This is a Purchase Description for a Storage Aid System to be installed at Barksdale Air Force Base, Louisiana, in Buildings 4845 and 6237. The document establishes minimum performance, design, fabrication, installation, orientation, and test requirements for a comprehensive storage solution with an effective date of 16 June 2026.

The system comprises multiple integrated components: a mezzanine with LED lighting and fire suppression in Building 4845; bin shelving with adjustable posts and back/side panels; a rail-guided man-up turret truck with 3,000-pound capacity, 240-inch lift height, and lithium-ion battery (one unit required with three optional units); a rail-guided orderpicker truck for Building 6237 with identical capacity and lift specifications; three stock assist vehicles with 200-pound load tray capacity; one walk-behind electric straddle stacker with 2,500-pound capacity; one 10,000-pound electric pallet jack; four pipe racks with 5,000-pound capacity; three sheet metal racks capable of storing 72" x 144" sheets; 7,500 plastic storage bins in three sizes (yellow Akro-Mils bins); and one enclosed tire rack for six B-52 tires. The contract also includes removal and disposal of existing equipment including a 45' x 92' bin shelving mobile aisle system, pallet rack mobile aisle system, three vertical lifts, and three sheet metal racks. All equipment must meet seismic design standards per UFC 3-310-04 for Shreveport, Louisiana, with minimum service life of 30 years for static components and 15 years for moving components. The contractor must provide shop drawings, equipment manuals, as-built drawings, and system operator and maintenance orientation training. Three acceptance tests—system checkout, quality conformance, and reliability demonstration—must be successfully completed prior to government acceptance, with a one-year warranty covering all equipment and components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER PURCHASE DESCRIPTION

FOR

STORAGE AID SYSTEM

AT

BARKSDALE AFB, LOUISIANA

BUILDINGS 4845 & 6237

CSN: GBR602

DATE: 16 JUNE 2026

PREPARED BY:

Attachment 2 - Purchase Description

FA460826QC110

Barksdale AFB, LA - Cover PD - Page i

Table of Contents

1. SCOPE

1.1. GENERAL SCOPE

2. APPLICABLE DOCUMENTS

2.1. GOVERNMENT DOCUMENTS

2.2. NON-GOVERNMENT DOCUMENTS

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

3.2. CHARACTERISTICS

3.2.1. NOISE LEVELS

3.2.2. ELECTRICAL CHARACTERISTICS

3.2.2.1. POWER SOURCE

3.2.2.2. INSTALLATION CODE

3.2.2.3. ENVIRONMENTAL PROTECTION

3.2.2.4. PROTECTION FROM MECHANICAL DAMAGE

3.3. DESIGN AND FABRICATION

3.3.1. DESIGN CRITERIA

3.3.1.1. MAINTAINABILITY

3.3.1.2. ENVIRONMENTAL CONDITIONS

3.3.1.3. STANDARD, COMMERCIAL COMPONENTS

3.3.1.4. STRUCTURAL REQUIREMENTS

3.3.1.5. VERIFICATION OF DIMENSIONS

3.3.1.6. OZONE DEPLETING SUBSTANCES (ODS)

3.3.1.7. SAFETY

3.3.1.7.1. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

3.3.1.7.2. PROTECTION AGAINST MOVING PARTS

3.3.1.7.3. PLACARDS

3.3.1.7.4. CLEAN-UP

3.3.1.8. ERGONOMIC DESIGN

3.3.2. PROTECTIVE COATINGS

3.3.2.1. PAINTING

3.3.2.2. PLATING

3.3.2.3. GALVANIZING

3.3.2.4. DISSIMILAR METALS

3.3.3. WELDING

3.3.3.1. FIRE PROTECTION

3.3.4. CUTTING

3.3.5. COORDINATION

3.3.6. NAMEPLATES

3.3.7. PRECEDENCE

3.3.8. MATERIALS

3.3.8.1. STEEL

3.3.8.2. MECHANICAL FASTENING DEVICES

3.3.8.3. ANCHORS

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page ii

3.4. DOCUMENTATION

3.4.1. MANAGEMENT REPORTS

3.4.2. SHOP DRAWINGS

3.4.3. EQUIPMENT MANUALS

3.4.4. AS-BUILT DRAWINGS

3.5. ORIENTATION

3.5.1. SYSTEM OPERATOR ORIENTATION

3.5.2. MAINTENANCE ORIENTATION

4. QUALITY ASSURANCE PROVISIONS

4.1. GENERAL

4.2. ACCEPTANCE TESTS

4.2.1. SYSTEM CHECKOUT TEST

4.2.2. QUALITY CONFORMANCE TEST

4.3. INSPECTIONS AND TESTING

4.3.1. INSPECTIONS

4.3.2. TESTS

4.4 WARRANTY

Attachment 2 - Purchase Description

Kirtland AFB, NM - Cover PD - Page 1 of 15

1. SCOPE

1.1. GENERAL SCOPE

This purchase description (PD) establishes the minimum performance, design, fabrication, installation, orientation, and test requirements for a storage aid system at Barksdale AFB, Louisiana, Buildings 4845 and 6237. The work shall be completed in accordance with this PD and Air Force (AF) Drawings GBR602-01 through -02. This PD covers all equipment, materials, and labor necessary to complete installation of the system. It also includes performing tests and making adjustments to the system as well as providing on-the-job instructions to Government personnel.

2. APPLICABLE DOCUMENTS

The following documents form a part of this PD to the extent specified herein. The issue in effect on the date the solicitation is issued shall apply.

