Attachment 2 - PWS Cathodic Protection_FINAL_April2026.pdf

PDF 663 KB Posted

Attached to
Cathodic Protection System Service - Beale AFB
Solicitation number
FA468626Q0004
Issued by

About this file

This is a Performance Work Statement (PWS) for cathodic protection system service at Beale Air Force Base in California, effective April 2026.

The contractor must provide annual inspection, preventative maintenance, and repair services for nine water storage tanks across the installation. Services include system integrity and potential testing (tank-to-water potential profile measurements), electrical and control system testing (anode and reference cell testing, rectifier cleaning and calibration), and general compliance tasks (fuse replacement, debris removal). Annual scheduled maintenance must occur between August and September each year. All work must comply with Unified Facilities Criteria (UFC) 3-570-06, original equipment manufacturer guidelines, and applicable federal regulations. The contractor must submit a detailed project plan for approval at least ten business days before work begins and provide an Annual Performance Booklet and completed AF IMT 1689 forms documenting all inspection data, evaluations, corrective actions, and recommendations upon service completion. For unscheduled corrective maintenance, the contractor must acknowledge requests within 24 hours and schedule on-site inspections within three business days. Minor repairs (materials ≤$50 per system) are contractor-funded; major repairs require COR approval and must be completed within 30 calendar days. The contractor must provide all personnel, equipment, tools, supplies, and materials at no additional cost to the Government. Contractor personnel must hold current CP tester certification from accredited associations such as NACE or STI, be knowledgeable in confined space entries per OSHA 1910.146, and comply with all security, environmental, and hazardous material handling requirements specified by Beale AFB.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

CATHODIC PROTECTION SYSTEM SERVICE

BEALE AIR FORCE BASE (AFB), California

April 2026

1. BACKGROUND. The 9th Civil Engineer Squadron (CES) at Beale Air Force Base (AFB) requires regularly scheduled inspection, maintenance, and repair services for cathodic protection systems installed on nine (9) water storage tanks across the installation. This preventative service is essential to mitigate corrosion, thereby preventing leaks, water contamination, and structural failures that could cause significant damage to mission-essential infrastructure. Properly maintained cathodic protection systems are critical for preserving the structural integrity of the base’s water supply and distribution network.

Neglecting this required maintenance can lead to accelerated corrosion, resulting in unexpected tank failures, costly emergency repairs, and potential disruptions to the water supply that could impact mission-critical activities.

2. SCOPE. The Contractor shall provide annual inspection, preventative maintenance, and repair services for all cathodic protection systems at Beale AFB, California, as detailed in Attachment 1 – List of Water Tank Specifications & Locations. The contractor shall perform services that include, but are not limited to, procedures such as conducting potential profile testing, taking electrical measurements of system components, and adjusting rectifiers for optimal performance. A cathodic protection system is defined as the complete assembly and its operating equipment, including all anodes, reference cells, rectifiers, meters, wiring, connections, and associated hardware. The Contractor shall comply with the standards referenced in Attachment 2 and Attachment 3, including Unified Facilities Criteria (UFC) 3- 570-06, the manufacturer’s instructions, and all applicable local, state, and federal rules and procedures.

The Contractor shall provide all personnel, equipment, tools, supplies, materials, and any other items and services necessary to perform the work identified within this Performance Work Statement (PWS).

3. DESCRIPTION OF SERVICE. The Contractor shall provide all-inclusive routine inspection, preventative maintenance, and repair services for all cathodic protection systems located at Beale AFB.

The service specifications require that all systems are inspected, tested, adjusted, and maintained to ensure safe, reliable, and continuous corrosion protection. All procedures must be executed in strict adherence to the requirements of UFC 3-570-06 and the original equipment manufacturers’ (OEM) maintenance recommendations. The contractor's responsibility covers the entire cathodic protection system. This includes, but is not limited to, the inspection and testing of anodes and reference cells; the inspection, cleaning, and testing of the rectifier, controls, meters, contacts, and all wiring and connections.

During each service, the contractor shall measure tank-to-water potential to monitor and verify the system's effectiveness on all submerged metal surfaces and adjust the system as needed for optimum corrosion control. Fuses shall be replaced as required. Upon service completion, the contractor is required to provide a detailed Annual Performance Booklet and annotate inspection records on Attachment 2 - Water Tank Calibration Table and Reference (AF IMT 1689), documenting all data obtained, an evaluation of the data, corrective actions taken, parts replaced, and recommendations for continued performance.

