This document is a comprehensive set of mechanical design drawings for the Richmond National Battlefield Park HVAC Systems Replacement project. The project involves replacing heating, ventilation, and air conditioning systems across eight park locations: Chimborazo Visitor Center, Cold Harbor Visitor Center, Watt House, Ranger Office (1900 Maintenance Way), Maintenance Building, Auto Shop Building, Quarters 13 (1910 Maintenance Way), and Fort Harrison Visitor Center, all located in the Richmond, Virginia area.
The scope of work includes demolition of existing heat pumps, concrete pads, refrigerant piping, ductwork, and associated equipment at each location, followed by installation of new heat pump systems with outdoor units mounted on precast concrete or HDPE pads. The project specifies installation of new ductwork, refrigerant lines routed through existing locations or new penetrations as required, reconnection to existing drainage systems, and provision of new thermostats for each unit. Key specifications include use of R410A refrigerant, MERV 8-13 filters, new grilles and diffusers for supply and return air, variable volume (VAV) terminal boxes for larger facilities, and energy recovery ventilation units where indicated. The drawings include detailed schedules identifying specific manufacturers and models for equipment including Mitsubishi and Trane heat pumps, Greenheck exhaust fans, and Viessmann boilers, with electrical service requirements and installation notes addressing historic preservation considerations throughout the park facilities. Construction details address duct sealing, insulation, hanger supports, roof curb installations, and penetration treatments to minimize visual intrusion and protect historic fabric.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RICHMOND NATIONAL BATTLEFIELD PARK
REPLACEMENT OF HVAC SYSTEMS
MECHANICAL
SHEET
COVER SHEET & DRAWING LIST
TITLE OF SHEET
M0.1 M0.2 M1.1 M1.2 M1.3 M1.4 M1.5 M1.6 M1.7 M1.8 M1.9 M1.10 M1.11 M2.1 M2.2 M2.3 M3.1 M3.2
LEGEND
LEGEND
CHIMBORAZO VISITOR CENTER DEMOLITION FLOOR PLAN
CHIMBORAZO VISITOR CENTER NEW WORK FLOOR PLAN
COLD HARBOR VISITOR CENTER FLOOR PLAN
WATT HOUSE FLOOR PLANS
RANGER OFFICE - 1900 MAINTENANCE WAY FLOOR PLANS
MAINTENANCE BUILDING DEMOLITION FLOOR PLANS
MAINTENANCE BUILDING NEW WORL FLOOR PLANS
AUTO SHOP BUILDING FLOOR PLANS
QUARTERS 13 - 1910 MAINTENANCE WAY FLOOR PLANS
GARTHRIGHT HOUSE FLOOR PLANS
FORT HARRISON VISITOR CENTER FLOOR PLAN
DETAILS
DETAILS
DETAILS
SCHEDULE
SCHEDULE
SUB SHEET
CS
LOCATION ADDRESS CITY, STATE, ZIP CODE HISTORIC MARKER COPY PLUS CODE
COLD HARBOR V.C. 5515 ANDERSON-WRIGHT DR MECHANICSVILLE, VA 23111 37° 35' 07.5" N, 77° 17' 12.7" W HPP7+47 Mechanicsville, Virginia CHIMBORAZO V.C. 3215 E BROAD STREET RICHMOND, VA 23223 37° 37' 37.2" N, 77° 24' 43.7" W GHGQ+P4 Richmond, Virginia FT HARRISON V.C. 8761 BATTLEFIELD PARK RD RICHMOND, VA 23231 37° 25' 41.5" N, 77° 22' 23.4" W CJHH+73 Richmond, Virginia GARTHRIGHT HOUSE 6019 COLD HARBOR RD MECHANICSVILLE, VA 23111 37° 35' 17.4" N, 77° 16' 42.6" W HPQC+6H Mechanicsville, Virginia WATT HOUSE 6283 WATT HOUSE RD (VA 718), MECHANICSVILLE, VA 23111, 37° 34' 25.9" N, 77° 17' 25.8" W HPF5+FQ Mechanicsville, Virginia PARK RESIDENCE 1910 MAINTENANCE WAY HENRICO, VA 23231 37° 25' 43.3" N, 77° 22' 37.2" W CJHF+F5H Richmond, Virginia RANGER OFFICE 1900 MAINTENANCE WAY HENRICO, VA 23231 37° 25' 43.0" N, 77° 22' 38.0" W CJHF+C4V Richmond, Virginia MAINTENANCE SHOP 1990 MAINTENANCE WAY HENRICO, VA 23231 37° 25' 44.6" N, 77° 22' 29.0" W CJHG+J47 Richmond, Virginia
PROJECT LOCATIONS:
LANDSCAPE
L1.1 COLD HARBOR VISITOR CENTER2
AutoCAD SHX Text
STATE
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
RICHMOND
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text NATIONAL PARK SERVICE HISTORIC ARCITECTURE, CONSERVATION & ENGINEERING INTERIOR REGION 1 NORTH ATLANTIC & APPALACHIAN
AutoCAD SHX Text
REPLACEMENT OF HVAC SYSTEMS
AutoCAD SHX Text
VARIOUS LOCATIONS
AutoCAD SHX Text
RICHMOND NATIONAL BATTLEFIELD PARK
AutoCAD SHX Text
AutoCAD SHX Text
HENRICO
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FOR REVIEW 4/17/2025
AutoCAD SHX Text
PROJECT SITE PLAN
AutoCAD SHX Text
STORAGE ROOM
EXHIBITION AREA
WOMEN'S RESTROOM MEN'S RESTROOM
UTILITY
ROOM
HP-1
W
EXISTING
UNDERGROUND
1-1/4" WATER LINE TO
REMAIN STORAGE ROOM
EXHIBITION AREA
WOMEN'S RESTROOM MEN'S RESTROOM
UTILITY
ROOM
STORAGE ROOM
EXHIBITION AREA
WOMEN'S RESTROOM MEN'S RESTROOM
UTILITY
ROOM
5'
' 4
6"
6"
6"
CU-1B
EXISTING WATER FOUNTAIN
NEW CONDENSING UNIT
TO REMAIN
PIN (2) 45°
REMOVE EXISTING CONCRETE PAVEMENT
54" x 304"
EXPANSION
JOINT
MATCH EXISTING
GRADE
EXPANSION
JOINT
EXPANSION
JOINT
NOTE:
NEW SIDEWALK GRADE TO MATCH ADJACENT
SIDEWALK AND DOOR THRESHOLDS INTO
RESTROOMS. GRADE OF SIDEWALK AT DRINKING
FOUNTAIN SHALL BE EXACTLY 27" BELOW
BOTTOM OF DRINKING FOUNTAIN.
NOTE:
NEW CONCRETE SHALL CONTAIN 6 x 6 10/10 WELDED
WIRE MESH PLACED ON PLASTIC CHAIRS IN THE
MIDDLE OF SLAB. ROLLED MESH WILL NOT BE ACCEPTED.
PINS SHALL BE 3/8" SMOOTH STEEL GREASED OR
SLEEVED ON ONE END.
INSTALL 2 TRUNCATED
DOME PADS ANCHORED
TO NEW CONCRETE.
PADS TO BE REINFORCED
FIBERGLASS POLYMER
RED, 2' x 5'
MANUVERING
SPACE 30" x 48"
EXTEND ELEC.
CONDUIT 3'
MANUVERING
SPACE 60" DIA.
MANUVERING
SPACE 36" x 60"
AND CAP. SET
3/8 STEEL PIN
AT END.
EDGES OF NEW SIDEWALK SHALL BE BACKED UP WITH
TOPSOIL. OTHER AREAS DAMAGED BY CONSTRUCTION
TO BE TOPSOILED AND REPAIRED. FINE GRADE TOPSOIL
AND SEED, FERTILIZE, AND MULCH.
NOTE:
AFTER REMOVING WALL, BACKFILL EXCAVATION
WITH BASE MATERIAL PLACED AND COMPACTED IN 12"
LIFTS. DO NOT BACKFILL WITH EXCAVATED SOIL.
MATCH EXISTING
GRADE TO
CENTERED ON
FOUNTAIN
EXISTING
SIDEWALK
EXISTING
SIDEWALK
EXISTING
SIDEWALK
EXISTING
SIDEWALK
EXISTING
SIDEWALK
EXISTING
SIDEWALK
PIN (2)
NEW 6" THICK
CONCRETE
SIDEWALK
EXCAVATE 12" WIDE ALONG EDGE
OF EXISTING SIDEWALK EXTENDING
6" OUTSIDE OF NEW CONCRETE
SIDEWALK. NEW BASE THICKNESS
IS 6" OVER COMPACTED SUBGRADE
BOTH SIDES OF BUILDING
SAW CUT FULL
DEPTH AT JOINT
REMOVE CONDENSING UNIT
AND REFRIGERATION PIPING.
REMOVE CONCRETE SLAB
AND BRICK WALL INCLUDING
FOOTING
CUT ELECTRIC
CONDUIT GOING
TO BUILDING AT
ELBOW. PROTECT
CUT END
REPLACEMENT OF HVAC SYSTEMS
RICHMOND NATIONAL BATTLEFIELD PARK
3215 E. BROAD STREET, RICHMOND, VA 23223
LANDSCAPE PLAN
COLD HARBOR VISITOR CENTERL1.1
DEMOLITION PLAN
1/4" = 1'-0"
NEW WORK PLAN
1/4" = 1'-0"
MATERIALS PLAN
1/4" = 1'-0"
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL LEGEND
M0.1
1. REFER TO ALL DRAWINGS SPECIFICATION FOR GENERAL DESCRIPTION OF AREAS REQUIRING DEMOLITION.
2. REFER TO CONSTRUCTION MANAGER'S INSTRUCTIONS FOR ALL EXISTING EQUIPMENT AND MATERIALS THAT SHALL REMAIN THE
PROPERTY OF THE OWNER.
3. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM SITE AND LEGALLY DISPOSED OF. STORAGE OR SALE OF ITEMS ON THE PROJECT
SITE IS PROHIBITED.
4. PROTECTION: ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT WINDBLOWN DUST.
5. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES SERVING OCCUPIED AREAS WITHOUT FIRST OBTAINING PERMISSION FROM
HARVARD FACILITIES. PROVIDE TEMPORARY SERVICES AS REQUIRED.
6. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND REFLECT OVERALL SYSTEM REMOVAL. NOT EVERY ITEM OR COMPONENT OF A
SYSTEM IS SHOWN.
7. THIS CONTRACTOR SHALL PROVIDE SHUT DOWN OF SERVICES (BOILERS, AHU, HEAT PUMPS, PUMPS, ETC.) AND TRACING OF ALL
PIPING WITHIN BASE BID.
DEMOLITION NOTED
1. GENERAL NOTES, SYMBOLS LIST AND DETAILS ARE APPLICABLE TO ALL MX.XX SERIES DRAWINGS.
2. DRAWINGS ARE DIAGRAMMATIC, DETERMINE EXACT LOCATIONS OF SYSTEMS AND COMPONENTS IN FIELD.
3. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER SECTIONS.
4. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
5. PROVIDE INFORMATION AND HARDWARE AS NECESSARY TO COORDINATE CONCRETE PADS AND STEEL PLATFORMS REQUIRED FOR
MECHANICAL WORK.
6. COORDINATE ROOF PENETRATIONS WITH WORK OF OTHER SECTIONS AND WITH FLASHING REQUIREMENTS.
7. SHEETMETAL FITTINGS SHOWN ARE TO BE PROVIDED. NO SUBSTITUTES SHALL BE ALLOWED WITHOUT PRIOR CONSENT FROM
ARCHITECT/ENGINEER.
8. REFER TO SPECIFICATIONS FOR DUCTWORK CONSTRUCTION CLASSES, SEAL, AND LEAKAGE CLASSES.
9. RUN DUCTS AND PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS. ALL DUCTWORK SHALL BE
INSTALLED AS CLOSE AS POSSIBLE TO WALL AND UNDERSIDE OF BEAMS AND JOISTS.
10. INSTALL THERMOSTATS AT LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY ARCHITECT. MOUNTING HEIGHT AFF SHALL COMPLY
WITH ADA.
11. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS) AND
TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST.
12. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT TRANSITIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.
13. ACCESS PANELS SHALL BE PROVIDED TO CLEAN COILS AND SERVICE DAMPERS, HEATERS, VALVES AND ALL CONCEALED MECHANICAL
EQUIPMENT.
14. SUPPORT ALL EQUIPMENT, PIPING AND DUCTWORK FROM BUILDING STRUCTURE TO PROVIDE A VIBRATION FREE INSTALLATION.
PROVIDE TO GC A LIST OF ALL WEIGHTS AND METHODS OF SUPPORT FOR COORDINATION. REFER TO SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
15. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED TO THE FIRE ALARM SYSTEM IN ACCORDANCE WITH DIVISION 28 SPECIFICATIONS. MOUNT THE DETECTORS IN DUCTWORK. SMOKE DETECTORS SHALL BE INSTALLED AND WIRED TO THE BAS SYSTEM
AND FAN STARTERS FOR SHUTDOWN IN ACCORDANCE WITH DIVISION 23 SPECIFICATIONS.
16. SMOKE DAMPERS SHALL BE UL555S LISTED.
17. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH NEC, AND DIVISION 26 SPECIFICATIONS.
18. INTERNAL AIR FLOW DIMENSIONS ARE SHOWN FOR DUCTS. CONTRACTOR SHALL INCREASE SIZE FOR LINER IF APPLICABLE.
19. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OTHER THAN SPECIFIC RENTED ITEMS IDENTIFIED ON PLANS.
20. DIFFUSER SIZES SHOWN ARE NECK SIZES; REGISTER AND GRILLE SIZE ARE NOMINAL.
21. ALL CONDENSATE DRAIN LINES SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH "P" TRAP, CONNECTED TO PLUMBING AS
INDICATED ON DRAWINGS.
22. PROVIDE FLEXIBLE CONNECTIONS ON ALL DUCTS CONNECTING TO FANS AND AIR HANDLING UNITS UNLESS INTERNALLY ISOLATED. ALL DUCTS TO BE GROUNDED ACROSS FLEXIBLE CONNECTION WITH FLEXIBLE COPPER GROUNDING STRAPS.
23. THE INSIDE OF DUCTWORK VISIBLE THROUGH A GRILLE OR DIFFUSER SHALL BE PAINTED FLAT BLACK.
24. INSULATE PIPING AND DUCTWORK AS SPECIFIED: PERFORM TESTS SPECIFIED BEFORE INSULATING.
25. PROVIDE HANGERS, CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON PIPING.
26. PROVIDE VENTS AT HIGH POINTS IN PIPING SYSTEMS AND DRAIN VALVES AT LOW POINTS.
27. PROVIDE AT LEAST THREE-ELBOW SWING FOR PIPE TAKE-OFFS TO TERMINAL EQUIPMENT AND RISERS.
28. ELBOWS IN DUCT SYSTEMS SHALL BE FULL RADIUS (CENTERLINE RADIUS = 1.5 DUCT WIDTH) WHERE SPACE PERMITS. WHERE LIMITED CLEARANCE OCCURS, PROVIDE SHORT RADIUS ELBOW WITH FULL LENGTH SPLITTER VANES PER SMACNA. MITERED (SQUARE) ELBOWS WITH TURNING VANES MAY NOT BE SUBMITTED WITHOUT WRITTEN CONSENT FROM THE ARCHITECT/ENGINEER.
29. ISOLATION VALVES IN PIPING SYSTEMS ARE NOT SHOWN ON PLANS (FOR CLARITY) BUT ARE REQUIRED AT ALL PIPE BRANCHES AND
CONNECTIONS TO EQUIPMENT REFER TO DETAIL SHEETS AND FLOW DIAGRAMS.
30. PITCH PIPING 1 INCH IN 20 FEET MINIMUM IN DIRECTION OF FLOW, TO ALLOW FOR DRAINING
31. MANUAL DAMPERS ARE NOT SHOWN ON THE DRAWINGS IN ORDER FOR DRAWING CLARITY. PROVIDE MANUAL ADJUSTABLE DAMPERS ON EACH LOW PRESSURE SUPPLY, RETURN, AND EXHAUST DUCT TAKE OFF, AND AT EACH TAKE OFF TO REGISTERS, GRILLES AND
DIFFUSERS.
32. PROVIDE CEILING ACCESS PANELS BELOW ALL EQUIPMENT LOCATED ABOVE CEILINGS. EXACT SIZE AND LOCATION SHALL BE
COORDINATED IN FIELD WITH ARCHITECT.
GENERAL NOTES
HYDRONIC SYSTEM SPECIFIC ABBREVIATIONS
GENERIC HVAC ABBREVIATIONS
AIR SYSTEM SPECIFIC ABBREVIATIONS
GE
FSD
FPI
FLTR
FD
FCU
AC
ACC
ACD
AF
AHU
ALD
ATD
AVS
F F&B
FB
FC
FA
AIR CONDITIONING
AIR COOLED CONDENSER UNIT
AIR FOIL
AIR HANDLING UNIT
AIR VOLUME TRAVERSE STATION
FAN
FACE AND BYPASS
FAN BOX
FORWARD CURVED
FREE AREA
FIRE DAMPER (W/ ACCESS DOOR)
COMBINATION FIRE/SMOKE
DAMPER
FINS PER INCH
FILTER
GENERAL EXHAUST
°F °C Ø
DEGREES FAHRENHEIT
DIAMETER
DEGREES CELSIUS
ACV
AD
ADJ
ADDL
AFF
AFG
ALT
ALUM
AP
ARCH
ATC
ATV
AVG
BAS
BBD
BDT
BF
BFF
BHP
BLDG
BLR
BOD
BOP
BOT
BSMT
BTU
BTUH
C
CA
CF
CL
CLG
CO
COL
COMP
CONC
CONN
CONTR
CORR
CUF
CUH
CYL
CRCU
D
DB
DC
DDC
DDCFP
DIA
DIM
DN
DWG
EA
EAT
EFF
ECUH
ELEC
ELEV
EMER
EMS
ENT
EQUIP
EUH
EXH
EXP
FAS
FOB
FOT
FTR
FCV
FFOP
FG
FLEX
FLR
FLRDR
FP
FPM
FT
FT/SEC
FURN
FVNR
G
GA
GAL
GALV
GC
GND
GPH
GPM
GRD
GWB
H
HCPD
HD
HP
HPG
HR
HZ
HX
WRT
WG
WF
WB
W/O W/ W
VTR
VFD
VERT
VEL
V
TYP
TOP
TOD
TEMP
TEL
TEFC
TAV
TA
SUP
SUCT
STL
STDBY
STD
SS
SQFT
SQ
SPECS
SOV
SCH
RPM
RM
R.H.
REQS
REQD
RET
REP
R
PVC
PSIG
PSID
PSIA
PRIM
PR
PRESS
POS
PLBG
PH
PD
PCF
P
OV
OFOI
OFCI
ODP
OD
OC
OB
NTS
NOM
NO.
