Attachment 2- Quote Worksheet.pdf

PDF 258 KB Posted

Attached to
Tremonton Field Office ADA Entrance Compliance Project
Solicitation number
12FPC326Q0058
Issued by

About this file

This is a Quote Worksheet for a Request for Quote (RFQ) related to ADA entrance compliance work at the Tremonton Field Office.

The RFQ 12FPC326Q0058 solicits quotes for low profile, low energy door operators with push pads, transmitters, and receivers (quantity 2), along with associated labor for installation and training, shipping and handling, travel, and electrical operations. All work and equipment must comply with the Performance Work Statement (PWS) and includes a standard one-year warranty. The quote must remain valid for 120 days from submission. Contractors must provide pricing for each of the five line items (CLINs 0001-0005) and calculate a total quote amount. The project has an 8-week completion timeline from the award date, with the majority of time allocated for material lead times due to the requirement that the facility entrance remain secure. The labor for disassembly and installation is expected to occur within one day since the door cannot remain unsecured. Quoters must submit their company name, SAM UEI, contact person name and title, date, and signature with their response.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tremonton Field Office ADA Entrance Compliance Project RFQ: 12FPC326Q0058

QUOTE WORKSHEET

Quote shall be valid for 120 Days

CLIN Description Qt Unit Unit Price Total

0001 LOW PROFILE-LOW

ENGERY DOOR OPERATOR

WITH PUSH PADS,

TRANSMITTERS/RECEIVERS

2 EA

0002 Labor to Install Equipment and Training

1 EA

0003 Shipping & Handling 1 EA 0004 Travel 1 EA 0005 Electrical Operations 1 EA

*All work and equipment is IAW PWS.

This will include a standard 1-year warranty

TOTAL QUOTE AMOUNT: __________________________________________

The completion time is 8 weeks from the award date IAW PWS. The majority of this time is material lead times as the facility entrance must remain secure. It is expected the labor for disassembly and installation will be within one day as the door cannot remain unsecure.

Company Name:

SAM UEI:

Name:

Title:

Date:

Signature: ________________________________________

File details come from the government source that posted it. Updated .