Attachment_2_-_Price_Schedule.docx

DOCX document 19 KB Posted

Attached to
BGNDRF WELL 2 REPAIR SERVICE
Solicitation number
140R4025Q0097
Issued by

About this file

This document is a Price Schedule for the BGNDRF Well No. 2 Repair Service solicitation issued by the Department of the Interior Bureau of Reclamation. The price schedule outlines a detailed breakdown for a well repair project, specifically for motor and pump replacement, with multiple line items covering mobilization, labor, equipment, and additional services. The schedule includes specific pricing components such as a 7.5 hp motor, pump end, check valve, splice kit, descaler chemical addition, bail and swab services, and video inspection before and after chemical addition. The total price will include a New Mexico Gross Receipts Tax of 7.8750%, and the government reserves the right to request additional information to substantiate each line item pricing. The solicitation (Number 140R4025Q0097) is for a comprehensive well repair service with a single Contract Line Item Number (CLIN) requiring a complete price submission for all listed components.

View the file

Other files

File Type Posted
Sol_140R4025Q0097_Amd_0002.pdf PDF
Sol_140R4025Q0097_Amd_0001.pdf PDF
Sol_140R4025Q0097.pdf PDF
Attachment_1_-_SOW__rev1.pdf PDF
Attachment_3_-_DB_Act_WD_NM20250008_2_14_2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BGNDRF Well No. 2 Repair Attachment 2

PRICE SCHEDULE

Offerors will be considered for award on the following Schedule A, but no offer will be considered for award on only a part of Schedule A. Offeror’s unit price provided in Schedule A shall include all mobilization, preparatory work, labor, equipment, transportation, shipping, supplies, materials, and taxes to meet requirements and delivery schedules.

PRICE SCHEDULE A

(MOTOR & PUMP REPLACEMENT - WELL NO. 2)

CLIN 00010
Description
Quantity

and Units Unit Prices Totals

1.
Mobilization (if applicable)
1.0 LS
$
$
2.
Labor (Pulling & Resetting Pump Assembly)
2.0 HRS
$
$
3.
Equipment (pump, motor, check valve, supplies). Itemize as much as possible below.
$
$
7.5 hp motor
1.0 EA
$
$
Pump end
1.0 EA
$
$
Check Valve with BOP
1.0 EA
$
$
Splice kit and other supplies
1.0 EA
$
$
4.
Descaler Chemical addition & flush
1.0 EA
$
$
5.
Bail & Swab
1.0 EA
$
$
6.
Video well before & after chemical addition
2.0 EA
$
$
7.
Replace or Reinstall insulation
1.0 EA
$
$

Subtotal =

8.
Unlisted Items, discovered during Pump Pull (Requires prior approval by CO)
1.0 LS
$
$
Subtotal =
$
*NMGRT 7.8750% =
$
Schedule A Total =
$

NOTE: There is only one CLIN for this requirement; however, there are multiple sublines needing price breakout.

The Government reserves the right to substantiate each line item by requesting additional information.

*Gross Receipts Tax Rate will be according to the location of work

File details come from the government source that posted it. Updated .