4. SCHEDULED PREVENTATIVE MAINTENANCE AND ROUTINE INSPECTION. The contractor shall perform scheduled annual maintenance and inspections to ensure the operational readiness, safety, and compliance of all cathodic protection systems listed in Attachment 1. All work shall adhere to the original equipment manufacturer’s (OEM) guidelines and the Unified Facilities Criteria (UFC) standards referenced in this PWS. The Contractor shall submit a detailed project plan for approval to the Contracting Officer (CO) and the Contracting Officer’s Representative (COR) at least ten (10) business days prior to the start of work. The Contractor shall not alter any existing working system unless pre-approved by the COR and the facility supervisor prior to dismantling the system.

4.1. Annual Scheduled Preventative Maintenance and Inspection. The contractor shall service and inspect all cathodic protection systems by conducting annual system inspections and operational checks, which shall be performed by qualified personnel. The annual inspection period must take place between August and September each year. These services shall include, but not be limited to, the following:

4.1.1. System Integrity and Potential Testing. The Contractor shall visually inspect and service all accessible system components. The primary inspection shall include conducting a Tank-to-Water potential profile within each tank to monitor and verify the effectiveness of the system on all submerged surfaces.

4.1.2. Electrical and Control System Testing. The Contractor shall test and adjust all electrical and control systems. This includes taking electrical measurements to test the anode and reference cells. The contractor shall inspect, test, and clean the rectifier, controls, meters, contacts, wiring, and connections. The system shall be adjusted as needed to provide optimum corrosion control on the submerged metal surfaces of the tank.

4.1.3. General Compliance and Site Maintenance. The contractor is required to replace fuses as required. The Contractor shall supply all necessary consumable items and equipment needed to accomplish the work at no additional cost to the Government. The Contractor shall remove all debris and equipment from the work location at the end of each day on which work is performed, ensuring compliance with all local and federal regulations.

5. UNSCHEDULED CORRECTIVE MAINTENANCE/REPAIR. Upon request of the Government, the Contractor shall provide unscheduled corrective maintenance and repair services for the cathodic protection systems, as necessary to restore and maintain proper and normal system operations. The Contractor shall respond to any unscheduled service call request within 24 hours to acknowledge the request and must have a scheduled date for the on-site inspection and repair within three (3) business days of the initial notification. Upon completion of performing diagnostics and troubleshooting, the contractor shall provide a written estimate of repair parts and labor needed to the Contracting Officer's Representative (COR) for approval. All requirements for inspection and repair located in Section 1 (Scheduled Preventative Maintenance and Routine Inspection) apply to unscheduled service calls. A completed unscheduled corrective maintenance/repair report shall be submitted to the COR and CO within ten (10) days of repair completion.

5.1. Replacement Parts. The Contractor shall acquire all parts and materials necessary for preventative maintenance and repairs and shall only use original equipment manufacturer (OEM) or approved equal material/parts and must be approved by the COR.

5.1.1. Minor Repairs. The Contractor shall repair equipment at the Contractor’s expense if the material cost is equal to or less than $50.00 per cathodic protection system. Minor repairs may be completed during the initial unscheduled service visit if the required parts are available.

5.1.2. Major Repairs. If the required repair work exceeds $50.00 in materials per cathodic protection system, the Contractor shall not proceed with the repair until approval is granted. The Contractor shall provide a written repair cost estimate to the COR for approval within three (3) business days from the date the deficiency was identified. The estimate shall, at a minimum, list all parts needed along with their associated costs. Once the COR provides written validation, the CO will give the Contractor the authority to proceed with ordering any parts and scheduling a final repair date. Upon receipt of written approval from the COR, the Contractor shall complete the major repair within 30 calendar days. If lead times for required parts are projected to exceed this timeframe, the Contractor must immediately notify the Contracting Officer in writing, provide supporting documentation from the supplier, and request an extension to the completion date

6. REPORTS AND DOCUMENTATION.

6.1. PROJECT PLAN. The Contractor shall submit a detailed project plan to the COR and CO at least ten (10) business days prior to the start of work. The project plan must include a step-by-step process of accomplishing all inspections/validations. As well as a list of proposed chemicals and equipment needed to accomplish the work. Work will not begin until the project plan has been approved by all governing authorities.

6.2. ANNUAL PERFORMANCE BOOKLET. The Contractor shall submit a report with all data obtained, evaluation of data, and recommendations for continued performance, IAW UFC 3-570-06, Appendix C-23. The Annual Performance Booklet (Report) shall include items listed in UFC 3-570- 06, Chapter 4; Priorities for Testing, Troubleshooting and Repairs (for water storage tanks only).

