Time, Monday through Friday (Federal Holidays excluded). Weekend work may be permitted with written approval from the Contracting Officer (C.O.) prior.

a. Federal Holidays:

1. New Year’s Day – January 1st

2. Martin Luther King Junior’s Birthday – Third Monday in January

3. President’s Day – Third Monday in February

4. Memorial Day – Last Monday in May

5. Juneteenth -- Third Monday in June

6. Independence Day – July 4th

7. Labor Day – First Monday in September

8. Columbus Day – Second Monday in October

9. Veteran’s Day – November 11th

10. Thanksgiving Day – Fourth Thursday in November

11. Christmas Day – December 25th

A.7 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS

a. The work shall conform to the specifications and drawings provided in the awarded contract. If there’s a discrepancy between drawings and specifications, the specifications shall take precedence.

b. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" follows reasonable and customary manufacturing and construction tolerances.

1. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

2. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

3. Government inspections and tests are for the sole benefit of the Government and do not—

i. Relieve the Contractor of responsibility for providing adequate quality control measures for duration of contract;

ii. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance.

iii. Constitute or imply acceptance; or

iv. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.

4. The presence or absence of a Government’s COR or Government Technical

Monitor (GTM) does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

5. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

6. The Contractor shall without charge to the Govt., replace or correct work found by the Government that is not conforming to the contract requirements. The Contractor shall promptly segregate and remove rejected material from the premises and legally off govt. lands.

7. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

8. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.

A.8 SAFETY

a. The contractor shall be responsible for providing an “Accident Prevention Plan” as covered in the Specifications Section 013300 Subsection 3.2

b. During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction or the US Army Corps of Engineers “Safety and Health Requirements Manual”, Sept 15 2008 (free online) whichever is more stringent. Smoking will not be permitted in any building, structure, or throughout the Forest. Fire precautions to prevent wildfire shall be included or initiated when weather and site conditions pose a significant opportunity for ignition of wildfire.

c. The Contractor shall abide by all Federal and State laws pertaining to the health and safety of individuals and equipment on the worksite. This includes minors working or observing the operations of the work in the field.

A.9 TRAFFIC MANAGEMENT / & TRAIL CLOSURE

a. The contractor shall be responsible for providing an “Traffic Control Plan” as covered in the Specifications Section 013300 Subsection 3.2

b. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until the traffic control plan is approved in writing by the CO.

c. The Contractor’s Traffic Control Plan shall additionally include erection of warning signs in advance to any place on the project where operations may interfere with the use of the roadway or trail by traffic and at all intermediate points, where the new work crosses or coincides with an existing roadway or trail work. The Contractor shall post warning signs on each end of the section of roadway or trail being worked. Signs are to be of the size, quantity, and colors as required in the current edition of the "Manual on Uniform Traffic Control Devises", (MUTCD). These signs shall be moved as needed to properly delineate and identify the section of the roadway or trail that are disturbed during waterline construction activities. All slow-moving equipment is to have a reflectorized "slow-moving" vehicle emblem properly attached.

d. The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public and their workers.

e. All work requiring the closure of a road and/or trail must be scheduled and approved by the Contracting Officer (CO) in writing prior to the commencement of that portion of work.

If for any reason traffic hazards (segments of unfinished work which may present a hazard such as rolls of surface material, berms on the shoulder, etc.) are left in or adjacent to the trail after normal working hours, the work is to be properly signed before and after the hazardous area with a Hazardous and/or Warning Sign(s). Signs shall provide adequate visibility and legibility conforming to Table 2A-3. Minimum Maintained Retroreflectivity of the MUTCD.

f. The MUTCD can be downloaded for free at https://mutcd.fhwa.dot.gov/

A.10 WORK CAMPS, STAGING, AND STORAGE AREAS

a. Areas for staging operations and storage of materials shall be as indicated on the Drawings and as approved by the CO.

b. There are multiple ongoing constructions at the Recreation Areas, therefore some of the staging areas will not be available for a period of time and the use of the contractor’s space needs shall be coordinated prior to its occupation. All contractor’s coordination shall be coordinated with the C.O. a minimum of 4 weeks in advance.

c. No overnight camping will be allowed on site.

d. The Government will not provide any security for the contractor’s storage/staging areas.

e. The Contractor shall be responsible for protecting their own materials stockpiled against adverse weather, damage, theft, and other risks of loss. The Government assumes no responsibility for material, theft of property, damage, or equipment left in the storage area and/or project site.

