This Statement of Work (SOW) details the requirements for operating and maintaining the North Central Lagoon Wastewater Treatment Facility for the Allegheny National Forest located in Bradford, Pennsylvania. The contract covers a base period from award to 13APR2026 with potential for 4 additional option years, requiring a certified wastewater treatment plant operator to perform comprehensive system operations including daily maintenance, effluent testing, recordkeeping, and reporting in accordance with NPDES permit requirements and Pennsylvania Department of Environmental Protection regulations.
Key operational responsibilities include seasonal startup and shutdown procedures, monthly and seasonal sampling of effluent and test wells, maintaining aeration lagoons, monitoring spray irrigation fields, and managing a complex wastewater treatment system that processes sewage from forest recreation area vault toilets and the Bradford Ranger Station. The operator must have a minimum of 3 years wastewater treatment plant experience, meet all PADEP operator requirements, and perform detailed recordkeeping including condition surveys, maintenance logs, flow logs, and monthly electronic monitoring reports. The facility operates year-round, with active spray irrigation permitted between March 15 and November 15, and functions as a holding pond during winter months.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Request for Services: Certified Wastewater Treatment Plant Operator at Bradford Ranger District Office (29 Forest Service Drive, Bradford, PA 16701).
Period of Performance:
Base – Date of Award to 13APR2026 with the possibility of 4 option years.
Description of Work:
The Allegheny National Forest is soliciting a contract for the operation, maintenance, testing, record keeping and reporting of the North Central Lagoon at the Bradford Ranger Station. The Bradford Office is located at 29 Forest Service Drive, Bradford, PA. The contractor is required to furnish all labor, material, equipment, tools, transportation and supplies sufficient to operate the system. No repairs to the system are authorized as part of this contract.
Bradford Ranger District Office:
The Bradford Ranger District Office NCL Operation and Maintenance Manual will be supplied to the successful bidder. The contractor is required to adhere to standards set forth in both the Operation and Maintenance Manual and the Water Quality Permit. Note: References of “supplies of repair parts” that are not associated with daily operation and performing repairs within the standard Operation and Maintenance of the system are not included as part of this contract.
Bradford Ranger District Office General Description: North Central Lagoon The Bradford Ranger District Office is located at 29 Forest Service Drive within the Allegheny National Forest. The Public Water System Name is “USDA Bradford Ranger Station” and the PWS ID is 6420303. This system has monthly, annual, and triennial monitoring requirements.
The North Central Lagoon Wastewater Treatment Facility (Facility) is located within the Allegheny Nation Forest, Corydon Township, McKean County, Pennsylvania. Specifically, the Facility is located adjacent to the Bradford Ranger Station/Administrative Site (Bradford Station), on the southwest corner of the intersection of PA Routes 59 and 321, approximately 15 miles west of Bradford, PA.
The Facility was originally constructed in 1976 to treat and dispose of two primary sources of sewage flow:
1. Sewage collected from various vault toilets and holding tanks located throughout the Allegheny National Forest recreation areas, and
2. Sewage pumped directly from the Bradford Station.
The North Central Lagoon wastewater treatment facility includes a receiving pit with coarse bar screen, a comminutor, a primary aeration lagoon, a chlorine contact tank, a holding pond, a spray irrigation pump, and a spray irrigation field. The facility also contains a small control building which houses electrical and pump controls, chemicals, and a hydro-pneumatic water tank. A duplex grinder pump station is located off-site to pump sewage from the Bradford Ranger Station to the Facility.
The system is operational year-round, spraying is permitted between March 15 and November 15. During the winter months, the Facility acts as a large holding pond. The water level in the lagoon is pumped down in the late fall, and sewage from the Bradford Station slowly fills the lagoon over the winter. No vault sewage is delivered to the Facility during this time, and no spray irrigation occurs throughout the winter.