2.1. GOVERNMENT DOCUMENTS

AIR FORCE INSTRUCTION (AFI)

AFI 91-203

Air Force Consolidated Occupational Safety Instruction

AIR FORCE OCCUPATIONAL SAFETY AND HEALTH (AFOSH)

AFOSH 48-20 Occupational Noise and Hearing Conservation Program

AFOSH 91-501

Air Force Consolidated Occupational Safety Standard

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1926 Safety and Health Regulations for Construction

AIR FORCE DRAWINGS

GBR602-01 EXISTING EQUIPMENT TO REMOVE

BUILDING 4845

BARKSDALE AFB, LA

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 2 of 15

GBR602-02 PROPOSED LAYOUT

BUILDING 4845

BARKSDALE AFB, LA

2.2. NON-GOVERNMENT DOCUMENTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 325 Steel Construction Manual

(Applications for copies shall be addressed to the American Institute of Steel Construction, Inc, 1 East Wacker Drive, Chicago IL 60601)

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI B11.19 Performance Criteria for Safeguarding

(Applications for copies shall be addressed to the American National Standards Institute, 1430 Broadway, New York, NY 10018)

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM A123 Standard Specification for Zinc (Hot Dip Galvanized) Coatings on Iron and Steel Products

ASTM A153 Standard Specification for Zinc Coating(Hot-Dip) on Iron and Steel Hardware

ASTM A307 Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

ASTM F3125 Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi and 150 ksi Minimum Tensile Strength

ASTM B633 Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel

(Applications for copies shall be addressed to the American Society for Testing and Materials, 1916 Race Street, Philadelphia PA 19103)

AMERICAN WELDING SOCIETY (AWS)

AWS B2.1 Specification for Welding Procedure and Performance Qualification

AWS D1.1 Structural Welding Code – Steel

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 3 of 15

AWS D14.1 Specification for Welding of Industrial and Mill Cranes and Other Material Handling Equipment

AWS Z49.1 Safety in Welding, Cutting, and Allied Processes

(Applications for copies shall be addressed to the American Welding Society, Inc, 550 NW Lejeune Road, P.O. Box 35140, Miami FL 33135)

NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA)

NEMA ICS 6 Industrial Controls and Systems: Enclosures

(Applications for copies shall be addressed to the National Electrical Manufacturers Association, 2101 L Street, NW, Washington DC 20037)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 51B Standard for Fire Prevention During Welding, Cutting, and Other Hotwork

NFPA 70 National Electrical Code

(Applications for copies shall be addressed to the National Fire Protection Association, One Batterymarch Park, P.O. Box 9101, Quincy MA 02269-9101)

SOCIETY OF AUTOMOTIVE ENGINEERS, INC (SAE)

SAE J429 Standard for Mechanical and Material Requirements for Externally Threaded Fasteners

(Applications for copies shall be addressed to the Society of Automotive Engineers, Inc, 400 Commonwealth Drive, Warrendale PA 15906)

UNIFIED FACILTIES CRITERIA (UFC)

UFC 3-520-01 Interior Electric Systems

UFC 3-600-01 Fire Protection Engineering for Facilities

UFC 3-310-04 Seismic Design of Buildings

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 4 of 15

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

The following major components shall be integrated to form the complete Storage Aid System and shall be installed in accordance with this Cover PD, Appendices A-G, and AF Drawings AKR304-01 and AKR304-02.

Mezzanine Appendix A- Mezzanine

Bin Shelving Appendix B- Bin Shelving

Swing Reach Turret Truck Appendix C- Turret Truck

Order Picker Appendix D- Order Picker

Stock Assist Vehicles Appendix E- Support Equipment

Straddle Stacker Appendix E- Support Equipment

10K Pallet Jack Appendix E- Support Equipment

Pipe Rack Appendix E- Support Equipment

Sheet Metal Rack Appendix E- Support Equipment

Plastic Storage Bins Appendix E- Support Equipment

Enclosed Tire Rack Appendix E- Enclosed Tire Rack

Removal and Disposal of Existing Equipment

Appendix G- Removal of Existing Equipment

3.2. CHARACTERISTICS

3.2.1. NOISE LEVELS

The Contractor shall consider noise levels in the design of the equipment. Hazardous noise shall not exceed 85 decibels A-weighted sound pressure level (dB(A)) for 8 hours in any 24-hour period or equivalent in accordance with AFOSH 48-20. Noise level measurements will be taken at a three-foot distance from the equipment producing the noise and at a level of five feet above the ground/floor in all locations in which personnel may be present during normal operations. If noise levels of installed equipment exceed this requirement, then noise shall be reduced through engineering controls; i.e., insulation, dampening, and isolation.

3.2.2. ELECTRICAL CHARACTERISTICS

3.2.2.1. POWER SOURCE

The Contractor shall run electrical power from the existing government supplies within the building. The Contractor shall furnish and install all necessary wiring and equipment for power distribution to the system and for control of the system.

3.2.2.2. INSTALLATION CODE

The installation shall, at a minimum, conform to applicable rules of NFPA 70 (National Electrical Code) and UFC 3-520-01.

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 5 of 15

3.2.2.3. ENVIRONMENTAL PROTECTION

All indoor enclosures and controls shall be in accordance with NEMA ICS 6, Type 12.

3.2.2.4. PROTECTION FROM MECHANICAL DAMAGE

No pushbuttons, control panel, conduit, shielded cable, wire, or electrical device shall be installed in such a way, that would expose it to mechanical damage during normal use.

If an electrical device, which includes photo eyes, is exposed to damage by material or personnel, then it shall be guarded.

3.3. DESIGN AND FABRICATION

3.3.1. DESIGN CRITERIA

3.3.1.1. MAINTAINABILITY

The system shall be designed, fabricated, and installed to facilitate maintainability and ensure a minimum service life of 30 years on static components and 15 years on moving components.

