This is a Schedule of Items (SOI) for RV pad and utility upgrades on the Kaibab National Forest in Northern Arizona, involving the North Kaibab Ranger District (NKRD) and Tusayan Ranger District (TRD). The document provides a structured pricing template for a base bid and four option bids, with all line items measured and priced on a lump-sum (LS) basis.
The base bid comprises two components: Tanglefoot Admin Site work (NKRD) with eight pay items including mobilization, six RV pad rehabilitations, and water/sewer line replacements; and Tusayan Ranger Station work (TRD) with mobilization and five RV pad rehabilitations. Option Bid #1 covers Jacob Lake Work Center with nine pay items including mobilization and eight RV pad rehabilitations. Option Bid #2 addresses Big Springs Work Center with nine pay items including mobilization, five RV pad rehabilitations, water line replacement, sewer line replacement, and electrical line extension. Option Bid #3 encompasses miscellaneous upgrades at multiple locations, including septic system work (locate, inspect, water test, tank and drain field replacement), propane line installations with RV connections at three sites totaling 19 connections, and water meter installation for eight RV pads at Jacob Lake Work Center. Option Bid #4 includes propane lines and five RV connections at Tusayan. Contractors must provide unit costs for each line item, with subtotals calculated for the base bid and each option, and a final combined total for all work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
SCHEDULE OF ITEMS
| KAIBAB NATIONAL FOREST |
| NORTH KAIBAB RANGER DISTRICT (NKRD), TUSAYAN RANGER DISTRICT (TRD) |
| KAIBAB TRAILER PAD AND UTILITY UPGRADES |
| BASE BID #1 - TANGLEFOOT ADMIN SITE (NKRD) | ||||||
| Pay Item | Description | Method of Measure | Pay Unit | Estimated Quantity | Estimated Unit Cost | Total |
| 000A | MOBILIZATION (TANGLEFOOT) | LSQ | LS | 1 | |
| 001A | RV Pad Rehabilitation (#1) | LSQ | LS | 1 | |
| 002A | RV Pad Rehabilitation (#2) | LSQ | LS | 1 | |
| 003A | RV Pad Rehabilitation (#3) | LSQ | LS | 1 | |
| 004A | RV Pad Rehabilitation (#4) | LSQ | LS | 1 | |
| 005A | RV Pad Rehabilitation (#5) | LSQ | LS | 1 | |
| 006A | RV Pad Rehabilitation (#6) | LSQ | LS | 1 | |
| 007A | Water Line Replacement | LSQ | LS | 1 | |
| 008A | Sewer Line Replacement | LSQ | LS | 1 | |
| SUBTOTAL FOR TANGLEFOOT BID = |
| BASE BID #2 - TUSAYAN RANGER STATION (TRD) | ||||||
| Pay Item | Description | Method of Measure | Pay Unit | Estimated Quantity | Estimated Unit Cost | Total |
| 000B | MOBILIZATION (TRD) | LSQ | LS | 1 | |
| 001B | RV Pad Rehabilitation (#13) | LSQ | LS | 1 | |
| 002B | RV Pad Rehabilitation (#16) | LSQ | LS | 1 | |
| 003B | RV Pad Rehabilitation (#18) | LSQ | LS | 1 | |
| 004B | RV Pad Rehabilitation (#26) | LSQ | LS | 1 | |
| 005B | RV Pad Rehabilitation (#27A) | LSQ | LS | 1 | |
| SUBTOTAL FOR TRD BID = | |||||
| SUBTOTAL FOR BASE BID = |
| OPTION BID #1- JACOB LAKE WORK CENTER (NKRD) | ||||||
| Pay Item | Description | Method of Measure | Pay Unit | Estimated Quantity | Estimated Unit Cost | Total |
| 000C | MOBILIZATION (JLWC) | LSQ | LS | 1 | |
| 001C | RV Pad Rehabilitation (#T1A) | LSQ | LS | 1 | |
| 002C | RV Pad Rehabilitation (#T1B) | LSQ | LS | 1 | |
| 003C | RV Pad Rehabilitation (#T2A) | LSQ | LS | 1 | |
| 004C | RV Pad Rehabilitation (#T2B) | LSQ | LS | 1 | |
| 005C | RV Pad Rehabilitation (#T3A) | LSQ | LS | 1 | |
| 006C | RV Pad Rehabilitation (#T3B) | LSQ | LS | 1 | |
| 007C | RV Pad Rehabilitation (#T4) | LSQ | LS | 1 | |
| 008C | RV Pad Rehabilitation (#T5) | LSQ | LS | 1 | |
| SUBTOTAL FOR OPTION #1 = |
| OPTION BID #2- BIG SPRINGS WORK CENTER (NKRD) | ||||||
| Pay Item | Description | Method of Measure | Pay Unit | Estimated Quantity | Estimated Unit Cost | Total |
| 000D | MOBILIZATION (BSWC) | LSQ | LS | 1 | |
| 001D | RV Pad Rehabilitation (#1) | LSQ | LS | 1 | |
| 002D | RV Pad Rehabilitation (#2) | LSQ | LS | 1 | |
| 003D | RV Pad Rehabilitation (#3) | LSQ | LS | 1 | |
| 004D | RV Pad Rehabilitation (#4) | LSQ | LS | 1 | |
| 005D | RV Pad Rehabilitation (#5) | LSQ | LS | 1 | |
| 006D | Water Line Replacement | LSQ | LS | 1 | |
| 007D | Sewer Line Replacement | LSQ | LS | 1 | |
| 008D | Electrical Line Extension | LSQ | LS | 1 | |
| SUBTOTAL FOR OPTION #2 = |
| OPTION BID #3 - OTHER UPGRADES (NKRD) | ||||||
| Pay Item | Description | Method of Measure | Pay Unit | Estimated Quantity | Estimated Unit Cost | Total |
| 001E | Tanglefoot - Existing Septic - Locate | LSQ | LS | 1 | |
| 002E | Tanglefoot - Existing Septic - TV Inspection | LSQ | LS | 1 | |
| 003E | Tanglefoot - Existing Septic - Water Test | LSQ | LS | 1 | |
| 004E | Tanglefoot - Replace Septic Tank | LSQ | LS | 1 | |
| 005E | Tanglefoot - Replace Septic Drain Field | LSQ | LS | 1 | |
| 006E | Tanglefoot - Propane lines and 6 RV Connections | LSQ | LS | 1 | |
| 007E | JLWC - Propane lines and 8 RV Connections | LSQ | LS | 1 | |
| 008E | BSWC - Propane lines and 5 RV Connections | LSQ | LS | 1 | |
| 009E | JLWC - Water Meters for 8 RV Pads | LSQ | LS | 1 | |
| SUBTOTAL FOR OPTION #3 = |
| OPTION BID #4 - OTHER UPGRADES (TRD) | ||||||
| Pay Item | Description | Method of Measure | Pay Unit | Estimated Quantity | Estimated Unit Cost | Total |
| 001F | Tusayan - Propane lines and 5 RV Connections | LSQ | LS | 1 | |
| SUBTOTAL FOR OPTION #4 = |
| SUBTOTAL FOR OPTIONS= |
| BASE + OPTIONS = |