Typical operations include adjusting control timers for proper aeration, setting irrigation pumping cycles, testing effluent to determine suitability for spraying, screening and grinding incoming truckloads of waste, and general recordkeeping. Maintenance includes cleaning and maintaining equipment, yard piping, and structures as well as general cleanliness and landscaping of the Facility.
A. Source protection – Systems should inspect the areas around their sources for any new sources of contamination.
B. Disinfection Treatment (if applicable) – Systems should perform routine maintenance on all disinfection treatment equipment.
C. Other Treatment (if applicable) – Systems should perform routine maintenance on all wastewater treatment equipment.
D. Storage (if applicable) – Systems should inspect lagoon liners for any possible holes for repair if needed.
E. Monthly Sampling – Systems are required to collect wastewater samples and verify with the laboratory that there are no contaminants present. A monthly sample must be collected at evenly spaced time intervals, from May through October.
Seasonal Startup and Shutdown Procedures
A. Spring Startup
Bradford Pump Station
This system is in operation year-round. The pumps require no lubrication under normal operating conditions. Conduct a visual inspection of the system daily while the pumps are in operation to ensure they are operating as designed. This can be accomplished by manually operating the mercury switches, if necessary.
Receiving Pit
1. Make sure the receiving pit and bar screen is clean and free of debris.
2. Make sure wooden baffles are in working order.
Comminutor
1. Remove plastic cover from the comminutor control panel.
2. Perform scheduled maintenance on the slow and high-speed shaft bearings and reduction mechanism. Use only recommended lubricants. See Comminutor Manual, located in Appendix F.
Aeration Lagoon and Holding Pond
1. Make a visual check of the exposed Hypalon liner checking for holes caused by ice, rodents, etc. Make any repairs necessary with manufacturer approved repair kits.
2. Replace the three aerators in the lagoon. Check electric cable for tight connections and make sure there are no worn spots in outer covering of the wires. Anchor aerators into position with cables.
3. Set the 3 time clocks and turn on electrical circuit breakers checking to see that each aerator operates.
4. Check lagoon monitoring wells for liner leakage. If water is in the pipe, collect a sample and have it tested for fecal coliform bacteria. Facility Engineer should be contacted if fecal coliform bacteria are present.
Irrigation Pump
1. Replace Hydr-O-Grind Pump in the pump station and hook up to discharge pipe.
2. Remove plastic cover from control panel.
Spray Irrigation Field
1. Replace Water Meter.
2. Remove plastic covers from each of the sprinklers.
3. Close valve on the drain line and replace the plug in the outlet end of the valve.
4. Open the valve (inside valve box) on the irrigation line.
5. Turn circuit breaker ON at the irrigation pump control box.
6. Set timer at control panel for desired spray cycle and turn pump control ON. While the pump is in operation, see that it is operating the mercury switches.
7. Adjust the line pressure to the sprinklers to 35 PSI. The valve and pressure gauge are located inside the valve box.
8. Sprinkler heads should be checked visually while working to ensure they are functioning properly.
9. Record the reading on the water meter to make sure no more than 14,400 gallons per week are sprayed.
Facility Water System
1. Replace water meter in supply line at the well.
2. Close drain line behind the control building.
3. Open valve to pressure tank.
4. Close sink faucet and two hose bibs.
5. Turn circuit breaker ON to start pump.
6. Check water meter to see that pump is working.
7. While the well is pumping, check the pump. Draw down tube for static water level is in the well.
Control Building
1. Replace drain plug in service sink trap.
2. Fill chlorinator feed tubes with Sanuril - 115 chlorine tablets.
3. Turn circuit breaker ON to the irrigation pump.
B. Fall Shutdown
Bradford Pump Station
This system is in operation year-round. The pumps require no lubrication under normal operating conditions. Conduct a daily visual inspection of the system while the pumps are in operation to determine if they are operating as designed. This can be accomplished by manually operating the mercury switches, if necessary.