NO
NIC
NC
NC
N/A
MU
MTD
MIN
MH
MFR
MEZZ
MECH
MCC
MCA
MBH
MAX
M
LVG
LF
LAB
LB
L
KVA
KW
INSUL
IN
ID
AVERAGE
ATMOSPHERIC VENT
AUTOMATIC TEMPERATURE CONTROL
ARCHITECT
ACCESS PANEL
ALUMINUM
ALTERNATE
ABOVE FINISHED GRADE
ABOVE FINISHED FLOOR
ADDITIONAL
BRITISH THERMAL UNIT PER HOUR
BRITISH THERMAL UNIT
BASEMENT
BOTTOM
BOTTOM OF PIPE
BOTTOM OF DUCT
BOILER
BUILDING
BRAKE HORSEPOWER
BELOW FINISHED FLOOR
BOILER FEED WATER
BLOWDOWN TANK
BOILER BLOW DOWN
BUILDING AUTOMATION SYSTEM
COLD ROOM CONDENSING UNIT
CYLINDER
CABINET UNIT HEATER
CUBIC FEET
CORRIDOR
CONTRACTOR
CONNECTION
CONCRETE
COMPRESSOR
COLUMN
CLEAN-OUT
CEILING
CENTERLINE
CEILING FAN
COMPRESSED AIR
CONVECTOR
DRAIN
DRAWING
DOWN
DIMENSION
DIAMETER
DIRECT DIGITAL CONTROL FIELD PANEL
DIRECT DIGITAL CONTROL
DRY COOLER
DRY BULB TEMPERATURE
EXPANSION
EXHAUST
ELECTRIC UNIT HEATER
EQUIPMENT
ENTERING
ENERGY MANAGEMENT SYSTEM
EMERGENCY
ELEVATION
ELECTRICAL
ELECTRIC CABINET UNIT HEATER
EFFICIENCY
ENTERING AIR TEMPERATURE
EACH
FULL VOLTAGE NON-REVERSING
FURNISHED
FEET PER SECOND
FEET
FEET PER MINUTE
FIRE PROTECTION
FLOOR DRAIN
FLOOR
FLEXIBLE
FIBERGLASS
FIREFIGHTERS OVERRIDE PANEL
FLOW CONTROL VALVE
FINNED TUBE RADIATION
FLAT ON TOP
FLAT ON BOTTOM
FIRE ALARM SYSTEM
GYPSUM WALL BOARD
GRADE (GROUND LEVEL)
GALLONS PER MINUTE
GALLONS PER HOUR
GROUND
GENERAL CONTRACTOR
GALVANIZED
GALLONS
GAUGE
GAS
HEAT EXCHANGER
HERTZ
HOUR
HIGH PRESSURE GAS
HORSEPOWER
HEAD
HANDICAPPED
HEIGHT
WITH RESPECT TO
WATER GAUGE
WIDE FLANGE
WET BULB TEMPERATURE
WITHOUT
WITH
WIDTH
VENT THROUGH ROOF
VARIABLE FREQUENCY DRIVE
VERTICAL
VELOCITY
VENT
TYPICAL
TOP OF PIPE
TOP OF DUCT
TEMPERATURE
TELEPHONE
TOTALLY ENCLOSED FAN COOLED
THERMOSTATIC AIR VENT
THROW-AWAY
SUPPLY
SUCTION
STEEL
STANDBY
STANDARD
STAINLESS STEEL
SQUARE FEET
SQUARE
SPECIFICATIONS
REVOLUTIONS PER MINUTE
ROOM
RELATIVE HUMIDITY
REQUIREMENTS
REQUIRED
RETURN
REPRESENTATIVE
REHEAT
SCHEDULE
SOLENOID OPERATED VALVE
POLYVINYL CHLORIDE
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH DIFFERENTIAL
POUNDS PER SQUARE INCH ABSOLUTE
PRIMARY
PRESSURE REFERENCE
PRESSURE
PROVIDED BY OTHER SECTION(S)
PLUMBING
PHASE
PRESSURE DROP
POUNDS PER CUBIC FOOT
PERIMETER HEAT
OUTLET VELOCITY
OWNER FURNISHED OWNER INSTALLED
OWNER FURNISHED CONTRACTOR INSTALLED
OPEN DRIP PROOF
OUTSIDE DIAMETER
ON CENTER
OCTAVE BAND
NOT TO SCALE
NOMINAL
NUMBER
NORMALLY OPEN
NOT IN CONTRACT
NOISE CRITERIA
NORMALLY CLOSED
NOT APPLICABLE
MAKEUP WATER
MOUNTED
MINIMUM
MANHOLE
MANUFACTURER
MEZZANINE
MECHANICAL
MOTOR CONTROL CENTER
MINIMUM CIRCUIT AMPS
THOUSAND BRITISH THERMAL UNITS PER HOUR
MAXIMUM
ONE THOUSAND
LEAVING
LINEAR FEET
LABORATORY
POUND
LENGTH
KILOVOLT AMPERE
KILOWATT
INSULATION
INCHES
INSIDE DIAMETER
BDD
BI
BC
BSD
BACKDRAFT DAMPER
BACKWARD INCLINED
BLOWER COIL
BIOSEAL DAMPER
CC
CD
CFM
CG
COOLING COIL
CUBIC FEET PER MINUTE
CEILING DIFFUSER
CEILING GRILLE
CREF CHILLER ROOM EXHAUST FAN
CU CONDENSING UNIT
DIFF
DWDI DOUBLE WIDTH DOUBLE INLET
DIFFUSER
DWSI
DX DIRECT EXPANSION
DOUBLE WIDTH SINGLE INLET
EF
EG
EHC
EHU
ERU
ER
ERHC
ESP
EXHAUST FAN
EXHAUST GRILLE
ELECTRICAL HEATING COIL
EXHAUST AIR HANDLING UNIT
ENERGY RECOVERY UNIT
EXHAUST REGISTER
ELECTRIC REHEAT COIL
EXTERNAL STATIC PRESSURE
WMS
VVR
VVE
VV
VD
WIRE MESH SCREEN
VARIABLE VOLUME RETURN AIR TERMINAL BOX
VARIABLE VOLUME EXHAUST AIR TERMINAL BOX
VARIABLE VOLUME SUPPLY AIR TERMINAL BOX
VOLUME DAMPER
UC UNDERCUT DOOR
TSP
TR
TG
TF
TOTAL STATIC PRESSURE
TRANSFER
TRANSFER GRILLE
TRANSFER FAN
TEF DEDICATED TOILET EXHAUST FAN
TE TOILET EXHAUST
SWSI
SWDI
SV
SR
SP
SM
SGD
SG
SFD
SF
SEF
SDET
SD
SCR
SATT
SA
SINGLE WIDTH SINGLE INLET
SINGLE WIDTH DOUBLE INLET
VARIABLE VOLUME SUPPLY AIR TERMINAL BOX
SUPPLY REGISTER
STATIC PRESSURE
SHEETMETAL
SLIDE GATE DAMPER
SUPPLY GRILLE
COMBINATION AUTOMATIC SMOKE/FIRE
DAMPER WITH ACCESS DOOR
SUPPLY FAN
SMOKE EXHAUST FAN
SMOKE DETECTOR
SMOKE DAMPER
SCREEN
SOUND ATTENUATOR
SUPPLY AIR
RV
RS
RR
RLF
RL
RHC
RG
RF
RD
RA
RETURN AIR VALVE/BOX
REFRIGERANT SUCTION
RETURN REGISTER
RELIEF
REFRIGERANT LIQUID
REHEAT COIL
RETURN GRILLE
RETURN FAN
REFRIGERANT DISCHARGE (HOT GAS)
RETURN AIR
PHC PREHEAT COIL
OED
OBD
OAI
OA
OPEN END DUCT
OPPOSED BLADE DAMPER
OUTSIDE AIR INTAKE
OUTSIDE AIR
LVDR
LUVR
LD
LAT
LOUVERED DOOR
LOUVER
LINEAR DIFFUSER
LEAVING AIR TEMPERATURE
IH INTAKE HOOD
HU
HV
HRU
HPU
HEPA
HC
HUMIDIFIER
HEATING & VENTILATING UNIT
HEAT RECOVERY UNIT
HEAT PUMP UNIT
HIGH EFFICIENCY PARTICULATE AIR FILTER
HEATING COIL
GWCE
GH
GLASS WASH CENTER EXHAUST
GRAVITY HOOD
GEF GENERAL EXHAUST FAN
AIR SEPARATOR
AUTOMATIC AIR VENTAAV
AS
CH
CHEM
CHW
CHWR
CHWS
DOV
ET
EWT
GR
GS
GHW
GHWR
GHWS GLYCOL HOT WATER SUPPLY
GLYCOL HOT WATER RETURN
GLYCOL HOT WATER
GLYCOL SUPPLY
GLYCOL RETURN
ENTERING WATER TEMPERATURE
EXPANSION TANK
DRAIN OFF VALVE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER
CHEMICAL FEED
CHILLER
HB
HCR
HCS
HRC
HW
HOSE BIBB CONN W/CHAINED CAP
HOT WATER
HEAT RECOVERY COIL - GLYCOL
HOT OR COLD WATER SUPPLY (DUAL TEMP)
HOT OR COLD WATER RETURN (DUAL TEMP)
UV
TDH
S(XXX)
RHWR
RHWS
T(XXX)
RHW
RH
RHP
PCHWS
PCHWR
PROCHW
PHX
PC
P
OS&Y
UNIT VENTILATOR
TOTAL DYNAMIC HEAD
TERTIARY (SYSTEM DEPENDENT PREFIX)
SECONDARY (SYSTEM DEPENDENT PREFIX)
REHEAT HOT WATER RETURN
REHEAT HOT WATER SUPPLY
REHEAT HOT WATER
REHEAT
RADIANT HEATING PANEL
PROCESS CHILLED WATER SUPPLY
PROCESS CHILLED WATER RETURN
PROCESS CHILLED WATER
PLATE HEAT EXCHANGER
PUMPED CONDENSATE
PUMP
OUTSIDE STEM AND YOKE
NET POSITIVE SUCTION HEAD
MANUAL AIR VENTMAV
NPSH
LWT
HWUH
HWS
HWR
HWRHC
HWPHC
HWHC
HWCUH HOT WATER CABINET UNIT HEATER
HOT WATER HEATING COIL
HOT WATER PREHEAT COIL
HOT WATER REHEAT COIL
HOT WATER RETURN
HOT WATER SUPPLY
HOT WATER UNIT HEATER
LEAVING WATER TEMPERATURE
VV SUPPLY VAV BOX
ADJUSTABLE
ACCESS DOOR
AUTOMATIC CONTROL VALVE
UH UNIT HEATER
SCHW SECONDARY CHILLED WATER
AIR TERMINAL DEVICE
ACOUSTICAL LINED DUCTWORK
AUTOMATIC CONTROL DAMPER
HR
HZ
HX HEAT EXCHANGER
HERTZ
HOUR 1. CONTRACT DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND MUST BE USED IN CONJUNCTION TO OBTAIN COMPLETE
CONSTRUCTION INFORMATION. CONTRACTOR SHALL COORDINATE ALL DRAWINGS AND SPECIFICATIONS PRIOR TO COMMENCING WORK.
QUESTIONS REGARDING DESIGN INTENT OR SYSTEM OPERATION SHALL BE PROMPTLY BROUGHT TO ATTENTION OF THE COR.
2. INSTALL DEVICES AND SYSTEM WIRING TO AVOID DISTURBANCE TO HISTORIC FABRIC AND TO AVOID VISUAL INTRUSION INTO PUBLIC VISITATION AREAS. HISTORIC PRESERVATION SHALL BE TAKEN INTO ACCOUNT THROUGHOUT THE PROJECT.
