Attachment 2- Quote Worksheet.pdf
PDF 258 KB Posted
- Solicitation number
- 12FPC326Q0058
About this file
This is a Quote Worksheet for a Request for Quote (RFQ) related to ADA entrance compliance work at the Tremonton Field Office.
The RFQ 12FPC326Q0058 solicits quotes for low profile, low energy door operators with push pads, transmitters, and receivers (quantity 2), along with associated labor for installation and training, shipping and handling, travel, and electrical operations. All work and equipment must comply with the Performance Work Statement (PWS) and includes a standard one-year warranty. The quote must remain valid for 120 days from submission. Contractors must provide pricing for each of the five line items (CLINs 0001-0005) and calculate a total quote amount. The project has an 8-week completion timeline from the award date, with the majority of time allocated for material lead times due to the requirement that the facility entrance remain secure. The labor for disassembly and installation is expected to occur within one day since the door cannot remain unsecured. Quoters must submit their company name, SAM UEI, contact person name and title, date, and signature with their response.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tremonton Field Office ADA Entrance Compliance Project RFQ: 12FPC326Q0058
QUOTE WORKSHEET
Quote shall be valid for 120 Days
CLIN Description Qt Unit Unit Price Total
0001 LOW PROFILE-LOW
ENGERY DOOR OPERATOR
WITH PUSH PADS,
TRANSMITTERS/RECEIVERS
2 EA
0002 Labor to Install Equipment and Training
1 EA
0003 Shipping & Handling 1 EA 0004 Travel 1 EA 0005 Electrical Operations 1 EA
*All work and equipment is IAW PWS.
This will include a standard 1-year warranty
TOTAL QUOTE AMOUNT: __________________________________________
The completion time is 8 weeks from the award date IAW PWS. The majority of this time is material lead times as the facility entrance must remain secure. It is expected the labor for disassembly and installation will be within one day as the door cannot remain unsecure.
Company Name:
SAM UEI:
Name:
Title:
Date:
Signature: ________________________________________
File details come from the government source that posted it. Updated .