3.3.1.2. ENVIRONMENTAL CONDITIONS

The system shall operate in a temperature range of 0 to 120 degrees Fahrenheit with up to 99 percent relative humidity. The system shall be constructed to operate in an open warehouse environment. For components located outdoors, the components shall be constructed for year-round outdoor use, operating in sun, rain, snow, and wind.

3.3.1.3. STANDARD, COMMERCIAL COMPONENTS

Standard, commercial components which have been for sale and available for purchase to the general public or government agencies for at least one year shall be used to the maximum extent possible. Where two or more units of the same type of equipment are required, these units shall be products of the same manufacturer. All equipment and materials shall be new.

3.3.1.4. STRUCTURAL REQUIREMENTS

The system shall be designed and constructed in accordance with state and local codes at Barksdale AFB, LA. The system shall also be designed to withstand the seismic conditions identified in the International Building Code for the Shreveport, LA locality and DOD regulation UFC 3-310-04.

3.3.1.5. VERIFICATION OF DIMENSIONS

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 6 of 15

The contractor shall become familiar with all details of the work, verify all dimensions in the field, and shall advise the Contracting Officer of any discrepancy before end of post award.

3.3.1.6. OZONE DEPLETING SUBSTANCES (ODS)

The Contractor shall not use or prescribe to the greatest extent possible any ODS in the installation and maintenance of the system. ODS includes, but is not limited to aerosol cans, certain cleaning solvents, and certain lubricants. If there is a question pertaining to the applicability of a substance, submit the name of the substance to the Contracting Officer for verification.

3.3.1.7. SAFETY

The Contractor shall consider the safety of personnel and equipment when designing and installing the system. Safety provisions shall be incorporated to the maximum extent possible. When possible, hazards shall be eliminated through design. When this is not possible, safety devices such as guards, interlocks, and barriers shall be installed.

If this does not eliminate the hazard, warning devices such as warning signs, indicator lights, and audio devices shall be installed. Safety requirements shall include, but are not limited to, the following.

3.3.1.7.1. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

The system installation practices and completed system shall meet all applicable requirements of OSHA 29 CFR 1910 and OSHA 29 CFR 1926.

3.3.1.7.2. PROTECTION AGAINST MOVING PARTS

Moving parts shall be provided with guards to protect personnel from possible injury.

Guards shall be in accordance with ANSI B11.19.

3.3.1.7.3. PLACARDS

Conspicuous placards shall be mounted adjacent to areas where hazards may exist (i.e., high voltage, pinch points, and tripping hazards). Placards shall also be used to identify operating limits (i.e., capacity, speed, and incline) in a conspicuous location for operators' use.

3.3.1.7.4. CLEAN-UP

The Contractor shall, at all times, keep the work area, including storage areas, free from the accumulation of waste materials and dust which would cause a hazard or nuisance to others. The approved methods of stabilization for dust control are sprinkling, chemical treatment (non-ODS) or a similar method approved by the COTR. If there is a cutting process, the solution shall be vacuumed up during the process to prevent dust pollution and water damage. Before leaving the site, the Contractor shall remove all rubbish, Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 7 of 15 tools, equipment, and materials that are not the property of the Government. At the completion of the installation/test, the Contractor shall leave the site in a clean, neat and orderly condition satisfactory to the COTR. Waste will be removed daily from the site and shall not be allowed to accumulate to the extent that it becomes a safety or fire hazard. It shall be the Contractor's responsibility to dispose of waste in accordance with all applicable Federal, State, County and Municipal codes.

3.3.1.8. ERGONOMIC DESIGN

The system design and layout shall incorporate ergonomic design criteria so the optimal interface between operator and equipment is attained.

3.3.2. PROTECTIVE COATINGS

All system component surfaces shall be protected from corrosion by painting, plating, or galvanizing.

3.3.2.1. PAINTING

Metal surfaces, which are not galvanized or plated, shall be cleaned, treated, and painted to protect against rust, corrosion, and deterioration. The first coat of paint or primer shall be applied to a dry clean surface as soon as practicable after cleaning and treating the metal. The primer shall not interfere with the application and adhesion of subsequent coats. Paint shall last the service life of the equipment. Paint shall be lead and chromate free and meet air pollution requirements for solvent emissions. When several standard colors are available, a color selection chart shall be submitted to the COTR with the shop drawings for selection. The finish coat shall be a smooth, even surface, free from runs, sags, and defects when dry. Welded surfaces shall be cleaned and painted after the welding process is complete. Pre-painted accessories, as well as surfaces not requiring paint, shall be protected from overspray.

3.3.2.2. PLATING

All surfaces to be plated shall be thoroughly cleaned to provide a surface free of mill scale, oil, grease, dirt, rust, and any other foreign material prior to being plated. Plating at a minimum shall comply with ASTM B633, Service Condition 1, Type I unless otherwise specified.

3.3.2.3. GALVANIZING

All metal surfaces to be galvanized shall be thoroughly cleaned to provide smooth surfaces and shall comply with ASTM A153 and ASTM A123.

3.3.2.4. DISSIMILAR METALS

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 8 of 15

Materials used and their locations shall not promote galvanic corrosion. No combination of materials shall be used that form an electrolytic couple of such nature that corrosion is accelerated.

3.3.3. WELDING

Dimensional tolerances for welded construction, details of welds, and quality of welds shall be in accordance with the applicable requirements of AWS B2.1, AWS D1.1, and AWS D14.1. Safety precautions during welding shall conform to AWS Z49.1.

3.3.3.1. FIRE PROTECTION

All welding, cutting, brazing, and burning operations shall be accomplished in strict compliance with the requirements outlined in AFI 91-203 and NFPA Standard 51B. Prior to starting any welding, cutting, brazing, or burning operations, the Contractor shall obtain a permit (USAF Welding, Cutting, and Brazing AF Form 592). This permit can be obtained by contacting the Barksdale Fire Department at least 24 hours in advance. A copy of each permit will be retained at the work site until the work has been completed.

