Attachment 2- PWS-9 MUNS Mold Abatement - FINAL-Aug2026.pdf
PDF 2 MB Posted
- Solicitation number
- FA468626QS020
About this file
This is a Performance Work Statement (PWS) for mold remediation services at Beale Air Force Base (BAFB) in California, effective August 2026.
The contractor shall provide professional mold remediation and disposal services at building B1358, BAFB. Primary deliverables include disassembling and permanently disposing of all restroom fixtures (toilets, sinks, light bulbs, mirrors, cove base) and the existing water heater; capping all exposed plumbing lines (water supply and drain) immediately after fixture removal; removing and disposing of afflicted drywall; and transporting all contaminated materials off-base in compliance with environmental regulations. The contractor must use proper equipment (dollies, hand trucks, protective wraps, gloves, glasses) to prevent damage to surrounding facilities and prevent contamination spread. All work must be completed within the scheduled performance period, and the contractor is responsible for all labor, supervision, equipment, materials, and transportation. Upon completion, all affected areas must be left clean, remediated, and free of contamination.
Standard operations occur Monday through Friday, 0800–1600, with authorized work windows limited to September 29–October 16 and November 10–27 to deconflict with AFCOMAC class schedules and federal holidays. Contractor must submit detailed remediation schedules to the Contracting Officer for approval prior to execution, with 72-hour advance notice required for any contractor-initiated schedule changes. All personnel requiring base access must submit a Contractor Entry Access List (EAL) template one week prior to work start, including comprehensive personal information, driver's license details, and vehicle registration/insurance documentation. The contractor bears full responsibility for regulatory compliance, environmental and occupational safety laws, and must reimburse the government for any fines or penalties assessed due to contractor negligence. No on-base storage is provided; all removed items are designated for immediate off-base disposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
(PWS)
FOR
MOLD REMEDIATION
AT BEALE AIR FORCE BASE (AFB),
CA
August 2026
1. Background: The 9th Munitions Squadron (9MUNS) at Beale Air Force Base (BAFB), California requires professional mold remediation services to support various operational, strategic, and emergency needs. These services will provide solutions for reclaiming property affected by mold. Once the project concludes, the structure will be left fully remediated, clean, and empty, ready for future follow-on construction or repair.
2. Scope: The Contractor shall provide professional services for the mold remediation and disposal of contaminated materials at BAFB. The Contractor shall ensure the proper removal, transport, and permanent disposal of all affected drywall, fixtures, and debris.
Upon completion of the service, the Contractor is responsible for clearing all equipment, waste, and materials from the work site and leaving all affected areas clean, remediated, and free of contamination.
3. Requirements: The Contractor shall perform all tasks related to mold remediation and disposal in accordance with (IAW) the standards and timelines outlined in this Performance
Work Statement (PWS). All services must be performed in a safe, efficient, and professional manner that minimizes disruption to Government operations. Services shall be provided in accordance with this PWS, applicable laws, regulations, and industry’s best practices.
4. Mold Remediation: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and transportation required to perform the safe and efficient removal of mold and disposal of contaminated fixtures at B1358, BAFB.
4.1. Coordination: The Contractor shall coordinate all servicing with the Contracting
Officer (CO) and their designated Government representative to ensure minimal disruption to Government operations. Remediation shall occur during normal duty hours and the below listed dates the Contractor can work without exposure to munitions. In no instance shall contractors perform work outside of normal duty hours without direct and continuous Government supervision. A detailed remediation schedule shall be submitted to the CO with the request for quote at the task order level and shall be approved by the Government representative prior to execution.
If Contractor initiated changes to the approved schedule are required, the Contractor shall submit a request at least 72 hours in advance along with a revised proposed schedule for Government approval. If Government directed change to the schedule is required, the Government will notify the Contractor no later than 72 hours prior to the scheduled work start date and request a revised proposed schedule for Government approval.
4.2. Mold Remediation Process: Remove, sanitize and dispose of assets. The Contractor shall:
• Disassemble and permanently dispose of all restroom fixtures (toilets, sinks, light bulbs, mirrors, cove base, etc.) and the existing water heater.