3. USE EXISTING ROUTING FOR NEW FEEDERS AND BRANCH CIRCUITS WHENEVER POSSIBLE. IF A PATH IS FOUND TO BE UNTENABLE, CONFIRM NEW ROUTING WITH THE COR. WIRING SHALL BE INSTALLED WITHIN CONDUIT WHERE EXISTING PATHS INCLUDE CONDUIT.
4. USE EXISTING HOLES AND OPENINGS TO INSTALL CONDUIT AND CABLE. WHERE NO USABLE PATH EXISTS, CUT NEW HOLES. COORDINATE
SIZE AND LOCATIONS OF DRILLED HOLES AND CUT OPENINGS WITH THE COR.
5. CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH THE SITE PRIOR TO SUBMITTING BID.
6. THE TERM "REMOVE" MEANS DISCONNECT AND REMOVE THE DEVICE INCLUDING OUTLETS, BRANCH CIRCUIT WIRING AND RACEWAY.
7. THE TERM “PROVIDE” MEANS FURNISH AND INSTALL, COMPLETE AND READY FOR USE.
8. THE TERM “CONTRACT DOCUMENTS” MEANS THE PROJECT MANUAL, DRAWINGS, ADDENDA, SKETCHES AND OTHER DOCUMENTATION THAT
DEFINE THE WORK.
9. ANY CONFLICTS BETWEEN SPECIFICATIONS AND DRAWINGS SHALL BE PROMPTLY BROUGHT TO COR’S ATTENTION. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK EXCEPT AT THEIR OWN RISK, UNTIL CLARIFICATIONS OF CONFLICTS ARE ISSUED TO THE
CONTRACTORS BY THE COR.
10. WHERE DEVICES, WIRING, MOLDING, ETC. ARE TO BE REMOVED FROM EXISTING HISTORIC FABRIC AND REMOVAL MAY NOT BE POSSIBLE WITHOUT DAMAGING EXISTING HISTORIC FABRIC, NOTIFY COR PRIOR TO THE REMOVAL OF THE ITEM.
11. PROVIDE ENGRAVED, PHENOLIC NAMEPLATE PANELS, SAFETY SWITCHES, CABINETS, ETC, TO IDENTIFY THE UNIT AND THE SOURCE PANEL
AND CIRCUIT NUMBER.
12. ALL ELECTRICAL MATERIALS SHALL BE TEMPERATURE RATED FOR 90°C.
ELECTRICAL NOTED
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL LEGEND
M0.2
DN
UP
W
CO
MAV
AAV
PT
E
FM
S
OR
OR
OR
R w
GATE VALVE
BALL VALVE
BALL VALVE WITH MEMORY STOP (BALANCING VALVE)
BALL VALVE WITH HOSE BIBB, CAP & CHAIN (DRAIN VALVES)
BUTTERFLY VALVE
BUTTERFLY VALVE WITH MEMORY STOP (BALANCING VALVE)
GLOBE VALVE
PRESSURE REDUCING VALVE
CHECK VALVE
STRAINER W/BALL VALVE, HOSE BIBB & CAP (GATE VALVE FOR STEAM)
SOLENOID VALVE
AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR
THREE WAY AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
THREE WAY AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR
AUTOMATIC FLOW CONTROL VALVE (PRESSURE INDEPENDENT)
COMBINATION FLOWMETER/SHUT OFF/BALANCING VALVE (CIRCUIT SETTER)
FLOW MEASURING DEVICE
FLOW SWITCH
SAFETY RELIEF VALVE
UNION OR FLANGE (AS INDICATED BY PIPE SIZE - SEE SPEC.)
BLIND FLANGE
END CAP
PRESSURE GAUGE WITH GAUGE CLOCK
PRESSURE/TEMPERATURE WELL
AUTOMATIC AIR VENT WITH ISOLATION VALVE
MANUAL AIR VENT
REDUCER (ECCENTRIC-FLAT ON BOTTOM OR FLAT ON TOP)
REDUCER (CONCENTRIC)
FLEXIBLE CONNECTION
EXPANSION JOINT
PIPE GUIDE
ANCHOR
RISE (SINGLE LINE - PLAN VIEW)
DROP (SINGLE LINE - PLAN VIEW)
VALVE IN VERTICAL
TOP TAKEOFF
BOTTOM TAKEOFF
PIPE BREAK (SINGLE LINE)
WATER METER DIAL TYPE
DIRT LEG
CLEAN-OUT FOR CONDENSATE DRAIN
RISE (DOUBLE LINE - PLAN VIEW)
DROP (DOUBLE LINE - PLAN VIEW)
PIPE BREAK (DOUBLE LINE)
DIRECTION OF FLOW IN PIPE
PITCH PIPE UP IN DIRECTION OF FLOW
PITCH PIPE DOWN IN DIRECTION OF FLOW
NEW WORK
SUPPLY LINES
RETURN LINES
PIPING LEGENDDUCTWORK
SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE
ROUND SUPPLY
DUCT UP
SUPPLY
DUCT UP
ROUND SUPPLY
DUCT DN
SUPPLY DUCT
DOWN
STANDARD RADIUS
ELBOW
( R = W )
SUPPLY/RETURN
EXHAUST
SPLIT TAKE-OFF
W/ BRANCH DAMPERS
SUPPLY
BULLHEAD SPLIT
SUPPLY
CEILING DUCT
GOOD FOR
RING DUCT
TAKEOFF TO
MTD DIFF/GRILLE
W/BRANCH TAKE-OFF
VOLUME DAMPER
CEILING DUCT
MTD DIFF/GRILLE
W/BRANCH TAKE-OFF
VOLUME DAMPER
OPEN END
DUCT W/VD &
1/2"x1/2" WMS
FLEXIBLE
DUCT
RISE/DROP
RISE/DROP
ROUND RETURN OR
EXHAUST
DUCT UP
RETURN/EXHAUST
DUCT UP
RETURN/EXHAUST
DUCT DOWN
ROUND RETURN OR
EXHAUST DUCT
DN
HORIZONTAL
OFFSET
SUPPLY/RETURN
/EXHAUST
RISE OR DROP
SUPPLY/RETURN/
EXHAUST
RING
DUCT
90° TAKE-OFF W/BRANCH TAKE-OFF
VOLUME DAMPER (VD IN LOW PRESSURE
SYSTEMS ONLY)
BULLHEAD CONVERGE
RETURN/EXHAUST
W/BRANCH TAKE-OFF
VOLUME DAMPER
SIDEWALL DUCT MTD
REGISTER/GRILLE
W/BRANCH TAKE-OFF
VOLUME DAMPER
SUPPLY SIDEWALL
LINEAR DIFFUSER
(W/ 1" INTERNALLY
LINED SM PLENUM)
BRANCH CONN
W/VD FOR EVERY
4' OF LINEAR
SUPPLY CEILING
LINEAR DIFFUSER (W/
1" INTERNALLY LINED
SM PLENUM) BRANCH
CONN W/VD FOR
EVERY 4' OF LINEAR BOOT
BY LD
MFR
AVS AIR VOLUME TRAVERSE STATION
WITH ACCESS DOOR
ROOF EXHAUST FAN
SHOWN ON ROOF
ROOF EXHAUST FAN
SHOWN ON FLOOR PLAN
RETURN OR EXHAUST
AIR FLOW
SUPPLY AIR FLOW
STANDARD 4-WAY BLOW
SUPPLY DIFFUSER
BLANKED FOR 3-WAY BLOW
SUPPLY DIFFUSER
BLANKED FOR 2-WAY BLOW
SUPPLY DIFFUSER
BLANKED FOR 1-WAY BLOW
SUPPLY DIFFUSER
ALTERNATE CFM LOCATION
DESIGN CFM
(200) A(200)
SYMBOL DESIGNATES ASSOCIATED
SYSTEM OR SERVICE (ie HWS)
REFER TO DRAWINGS ( ) FOR
CONTINUATION XXX
SMOKE DETECTOR
PRESSURE TRANSMITTER
HUMIDITY INDICATOR
TEMPERATURE INDICATOR
HUMIDITY SENSOR
TEMPERATURE SENSOR
HUMIDISTAT
THERMOSTATSECTION DESIGNATION SHEET NUMBER
DETAIL DESIGNATION SHEET NUMBER
REVISION NUMBER
DIFFUSER, GRILLE, REGISTER LETTER
DESIGNATOR
CALL OUT SYMBOLS
M.XX
M.XX
SDET
P
MI
TI
MS
TS
C CARBON DIOXIDE SENSOR
MATCHLINE
BDD BACKDRAFT DAMPER
FSD COMBINATION SMOKE/FIRE
DAMPER W/ACCESS DOOR
SGD SLIDE GATE DAMPER
VD MANUAL VOLUME DAMPER
(OBD IN DIFFUSER)
ACD AUTOMATIC CONTROL DAMPER
W/ACCESS DOOR
SD AUTOMATIC SMOKE DAMPER
W/ACCESS DOOR
FD FIRE DAMPER W/ ACCESS DOOR
X PIPE ANCHOR FOR EXPANSION LOOP
PIPE GUIDE FOR EXPANSION LOOP
EQUIPMENT TAG SYMBOLS & ABBREVIATIONS
RH
VFD
C
C
C
VARIABLE FREQUENCY DRIVE
UNIT HEATER
CABINET HEATER
COOLING COIL
REHEAT COIL
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
W/ MODULATING ACTUATOR
W/ MODULATING ACTUATOR
W/ TWO POSITION ACTUATOR
BACKDRAFT DAMPER
PARALLEL BLADE DAMPER
W/ TWO POSITION ACTUATOR
OPPOSED BLADE DAMPER
ROOF FAN
FLOW DIAGRAM AND CONTROL DIAGRAM EQUIP SYMBOLS
C
H
HEATING COIL
FILTER BANK
INLINE CENTRIFUGAL FAN
CENTRIFUGAL FAN
PUMP
UPBLAST CENTRIFUGAL FAN
TAG
NO
TAG
NO
EXPANSION TANK
AIR SEPARATOR
CHEMICAL FEED SYSTEM
AIR TERMINAL BOX WITH
REHEAT COIL
AIR TERMINAL BOX
AAV
NOTE: REFER TO SCHEDULES FOR EQUIPMENT SPECIFIC DATA
OCCUPIED MAX CFM
UNOCCUPIED CFM
TERMINAL BOXVAV/VAVE
XXX
XXX
OCCUPIED MAX GPM
TERMINAL BOXVAV/VAVE
XXX
AIR VALVE
PUSH BUTTONPB
RF SHIELDED ROOM
EQUIPMENT NOT
REQUIRING
ELECTRIC SERVICE
EQUIPMENT
REQUIRING
ELECTRIC SERVICE
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
KITCHEN
HALL HALL
STORAGE
CONFERENCE ROOM
HP
SERVICE
STAIRS
UNISEX
TOILET
STORAGE
REFRIGERATION
LINE STORAGE
EF
TO REMAIN
(E)12x6 SA
(TYP 2)
(E)10x8 SA
(E)8x8 SA (E)8x8 SA
(E)8x8 SA (E)8x8 SA
(E)6Ø SA
(E)8x8 SA
(E)24x24 RA
HALL
EXHIBIT ROOM #2 EXHIBITION ROOM
RECEPTION LOBBY
STAIRS
HP
CUCU
LIBRARY STAFF
ROOM
WOMEN
TOILET
MEN
TOILET SERVICE
STAIRS
REFRIGERATION
LINE
(E)10x8 SA
(E)10x8 SA
(E)10x8 SA (E)10x8 SA
(E)10x8 SA (E)18x12 RA(E)18x12 RA
(E)24x24 SA(E)24x24 SA
(E)24x24 SA
(E)10x6 SA
(E)10x6 SA
(E)24x12 SA
AHU
CHAMBER
OFFICE
HALL
CHAMBER
PARLOR
CHAMBERCHAMBER
STAIRS
LIVING ROOM
SERVICE
STAIRS
RECEPTION
ROOM
(E)8x8 SA
(E)8x8 SA
(E)10x6 RA (E)10x6 RA
(E)8x8 SA
(E)8x8 SA
(E)4x4 SA
(E)8x8 SA (E)8x8 SA
(E)10x6 RA (E)10x6 RA
(E)6x6 SA(E)6x6 SA
(E)8x8 RA
(E)200 CFM RA
(E)10x6 RA
(E)10x6 RA
(E)8x8 RA
REPLACEMENT OF HVAC SYSTEMS
RICHMOND NATIONAL BATTLEFIELD PARK
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL DEMOLITION FLOOR PLAN
CHIMBORAZO VISITOR CENTERM1.1
LEVEL 2 FLOOR PLAN
1/8" = 1'-0"
ROOF FLOOR PLAN
1/8" = 1'-0"
SCOPE OF WORK:
DEMOLISH HEAT PUMPS, PADS, AND REFRIGERATION LINES.