Operations that produce flying, dropping slag, metal or embers shall have sufficient non-combustible materials and fire blankets on site to protect against fire damage or personal injury. In addition, the contractor shall provide a minimum of 2 portable fire extinguishers at the work site until the work has been completed. Extinguishers shall meet a rating of 4A-40BC and the requirements outlined in AFOSH 91-501, Chapter 6.

At the close of their operation, the contractor shall make a thorough inspection of each building in which he/she has performed work. This inspection shall ensure that all necessary safeguards relative to potential fire hazards are in effect and operational. The contractor shall familiarize themselves and their personnel on the location of all telephones needed for fire reporting. The contractor shall maintain good housekeeping practices to reduce the risk of fire, damage, and/or personal injury. All scrap materials, rubbish, and refuse shall be removed daily from in and around the building and shall not be permitted to be strewn on adjacent property. Flammable and combustible materials used inside the building shall be kept to a minimum and removed from the building during unused periods. Storage of flammable/combustible materials shall not be permitted inside the building.

3.3.4. CUTTING

All edges produced by cutting operations shall be finished by grinding (or other method approved by the COTR) to a surface finish equivalent to that of adjacent surfaces.

Sharp edges shall not be acceptable.

3.3.5. COORDINATION

The Contractor shall obtain approval from the local base civil engineering, fire, safety, and bioenvironmental offices before making any modifications to the existing structure to accommodate the new system. The modifications shall match existing work and shall

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 9 of 15 be of comparable quality. The COTR shall also approve all modifications before they are made.

3.3.6. NAMEPLATES

The Contractor shall provide and install one corrosion resistant metal nameplate for each component. A nameplate for each row of shelving/rack shall be provided such that if one row is dismantled, the nameplates will exist elsewhere. Nameplates shall be located in a visible and safe location. Nameplates shall last the life of the equipment and shall be capable of withstanding local environmental conditions. Nameplates shall be stamped, engraved, or etched in a print type not less than 1/8-inch tall. No nameplate or product marking shall be installed until all touch-up painting has been completed.

The nameplate or product marking shall clearly display the following headings and corresponding information.

Type of equipment Name of manufacturer Model Number Contract Number Serial Number Capacity Weight Manufacture Date, Month/Year "Property of US Government"

3.3.7. PRECEDENCE

Where local codes and standards conflict with the contents of this PD, the more stringent requirement shall prevail.

3.3.8. MATERIALS

3.3.8.1. STEEL

The structural steel components shall meet all design property requirements of AISC 325.

3.3.8.2. MECHANICAL FASTENING DEVICES

Unless otherwise specified, all threaded connectors of diameter greater than 7/16 inch shall be either A325 bolts conforming to ASTM A325 or SAE Grade 5 bolts conforming to SAE J429. All structural joints shall be in accordance with AISC 360. Bolt hole diameters shall not exceed nominal bolt diameters by more than 1/16 inch. All bolt holes shall be free of burrs, pins, or slivers. Bolts shall extend a minimum of two threads beyond the nuts, but not more than five threads. All nuts, bolts, and other threaded fasteners shall be plated or galvanized to prevent corrosion. All threaded fasteners shall utilize plated flat or lock washers as required.

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 10 of 15

3.3.8.3. ANCHORS

Anchors shall, at a minimum, meet the requirements of ASTM A307. Anchors shall be either the drop-in expansion type or wedge type. All anchors shall be sufficient in size to withstand the calculated pullout and shear forces experienced by the equipment.

Minimum anchor sizes shall be 3/8 inch in diameter or, if applicable, as specified in the appendices. Anchor lengths shall be long enough to assure that the manufacturer's minimum embedment in concrete is maintained and shall be installed properly to maintain the required minimum concrete embedment. Anchors shall be spaced so that the manufacturer's recommended minimum allowable spacing between anchors is maintained and the recommended minimum allowable edge distance is maintained. All anchors shall be torqued to the manufacturer's recommended installation torque. When required, adhesive anchors may be used; subject to approval by the COTR.

3.4. DOCUMENTATION

The Contractor shall provide documentation (data) as described below and in accordance with Table 1 below. Where possible, the Contractor shall print on recycled paper. Also, the Contractor shall not require the use of any Class I ozone depleting substance in any submittal.

3.4.1. MANAGEMENT REPORTS

The Contractor shall provide a monthly status report complete with schedule. The report shall be either Microsoft word document or a PDF file. The monthly status report shall be submitted in accordance with Table 1. Contractor format is acceptable as long as it provides the following information as a minimum;

A) A front cover sheet which includes the title of report, the contractor’s name and address, the base name, the contract number, and the date.

B) A schedule showing actual progress to date against current contract schedule through contract completion is required. In addition, forecasted delivery and other significant project milestones should address/include, at a minimum:

CLIN deliveries, submission of all data items, post award site visit (if applicable), shipping of deliverables, installation, training/orientation (if required), system checkout test, quality conformance test, reliability demonstration test, etc."

C) The body of the report shall provide a summary of the progress to date. It shall identify any problem areas, any changes in schedule or contract equipment, any engineering change proposals, all significant trips, emails, or telephone calls affecting the performance or scope of the contract.

3.4.2. SHOP DRAWINGS

The Contractor shall provide shop drawings for the system and equipment layout, fire suppression drawings and design calculation stamped and submitted for approval by Base Fire. Shop drawing package shall be submitted in accordance with Table 1. Hard

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 11 of 15 copy size of drawing shall be dependent on clarity of drawing, but as a minimum shall be B size. Shop drawings shall be submitted in a time frame, which meets the contract schedule. Government shall have two weeks to review shop drawings. Any resubmittals required shall be resubmitted within one week.