1. SANITARY FACILITIES: Toilet facilities will not be provided by the Government at project sites.

2. WATER: Water is available at the site for construction purposes as long as the water system is operational. The USFS will supply water to the contractor utilizing the existing water wells to pump and charge the new installed line. This operation will require coordination between the contractor, CO, COR, and the Forest since it will ultimately impact the existing system causing one of the systems to not be operational during time of charging, testing, chlorination, and flushing. All contractor’s coordination shall be coordinated with the C.O. a minimum of 2 weeks in advance.

3. ELECTRICITY: Not available

4. TELEPHONE: Cell phone coverage may not be available throughout 98% of the project proximity; the closest supply sources may be in Rio Grande, Puerto Rico which is 6.90 miles (11.1 Km) north of the project location.

A.11 INSPECTION OF WORKSITE

a. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

A.12 WILDLIFE AND PLANTING MITIGATIONS AND PROTECTIONS.

A. Plants

a. Erosion control materials will be made from biodegradable materials to the extent possible and be sterile (free of any plant material). No hay or straw will be used unless it is certified weed-free.

b. Only native species will be planted. Species to be planted are to be reviewed and approved by Forest Ecologist in advance.

c. Known invasive non-native plant locations in the project area will be flagged and GPS. Any equipment that operates in the flagged invasive plant area must be washed before moving outside of the invasive plant area.

d. Invasive species will be removed using hand tools and covered with biodegradable black plastic tarp to decompose.

e. All vehicles and construction equipment will need to be inspected at the forest entrance for any potential invasive plants.

f. Known locations of federally listed plants will be flagged, for no cutting and no ground disturbance within the flagged area.

g. Before cutting or removal of trees, trees will be inspected for presence of birds and bird nests. Trees will be removed once they are not being occupied or used by birds and approved by Forest Biologist and Forest Ecologist.

h. If trees will be cut, and after approval by Forest Biologist and Forest Ecologist, the Forest Ecologist will determine if trees are salvageable. If so, he will determine where the tree(s) must be taken.

B. Puerto Rican Broad-winged hawk

1. If an active broad-winged hawk nest or roost is found during surveys

February 1 through July 1: no work or human activities within 150 feet (46 m) of nest or roost.

February 1 through August 1: noise cannot exceed 86 decibels when measured within 450 feet (150 meters) of nest or roost.

2. Noise barriers and noise absorption materials can be used around project work to reduce sound.

3. Monthly monitoring of nest or roost by biologist during project work.

No cutting or removal of mature trees of 8 inches (25 cm) d.b.h. or greater within 900 feet (300 meters) of the nest or roost.

C. Sharp -Shinned Hawk

1. If an active sharp-shinned hawk nest or roost is found during surveys:

a. Ground surveys will commence to locate the nest or roost tree.

b. March 1 through July 1: noise cannot exceed 96 decibels1 when measured within 50 feet (15.2 m) of the nest or roost.

c. Monthly monitoring of nest or roost by biologists during project work.

d. No cutting or removal of mature trees of 8 inches (25 cm) d.b.h. or greater within 150 feet (50 meters) of the nest or roost.

D. Puerto Rican Boa

1. Before heavy equipment including excavator, backhoe, skidsteer, are used in an area, a qualified person2 is to inspect equipment to search for and remove boas from the equipment. Particular attention to the wheels, wheel wells, grills, and engines.

The qualification to remove a boa is that the individual shall have a Fish and Wildlife handling permit to touch/remove the boa.

2. Before grubbing or chainsaw work to remove woody debris, trees, or logs, search for and remove boas from woody debris.

3. If boas are found alive, they will be relocated by a qualified person2 to adjacent forested areas away from the work area that has woody debris and in the shade of

1 Sharp-shinned hawks in Maricao State Forest have shown no disturbance effects from routine use of weed trimmer under nest (Weaver, 2020). The average weed trimmer produces 96 decibels of sound.

2 Person approved by FWS to identify and handle the Puerto Rican Boa.

the canopy of the trees. If dead boas are found, after documentation, it will be buried more than 164 feet (50 m) from buildings or trails.

4. All instances where boas are seen, seen, relocated, or harmed, will be documented.

Documentation will include a picture (when possible), date, time, latitude and longitude of the location of boa, the type of action taken with boa (if any), and any harm to boa. Documentation will be shared with US Fish and Wildlife Service and Forest Service Forest Biologist.

5. Prior to clearing vegetation, the area will be surveyed twice by a qualified person – once the day before and once the morning of clearing vegetation.