DEMOLISH AHU, ROOF CURB, AND 2ND FLOOR DUCTWORK THAT IS
INDICATED ON PLAN.
DETACH FLEX DUCT AND DEMOLISH DIFFUSER.
DEMOLISH EXHAUST FAN IN THE BATHROOM.
BASEMENT FLOOR PLAN
1/8" = 1'-0"
LEVEL1 FLOOR PLAN
1/8" = 1'-0"
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED
TO SHOW ALL TRANSITIONS, OFFSETS, ETC. CONTRACTOR SHALL
FIELD VERIFY EXISTING CONDITIONS AND PROVIDE ALL NECESSARY
FITTINGS TO COMPLETE THE INTENT OF THE DRAWINGS. ANY
DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS SHALL
BE REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION.
CONTRACTOR MAY LOCATE MECHANICAL EQUIPMENT DIFFERENTLY
THAN SHOWN ON DRAWINGS DUE TO CONFLICTS, AS LONG AS
FUNCTION AND/OR APPEARANCE ARE NOT AFFECTED.
2. ALL NEW MATERIAL, INCLUDING BUT NOT LIMITED TO DUCTWORK,
PIPING, WIRING, AND HANGERS SHALL THAT PENETRATE SURFACES
SHALL USE EXISTING OPENINGS WHENEVER POSSIBLE. IF NEW
PENETRATIONS ARE REQUIRED OR EXISTING ONES ARE ABANDONED,
USE MATERIALS THAT VISUALLY MATCH IN-PLACE ADJACENT
SURFACES TO THE FULLEST EXTENT POSSIBLE. REFER TO
SPECIFICATION 01 73 29 CUTTING AND PATCHING.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL BE PERFORMED BY AN ELECTRICIAN LICENSED
IN THE COMMONWEALTH OF VIRGINIA.
2. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL CONDUCT A
THOROUGH ASSESSMENT OF THE EXISTING ELECTRICAL SYSTEM.ENSURE
PROPOSED MECHANICAL REPLACEMENTS AND UPGRADES INTEGRATE
SEAMLESSLY WITH THE CURRENT INFRASTRUCTURE. PERFORM LOAD
CALCULATIONS FOR THE EXISTING ELECTRICAL SYSTEM TO ENSURE
ADEQUATE POWER DISTRIBUTION. ADJUST FOR NEW LOADS OR EQUIPMENT,
ENSURING THE SYSTEM CAN HANDLE THE ADDITIONAL DEMAND WITHOUT
OVERLOAD.
3. ONCE EQUIPMENT AS BEEN DISCONNECTED, VERIFY THAT FEEDERS ARE
DE-ENERGIZED AND DEVICES ARE OBSOLETE AND REMOVE WIRING, RACEWAY
AND DEVICES. NOTIFY THE COR IF A FEEDER AND ASSOCIATED DEVICES ARE
FOUND TO BE FOR EQUIPMENT THAT IS.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
HALL HALL
STORAGE
CONFERENCE ROOM
HP-1A
(E)910 CFM RA
SERVICE
STAIRS
T
UNISEX
TOILET
STORAGE
REFRIGERATION
LINE
REMOVE DIFFUSER
AND CONNECT FLEX
DUCT TO DUCT SHEET
METAL DUCT AND
SEAL.
STORAGE
EF-1A
EXISTING LOUVER
PROVIDE SHUT OFF ON
CONDENSATE DRAIN
WITH FLOAT SWITCH
(E)105 CFM SA
(TYP 2)
(E)100 CFM SA
(E)100 CFM SA
(E)100 CFM SA
(E)100 CFM SA
(E)100 CFM SA
(E)100 CFM SA (E)100 CFM SA
8x6
HALL
EXHIBIT ROOM #2 EXHIBITION ROOM
RECEPTION LOBBY
STAIRS
CU-1A CU-2A HP-2A
T
LIBRARY STAFF
ROOM
WOMEN
TOILET
MEN
TOILET SERVICE
STAIRS
REFRIGERATION
LINE
(E)50 CFM SA
(E)50 CFM SA
(E)50 CFM SA (E)750 CFM SA
(E)75 CFM SA
(E)75 CFM SA
(E)75 CFM SA
(E)150 CFM SA (E)150 CFM SA
(E)60 CFM SA
(E) 445 CFM RA(E) 445 CFM RA
(E)100 CFM SA
AHU-1A
HATCH DOWN TO
ATTIC. LOCATE VAV
BOXES IN ATTIC.
18x15 SA DUCT DN 15x18 RA DUCT DN
CHAMBER
OFFICE
HALL
CHAMBER
PARLOR
CHAMBERCHAMBER
STAIRS
LIVING ROOM
SERVICE
STAIRS
T
T
T T
RECEPTION
ROOM
(E)250CFM SA
(E)250 CFM SA
(E)100 CFM SA
(E)200CFM SA (E)250CFM SA
(E)200CFM SA
(E)250CFM SA
(E)100 CFM SA
(E)180 CFM SA
VV-1
VV-4
VV-4
VV-4
18x15
12x10
12x10
8x8
8x8
14x10
8x8
8x8
6x6
(E)250 CFM RA(E)200 CFM RA
(E)250 CFM RA
(E)250 CFM RA
(E)250 CFM RA
(E)180 CFM RA
(E)100 CFM RA (E)200 CFM RA
10x8
REPLACEMENT OF HVAC SYSTEMS
RICHMOND NATIONAL BATTLEFIELD PARK
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL NEW WORK FLOOR PLAN
CHIMBORAZO VISITOR CENTERM1.2
LEVEL 2 FLOOR PLAN
1/8" = 1'-0"
ROOF FLOOR PLAN
1/8" = 1'-0"
BASEMENT FLOOR PLAN
1/8" = 1'-0"
LEVEL1 FLOOR PLAN
1/8" = 1'-0"
SCOPE OF WORK:
CLEAN ALL EXISTING DUCTWORK AND REPLACE ANY DAMAGES SHEET METAL AND INSULATION.
ASSUME 10' OF NEW DUCTWORK AND INSULATION.
INSTALL NEW HEAT PUMPS. OUTDOOR UNITS SHALL BE ON NEW 3" PRECAST CONCRETE OR HPDE PAD . REFRIGERANT LINE SERVING HP-1A RUNS ALONGTHE GROUND TO OPENING INTO THE BASEMENT.
REFRIGERANT LINE SERVING HP-2A RUNS UP THE EXTERIOR OF THE BUILDING INTO THE FIRST FLOOR.
RUN NEW REFRIGERANT LINES IN EXISTING LOCATIONS. INDOOR UNITS SHALL BE INSTALLED IN EXISTING LOCATIONS. RECONNECT TO EXISTING DUCTWORK AND RUN CONDENSATION TO EXISTING
DRAIN. PROVIDE NEW THERMOSTAT FOR EACH HEAT PUMP.
INSTALL NEW AHU ON THE EXISTING ROOF CURB. NEW AHU MATCHES THE EXISTING UNIT
DIMENSIONS. RUN DUCTWORK THROUGH THE EXISTING ROOF OPENINGS.
REPLACE EXHAUST FAN, PROVIDE NEW DUCTWORK CONNECTING FAN TO EXISTING LOUVER. CLEAN
EXISTING LOUVER.
INSTALL (4) VAV BOXES IN THE ATTIC, CONFIRM VAVS HAVE MANUFACTURES REQUIRED CLEARANCE..
PROVIDE NEW THERMOSTAT FOR EACH BOX.
BALANCE AIR SYSTEM BASED ON THE CFMS ON THE FLOOR PLAN.
PROVIDE TRANE CONCIERGE SYSTEM. TIE IN AHU. HEAT PUMPS, AND ALL THERMOSTATS. LOCATED
CONTROLLER IN BASEMENT MECHANICAL ROOM.