3.4.3. EQUIPMENT MANUALS

The Contractor shall provide separate maintenance and Illustrated Parts Breakdown (IPB) manuals for all equipment.

3.4.4. AS-BUILT DRAWINGS

The Contractor shall provide as-built drawings of all drawings submitted as part of the shop drawing package. As-built drawings shall be submitted in accordance with Table 1.

Table 1 – Data Requirements

SUBMITTAL DUE DATE DISTRIBUTION LIST

Buyer identified at time of award

Base POC

Management Reports (3.4.1)

1st business day of each month starting after the month the contract is awarded

Email with attachment of report

Email with attachment of report

Email with attachment of report

Shop Drawings (3.4.2)

Due date is same as CLIN 0001

Email with attachment of drawings (AutoCAD and

PDF)

Email with attachment of drawings (PDF)

Email with attachment of drawings (AutoCAD and

PDF)

Equipment Manuals (3.4.3)

With delivery of equipment

Email with attachment of manuals (PDF)

Email indicating delivery of manuals completed

Email with attachment of manuals (PDF) and 3 sets of hard copies

System Checkout Certificate

(4.2.1)

Due upon contractor system installation inspection completion

Email with attachment of system checkout certificate (Word Document or

PDF)

Email with attachment of system checkout certificate (Word Document or

PDF)

Email with attachment of system checkout certificate (Word Document or

PDF)

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 12 of 15

As-built Drawings

(3.4.4)

30 days after Government acceptance of system

Email with attachment of drawings (AutoCAD and

PDF

Email with attachment of drawings (PDF)

Email with attachment of drawings (AutoCAD and

PDF)

3.5. ORIENTATION

The Contractor shall provide technical services and materials to orient Government personnel. Fully qualified Contractor personnel who are knowledgeable of the system shall accomplish all orientation. Courses shall be combined in accordance with the Contractor's standard commercial training courses, where applicable, provided all aspects of training are included. Orientation shall be provided at Barksdale AFB, LA.

The Contractor shall provide each attendee with a certificate indicating successful completion of the orientation. All orientation shall be completed prior to the start of the quality conformance test.

3.5.1. SYSTEM OPERATOR ORIENTATION

This orientation shall provide instructions in the overall operational functions that are performed by the system operators. Instructions shall include the operation of all the system components. Upon completion of this course, the operators shall be able to operate all components of the system. Operators shall be able to perform these functions using only the reference manuals provided with the system relative to operations. The hands-on phase shall include actual operation of the system under the supervision and instruction of the Contractor. An estimated 6 students with possibly no experience will attend per building.

3.5.2. MAINTENANCE ORIENTATION

This orientation shall provide instructions in corrective and preventive maintenance of the system delivered. Instruction shall include installation and adjustment of all system components. Upon completion of this orientation, students shall be able to install, adjust, and maintain equipment using only the maintenance reference manual delivered. The hands-on phase shall include actual field instruction in the maintenance requirements of the installed system. An estimated 6 students with possibly no experience will attend per building.

4. QUALITY ASSURANCE PROVISIONS

4.1. GENERAL

The COTR shall monitor the installation of the system. The system delivery dates shall not be extended because of work stoppages caused by unacceptable practices and/or test failures. The Government will provide all test loads. The Contractor shall be responsible for loading and unloading all test loads and performing all inspections and

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 13 of 15 tests. The Contractor shall provide a knowledgeable and authoritative representative on site during the entire acceptance tests.

4.2. ACCEPTANCE TESTS

Three tests must be successfully completed prior to the Government accepting the system. These tests are the system checkout test, the quality conformance test, and the reliability demonstration test.

4.2.1. SYSTEM CHECKOUT TEST

Upon completion of installation, the Contractor using loads of the type specified herein and, in the appendices, shall check out the system. The Contractor shall inspect the system to assure that the system meets all the requirements of 4.3.1. The Contractor shall also test the system in accordance with the test defined in 4.3.2. All inspections and tests shall be repeated until all modifications and/or adjustments are complete and the system passes all inspections and tests. The Contractor shall submit to the Contracting Officer written certification that the system has passed the requirements of this paragraph. The COTR will schedule the quality conformance test to start within 10 days following the receipt of the written certification from the Contractor. Notification of a system checkout test shall comprise of an e-mail to the Contracting Officer, COTR, and project engineer stating:

“The system has undergone testing/inspection and successfully met all requirements within the contract and is ready to undergo the Quality Conformance Test. Any deficiencies found at the Quality Conformance Test which result in the system being failed may result in consideration.”

4.2.2. QUALITY CONFORMANCE TEST

As part of the quality conformance test, the Contractor shall provide written certification that the requirements listed in this PD have been met. This certification is required on or before the start of the quality conformance test as detailed in 4.2.1. The Contractor, in the presence of the COTR, shall inspect the system to confirm that the system meets all the requirements of 4.3.1. The Contractor, in the presence of the COTR, shall also test the system in accordance with the test defined in 4.3.2. Upon successful completion of all tests and inspections, the reliability demonstration shall start.

4.3. INSPECTIONS AND TESTING

This section defines all inspections and tests that must be completed as part of the system checkout test and repeated at the quality conformance test. The Contractor may add to this list, or question any requirement, by sending a letter to the Contracting Officer prior to the acceptance tests. The COTR will classify all deficiencies encountered into one of the defect classification listed below. Any critical or major defect found shall be cause for rejection of the system. Any combination of two or more minor defects shall leave the rejection of the system at the discretion of the COTR.

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 14 of 15

Critical Defect - A defect that judgment and experience indicate is likely to result in hazardous or unsafe conditions for individuals using, maintaining, working near, or depending upon the equipment.