Receiving Pit
1. Make sure that the receiving pit and manual bar screen are clean and free of all debris.
Comminutor Pit
1. Cover the control panel with plastic.
2. Check inside manhole to make sure the drain line is open.
Aeration Lagoon and Holding Pond
Aeration Lagoon:
1. Three days after the last load of sewage has been dumped into the lagoon, two of the aerators can be removed for the winter. Shut the circuit breaker OFF on the two aerators that are being removed.
2. The lagoon volume required for the sewage from the Bradford Ranger Station and winter precipitation necessitates lowering the lagoon three feet below normal operating level. This will be a manual operation. Lower water level to the 25th bolt on the loading dock
During the shut-down period, it will be necessary to spray 14,400 gallons three times per week for six weeks. The upper two feet of drawdown can be achieved by opening the upper draw down valve, which will drain through the chlorinator. Once the holding pond reaches normal operating level, shut the valve, and set the time clock to operate for twenty hours. Every other day, repeat the same procedure until the lagoon level has dropped to the elevation of the drawdown pipe. The last one foot of sewage will have to be drained out by opening the lagoon drain valve. An automatic chlorinator will have to be set up to add chlorine while draining the lagoon by this method. Again, fill the holding pond to normal operating level. Allow the sewage to set overnight in the holding pond before starting the spray irrigation. Repeat this procedure until there is only one foot of sewage over the bottom of the aerator dock.
3. The last aerator should be removed for the winter. Shut the circuit breaker OFF. Cover the aerators with plastic to protect them from the elements. It may be necessary to use a rowboat to remove the last aerator.
Holding Pond:
Beginning on or around September 1, keep Holding Pond pumped down to lowest level.
Irrigation Pump
1. Shut the circuit breaker for the irrigation pump to the OFF position.
2. Disconnect pump, remove it from the manhole, and store it at the Ranger Station garage workshop.
3. Cover the control panel with plastic. DO NOT shut the electricity off to the controls. The control panel has a strip heater inside to keep the controls dry.
Spray Irrigation Field
1. Remove the plug from the valve at the end of the line and open the valve. This will allow the system to drain.
2. Cover the sprinklers with plastic covers.
3. Open the valve in the valve box.
4. Remove the water meter.
Facility Water System
1. Turn the circuit breaker to the water well OFF.
2. Open the drain line behind the control building.
3. Open sink faucet and 2 hose bibs (#1) outside control building (#2) at Comminutor Pit.
4. After the pressure is off the system, drain the water pressure tank.
5. Remove the water meter at the well and store it at Ranger Station garage workshop.
Control Building
1. Remove tablets from chlorinator feed tubes (Sanuril - 115 chlorine tablets) and store in an airtight container.
Sampling, Testing and Monitoring
Sampling and testing of the treated effluent must be completed on a regularly scheduled basis and as required by the facilities NPDES discharge permit. The operator is responsible for collecting effluent samples and delivering them to the Contract Laboratory. Samples shall be collected two times per month from May through November.
Effluent samples shall be collected from the sampling port located just past the flow meter on the effluent pipe from the spray irrigation pump to the spray field. Samples shall be analyzed for the parameters listed on the DMR.
There are six test wells in the spray irrigation area that should be tested for fecal coliform bacteria every other month, starting in June and ending in October. Any positive tests will be reported to the Forest Engineer. Additionally, if there is water in the treatment lagoon monitoring wells, collect a sample from the wells and have the sample tested for fecal coliform bacteria. Directions for taking these samples are included below. Samples will be taken by the operator and run by the approved contract laboratory.
All testing and sampling shall be conducted in accordance with applicable permit limitations and in compliance with all EPA and Pennsylvania Department of Environmental Protection (PA DEP) regulations. Sampling and testing shall be conducted by a Pennsylvania certified wastewater plant operator.
All test results should be mailed to the Forest Engineer and should be added to this Manual in Appendix G.