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND
NOT INTENDED TO SHOW ALL TRANSITIONS, OFFSETS,
ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO
COMPLETE THE INTENT OF THE DRAWINGS. ANY
DISCREPANCIES BETWEEN DRAWINGS AND FIELD
CONDITIONS SHALL BE REPORTED TO THE
CONTRACTING OFFICER FOR RESOLUTION.
CONTRACTOR MAY LOCATE MECHANICAL EQUIPMENT
DIFFERENTLY THAN SHOWN ON DRAWINGS DUE TO
CONFLICTS, AS LONG AS FUNCTION AND/OR
APPEARANCE ARE NOT AFFECTED.
2. ALL NEW MATERIAL, INCLUDING BUT NOT LIMITED TO
DUCTWORK, PIPING, WIRING, AND HANGERS SHALL THAT
PENETRATE SURFACES SHALL USE EXISTING OPENINGS
WHENEVER POSSIBLE. IF NEW PENETRATIONS ARE
REQUIRED OR EXISTING ONES ARE ABANDONED, USE
MATERIALS THAT VISUALLY MATCH IN-PLACE ADJACENT
SURFACES TO THE FULLEST EXTENT POSSIBLE. REFER
TO SPECIFICATION 01 73 29 CUTTING AND PATCHING.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL BE PERFORMED BY AN ELECTRICIAN
LICENSED IN THE COMMONWEALTH OF VIRGINIA.
2. FOR EQUIPMENT BEING REPLACE IN-KIND, THE ELECTRICAL
CONTRACTOR SHALL DISCONNECT POWER WIRING FROM
MECHANICAL EQUIPMENT. NEATLY COIL DISCONNECTED WIRING
AND STORE IN-PLACE DURING CONSTRUCTION. AFTER NEW
EQUIPMENT HAS BEEN SET-IN-PLACE CONNECT EXISTING POWER
WIRING TO NEW EQUIPMENT.
3. FOR ALL NEW EQUIPMENT, ELECTRICAL CONTRACTOR SHALL
IDENTIFY THE POWER SOURCE, ENSURE THE PANEL HAS THE
CAPACITY TO HANDLE THE ADDITIONAL LOAD. IF AN ELECTRICAL
UPGRADE IS NECESSARY, NOTIFY COR. INSTALL DEDICATED
CIRCUIT BREAKER AND PROPER WIRE FOR THE EQUIPMENT. RUN
CONDUIT AND WIRING THROUGH EXISTING PENETRATION. INSTALL
LOCAL DISCONNECT ON EQUIPMENT.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
STORAGE ROOM
EXHIBITION AREA
WOMEN'S RESTROOM
MEN'S RESTROOM
UTILITY
ROOM
10"Ø x8 x1
8x
8x6 12x14
TO ATTIC)
12x14 (UP
AHU-1
18x12
HP-1
EF-2EF-1
6" CONCRETE PAD
VD
VD
VD
VD
W
10"Ø
EXISTING UNDERGROUND
1-1/4" WATER LINE TO REMAIN
WATER FOUNTAIN
EXISTING UNDERGROUND
REFRIGERANT PIPING
STORAGE ROOM
EXHIBITION AREA
WOMEN'S RESTROOM
MEN'S RESTROOM
UTILITY
ROOM
10"Ø x8 x1
8x
8x6 12x14
TO ATTIC)
12x14 (UP
VD
VD
VD
VD
W
10"Ø
CU-1B
HP-1A
EF-1B
EXISTING UNDERGROUND
1-1/4" WATER LINE TO REMAIN
T
(E)290 CFM SA
B3(575 CFM RA)
REFRIGERANT
LINE
WATER FOUNTAIN
(E)150 CFM EX
10Ø
8Ø
(E)75 CFM SA
(TYP 4)
L-1B
(E)285 CFM SA
20x20
(E)150 CFM EX
REPLACEMENT OF HVAC SYSTEMS
RICHMOND NATIONAL BATTLEFIELD PARK
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL FLOOR PLAN
COLD HARBOR VISITOR CENTERM1.3
DEMOLITION FLOOR PLAN
1/4" = 1'-0"
NEW WORK FLOOR PLAN
1/4" = 1'-0"
SCOPE OF WORK:
DEMOLISH HEAT PUMP, CONCRETE PAD, AND BRICK WALL. DEMOLISH ALL
REFRIGERANT PIPING.
DEMOLISH EXHAUST FANS.
CLEAN ALL EXISTING DUCTWORK AND REPLACE ANY DAMAGES SHEET METAL AND
INSULATION. ASSUME 10' OF NEW DUCTWORK AND INSULATION.
INSTALL NEW HEAT PUMP. OUTDOOR UNIT SHALL MOUNTED ON THE SIDE OF THE
BUILDING. RUN NEW REFRIGERANT LINES IN THE BUILDING WITHOUT RUNNING
BELOW GRADE. INDOOR UNITS SHALL BE INSTALLED IN EXISTING LOCATIONS.
RECONNECT TO EXISTING DUCTWORK AND RUN CONDENSATION TO EXISTING DRAIN.
PROVIDE NEW THERMOSTAT.
PROVIDE NEW EXHAUST FAN LOCATED IN THE CEILING PLENUM. PROVIDE NEW
DUCTWORK CONNECTING FAN TO NEW LOUVER ON EXTERIOR WALL. ACCESS
CEILING PLENUM THROUGH ACCESS HATCH IN STORAGE ROOM. AVOID ADD ANY
OPENINGS IN CEILING/
BALANCE AIR SYSTEM BASED ON THE CFMS ON THE FLOOR PLAN.
HEAT PUMP AND FAN SHALL BE CONTROLLED BY MANUFACTURE'S INTEGRAL
CONTROLS.
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND
NOT INTENDED TO SHOW ALL TRANSITIONS, OFFSETS,
ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS
TO COMPLETE THE INTENT OF THE DRAWINGS. ANY
DISCREPANCIES BETWEEN DRAWINGS AND FIELD
CONDITIONS SHALL BE REPORTED TO THE
CONTRACTING OFFICER FOR RESOLUTION.
CONTRACTOR MAY LOCATE MECHANICAL EQUIPMENT
DIFFERENTLY THAN SHOWN ON DRAWINGS DUE TO
CONFLICTS, AS LONG AS FUNCTION AND/OR
APPEARANCE ARE NOT AFFECTED.
2. ALL NEW MATERIAL, INCLUDING BUT NOT LIMITED TO
DUCTWORK, PIPING, WIRING, AND HANGERS SHALL
THAT PENETRATE SURFACES SHALL USE EXISTING
OPENINGS WHENEVER POSSIBLE. IF NEW
PENETRATIONS ARE REQUIRED OR EXISTING ONES
ARE ABANDONED, USE MATERIALS THAT VISUALLY
MATCH IN-PLACE ADJACENT SURFACES TO THE
FULLEST EXTENT POSSIBLE. REFER TO SPECIFICATION
01 73 29 CUTTING AND PATCHING.
2 2
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL BE PERFORMED BY AN ELECTRICIAN LICENSED IN
THE COMMONWEALTH OF VIRGINIA.
2. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL CONDUCT A
THOROUGH ASSESSMENT OF THE EXISTING ELECTRICAL SYSTEM.ENSURE
PROPOSED MECHANICAL REPLACEMENTS AND UPGRADES INTEGRATE SEAMLESSLY
WITH THE CURRENT INFRASTRUCTURE. PERFORM LOAD CALCULATIONS FOR THE
EXISTING ELECTRICAL SYSTEM TO ENSURE ADEQUATE POWER DISTRIBUTION.
ADJUST FOR NEW LOADS OR EQUIPMENT, ENSURING THE SYSTEM CAN HANDLE THE
ADDITIONAL DEMAND WITHOUT OVERLOAD.
3. ONCE EQUIPMENT AS BEEN DISCONNECTED, VERIFY THAT FEEDERS ARE
DE-ENERGIZED AND DEVICES ARE OBSOLETE AND REMOVE WIRING, RACEWAY AND
DEVICES. NOTIFY THE COR IF A FEEDER AND ASSOCIATED DEVICES ARE FOUND TO
BE FOR EQUIPMENT THAT IS.
4. FOR EQUIPMENT BEING REPLACE IN-KIND, THE ELECTRICAL CONTRACTOR SHALL
DISCONNECT POWER WIRING FROM MECHANICAL EQUIPMENT. NEATLY COIL
DISCONNECTED WIRING AND STORE IN-PLACE DURING CONSTRUCTION. AFTER NEW
EQUIPMENT HAS BEEN SET-IN-PLACE CONNECT EXISTING POWER WIRING TO NEW
EQUIPMENT.
5. FOR ALL NEW EQUIPMENT, ELECTRICAL CONTRACTOR SHALL IDENTIFY THE POWER
SOURCE, ENSURE THE PANEL HAS THE CAPACITY TO HANDLE THE ADDITIONAL
LOAD. IF AN ELECTRICAL UPGRADE IS NECESSARY, NOTIFY COR. INSTALL
DEDICATED CIRCUIT BREAKER AND PROPER WIRE FOR THE EQUIPMENT. RUN
CONDUIT AND WIRING THROUGH EXISTING PENETRATION. INSTALL LOCAL
DISCONNECT ON EQUIPMENT.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
DINNING
ROOM
WASHROOM
MECH.
ROOMHP-4-E
HP-3E
BRANCH BOX
UP TO
HEAT PUMP
UP TO
HEAT PUMP
REFRIGERATION
LINE (TYP)
LIVING
ROOM
LIVING
ROOM
CORRIDOR
MECH.
CLOSET
HP-1E
HP-5E
CU-3E CU-2E CU-1E
REFRIGERATION
LINE
PROVIDE LINE COVER
OVER REFRIGERATION
LINE RUN UP THE
EXTERIOR OF THE
BUILDING.
REFRIGERATION
DN TO BASEMENT
(E) 335 CFM SA
(E)735 CFM RA
(E) 400 CFM SA
T REFRIGERATION
DN TO BASEMENT
BEDROOM #1
BEDROOM #2
WASHROOM
HP-2E
REFRIGERATION
LINE
(E)245 CFM RA
(TYP 3)
(E)125 CFM SA
(TYP 5)
(E)110 CFM SA
(TYP 1)
T
KITCHEN
DINNING
ROOM
WASHROOM
MECH.