Major Defect - A defect other than critical that is likely to result in failure, or reduce materially the system for its intended purpose.

Minor Defect - A defect that is not likely to reduce materially the usability of the system for its intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the system.

4.3.1. INSPECTIONS

The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of the cover purchase description (and associate appendices, if applicable).

These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

4.3.2. TESTS

The tests in associated appendices shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

No. Paragraph Test Result

1. 3.3.1.7.3. Inspect to see that placards are provided where unsafe conditions exist.

☐ Pass

☐ Fail

2. 3.3.1.7.4. Ensure the work site around the system is clean. ☐ Pass

☐ Fail

3. 3.3.8.3. Bolts are embedded to the correct depth, lock washers are provided, and nuts are tightened.

☐ Pass

☐ Fail

4. 3.3.2. Equipment is protected from the environment by either paint, coatings, galvanizing, or the type of material used.

☐ Pass

☐ Fail

5. 3.3.6. Nameplates provided and securely attached to all equipment.

☐ Pass

☐ Fail

6. 3.4.3. Manuals provided and are acceptable where required. ☐ Pass

☐ Fail

7. 3.5. Ensure all training has been provided. ☐ Pass

☐ Fail

4.4 WARRANTY

The contractor shall warrant that all equipment and components furnished under this contract will be free from defects in material or workmanship and will conform with all requirements of this contract. The warranty period shall last one year after final

Attachment 2 - Purchase Description

Barksdale AFB, LA - Cover PD - Page 15 of 15 acceptance. When return, correction, or replacement is required, transportation charges and responsibility for the supplies while in transit shall be borne by the contractor. Any equipment or components thereof, corrected or furnished in replacement under this warranty, shall also be subject to the terms of this warranty to the same extent as supplies initially delivered. The warranty, with respect to the equipment or components thereof, shall be equal in duration to the length of the original warranty and shall run from the date of delivery of the corrected or replaced supplies. The Contracting Officer's Technical Representative (COTR) or Base Project Officer (BPO) shall notify the contractor of failures that require correction under this warranty. The contractor shall provide an email explaining the suspected cause of failure, listing the defective item(s), course of action (i.e. replace or repair), time to complete (i.e. delivery and installation or time to repair), and any other details that may be relevant.

THIS AREA LEFT BLANK INTENTIONALLY

Attachment 2 - Purchase Description

Barksdale AFB, LA – Appendix A - Page 1 of 4

1. GENERAL SCOPE

This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for a mezzanine at Barksdale AFB, Building 4845. The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and Air Force (AF) Drawing GBR602-02. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.

2. APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD as well as ASTM A36, ASTM A446, ASTM A500, ASTM A570, ASTM A611, OSHA 1910.23 and

OSHA 1910.24.

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

The mezzanine shall provide an elevated storage space within Building 4845.

3.2. CHARACTERISTICS

The mezzanine shall conform to the following requirements.

3.2.1. CONFIGURATION REQUIREMENTS

The mezzanine shall be located and configured as shown on AF Drawing GBR602-02.

3.2.2. STRUCTURE AND INSTALLATION

• GENERAL REQUIREMENTS

o Load Capacity: All components capable of supporting a minimum capacity of

150 pounds per square foot (uniformly distributed) without permanent deflection or deformation o Dimension and Clear Height: As shown on AF Drawing GBR602-02 o Freestanding: Not attached to any existing building wall or column and not require cross bracing between columns.

o All components pre-engineered to eliminate on-site welding.

o Designed to withstand seismic forces as specified in the International Building

Code for the Shreveport, LA locality and DOD regulation UFC 3-310-04.

o No component deflect greater than the length of the component divided by

360 (L/360) under uniformly loaded conditions

• COLUMNS

o Cold formed, structural steel tubing o Meet or exceed requirements of ASTM A500, Grade B, FY-46KSI o Pre-punched for connection to beams and joists

Attachment 2 - Purchase Description

Barksdale AFB, LA – Appendix A - Page 2 of 4 o Minimum 6-inch by 6-inch x 3/16 inch thick

• BASE PLATES

o Used under each column to distribute load o Factory welded to columns and prepunched for anchors o Anchored in accordance with manufacturers recommended procedures o Meet or exceed ASTM A36 o Minimum 10-inch by 10-inch x 5/8-inch o Grout used in accordance with manufacturers recommended procedures

• FRAMING

o Meet or exceed requirements of ASTM A570 for hot rolled structural steel members o Meet or exceed requirements of ASTM A500 for cold-formed structural steel members o Beams are structural steel and prepunched for secure connection to column and joists with A325 bolts o Joists are structural steel and prepunched for secure connection to beams with A325 bolts o Minimum 18-guage steel for structural steel bridging channels

• DECKING

o Consist of a metal roof deck and composite flooring with minimum density of

60 pounds per cubic foot o Metal Roof Deck

Galvanized metal roof decking Minimum 20-gauge, type-B roof deck meeting the requirements of

ASTM A611, Grade C; or minimum 18 gauge, type-B roof deck meeting the requirements of ASTM A446, Grade A

Securely fastened to framing with plated, self-tapping, steel screws or equivalent o Composite Flooring Resindek or equivalent Minimum ¾ inch thich Exterior sealant used, Acryseal or equivalent Tongue and groove on long sides forming an integral surface Securely fastened to framing with manufacturer’s recommended installation procedures

• STAIRS

o Provided at the locations shown on AF Drawing GBR602-02 o Include stairs, structural steel stringers, railings, platforms, and all necessary hardware for installation o Designed in accordance with OSHA 1910.24 o 36 inches wide o Platforms utilized as necessary to ensure incline does not exceed 40 degrees