6.3. WATER TANK CALIBRATION TABLE AND REFERENCE (AF IMT 1689). All inspections will be IAW UFC 3-570-03, Table 3-6 & 3-7. Inspection records will be annotated on Attachment 2 - Water Tank Calibration Table and Reference (AF IMT 1689).

7. SERVICE SUMMARY. The Service Summary (SS) outlines the minimum standards with delivery method and promotes continuous improvement in contractor performance. The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each performance objective. The SS provides information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in FAR 52.212-4(a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.

PWS Ref & Performance

Objective

Performance Threshold

PO-1: 4. Scheduled Preventative Maintenance and Routine Inspection

The contractor shall perform scheduled annual maintenance and inspections to ensure the operational readiness, safety, and compliance of all cathodic protection systems listed in Attachment 1. The annual inspection period must take place between August and September each year. Rescheduling outside of this window is not permitted without prior written approval from the Contracting Officer (CO).

All work shall adhere to the original equipment manufacturer’s (OEM) guidelines and the Unified Facilities Criteria (UFC) standards referenced in this PWS 95% of the time.

PO-2: 4. Scheduled Preventative Maintenance and Routine Inspection

The Contractor shall submit a detailed project plan for approval to the Contracting Officer (CO) and the Contracting Officer’s Representative (COR) at least ten (10) business days prior to the start of work. The project plan must be submitted no later than 10 business days prior to the scheduled start of work 95% of the time. A submittal received later than this deadline will be considered a failure to meet the performance threshold.

PO-3: 4.1. Annual Scheduled Preventative Maintenance and Inspection

The contractor shall perform a comprehensive inspection, testing, and adjustment of all system components, including potential profiling, electrical measurements, and rectifier/control cleaning and calibration, to ensure optimal performance. Furthermore, the contractor shall supply all necessary consumables and remove all debris from the work area upon service completion. All tasks listed in sections 4.1.1, 4.1.2, and 4.1.3 must be performed and documented for every system during the annual service visit 95% of the time. Should this deficiency occur more than two (2) times within any 12-month period, it may result in a formal Contractor Action Report (CAR).

PO-4: 5.

Unscheduled Corrective Maintenance/Repair

The Contractor shall respond to any unscheduled service call request within 24 hours to acknowledge the request and must have a scheduled date for the on-site inspection and repair within three (3) business days of the initial notification.

Acknowledgment of a service request within 24 hours and scheduling of an on-site visit within three (3) business days must occur 95% of the time. Failure to meet either the acknowledgment or scheduling timeline for any service call will be documented as a performance failure.

8. DELIVERABLES. The Contractor shall provide the following deliverables. Acceptance of final documents is subject to Government approval. All deliverables shall be submitted via email to the 9 CES Civil Engineer Squadron, Contracting Officer Representative (COR) and Contracting Officer (CO).

Deliverable PWS Section Frequency Format Submit To

Project Plan 4, 6.1 Submit at least ten (10) business days prior to the start of work.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR and

CO

Unscheduled Corrective Maintenance/Repair Report

5 Submit within ten (10) days after completion of each unscheduled service.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR and

CO

Major Repair Cost Estimate

5.1.2 Submit within three (3)

business days from the date a deficiency exceeding $50.00 is identified.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR and

CO

Annual Performance Booklet

3, 6.2 Annually, upon completion of the scheduled inspection period.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR

Water Tank Calibration Table and Reference (AF IMT 1689)

3, 6.3 Annually, submitted with the Annual Performance Booklet.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR

Entry Access Listing

(EAL)

Security (General Information)

Submit at least five (5) business days prior to the start of work on base.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR

Hazardous Material (HM) List

9.1.1 Submit at least five (5)

days prior to bringing any hazardous materials onto the installation.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR and

HMP

Initial HM Inventory 9.1.1 Submit within five (5) days after the initial job start.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR and

HMP

Quarterly HM Inventory Update

9.1.1 Quarterly, no later than the

10th of the month following the previous quarter.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR and

HMP

Spill Report 9.1.4 Submit within 48 hours of any spill incident.

A PDF, Word, or Excel document shall be submitted in writing via email.

