This is an Estimated Government Cost (IGCE) and Schedule of Items for the Lone Mountain Material Source Site Development & Aggregate Stockpiling project. The document outlines a base bid and four additive bid items for establishing a quarry operation on the Sierra Vista Ranger District of the Coronado National Forest. The base bid includes mobilization (1 lump sum), topsoil stripping and stockpiling (2 acres), and blast/excavation with crushing and stockpiling of aggregate with "G" grading (11,000 cubic yards). Four additive bid items are included for additional crushing and stockpiling work at quantities of 2,200 cubic yards, 1,200 cubic yards, 1,200 cubic yards, and 1,000 cubic yards respectively, allowing the government to exercise optional work based on funding and project requirements.
The pricing template shows estimated unit costs and totals as blank fields ($0.00), indicating that contractors will provide their own cost proposals for each line item. This solicitation, numbered 127EAX26Q0021, is issued as a Request for Quotation (RFQ) and is set aside for small business concerns under the NAICS code 237310 (Highway, Street, and Bridge Construction) with a size standard of $45 million. The Department of Agriculture Forest Service is the contracting agency, and the work involves rock blasting, excavation, crushing, and stockpiling operations to produce road surfacing aggregate.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0001 127EAX26Q0021.pdf | ||
| RFI Log 127EAX26Q0021 RFI 01-07.docx | DOCX document | |
| Attachment 3 Map LoneMountainMaterialSourceSite_Map.pdf | ||
| Attachment 7 General Decision No. AZ20260055.pdf | ||
| Attachment 4 Table 703-3.pdf | ||
| 127EAX26Q0021 SF1442.pdf | ||
| Attachment 5 FSSS LoneMountainMaterialSourceSite_FSSS.docx | DOCX document | |
| Attachment 6 Fire Plan Guidelines 170515.docx | DOCX document | |
| Attachment 1 SOW LoneMountainMaterialSourceSite_042926.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE
LONE MOUNTAIN MATERIAL SOURCE SITE PROJECT SCHEDULE OF ITEMS
PROJECT: LONE MOUNTAIN MATERIAL SOURCE SITE DEVELOPMENT & AGGREGATE STOCKPILING
| BASE BID ITEM: | Establish Quarry, Crush and Stockpile | ||
| Pay Item | Description | Method of | |
| Measure | Estimated | ||
| Quantity | Pay Unit | Estimated | |
| Unit Cost | Total |
| 151(01) | Mobilization | LSQ | 1 | LS | |
| 204(01) | Topsoil Stripping and Stockpiling | AQ | 2 | ACRE | |
| 320(01) | Blast/Excavate Rock, Crush and Stockpile Aggregate ("G" Grading) | AQ | 11,000 | CY | |
| MAIN SUBTOTAL | $0.00 | ||||
| TOTAL WITH MOBILIZATION | $0.00 |
| ADDITIVE BID ITEM 1: | Additional Crush and Stockpile | ||
| Pay Item | Description | Method of | |
| Measure | Estimated | ||
| Quantity | Pay Unit | Estimated | |
| Unit Cost | Total |
| 320(02) | Blast/Excavate Rock, Crush and Stockpile Aggregate ("G" Grading) | AQ | 2,200 | CY | ||
| ADDITIVE 1 BID SUBTOTAL | $0.00 | |||||
| TOTAL WITH ADDITIVE 1 | $0.00 |
| ADDITIVE BID ITEM 2: | Additional Crush and Stockpile | ||
| Pay Item | Description | Method of | |
| Measure | Estimated | ||
| Quantity | Pay Unit | Estimated | |
| Unit Cost | Total |
| 320(03) | Blast/Excavate Rock, Crush and Stockpile Aggregate ("G" Grading) | AQ | 1,200 | CY | |||
| ADDITIVE BID 2 SUBTOTAL | $0.00 | ||||||
| TOTAL WITH ADDITIVES 1 AND 2 | $0.00 | ||||||
| ADDITIVE BID ITEM 3: | Additional Crush and Stockpile | ||||||
| Pay Item | Description | Method of | |||||
| Measure | Estimated | ||||||
| Quantity | Pay Unit | Estimated | |||||
| Unit Cost | Total |
| 320(04) | Blast/Excavate Rock, Crush and Stockpile Aggregate ("G" Grading) | AQ | 1,200 | CY | |||
| ADDITIVE BID 2 SUBTOTAL | $0.00 | ||||||
| TOTAL WITH ADDITIVES 1 AND 2 AND 3 | $0.00 | ||||||
| ADDITIVE BID ITEM 4: | Additional Crush and Stockpile | ||||||
| Pay Item | Description | Method of | |||||
| Measure | Estimated | ||||||
| Quantity | Pay Unit | Estimated | |||||
| Unit Cost | Total |
| 320(05) | Blast/Excavate Rock, Crush and Stockpile Aggregate ("G" Grading) | AQ | 1,000 | CY | ||
| ADDITIVE BID 2 SUBTOTAL | $0.00 | |||||
| TOTAL WITH ADDITIVES 1 AND 2 AND 3 AND 4 | $0.00 |