Attachment 2 - Purchase Description

Barksdale AFB, LA – Appendix A - Page 3 of 4 o Closed tread with diamond plate o Stringers meets or exceed requirements of ASTM A36 o Painted safety yellow o Stair Railing:

Provided on the open sides of all exposed stairways and platforms Designed in accordance with OSHA 1910.23 Either 2-rail or 3-rail type Top rail between 30-34 inches above stair tread Minimum 1-1/4 inch, schedule 40 steel tubing Joined with galvanized fittings or pre-engineered union Bolt connected or factory welded to the stringer Capable of withstanding minimum 200 pound load applied in any direction at any point on the top rail

• MEZZANINE RAILING

o Provided on the open sides of all exposed mezzanine floor o Designed in accordance with OSHA 1910.23 o Either 2-rail or 3-rail type o Top rail between 42 inches above mezzanine decking o Minimum 1-1/2 inch, schedule 40 steel tubing o Joined with galvanized fittings or pre-engineered union o Bolt connected to structural framing beam o Capable of withstanding minimum 200 pound load applied in any direction at any point on the top rail o Support posts spaced on maximum 8-foot centers

• KICKPLATE

o Provided on the open sides of the mezzanine and platforms o Minimum 4-inches high o Maximum ¼-inch clearance between floor and bottom of kickplate o Minimum 14 gauge steel o Securely fastened to mezzanine or railings

• PALLET GATE

o Provided as shown on AF Drawing GBR602-02 o Constructed of steel tubing matching the railing o Provide minimum opening of 60 inches o Only pivot types are acceptable.

• FIRE SUPPRESSION SYSTEM

o Wet-pipe sprinkler system installed in accordance with NFPA guidelines and applicable fire codes at Barksdale AFB.

o Contractor shall perform a flow-test to ensure the existing building fire suppression system has sufficient flow for the new system.

Attachment 2 - Purchase Description

Barksdale AFB, LA – Appendix A - Page 4 of 4 o Fire suppression design and hydraulic calculations shall be sealed by a qualified registered Professional Engineer in Louisiana and provided to the COTR for approval.

o Contractor shall notify the Base Fire Department before connecting the mezzanine fire suppression system into the building system.

o Location of tie-in point TBD at time of Post Award Meeting but not to exceed 200 feet from the location of the mezzanine.

• ELECTRICAL

o LED lighting provided underneath mezzanine with a minimum illuminance level of 50 foot-candles measured at 30 inches above the floor.

o Supported by mezzanine.

o On/off switches located as shown on AF Drawing GBR602-02

Enclosed, tumbler type Located 52 +/- 2-inches in height from floor

• SAFETY FEATURES

o Metal live load capacity signs displayed on all sides of mezzanine o No-step signs posted on all railings on maximum 20-foot centers o Minimum vertical member safety factor of 1.92 to 1 o Minimum horizontal member safety facoty of 1.67 to 1

4. QUALITY ASSURANCE PROVISIONS

4.1. INSPECTION

The mezzanine system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

4.2. TESTS

The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

No. Description Result

1. Maximum loads shall be placed randomly in the mezzanine. After not less than four hours, the test loads shall be removed and the mezzanine examined for signs of deformation. If any component of the system exhibits plastic or elastic deformation outside of the approved parameters, the system fails the test.

☐ Pass

2. The lighting under the mezzanine shall be turned on. Test the lighting with a light meter 30 inches from the floor. If the lighting is not a minimum of 50 foot-candles then the system shall fail the test.

Barksdale AFB, LA – Appendix B - Page 1 of 3

This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for bin shelving at Barksdale AFB, Building 4845. The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and Air Force (AF) Drawing GBR602-02. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.

2. APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD.

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

The bin shelving shall be used to store hand-liftable items and interface with the mezzanine specified in Appendix A.

3.2. CHARACTERISTICS

Bin shelving shall conform to the following requirements.

3.2.1. CONFIGURATION REQUIREMENTS

Bin shelving shall be located and configured as shown on AF Drawing GBR602-02.

3.2.2. STRUCTURE AND INSTALLATION

SHELF DETAILS

o Shelf size shall be as shown on AF Drawing GBR602-02 o Capacity as shown on AF Drawing GBR602-02 o Shelf edges shall be flanged down on all sides with at least one additional return flange o Shelf shall have adjustable shelf clips to secure all four corners o Not exhibit permanent deformation and elastic deformation shall not exceed .875 percent of the unsupported span. The following formula shall be used to determine the deflection amount:

Deflection = [(M1 - M2) / shelf beam length ] * 100

SUPPORTING POSTS

o Posts shall be as shown on AF Drawing GBR602-02 o Shall have capacity sufficient to support shelfs as shown on AF Drawing

GBR602-02

o Shall be adjustable by 1 or 1-1/2 inch increments o Shall be beaded, box, or angle upright type as defined by the Shelving

Manufacturers Association

Attachment 2 - Purchase Description

Barksdale AFB, LA – Appendix B - Page 2 of 3

PANELS

o Back panels shall be on all shelving units o Side panels shall be on all shelving units

BASE STRIP

o Shall be installed between bottom shelf and floor on all units

FOOT PLATES

o Each supporting post shall have a foot plate and be secured to floor with anchor bolts o Foot plates shall be secured behind base strips

FREESTANDING STRUCTURE

o Shall be a rigid freestanding structure o Shall be installed per manufacturers instructions

ASSEMBLY

o Shall be assembled using all required components as per manufacturers instructions o Shelving shall be secured to the supporting posts by means of positive engaging clips

ALIGNMENT

o Shall maintain shape and positions under full load o Aisle alignment shall be maintained from unit to unit by 1/8 inch o Vertical alignment shall be within 1/4 inch o All leveling shims shall be secured under foot plates

ROW MARKERS

o Two card holders installed on the end of each rack section for row identification.

o Card holders capable of holding and shielding 8.5 inch by 11 inch printed labels from debris.

o Securely mounted between 7 feet and 10 feet from the floor.