The procedure for collecting bacteriological samples consists of the following:
1. Obtain sample bottles and forms from the approved laboratory.
2. Wash hands and wear latex gloves if possible.
3. Take samples from all approved sampling locations.
4. Avoid contamination of the sample during collection. Keep the sample bottle closed until the sample is collected. Do not touch the threads on the cap or the neck of the sample bottle and do not place the cap on the ground. Do not rinse the sample bottle before collecting the sample, as sometimes chemicals are added to neutralize residual chlorine in the sample.
5. Hold the sample bottle near the bottom, fill it ¾ full, and replace the cap immediately.
6. Label the sample bottle, fill out the collection form, and deliver the form and sample to the laboratory. Keep a copy of the form for your records.
7. Samples should be kept upright and refrigerated or kept on ice. Deliver the samples to the laboratory within 4 hours of being collected and before the contract laboratory closes for the day. Coordinate sample times with the contract laboratory. It is best to collect bacteria samples first thing in the morning and deliver them to the laboratory by noon so that all holding times are maintained. The holding time for fecal Coliform bacteria is 6 hours.
Recordkeeping and Reporting
It is important to keep records of all condition surveys, water quality testing, DMRs, data logs, routine maintenance, and equipment repairs/replacements. Ensure that updated manufacturer’s literature is added to this manual when components are added or replaced. Copies of all reports and tests should be added to this manual. Copies of state required parameter testing shall be kept for a minimum of 5 years.
Wastewater System Condition Survey
A condition survey is a physical inspection of the wastewater treatment facility. The survey should be conducted annually to assess the overall condition and operation of the facility. The survey should note any recent alterations or additions to the system or the facility equipment, recommend any corrections to system operation or equipment replacement, and note any potential facility issues.
A Wastewater System Condition Survey generally includes the following:
1. Description of site features.
2. Assessment of treatment tanks.
3. Assessment of treatment equipment.
4. Description of small equipment enclosures (not on building inventory).
5. Miscellaneous equipment and records.
6. Assessment of the collection system.
Ideally, condition surveys can be conducted semi-annually for efficient, ongoing system operation. Condition surveys conducted in the fall after shut-down can identify issues that should be corrected before start-up of the next season. Plans can be made, and parts can be ordered during the winter to prepare for early season maintenance. Condition surveys conducted in the spring before start-up can identify any damage or necessary repair from vandalism, storms, frost action, etc. All condition surveys should be added to this manual in Appendix H, including any notes, sketches, and correspondence regarding facility issues. Condition Surveys are required each Spring before start-up and are encouraged in the Fall, but not required.
Recordkeeping and Testing Results All flow and treatment records as well as wastewater testing results should be added to this manual. Laboratory testing data (Appendix H) and DMRs (Appendix I) should be added to this manual as they are received/generated.
Maintenance Log Keep an updated log of all maintenance activities performed, including the location and any problems encountered. Copies of the maintenance log should be added to this manual at the end of each operating season.
Flow Logs Flow logs showing the cumulative flow meter readings and the daily flows pumped to the spray field should be added to Appendix K at the end of each year. Insert all logs showing the total volume of wastewater received at the facility each day in Appendix K.
Responsibilities and Certification of Key Personnel Operator Qualifications: The Operator shall have a minimum 3 years of experience operating wastewater treatment plants. The Operator shall meet all PADEP Water Treatment Plant Operator Requirements sufficient to operate this facility. The Operator will have all required credentials and licenses and must provide them in response to solicitation.
The system operator will provide names and responsibilities of staff responsible for managerial decisions, fiscal decision, operations, maintenance, ordering supplies, taking tests, sending test results to the state and Forest Service permit administrator, performing annual inspections, etc. as applicable.
The “Current Operator and Backup Operator” form below should be kept up to date. The facility operator will be responsible for completing and submitting the DEP Available Operator Annual Report Form. If the operator changes at any time, the DEP Change of Available Operator Form shall be completed and submitted to the DEP within 10 days of the change in operators.