E. Erosion Control & Aquatic Fauna

1 .Ensure that all erosion control materials use mesh openings 0.5 inch (1.3 cm) or smaller (no mesh is best) to prevent strangling of Puerto Rican Boas, and are made of biodegradable materials (jute mat, fiber mat, erosion control mat, certified weed-free straw), or are removed from the site at the end of the sediment control plan period and are to be sterile to prevent the introduction of invasive weeds. The plastic in straw waddles needs removal at the end of the sediment control plan period. No hay or straw will be used unless it is certified weed-free.

2. Follow standard BMPs for preventing pollution from entering water courses including:

a. Use of protective tarps or covering of ground when mixing concrete and mix concrete at least 328 feet (100 m) away from standing or flowing water bodies when possible. If concrete is to be mixed closer than 328 feet (100 m) to water bodies, then a concrete spill prevention plan will be developed and approved in advance.

b. Use of gasoline- or diesel-powered equipment requires the development of a spill protection planto be reviewed and approved in advance. Refilling gasoline powered equipment to occur when equipment is not in or immediately adjacent to waterbodies, and equipment is on top of protective spill protection device.

Storage of gasoline containers more than 328 feet (100 m) from standing or flowing water bodies, and to occur on top of protective spill protection device.

c. Construction debris is removed from site.

3. Follow standard BMPs construction instream including:

a. For work that is on the streambanks or instream, project work is to occur in low flow conditions.

i. Work areas will be isolated from stream flows with barriers to limit increases in sedimentation of the streams.

b. After work is completed in isolated area, allow sediment to settle, remove construction debris and remove pollutants prior to removing barriers and reconnecting the work area to the rest of the stream.

c. Work instream will be scheduled so that the part of the stream that is isolated from work areas may flow uninhibited at all times.

d. Mechanical equipment used instream will use vegetable oil instead of hydraulic fluids.

4. General mitigations:

a. Do not play music loudly at the work sites.

b. No feeding of wild animals nor domestic animals on the forest.

c. Cap the ends of the old pipes to prevent wildlife from getting stranded.

d. Vegetation would be cleared by hand with machetes and chainsaws.

A.13 CONTRACT TIME

a. Refer to the solicitation schedule for contract period of performance.

A.14 CONTROL OF NOXIOUS WEEDS – CLEANING OF EQUIPMENT

a. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. The contractor shall notify the Contracting Officer a minimum of 1-week in advance to coordinate timing and location of inspection before mobilizing to the National Forest.

A.15 FINAL ACCEPTANCE

a. The Government may inspect, sample, or test work before final acceptance of the project. The contractor shall maintain the work during construction and until the project is accepted. The contractor will be responsible for repairing damage caused by the Contractor before final acceptance of the entire project at no cost to the Government.

See FAR Clause 52.236-11 Use and Possession Prior to Completion.

b. The contractor shall notify the CO when the entire project is complete to schedule an inspection or an inspection in phases. If work is determined to be complete, the inspection will constitute the final inspection. The Contractor will be notified in writing of final acceptance as of the date of the final inspection. Final acceptance relieves the Contractor of further responsibility for the maintenance of the project.

c. If the inspection discloses unsatisfactory work, the CO will provide to the Contractor with a list of the work that is incomplete or requires correction. Immediately complete or correct the work. Submit notification when the work has been completed as provided above.

d. After project final acceptance, the contractor shall provide a 1-year construction warranty for the project finished work in its entirety. This warranty shall continue for a period of 1 year from the date of final acceptance of the work per “Far Clause 52.246- 21 Warranty of Construction.”

A.16 SPECIFICATIONS

a. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made.

Section 010250 - Construction Staking Section 011250 - Measurement And Payment Section 011500 - Archeological Protection Section 011700 - Accident Prevention Section 011900 - Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 015100 - Temporary Traffic Control Section 017320 - Selective Demolition Section 023701 – Sediment, Pollution, And Erosion Control Measures Section 024100 - Waste Material Disposal Section 024102 - Removal And Disposal Of Structures And Obstructions Section 033000 - Cast-In-Place Concrete Section 033020 - Concrete From Packaged Dry Mix For Minor Structures Section 033530 - Cast-In-Place Concrete Gutter Section 048600 - Stone Veneer Section 221100 - Water Distribution Systems Section 221102 - Curb Valves And Boxes Section 221103 – Plumbing Appurtenances Section 221105 - Water Hydrants Section 221219 - Aboveground Concrete Rectangular Potable-Water Storage Tanks Section 260500 - Common Work Results For Electrical Section 311000 - Clearing And Grubbing Section 312000 - Earthwork Section 321200 - Hot-Mix Asphalt Paving Section 321204 - Crushed Aggregate Base Or Surface Course Section 322705 - Pavement Sawing Section 323113 - Chain-Link Fences And Gates Section 330523 - Utility Horizontal Directional Drilling

END OF SECTION C