ATTACHMENT 2_SOI_KNF RV PADS_Updated 3.12.2026.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Trailer Pad/Housing Unit Improvements on the Kaibab National Forest in Northern AZ
Solicitation number
127EAX26Q0017
Issued by

About this file

This is a Schedule of Items (SOI) for RV pad and utility upgrades on the Kaibab National Forest in Northern Arizona, involving the North Kaibab Ranger District (NKRD) and Tusayan Ranger District (TRD). The document provides a structured pricing template for a base bid and four option bids, with all line items measured and priced on a lump-sum (LS) basis.

The base bid comprises two components: Tanglefoot Admin Site work (NKRD) with eight pay items including mobilization, six RV pad rehabilitations, and water/sewer line replacements; and Tusayan Ranger Station work (TRD) with mobilization and five RV pad rehabilitations. Option Bid #1 covers Jacob Lake Work Center with nine pay items including mobilization and eight RV pad rehabilitations. Option Bid #2 addresses Big Springs Work Center with nine pay items including mobilization, five RV pad rehabilitations, water line replacement, sewer line replacement, and electrical line extension. Option Bid #3 encompasses miscellaneous upgrades at multiple locations, including septic system work (locate, inspect, water test, tank and drain field replacement), propane line installations with RV connections at three sites totaling 19 connections, and water meter installation for eight RV pads at Jacob Lake Work Center. Option Bid #4 includes propane lines and five RV connections at Tusayan. Contractors must provide unit costs for each line item, with subtotals calculated for the base bid and each option, and a final combined total for all work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS

KAIBAB NATIONAL FOREST
NORTH KAIBAB RANGER DISTRICT (NKRD), TUSAYAN RANGER DISTRICT (TRD)
KAIBAB TRAILER PAD AND UTILITY UPGRADES
BASE BID #1 - TANGLEFOOT ADMIN SITE (NKRD)
Pay ItemDescriptionMethod of MeasurePay UnitEstimated QuantityEstimated Unit CostTotal
000AMOBILIZATION (TANGLEFOOT)LSQLS1
001ARV Pad Rehabilitation (#1)LSQLS1
002ARV Pad Rehabilitation (#2)LSQLS1
003ARV Pad Rehabilitation (#3)LSQLS1
004ARV Pad Rehabilitation (#4)LSQLS1
005ARV Pad Rehabilitation (#5)LSQLS1
006ARV Pad Rehabilitation (#6)LSQLS1
007AWater Line ReplacementLSQLS1
008ASewer Line ReplacementLSQLS1
SUBTOTAL FOR TANGLEFOOT BID =
BASE BID #2 - TUSAYAN RANGER STATION (TRD)
Pay ItemDescriptionMethod of MeasurePay UnitEstimated QuantityEstimated Unit CostTotal
000BMOBILIZATION (TRD)LSQLS1
001BRV Pad Rehabilitation (#13)LSQLS1
002BRV Pad Rehabilitation (#16)LSQLS1
003BRV Pad Rehabilitation (#18)LSQLS1
004BRV Pad Rehabilitation (#26)LSQLS1
005BRV Pad Rehabilitation (#27A)LSQLS1
SUBTOTAL FOR TRD BID =
SUBTOTAL FOR BASE BID =
OPTION BID #1- JACOB LAKE WORK CENTER (NKRD)
Pay ItemDescriptionMethod of MeasurePay UnitEstimated QuantityEstimated Unit CostTotal
000CMOBILIZATION (JLWC)LSQLS1
001CRV Pad Rehabilitation (#T1A)LSQLS1
002CRV Pad Rehabilitation (#T1B)LSQLS1
003CRV Pad Rehabilitation (#T2A)LSQLS1
004CRV Pad Rehabilitation (#T2B)LSQLS1
005CRV Pad Rehabilitation (#T3A)LSQLS1
006CRV Pad Rehabilitation (#T3B)LSQLS1
007CRV Pad Rehabilitation (#T4)LSQLS1
008CRV Pad Rehabilitation (#T5)LSQLS1
SUBTOTAL FOR OPTION #1 =
OPTION BID #2- BIG SPRINGS WORK CENTER (NKRD)
Pay ItemDescriptionMethod of MeasurePay UnitEstimated QuantityEstimated Unit CostTotal
000DMOBILIZATION (BSWC)LSQLS1
001DRV Pad Rehabilitation (#1)LSQLS1
002DRV Pad Rehabilitation (#2)LSQLS1
003DRV Pad Rehabilitation (#3)LSQLS1
004DRV Pad Rehabilitation (#4)LSQLS1
005DRV Pad Rehabilitation (#5)LSQLS1
006DWater Line ReplacementLSQLS1
007DSewer Line ReplacementLSQLS1
008DElectrical Line ExtensionLSQLS1
SUBTOTAL FOR OPTION #2 =
OPTION BID #3 - OTHER UPGRADES (NKRD)
Pay ItemDescriptionMethod of MeasurePay UnitEstimated QuantityEstimated Unit CostTotal
001ETanglefoot - Existing Septic - LocateLSQLS1
002ETanglefoot - Existing Septic - TV InspectionLSQLS1
003ETanglefoot - Existing Septic - Water TestLSQLS1
004ETanglefoot - Replace Septic TankLSQLS1
005ETanglefoot - Replace Septic Drain FieldLSQLS1
006ETanglefoot - Propane lines and 6 RV ConnectionsLSQLS1
007EJLWC - Propane lines and 8 RV ConnectionsLSQLS1
008EBSWC - Propane lines and 5 RV ConnectionsLSQLS1
009EJLWC - Water Meters for 8 RV PadsLSQLS1
SUBTOTAL FOR OPTION #3 =
OPTION BID #4 - OTHER UPGRADES (TRD)
Pay ItemDescriptionMethod of MeasurePay UnitEstimated QuantityEstimated Unit CostTotal
001FTusayan - Propane lines and 5 RV ConnectionsLSQLS1
SUBTOTAL FOR OPTION #4 =
SUBTOTAL FOR OPTIONS=
BASE + OPTIONS =