• Cap all exposed plumbing lines (both water supply and drain lines) immediately following fixture removal to ensure the system is securely sealed and prepared for future renovation.
• Remove and dispose of existing afflicted drywall.
• Use proper equipment (e.g. dollies, hand trucks, protective wraps, gloves, glasses etc.) to prevent damage to surrounding uncontaminated facilities, floors, and walls during the tear-out process.
• Transport items in a manner that prevents contamination spread to surrounding areas.
• Ensure all work is completed within the scheduled performance period.
4.3. Contaminated Waste Disposal: The Contractor shall not perform any inventory, condition assessment, or salvage operations for the fixtures. All removed restroom fixtures, drywall, and materials within the remediation zone shall be treated as contaminated waste. The Contractor is responsible for loading, transporting, and permanently disposing of these items off-base in accordance with all applicable environmental regulations.
4.4. Remediation Labor: The Contractor shall provide all labor, supervision, equipment, and materials necessary to tear out, remediate, and dispose of Government-owned fixtures and materials in accordance with (IAW) the scope of this contract.
5. Areas of Responsibility: The Contractor shall be responsible for the satisfaction of all applicable regulatory agency requirements, including transport and proper disposal of all fixtures, and mold abatement. In the event that a regulatory agency or authority assesses a monetary fine, surcharge, or penalty against the government for violations caused by contractor negligence, the Contractor shall reimburse the government for the amount of that fine.
6. Safety: The Contractor shall adhere to all applicable federal, state, local, and Department of Defense (DoD) safety regulations and standards throughout the call order service.
7. Environmental and Occupational Safety and Health: The contractor shall be fully responsible for compliance with all Base, County, State, and Federal environmental/occupational safety laws, rules and regulations. The contractor shall follow life and safety codes and take necessary actions to avoid conditions which may be hazardous to the health and safety of base personnel. Any apparent conflict between compliance with the above information and satisfying the requirements of the contract shall be immediately brought to the attention of the CO for a resolution, prior to the performance of the work in question.
8. Security Requirements: It is mandatory for all personnel requiring access to BAFB to submit a contractor EAL Template to the Contracting Officer no later than one (1) week before needing access to the installation. The Visitor EAL Template must include comprehensive details such as Full Name, Date of Birth, Social Security Number, Driver's
License Number, and State of issuance. Any vehicles entering the installation must have proof of registration and insurance.
• All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the government installation, shall abide by all security instructions and directives of Beale AFB
• The contractor shall be responsible for the action of any of their sub-contractors and their employees who are working on Beale AFB.
9. Government Furnished Property and Services: The Government will not provide designated storage areas located on Beale Air Force Base (BAFB) for the temporary storage of furniture or fixtures, as all removed items under this PWS are designated for immediate off-base disposal.
10. Hours Of Operation: Standard remediation operations shall occur Monday through
Friday, 0800–1600. Specific delivery windows may be specified in individual Call Orders.
The following Federal holidays and class dates are observed:
Authorized Work Windows (Special Consideration):
Work is strictly authorized only during the following dates to deconflict with AFCOMAC class schedules:
• 29 September – 16 October
• 10 November – 27 November
New Year's Day 1 January
Martin Luther King’s Birthday Third Monday in January
President's Day Third Monday in February
Memorial Day Last Monday in May
Juneteenth 19 June
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
Class 25-006 01 June – 19 June
Class 25-007 07 September – 25 September
Attachment 3
Attachment 4
CONTRACTOR ENTRY ACCESS LIST FORM
Effective 15 Aug 2016 the USAF will implement REAL ID Act requirements IAW Public Law 109-13 and the Code of Federal Regulations (CFR)
Title 6, Part 37
Note: Personnel will be placed on an EAL for no longer than 29 Days and 15 Business days to receive there DBIDS Card. Any longer will require an 1172 form to get a base pass or a memo from contracting. Handwritten/PDF submittals will not be processed.
NOTE: SSN is used to positively identify individuals. Failure to identify individuals is automatic denial to Beale AFB.
Employee's
LEGAL Last
Name
Employee's
LEGAL First
Name
DOB Drivers
License
Number
Issuing
State
Start
Date
Expiration
Date
Sponsor
Name/DOB
Sponsor
Phone
Number