ROOMHP
HP
LIVING
ROOM
LIVING
ROOM
CORRIDOR
MECH.
CLOSET
HP
HP
CU CU CU
(E)10x10 SA HIGH (E)14x14 RA LOW
(E)10x16 SA HIGH
BEDROOM #1
BEDROOM #2
WASHROOM
HP
(E)12x12 RA
(TYP 3)
(E) 6" Ø SA
(TYP 6)
REPLACEMENT OF HVAC SYSTEMS
RICHMOND NATIONAL BATTLEFIELD PARK
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL FLOOR PLAN
WATT HOUSEM1.4
LEVEL 2 NEW WORK FLOOR PLAN
1/8" = 1'-0"
BASEMENT NEW WORK FLOOR PLAN
1/8" = 1'-0"
LEVEL1 NEW WORK FLOOR PLAN
1/8" = 1'-0"
LEVEL 2 DEMO FLOOR PLAN
1/8" = 1'-0"
BASEMENT DEMO FLOOR PLAN
1/8" = 1'-0"
LEVEL1 DEMO FLOOR PLAN
1/8" = 1'-0"
SCOPE OF WORK:
DEMOLISH HEAT PUMPS, CONCRETE PADS, AND REFRIGERANT PIPING. FUJITSU
SPLIT SYSTEM CONSISTING OF (1) OUTDOOR UNIT AND (3) INDOOR UNIT SHALL BE
RETURNED TO THE PARK.
DUCTWORK RECENTLY CLEANED AND DOES NOT NEED TO BE CLEANED.
INSTALL NEW HEAT PUMPS. OUTDOOR UNITS SHALL BE ON NEW 3" PRECAST
CONCRETE OR HPDE PAD . REFRIGERANT LINE SERVING HP-1E RUNS UP THE
EXTERIOR OF THE BUILDING INTO THE SECOND FLOOR. REFRIGERANT LINE SERVING
HP-2E RUNS ALONG THE GROUND TO OPENING INTO THE BASEMENT AND THROUGH
THE BASEMENT CEILING TO A RISER TO THE FIRST FLOOR CU-3E CONSISTS OF (3)
REFRIGERANT LINE SERVING HP-3E, HP-4E, AND HP-5E. ALL (3) LINES RUNS ALONG
THE GROUND TO OPENING INTO THE BASEMENT TO THERE DEDICATED UNIT.RUN
NEW REFRIGERANT LINES IN EXISTING LOCATIONS. INDOOR UNITS SHALL BE
INSTALLED IN EXISTING LOCATIONS. RECONNECT TO EXISTING DUCTWORK AND RUN
CONDENSATION TO EXISTING DRAIN. PROVIDE NEW THERMOSTAT FOR EACH HEAT
PUMP.
BALANCE AIR SYSTEM BASED ON THE CFMS ON THE FLOOR PLAN.
HEAT PUMP SHALL BE CONTROLLED BY MANUFACTURE'S INTEGRAL CONTROLS.
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO
SHOW ALL TRANSITIONS, OFFSETS, ETC. CONTRACTOR SHALL FIELD VERIFY
EXISTING CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO
COMPLETE THE INTENT OF THE DRAWINGS. ANY DISCREPANCIES BETWEEN
DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE
CONTRACTING OFFICER FOR RESOLUTION. CONTRACTOR MAY LOCATE
MECHANICAL EQUIPMENT DIFFERENTLY THAN SHOWN ON DRAWINGS DUE TO
CONFLICTS, AS LONG AS FUNCTION AND/OR APPEARANCE ARE NOT
AFFECTED.
2. ALL NEW MATERIAL, INCLUDING BUT NOT LIMITED TO DUCTWORK, PIPING,
WIRING, AND HANGERS SHALL THAT PENETRATE SURFACES SHALL USE
EXISTING OPENINGS WHENEVER POSSIBLE. IF NEW PENETRATIONS ARE
REQUIRED OR EXISTING ONES ARE ABANDONED, USE MATERIALS THAT
VISUALLY MATCH IN-PLACE ADJACENT SURFACES TO THE FULLEST EXTENT
POSSIBLE. REFER TO SPECIFICATION 01 73 29 CUTTING AND PATCHING.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL BE PERFORMED BY AN ELECTRICIAN LICENSED IN
THE COMMONWEALTH OF VIRGINIA.
2. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL CONDUCT A
THOROUGH ASSESSMENT OF THE EXISTING ELECTRICAL SYSTEM.ENSURE
PROPOSED MECHANICAL REPLACEMENTS AND UPGRADES INTEGRATE SEAMLESSLY
WITH THE CURRENT INFRASTRUCTURE. PERFORM LOAD CALCULATIONS FOR THE
EXISTING ELECTRICAL SYSTEM TO ENSURE ADEQUATE POWER DISTRIBUTION.
ADJUST FOR NEW LOADS OR EQUIPMENT, ENSURING THE SYSTEM CAN HANDLE THE
ADDITIONAL DEMAND WITHOUT OVERLOAD.
3. ONCE EQUIPMENT AS BEEN DISCONNECTED, VERIFY THAT FEEDERS ARE
DE-ENERGIZED AND DEVICES ARE OBSOLETE AND REMOVE WIRING, RACEWAY AND
DEVICES. NOTIFY THE COR IF A FEEDER AND ASSOCIATED DEVICES ARE FOUND TO
BE FOR EQUIPMENT THAT IS.
4. FOR EQUIPMENT BEING REPLACE IN-KIND, THE ELECTRICAL CONTRACTOR SHALL
DISCONNECT POWER WIRING FROM MECHANICAL EQUIPMENT. NEATLY COIL
DISCONNECTED WIRING AND STORE IN-PLACE DURING CONSTRUCTION. AFTER NEW
EQUIPMENT HAS BEEN SET-IN-PLACE CONNECT EXISTING POWER WIRING TO NEW
EQUIPMENT.
5. FOR ALL NEW EQUIPMENT, ELECTRICAL CONTRACTOR SHALL IDENTIFY THE POWER
SOURCE, ENSURE THE PANEL HAS THE CAPACITY TO HANDLE THE ADDITIONAL
LOAD. IF AN ELECTRICAL UPGRADE IS NECESSARY, NOTIFY COR. INSTALL
DEDICATED CIRCUIT BREAKER AND PROPER WIRE FOR THE EQUIPMENT. RUN
CONDUIT AND WIRING THROUGH EXISTING PENETRATION. INSTALL LOCAL
DISCONNECT ON EQUIPMENT.
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
HP-2F
CU-2F
HP-1F
CU-1F
REFRIGERATION LINE
REFRIGERATION LINESTORAGE
IT
BATH
SERVER
L/E CHIEF
KITCHEN
BATH
L/E OFFICERS
COPY ROOM
RESOURCES
CHIEF
GARAGE
(E)65CFM SA
(E)70CFM SA
(TYP 2)
(E)70CFM SA
(E)50CFM SA
(E)50CFM SA
(E)50CFM SA
(E)50CFM SA
(E)70CFM SA
(TYP 3)
(E)70CFM SA
(TYP 2)
(E)875 CFM RA
T
CU
HP
CU
REFRIGERATION LINE
REFRIGERATION LINESTORAGE
IT
BATH
SERVER
L/E CHIEF
KITCHEN
BATH
L/E OFFICERS
COPY ROOM
RESOURCES
CHIEF
GARAGE
(E)12x4 SA
(E)12x4 SA
(TYP 2)
(E)12x4 SA
(E)12x4 SA (E)12x4 SA
(E)12x4 SA
(E)12x4 SA
(E)12x4 SA
(TYP 3)
(E)12x4 SA
(TYP 2)
(E)12x12 RA
REPLACEMENT OF HVAC SYSTEMS
RICHMOND NATIONAL BATTLEFIELD PARK
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL FLOOR PLAN
RANGER OFFICE, 1900 MAINTENANCE WAYM1.5
1900 MAINTENANCE WAY DEMO FLOOR PLAN
1/4" = 1'-0"
1900 MAINTENANCE WAY NEW WORK FLOOR PLAN
1/4" = 1'-0"
SCOPE OF WORK:
DEMOLISH HEAT PUMPS, CONCRETE PADS, AND REFRIGERANT PIPING.
CLEAN ALL EXISTING DUCTWORK AND REPLACE ANY DAMAGES SHEET METAL AND
INSULATION. ASSUME 10' OF NEW DUCTWORK AND INSULATION.
INSTALL NEW HEAT PUMPS. OUTDOOR UNITS SHALL BE ON NEW 3" PRECAST
CONCRETE OR HPDE PAD. REFRIGERANT LINE SERVING HP-1F AND HP-2F RUNS ALONG
THE GROUND TO OPENING INTO THE BUILDING. RUN NEW REFRIGERANT LINES IN
EXISTING LOCATIONS. INDOOR UNITS SHALL BE INSTALLED IN EXISTING LOCATIONS.
RECONNECT TO EXISTING DUCTWORK AND RUN CONDENSATION TO EXISTING DRAIN.
PROVIDE NEW THERMOSTAT FOR EACH HEAT PUMP.
BALANCE AIR SYSTEM BASED ON THE CFMS ON THE FLOOR PLAN.
HEAT PUMP SHALL BE CONTROLLED BY MANUFACTURE'S INTEGRAL CONTROLS.
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO SHOW ALL
TRANSITIONS, OFFSETS, ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT OF
THE DRAWINGS. ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS
SHALL BE REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION. CONTRACTOR
MAY LOCATE MECHANICAL EQUIPMENT DIFFERENTLY THAN SHOWN ON DRAWINGS DUE
TO CONFLICTS, AS LONG AS FUNCTION AND/OR APPEARANCE ARE NOT AFFECTED.
2. ALL NEW MATERIAL, INCLUDING BUT NOT LIMITED TO DUCTWORK, PIPING, WIRING, AND
HANGERS SHALL THAT PENETRATE SURFACES SHALL USE EXISTING OPENINGS
WHENEVER POSSIBLE. IF NEW PENETRATIONS ARE REQUIRED OR EXISTING ONES ARE
ABANDONED, USE MATERIALS THAT VISUALLY MATCH IN-PLACE ADJACENT SURFACES
TO THE FULLEST EXTENT POSSIBLE. REFER TO SPECIFICATION 01 73 29 CUTTING AND
PATCHING.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL BE PERFORMED BY AN ELECTRICIAN LICENSED IN
THE COMMONWEALTH OF VIRGINIA.
2. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL CONDUCT A
THOROUGH ASSESSMENT OF THE EXISTING ELECTRICAL SYSTEM.ENSURE
PROPOSED MECHANICAL REPLACEMENTS AND UPGRADES INTEGRATE SEAMLESSLY
WITH THE CURRENT INFRASTRUCTURE. PERFORM LOAD CALCULATIONS FOR THE
EXISTING ELECTRICAL SYSTEM TO ENSURE ADEQUATE POWER DISTRIBUTION.
ADJUST FOR NEW LOADS OR EQUIPMENT, ENSURING THE SYSTEM CAN HANDLE THE
ADDITIONAL DEMAND WITHOUT OVERLOAD.
3. ONCE EQUIPMENT AS BEEN DISCONNECTED, VERIFY THAT FEEDERS ARE
DE-ENERGIZED AND DEVICES ARE OBSOLETE AND REMOVE WIRING, RACEWAY AND
DEVICES. NOTIFY THE COR IF A FEEDER AND ASSOCIATED DEVICES ARE FOUND TO
BE FOR EQUIPMENT THAT IS.
4. FOR EQUIPMENT BEING REPLACE IN-KIND, THE ELECTRICAL CONTRACTOR SHALL
DISCONNECT POWER WIRING FROM MECHANICAL EQUIPMENT. NEATLY COIL
DISCONNECTED WIRING AND STORE IN-PLACE DURING CONSTRUCTION. AFTER NEW
EQUIPMENT HAS BEEN SET-IN-PLACE CONNECT EXISTING POWER WIRING TO NEW
EQUIPMENT.
5. FOR ALL NEW EQUIPMENT, ELECTRICAL CONTRACTOR SHALL IDENTIFY THE POWER
SOURCE, ENSURE THE PANEL HAS THE CAPACITY TO HANDLE THE ADDITIONAL
LOAD. IF AN ELECTRICAL UPGRADE IS NECESSARY, NOTIFY COR. INSTALL
DEDICATED CIRCUIT BREAKER AND PROPER WIRE FOR THE EQUIPMENT. RUN
CONDUIT AND WIRING THROUGH EXISTING PENETRATION. INSTALL LOCAL
DISCONNECT ON EQUIPMENT.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
MECHANICAL
SHOP
STORAGE
ROOM
KITCHEN
TRAINING
ROOM
STORAGE
STORAGE
ROOM
MECHANICAL
SHOP
OFFICE
OFFICE
MECH
WOMENS MENSWASHROOM
STORAGESTORAGESTORAGESTORAGE
STORAGE
CORRIDOR
EF-2EF-1AC-1
HP-1
AC
AC
HP-1
HP
AC
REFRIGERATION LINE
REFRIGERATION LINE
(E)24x24 SA
(TYP 4)
(E)24x24 RA
(E)24x24 RA
(E)24x24 SA
(TYP 2)
(E)24x24 RA
(E)24x24 SA
(TYP 7)
(E)24x24 RA(E)24x24 RA
(E)24x24 RA (E)24x24 SA
(TYP 2)
(E)24x24 SA
(E)24x24 SA
(E)24x24 SA(E)24x24 SA (E)24x24 SA(E)16x16 SA
(TYP 3)
(E)24x24 RA
VENT VENTVENT
REPLACEMENT OF HVAC SYSTEMS
RICHMOND NATIONAL BATTLEFIELD PARK
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL DEMOLITION FLOOR PLAN
MAINTENANCE BUILDINGM1.6
DEMOLITION FIRST FLOOR PLAN
1/8" = 1'-0"
1/8" = 1'-0"
SCOPE OF WORK:
DEMOLISH HEAT PUMPS, CONCRETE PADS, AND REFRIGERANT PIPING.
DEMOLISH (3) ATTIC VENTS
DEMOLISH WALL AC UNIT AND ENCLOSE WALL.
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO
SHOW ALL TRANSITIONS, OFFSETS, ETC. CONTRACTOR SHALL FIELD VERIFY
EXISTING CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO
COMPLETE THE INTENT OF THE DRAWINGS. ANY DISCREPANCIES BETWEEN
DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE
CONTRACTING OFFICER FOR RESOLUTION. CONTRACTOR MAY LOCATE
MECHANICAL EQUIPMENT DIFFERENTLY THAN SHOWN ON DRAWINGS DUE TO
CONFLICTS, AS LONG AS FUNCTION AND/OR APPEARANCE ARE NOT
AFFECTED.
2. ALL NEW MATERIAL, INCLUDING BUT NOT LIMITED TO DUCTWORK, PIPING,
WIRING, AND HANGERS SHALL THAT PENETRATE SURFACES SHALL USE
EXISTING OPENINGS WHENEVER POSSIBLE. IF NEW PENETRATIONS ARE
REQUIRED OR EXISTING ONES ARE ABANDONED, USE MATERIALS THAT
VISUALLY MATCH IN-PLACE ADJACENT SURFACES TO THE FULLEST EXTENT
POSSIBLE. REFER TO SPECIFICATION 01 73 29 CUTTING AND PATCHING.
DEMOLITION ROOF PLAN
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL BE PERFORMED BY AN ELECTRICIAN LICENSED
IN THE COMMONWEALTH OF VIRGINIA.
2. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL CONDUCT A
THOROUGH ASSESSMENT OF THE EXISTING ELECTRICAL SYSTEM.ENSURE
PROPOSED MECHANICAL REPLACEMENTS AND UPGRADES INTEGRATE
SEAMLESSLY WITH THE CURRENT INFRASTRUCTURE. PERFORM LOAD
CALCULATIONS FOR THE EXISTING ELECTRICAL SYSTEM TO ENSURE
ADEQUATE POWER DISTRIBUTION. ADJUST FOR NEW LOADS OR EQUIPMENT,
ENSURING THE SYSTEM CAN HANDLE THE ADDITIONAL DEMAND WITHOUT
OVERLOAD.
3. ONCE EQUIPMENT AS BEEN DISCONNECTED, VERIFY THAT FEEDERS ARE
DE-ENERGIZED AND DEVICES ARE OBSOLETE AND REMOVE WIRING,
RACEWAY AND DEVICES. NOTIFY THE COR IF A FEEDER AND ASSOCIATED
DEVICES ARE FOUND TO BE FOR EQUIPMENT THAT IS.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
AutoCAD SHX Text 313918
AutoCAD SHX Text
AutoCAD SHX Text
ELS
AutoCAD SHX Text
ELS
AutoCAD SHX Text
HACE
AutoCAD SHX Text
APRIL 2025
MECHANICAL
SHOP
STORAGE
ROOM
KITCHEN
TRAINING
ROOM
STORAGE
STORAGE
ROOM
MECHANICAL
SHOP
OFFICE
OFFICE
MECH
WOMENS MENSWASHROOM
STORAGESTORAGESTORAGESTORAGE
STORAGE
CORRIDOR
EF-2EF-1
HP
CU-1H
CU-2H
CU-3H
HP-1H HP-2H
HP-3H
HP-4H
PROVIDE FILTER
BOX WITH 4"
PLEATED FILTER
BRANCH BOX
TT
REFRIGERATION LINE
REFRIGERATION LINE
(E) 400 CFM SA
(TYP 4)
(E) 400 CFM RA
(E) 300 CFM RA
(E) 150 CFM SA
(TYP 2)
(E) 700 CFM RA
(E) 100 CFM SA
(TYP 7)
(E) 600 CFM RA(E) 250 CFM RA
(E) 100 CFM RA
(E) 150 CFM SA
(TYP 2)
(E) 100 CFM SA
(E) 100 CFM SA
(E) 150 CFM SA(E) 150 CFM SA
(E) 150 CFM SA(E) 150 CFM SA
(TYP 3)
(E) 450 CFM RA
T
T
EF-1H EF-2H EF-3H
T
PROVIDE
THERMOSTAT
IN ATTIC.
REPLACEMENT OF HVAC SYSTEMS
RICHMOND NATIONAL BATTLEFIELD PARK
3215 E. BROAD STREET, RICHMOND, VA 23223
MECHANICAL NEW WORK FLOOR PLAN
MAINTENANCE BUILDINGM1.7
FIRST FLOOR FLOOR PLAN
1/8" = 1'-0"
NEW WORK FLOOR PLAN
1/8" = 1'-0"
SCOPE OF WORK:
CLEAN ALL EXISTING DUCTWORK AND REPLACE ANY DAMAGES SHEET METAL AND INSULATION. ASSUME
10' OF NEW DUCTWORK AND INSULATION.
INSTALL NEW HEAT PUMPS. OUTDOOR UNITS SHALL BE ON NEW 3" PRECAST CONCRETE OR HPDE PAD .
REFRIGERANT LINE SERVING HP-1H RUNS ALONG THE GROUND TO EXISTING OPENING INTO THE BUILDING. REFRIGERANT LINE SERVING HP-2H RUNS UP THE EXTERIOR OF THE BUILDING ENTERING THE BUILDING THROUGH A NEW OPENING INTO THE ATTIC. REFRIGERANT LINE FROM CU-3H RUNS ALONG THE GROUND TO EXISTING OPENING INTO THE BUILDING. BRANCH BOX SERVING HP-3H AND 4H SHALL BE LOCATED IN STORAGE ROOM IN AN ACCESSIBLE LOCATION. INDOOR UNITS SHALL BE INSTALLED IN EXISTING LOCATIONS. RECONNECT TO EXISTING DUCTWORK AND RUN CONDENSATION TO EXISTING
DRAIN. PROVIDE NEW THERMOSTAT FOR EACH HEAT PUMP.
BALANCE AIR SYSTEM BASED ON THE CFMS ON THE FLOOR PLAN.
INSTALL EXHAUST FANS ON THE ROOF AND LOCATE DISCONNECTS IN THE ATTIC.
HEAT PUMP AND FANS SHALL BE CONTROLLED BY MANUFACTURE'S INTEGRAL CONTROLS.
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT
INTENDED TO SHOW ALL TRANSITIONS, OFFSETS, ETC.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND
PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT
OF THE DRAWINGS. ANY DISCREPANCIES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .