Attachment 2 SOW.pdf
PDF 692 KB Posted
- Attached to
- BAFB Main Base Housing Switching Station
- Solicitation number
- FA460825QS060
About this file
This Statement of Work (SOW) details the replacement of existing switchgear with S&C Vista switches at the Main Base Housing switching station for Barksdale Air Force Base. The 2 CES/CEOFE Electrical section will provide three switches, including replacement relay switches from two Models 321 and two Model 523. The contractor is responsible for removing relays and equipment from the existing cabinets, installing them into the Housing cabinet panel, and programming the switches to mimic existing relays.
Key requirements include protecting 15kV cable during removal/installation, using new parts for all connections, providing any additional cable for circuit extensions, and working only between 07:30 a.m. and 4:30 p.m., excluding federal holidays and weekends. The contractor must coordinate with the Contracting Officer, notify points of contact when moving onto the work site, protect building property, control dust and toxic fumes, and clean up the work site daily. All demolished equipment and debris must be removed upon project completion, leaving the area in an acceptable condition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SwitchGears Amendment 1.pdf | ||
| Attachment 4.pdf | ||
| Attachment 3 BID SCHEDULE.pdf | ||
| Attachment 1 Provisions and Clauses FA460825QS060.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DESCRIPTION OF WORK: Replace all existing switchgear with S&C Vista switches at Main Base Housing switching station. 2 CES/CEOFE Electrical section will provide the three switches needed. CEOFE Electrical section will provide replacement relay switches from two available Switches, Models 321 and two Model 523. The contractor is responsible for removal of relays and any additional equipment/hardware from the Models 321 and two Model 523 cabinets to be installed into the Housing cabinet panel. The three switches must be programmed to mimic those of the existing relays. 2 CES will dispose of all removed switchgear components/hardware. The contractor shall ensure all switch gear components/hardware removed from the Housing switch station is accomplished without damaging existing incoming and outgoing cable feed wiring, components, and circuits. The contractor shall only be responsible for protecting the incoming and outgoing 15kV cable and maintained throughout removal/installation of Housing switchgear components. See attachment 1 Vista Switch diagram. All secondary wiring and connections to the existing switchgear will not be needed for the Vista switches. All connections to Vista switches and/or junction boxes and splices will be made with new parts. Any additional cable necessary for circuit extensions needs to be provided by the contractor.
A. The contractor shall manage all data created for Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the AF Records Management procedures in Air Force Instruction (AFI) 33-332, Air Force Manual (AFMAN) 33-363, and Air Force Instruction (AFI) 33-364 (or their subsequent replacements).
B. FIELD CONDITIONS: The contractor shall be responsible for all field measurements to accomplish work. Quantity and sizes of materials shall be determined from site visits and drawings. The contractor shall carefully examine the entire site and building and shall make all necessary investigations to become thoroughly aware of the existing conditions and all difficulties involved in the completion of the work in accordance with the contract documents. Furthermore, the contractor shall provide their own special equipment needed to fulfill the accomplishment of work and obey any safety regulations assigned to Barksdale
AFB.
C. ACCOMPLISHMENT OF WORK: The contractor must ensure all access to the existing building always remains clear for occupants and emergency egress during the construction period. All temporary closures, barriers, and protective procedures shall be coordinated with the Contracting Officer or representative. All work shall be accomplished between the hours of 07:30 a.m. and 4:30 p.m. to exclude federal holidays and weekends.
D. WORK CONDITIONS: The contractor shall coordinate work with the Contracting Officer or representative. The contractor shall notify 2 CES/CEOFE points of contact the day he/she moves onto the work site to commence work. The contractor shall again provide notification of the day he/she moves back to the work site after an interruption of the work schedule and updates if required. This schedule shall
FA460825QS060
Attachment 2 describe major work items and projected completion dates.
E. PROTECTION OF BUILDING PROPERTY AND PERSONNEL: The contractor shall protect all building property located in or adjacent to the building and shall repair, replace, or otherwise be held liable for all such damage. Building property includes, but is not limited to, furniture, vehicles, or items of supplies. Exercise control measures of all dust and toxic fumes associated with certain construction operations, to prevent hazards or illnesses to base and contractor personnel.
F. CLEAN UP: The contractor shall clean up each work site at the end of each workday to the satisfaction of the POC. Upon completion of the work, all demolished equipment and debris shall be removed from the site and the area shall be left in a neat and completely acceptable condition.