COR and

CEE

9. GOVERNMENT FURNISHED SERVICES.

9.1. Utilities. Reasonable quantities of electricity and water shall be provided to the Contractor without charge. The Contractor shall be responsible for installation, maintenance, repair, and removal of temporary connections or lines, and for returning all utilities connections to original conditions. No utility service shall be interrupted unless authorized by the COR. No utility service shall be interrupted to make connection, to relocate, or for any purposes without approval of the COR.

Request for permission to shutdown services shall be submitted in writing to the COR fourteen (14) calendar days prior to date of proposed interruption. The request shall give relevant information (e.g.

date, time, duration, etc.).

9.2. Services. The Government will provide police and fire protection while on Beale AFB. In the event of a medical emergency, call “911” for transportation of an injured employee by civilian ambulance to a local hospital. The Government shall provide emergency medical treatment for life-threatening emergencies only until civilian ambulance arrives.

9.3. Damage to Government Facilities and Property. The Contractor shall reimburse the Government if details of formal investigation of fire or other related or unrelated structural damage result in pecuniary liability assessed to the Contractor. The Contractor shall replace all damaged or lost Government Furnished Facilities, Government Furnished Equipment and/or Government Furnished Materials at no cost to the Government.

10. GENERAL INFORMATION.

10.1. Contractor Personnel. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.

10.2. Safety. The Contractor shall follow all applicable AFOSH standards pertaining to the work being accomplished. The Contractor shall comply with all applicable local, city, county, state, and federal regulations pertaining to Cathodic Protection System Inspections, waste handling, waste hauling, and waste disposal.

10.3. Contractor Qualifications. All work shall be performed by or under the certified technician of a contractor who shall submit to the COR, documentation showing that they possess current and up to date certification as a CP tester by accredited associations like the National Association of Corrosion Engineers (NACE) or Steel Tank Institute (STI).

10.4. Confined Spaces. The Contractor must be knowledgeable on making confined space entries.

While making confined space entries the Contractor will comply with OSHA Standard 1910.146 and all applicable Federal and State laws and regulations. The Contractor must furnish all of the special equipment necessary to make a confined space entry. Equipment is subject to inspection by 9 CES/CEOIU (Water/Fuel Systems).

11. SECURITY. The Contractor shall comply with all requirements and procedures IAW DAFFARS 5352.242-9000, Contractor Access to Department of the Air Force Installations. The Contractor shall obtain base identification and vehicle passes, if required, for all Contractor personnel who make frequent visits to or perform work on the Department of the Air Force installations cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished Contractor identification badges while visiting or performing work on the installation. An Entry Access Listing (EAL) (Attachment 3) shall be submitted to the COR within five (5) business days prior to the start of work on base. The EAL will be sent to Security Forces who will conduct a background check on each employee. Upon clearance and approval, the Contractor will be notified and will have approximately ten days to get their base passes from Pass & ID. During the performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who has quit, been terminated, or no longer requires access to the work site.

11.1. Base Closures. Work scheduled, but not accomplished, during a base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening of the base.

11.2. Traffic Laws. The Contractor and their employees shall comply with all installation traffic regulations.

11.3. Cellular Phone Operation Policy. The contractor shall comply with local base policies regarding cellular phone operation.

12. SCHEDULE COORDINATION. The scheduling of all inspection and maintenance services is contingent upon the operational requirements and accessibility of each facility. Services shall be performed during normal Government duty hours (0730-1630, Monday-Friday), unless otherwise approved by the Contracting Officer's Representative (COR). The Contractor shall be responsible for coordinating all phases of work with the COR, including submitting a proposed schedule for all annual inspection services at least fourteen (14) business days prior to the intended visit. For a complete list of facility numbers, locations, and the corresponding frequency of service, refer to Attachment 1 – List of Water Tank Specifications & Locations.

13. RECOGNIZED FEDERAL HOLIDAYS. The Contractor is not required to provide service on federal holidays. If any holiday falls on Saturday, the preceding Friday will be observed. If any holiday falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance. If these Holidays fall on Saturday, the preceding Friday will be observed. If these Holidays fall on Sunday, the following Monday will be observed. Any other day designated by Federal Statute. Any other day designated by Executive Order. Any other day designated by the President’s Proclamation. Down-days.

(i.e., Family Day) declared by the ACC Commander are considered duty days and are not included in the definition of a holiday. The following Federal holidays are observed:

New Year’s Day 1 January Martin Luther King’s Birthday Third Monday of January President’s Day Third Monday of February Memorial Day Last Monday in May Juneteenth 19 June

Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

13.1. Administrative Days. The Wing Commander may order a base closure due to weather or other unforeseen circumstances. Contractor employees shall not report to work if the base is closed, but work shall be accomplished as soon as possible after reopening of the base.