COLOR

o Shall be as specified by COTR

4. QUALITY ASSURANCE PROVISIONS

4.1. INSPECTION

The bin shelving shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

Attachment 2 - Purchase Description

Barksdale AFB, LA – Appendix B - Page 3 of 3

4.2. TESTS

The following test shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

No. Description Result

1. Maximum loads shall be placed randomly in the shelf system. After not less than four hours, the test loads shall be removed and the shelving examined for signs of deformation. If any component of the system exhibits plastic or elastic deformation outside of the approved parameters, the system fails the test.

THIS AREA LEFT BLANK INTENTIONALLY

APPENDIX C

RAIL-GUIDED MAN-UP TURRET TRUCK

AT

BARKSDALE AFB, LA

CSN GBR602

Barksdale AFB, LA – Appendix C - Page 1 of 4

1. SCOPE

This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for a rail-guided man-up turret truck system at Barksdale AFB, Building 4845. The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and Air Force (AF) Drawing GBR602-02. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.

2. APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD as well as conform to ANSI B56.1 Safety Standard for Low, High Lift Trucks.

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

One rail-guided man-up turret truck shall be provided and installed. An additional three turret trucks shall be options, each able to be executed individually from one another.

The turret trucks shall interface with existing pallet rack in Building 4845.

3.2. CHARACTERISTICS

Rail-guided man-up turret trucks shall conform to the following requirements.

3.2.1. REQUIREMENTS

General Requirements o Minimum Rated Load Capacity: 3,000 pounds at 24-inch load centers o Minimum Power: 24V o Minimum Amp Hour: Continuous eight hours of operation o Battery Type: Lithium-Ion o Operator Type: Standing/Sitting o Lift Height: 240 inches to top of forks o Maximum Collapsed Height: 144 inches o Fork Dimensions: 36 [L] o Fork Adjustments: Adjustable on max 2 inch increments o Minimum Travel Speed (unloaded): 5.0 + 2.0 MPH o Minimum Travel Speed (max load): 3.0 MPH o Maximum Travel Speed (when operator platform is raised 24 + 6 inches): 2.0 + 0.2 MPH o Minimum Raising Speed: 45 ft/min with rated load o Maximum Lowering Speed: 30 ft/min with rated load o Load Stability: No jerky movements that would displace load o Operator Stability: No excessive sway when positioning load at max height

Attachment 2 - Purchase Description

Barksdale AFB, LA – Appendix C - Page 2 of 4 o Mast System: Use of both primary and auxiliary mast Braking System o Type: Mechanical and/or Electrical o Braking Application: Caster and Drive

Operational Capabilities o Minimum Reach Distance: 24 inches o Minimum Tilt: 5 degrees up and 2 degrees down o Minimum Side Shift: +/- 2 inches from center o Wheel Type: Non-marking wheels o Aisle Operation: Must be able to operate with a 40 x 48-inch pallet within

66-inch aisles o Speed Control: Capable of plugging, slowing speed by reversing the speed control o Rail Guidance: Capable of rail guidance movement within aisles o Fork Rotation: Fully loaded palletized load able to rotate 180 degrees on vertical access at any height to face either side of aisle.

Safety Features & Indicators o Hour indicator o Battery charge indicator o Highly visible red/amber flashing lights o Horn o Working spotlight o Operator compartment fan and light o Aisle lighting o Dead man brake o Overload protection to prevent lifting loads greater than 110% of the rated capacity o Lift limit switch with override o Folding seat to allow operation from sitting or standing position o Hinged operator restraint side rails with lockout capability o Operator compartment overhead safety guard with labeled anchorage point o Full body safety harness o Auxiliary lowering device

Accessible from ground level Not require use of tools for access or operation Lower speed (min/max): 40 ft/min, 100 ft/min o Fire extinguisher o Window or wire mesh between operator’s compartment and mast

Charging Requirements o A compatible battery charger shall be installed as located on AF Drawing

GBR602-02 and shall be in accordance with NFPA 70.

o On-board charger shall be compatible with a 240-volt power source.

Attachment 2 - Purchase Description

Barksdale AFB, LA – Appendix C - Page 3 of 4 o Chargers shall comply with NEMA IB 6-83 standards.

Training o Training shall be provided in accordance with ANSI B56.1 standards

The rail-guided man up turret track shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as part of the quality conformance test.

4.2. TESTS

The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

No. Description Result

1. The turret truck shall be tested for four hours as registered by the hour meter. It shall have a fully charged battery before testing begins. The truck shall be tested while carrying a maximum load, and shall be driven down all aisles of the rack system. The truck fails the test if it is not capable of interfacing with each shelving position in the system.

☐ Pass

☐ Fail

2. The side rails for the turret truck shall be raised and locked into position. The operator shall attempt to operate the turret truck. If the operator is able to operate the turret truck with either side rail in the raised position, the turret truck fails the test. If either side rail will not remain in the raised position, the turret truck fails the test.

☐ Pass

☐ Fail

3. The operator shall attempt to activate the turret truck while not standing on the deadman brake. If the turret truck activates either vertically or horizontally the turret truck fails the test.

☐ Pass

☐ Fail

4. The turret truck shall be loaded with a pallet load in excess of 3,300 pounds. An operator shall attempt to lift the load. If the turret truck can lift the load, and the overload valve does not open, then the turret truck fails the test.

☐ Pass

☐ Fail

5. The platform shall be raised to a height of 10 feet above the warehouse floor with a 3,000-pound load. The auxiliary lowering control will be activated and the descent of the platform timed.