Attachment 2 - Schedule of Items.doc

DOC document 29 KB Posted

Attached to
Ottawa National Forest Ottawa Lake Day Use Building Roof Replacement
Solicitation number
12445526Q0032
Issued by

About this file

This is a Schedule of Items pricing template for the Lake Ottawa Day Use Roof Project under solicitation 124455Q0032 issued by the Department of Agriculture Forest Service for a roof replacement on the Ottawa National Forest. The schedule contains two line items requiring contractor pricing: Item 1 is a Day Use Building roof replacement quoted as a lump sum for 42 square feet, and Item 2 is roof sheathing quoted as a lump sum for 128 square feet, which represents a contingent pay item applicable only if damaged roof decking is discovered during work and requires replacement. All work for each line item includes complete installation with labor, materials, and equipment.

Contractors submitting quotations must complete the pricing template by entering unit prices and total prices for each item, and must provide company information including contractor name, Unique Entity Identifier (UEI), email, and phone number. This is a Total Small Business Set-Aside with a small business size standard of $37 million, and the applicable North American Industry Classification Standard Code is 237990. Questions regarding the solicitation must be submitted by March 10, 2026 at 3:00 PM Eastern Time. No site visit is planned for this acquisition.

View the file

Other files

File Type Posted
260227 QA.pdf PDF
Attachment 5 - Wage Determination MI20260157 Iron County.pdf PDF
Attachment 4 - Drawings.pdf PDF
Attachment 1 - RFQ 12445526Q0032.pdf PDF
Attachment 3 - Statement of Work.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

Lake Ottawa Day Use Roof Project

ITEM

DESCRIPTION

PAY

UNIT

TOTAL

NO.

UNIT

QTY

PRICE PRICE

Day Use Building Lump Sum 42 SQ $____ $____ Sheathing

Lump Sum 128 SQ FT $____ $____

TOTAL: $_____

NOTES:

1. Work for individual line items includes all work, labor, materials, equipment, etc., for the complete installation of the items and its accessories.

2. Item 2, Sheathing, is a pay item in the event damaged roof decking is found and requires replacement.

Contractor Name:______________________________________

Contractor UEI:________________________________________

Contractor Email:______________________________________

Contractor Phone Number:_______________________________

File details come from the government source that posted it. Updated .