14. CLEAN-UP. The Contractor shall keep the work area orderly and, in a hazard free condition. The Contractor shall be responsible for clean-up of the job site including removal of all waste from site areas.

All debris and waste shall be properly disposed of properly at an off-base property.

15. WARRANTY OF WORK. The contractor warrants that all services performed, and deliverables provided under this contract shall 1) conform to the requirements of the contract, 2) be performed in a professional and workmanlike manner in accordance with industry standards, 3) be free from defects in materials and workmanship for a period of 12 months from the date of acceptance by the Government, unless a manufacturer's parts warranty is greater than one year, then the greater warranty shall prevail.

15.1. Correction of Defects. If any defects or deficiencies in the work are identified during the warranty period, the contractor shall, at no additional cost to the Government promptly correct the defects or deficiencies, replace or repair any defective materials, workmanship, or services, and provide any additional services necessary to remedy the issue.

15.2. Notification of Defects. The Government will notify the contractor in writing of any identified defects or deficiencies. The contractor shall respond within 48 hours of receiving notice and provide a plan to resolve the issue.

15.3. Exclusions. The warranty does not cover defects resulting from misuse, abuse or negligence by the Government or third parties and alterations or modifications made by the Government without the contractor’s prior written consent.

16. ENVIRONMENTAL CONTROL.

16.1. Compliance with Laws and Regulations. The Contractor shall be knowledgeable of and comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change the term of this contract, the Contractor shall comply with such law/regulation as changed. If there is an increase or decrease in cost as a result of the change, the Contractor shall immediately inform the CO.

16.2. Notification of Environmental Spills. If the Contractor spills or releases any substance listed in 40 CFR 302 into the environment, the Contractor shall immediately report the incident to the COR.

The Contractor shall be liable for the spill or release of such substances.

16.3. Environmental and Hazardous Material Handling. The Contractor is responsible for advising his employees of all Environmental and Hazardous Material Handling and is also required to have and maintain Material Safety Data Sheets (MSDS) on all materials that are required by State and Federal Laws and/or Regulations. (Reference AFI 91-301 and OSHA requirements) to include AF and OSHA requirements.

17. HAZARDOUS MATERIALS AND HAZARDOUS WASTE (HM/HW).

17.1. Hazardous Material. Hazardous material includes all material hazardous to health, safety, or the environment, such as but not limited to, hazardous chemicals, hazardous substances, toxic chemicals, and extremely hazardous substances, as defined by any of the following but not limited to:

• 29 Code of Federal Regulation (CFR) 1910.1200

• 40 CFR Part 302, Table 302.4

• 40 CFR Part 355 with Appendices

• 40 CFR 372.65

• The Government’s policy is to reduce the use of hazardous materials in keeping with federal pollution prevention goals. Beale AFB operates a Hazardous Material Pharmacy (HMP) and COR to control and reduce the use of hazardous materials and to maintain a hazardous chemical inventory in accordance with policy and regulatory requirements.

• The Contractor shall use non-hazardous Materials whenever possible.

17.1.1. Requirements. Hazardous materials must be approved by the HMP and COR prior to being brought onto the installation. The Contractor shall submit a list of all hazardous materials intended for use, along with corresponding Material Safety Data Sheets (MSDS), to the HMP and COR, through the COR, at least five (5) days prior to beginning work or bringing hazardous materials onto the installation. The listing shall include product name, chemical type, and quantity to be brought onto the installation, process for which it will be used, and disposal method for empty containers and any resulting hazardous or non-hazardous waste. The Contractor shall submit to the HMP and COR, an inventory of approved hazardous materials brought onto the installation within five (5) days after initial job start. The inventory shall include the product name, chemical type, and quantity to be used. An updated quarterly inventory shall be submitted to the HMP and COR not later than the 10th of the month following the previous quarter listing quantities used during the previous month, total quantities used since job start (on an annual basis), and any amount disposed of as hazardous or non-hazardous waste.

The Contractor shall be responsible for knowing which materials are considered hazardous and shall comply with federal state, and local requirements pertaining to the proper use, labeling, storage, transporting, and disposal of hazardous materials and hazardous wastes. Hazardous material will not be stored on base.

17.1.2. Cost or Fines. Any costs or fines levied against the installation due to the Contractor’s failure to comply with applicable Federal, State, and local laws shall be borne by the Contractor.

17.1.3. Hazardous Waste. Government policy is to reduce the disposal of hazardous waste in keeping with federal pollution prevention goals. Hazardous waste includes, but is not limited to, material discarded or disposed of which exhibits characteristics of toxicity, reactivity, corrosivity, or ignitability, or which is listed as hazardous waste by any of the following but not limited to:

• 40 CFR Part 261

• CCR Title 22, Division 4.5

• RCRA Subtitle D of 40 CFR Parts 240-247 and 255-258

• DoD Directive 4165.60

• AFI 32-7042

17.1.4. Spill Prevention and Response. The contractor shall ensure all employees are knowledgeable of spill prevention and response procedures. If a spill does occur, the Contractor shall take immediate action to contain it and report the incident to the Fire Department by dialing

911 from any base phone. If calling by cellular phone, dial (530) 634-2117. The Contractor shall also notify the COR and Civil Engineering Environmental (CEE) at 4-2844 (Government telephone) or (530) 634-2844 (commercial). The spill shall also be reported in writing by the Contractor to the COR and CEE within 48 hours. SPILL CLEAN-UP: The Contractor shall clean-up, containerize and properly dispose of any spills caused by Contractor employees such that no petroleum product, toxic chemical or hazardous substance enters any creek, gutter, or other appurtenance leading to natural drainage, storm drainage, or sanitary sewer systems. This includes any chemicals or substances that cause soil staining or other potential for air, water, or soil degradation as determined by the Base Environmental Flight. All spills shall be cleaned to the satisfaction of COR and CEE.

17.1.4.1. Spill Report. The Contractor should anticipate that the Government will report any hazardous spills or discharges to Federal, State, and local environmental regulatory agencies, as appropriate, and that the contractor will be held responsible for clean-up and remedial action according to Federal, State, local and Government specifications. If required by the Government, the Contractor shall sample, in the presence of COR and CEE, the spill site to show adequacy of spill clean-up. If Government assistance is provided for the clean-up, the Contractor will be charged the cost of labor and materials used for this purpose.

17.1.4.2. Government Spill Clean-Up. Spill clean-up using Government resources will be charged to the Contractor at an amount determined by the CO, based upon actual costs incurred.

17.2. Ozone Depleting Chemicals (ODC). The Contractor shall not use, in performance of this requirement, Class I ODC’s, nor shall the delivery of these Class I ODC’s be any item of supply or part of any service. If no suitable substitute to a Class I ODC exists, the Contractor must contact the

CO.

Attachment 1 – List Of Water Tank Specifications & Locations

Capacity/Structure Location System No. System Type

500,000 Reservoir Housing Tank P4800 90576 Galvanic

1,000,000 Reservoir Housing Tank P4802 90577 Galvanic

500,000 Reservoir Pave Paws Tank P5750 90578 Galvanic

3,000,000 Reservoir Cantonment Tank P2694 90579 Impressed

250,000 Elevated Storage Tank Building 1150 90575 Impressed

50,000 Reservoir Reservoir #1, Building 1038 90237 Impressed

50,000 Reservoir Reservoir #2, Building 1038 90238 Impressed

45,000 Reservoir Reservoir #3, Building 11598 N/A Galvanic

45,000 Reservoir Reservoir #4, Building 11599 N/A Galvanic

Attachment 2 - Water Tank Calibration Table and Reference (AF IMT 1689)

Attachment 3 - UFC 3-570-06, TABLE 3-6 & 3-7

Attachment 4 - Entry Access Listing (EAL)

CONTRACTOR ENTRY ACCESS LIST FORM

Effective 15 Aug 2016 the USAF will implement REAL ID Act requirements IAW Public Law 109-13 and the Code of Federal Regulations (CFR) Title 6, Part 37

Note: Personnel will be placed on an EAL for no longer than 29 Days and 15 Business days to receive there DBIDS Card. Any longer will require an 1172 form to get a base pass or a memo from contracting. Handwritten/PDF submittals will not be processed.

NOTE: SSN is used to positively identify individuals. Failure to identify individuals is automatic denial to Beale AFB.

Employee's LEGAL Last Name

Employee's LEGAL First Name

DOB Drivers License Number

Issuning State Start Date Expiration Date

Sponsor Name/DOB Sponsor Phone Number Sponsors DOD ID/

EDIPI

Destination Company Name Authorized Entry Times/ Days Contract Number

SSN