Current Operator and Backup Operator Form
KEEP THIS FORM UP TO DATE
| Date |
| Operator Name and Telephone Numbers |
| Backup Operator Name and Telephone Numbers |
Name:
Work:
Cell:
Home:
Name:
Work:
Cell:
Home:
Name:
Cell:
Home:
Name:
Work:
Name:
Cell:
Home:
Name:
Work:
Name:
Cell:
Home:
Name:
Work:
Name:
Cell:
Home:
Name:
Work:
Name:
Cell:
Home:
Name:
Work:
Required Certification:
Operator Qualifications: The Operator shall have a minimum 3 years of experience operating wastewater treatment plants. The Operator shall meet all PADEP Water Treatment Plant Operator Requirements sufficient to operate this facility. Credentials and licenses for the Operator shall be provided with response to solicitation.
SAFETY AND HEALTH:
References: In addition to publications referenced in the Contract, the following Code of Federal Regulations (CFR) publications designate and define hazardous materials and conditions and establish procedures for handling these materials and conditions.
· 29 CFR, Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards.
· 29 CFR, Part 1926: OSHA Construction Industry Standards.
· 40 CFR, Part 61: National Emission Standards for Hazardous Air Pollutants.
· 40 CFR, Part 261: Environmental Protection Agency (EPA) Characteristics of Hazardous Waste.
· 40 CFR, Part 761, EPA Polychlorinated Biphenyls (PCBs), Manufacturing, Processing, Distribution in Commerce and Use Prohibitions.
Acquisition of Publications: Referenced CFR publications may be purchased from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402.
SAFETY MEETING
Prior to commencing work, representatives of the Contractor, shall meet with the Government to review the contractor’s safety and health program. The Contractor's safety and health program shall be reviewed, and implementation of safety and health provisions pertinent to the work shall be discussed.
COMPLIANCE WITH REGULATIONS
Contractor Responsibility: The contractor shall assume full responsibility and liability for compliance with all applicable codes, standards and regulations pertaining to the health and safety of personnel during the execution of the work. The contractor shall have written safety and health programs in compliance with 29 CFR Parts 1910 and 1926.
SUBMITTALS
Safety and Health Programs: The contractor shall submit, for approval, copies of the project safety and health programs, as applicable to the work scope, or required as the result of the safety meeting, including but not necessarily limited to the following:
· Occupational Noise Exposure
· Fall Protection
· Personnel Protective Equipment
· Control of Hazardous Energy
· Confined Spaces
· Heavy Equipment Operation
PERSONNEL PROTECTIVE EQUIPMENT
Special facilities, devices, equipment, and similar items used by the contractor in execution of the work shall comply with 29 CFR Part 1910, Subpart I and other applicable regulations.
EMERGENCY SUSPENSION OF WORK
When the contractor is notified by the Government, of noncompliance with safety or health provisions of the contract, the contractor shall immediately, correct the unsafe or unhealthy condition. If the contractor fails to comply promptly, all or part of the work will be stopped by Government notice. The contractor shall not be allowed any extension of time or compensation for damages in connection with a work stoppage for unsafe or unhealthy conditions.
Reporting and Sampling:
Wastewater data must be submitted on the monthly Electronic Monitoring Reports (EDMRs) digitally and received by the DEP monthly.
PROTECTION OF PERSONNEL
The Contractor shall take all necessary precautions to prevent injury to the public, occupants, or damage to property of others.
ENVIRONMENTAL PROTECTION
Dispose of solid, liquid, and gaseous contaminants in accordance with local codes, laws, ordinances, and regulations.
Comply with applicable federal, state, and local noise control laws, ordinances, and regulations, including but not limited to 29 CFR 1910.95 and 29 CFR 1926.52.
Additional Requirements:
· Inform Contracting Officers Representative (COR) of mechanical problems, required repairs or maintenance activities required beyond the scope of this contract. Notification must be made in writing to the COR within 24 hours of discovery of problem.
· Perform general maintenance, such as cleaning.