Attachment 2 - Section B - CLIN Structure.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
MK 60 Mod 2 All Up Round (AUR) Simulator Capsule Tube Assemblies
Solicitation number
N66604-21-R-0314
Issued by

About this file

This document includes a solicitation for the procurement of MK 60 Mod 2 All Up Round (AUR) Simulator Capsule Tube Assemblies by the Naval Undersea Warfare Center Division in Newport, Rhode Island. The Navy requires the delivery of 25 units within 18 months of contract award at a fixed unit price to be proposed by offerors in their response. Proposals are due by October 4, 2021 with award being made to the lowest price technically acceptable offer. This procurement is set aside exclusively for small businesses and has a Defense Priority of DO-C9. Offerors must include pricing for all contract line items, payment terms, delivery schedule, point of contact information, CAGE code and DUNS number with their submissions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SECTION B - Offerors submitting a quote shall fill in the two (2) tables below and must provide them as a part of proposal submission:
TABLE 1 - PROPOSAL INCLUDING FIRST ARTICLE WAIVER
Item Number/DescriptionQuantityUnit PriceTotal
CLIN 0001 – MK 60 AURS Capsule Tube Assemblies manufactured in accordance with (IAW) the Statement of Work (SOW) in Section C2$ - 0
OPTION CLIN 0002 – Remaining 23 units manufactured IAW the SOW in Section C.23$ - 0
OPTION CLIN 0003 – MK 60 AURS Capsule Tube Assemblies manufactured in accordance with the SOW in Section C.25$ - 0
TOTAL$ - 0
NOTE: If the offeror has manufactured the MK 60 Mod 2 AURS Capsule Tube Assemblies within (5) five years from the solicitation posting date, then a request for a waiver from producing the First Articles shall be submitted to the Government within the offeror’s proposal, which shall include the purchase order number(s) or contract(s) which the MK 60 Mod 2 AURS Capsule Tube Assemblies were previously manufactured. The request of a waiver does not guarantee that the offeror will be granted a waiver.
TABLE 2 - PROPOSAL NOT INCLUDING FIRST ARTICLE WAIVER
Item Number/DescriptionQuantityUnit PriceTotal
CLIN 0001 – MK 60 AURS Capsule Tube Assemblies manufactured in accordance with (IAW) the Statement of Work (SOW) in Section C25$ - 0
OPTION CLIN 0002 – MK 60 AURS Capsule Tube Assemblies manufactured in accordance with the SOW in Section C.25$ - 0
TOTAL$ - 0
SECTION F - Delivery Schedule
Delivery Schedule (if First Article IS required)
ItemQuantityDelivery Date
First Article Units2 EAWithin 5 months after Welding Cert Approvals
Option Production Units for Base Period23 EAWithin 18 months AOE once FAS are approved (2 per month)
Option CLIN Production Units25 EAWithin 18 months AOE (2 per month)
Delivery Schedule (if First Article IS NOT required)
ItemQuantityDelivery Date
Production Units25 EAWithin 18 months ADC
Option CLIN Production Units25 EAWithin 18 months AOE (2 per month)
ADC = After Date of Contract