Attachment 2 Price Exhibit.pdf
PDF 57 KB Posted
- Attached to
- PUMP OUT SERVICES FOR SANITARY SEWER SEPTIC TANKS & MANHOLES, U. S. ARMY INSTALLATIONS, OKINAWA JAPAN
- Solicitation number
- FA527026Q0005
About this file
This document contains five price exhibits (A through E) structured as pricing templates for multiple contract line items (CLINs) related to septic tank maintenance and sanitary sewer services at federal facilities in Okinawa.
Each price exhibit follows an identical structure with four CLINs (0001, 1001, 2001, 3001, and 4001 respectively) covering Army Facilities and DLA Energy Okinawa locations. The required services include Storage Type maintenance at Bolo Point Building 1007A (1,000 KG annually), Septic Tank services at Chimuwan Tank Farm Buildings 301, 302, 111, 112, and 201 with quantities ranging from 4,000 to 6,600 KG annually, and Sanitary Sewer Septic Tanks and Manholes emergency call services at all buildings (6,200 KG as required). The Army Facilities subtotal is 19,200 KG annually, while DLA Energy Okinawa subtotal is 20,800 KG annually, for a combined ground total of 40,000 KG per year across all exhibits. Each exhibit includes columns for Locations, Building Numbers, Type, Frequency (Yearly), Quantity in KG, Unit Cost, and Total, though the Unit Cost and Total columns are left blank for contractor pricing input. The exhibits appear to be identical in substance across all five CLINs, suggesting options or renewal periods for the same scope of work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Locations Bldg No. Frequency (Yearly)
Quantity (KG) Unit Cost Total
A001AA Bolo Point 1007A 1 1,000 205 10 MEN As Required 4,000
301 10 MEN 1 4,000
302 10 MEN 1 4,000
A001AC Emergency Calls All Bldgs As Required 6,200
19,200
Chimuwan Tank 111 10 MEN 1 4,000 Farm#1 & 2 112 16 MEN 1 6,600
201 10 MEN 1 4,000
A001AE Emergency Calls All Bldgs As Required 6,200
20,800 40,000
DLA TOTAL:
GROUND TOTAL:
Sanitary Sewer Septic Tanks and Manholes
ARMY TOTAL:
Septic Tank
Sanitary Sewer Septic Tanks and Manholes
A001AB
A001AD
A001 Army Facilities CLIN 0001
DLA Energy Okinawa
Price Exhibit A
Type
Chimu-wan Tank Farm#2 & 3 Septic Tank
Storage Type
Quantity (KG) Unit Cost Total
B001AA Bolo Point 1007A 1 1,000 205 10 MEN As Required 4,000
301 10 MEN 1 4,000
302 10 MEN 1 4,000
B001AC Emergency Calls All Bldgs As Required 6,200
19,200
Chimuwan Tank 111 10 MEN 1 4,000 Farm#1 & 2 112 16 MEN 1 6,600
201 10 MEN 1 4,000
B001AE Emergency Calls All Bldgs As Required 6,200
20,800 40,000
Price Exhibit B CLIN 1001
Type
B001 Army Facilities Storage Type
B001AB
Chimu-wan Tank Farm#2 & 3 Septic Tank
Sanitary Sewer Septic Tanks and Manholes
ARMY TOTAL:
DLA Energy Okinawa
B001AD
Septic Tank
Sanitary Sewer Septic Tanks and Manholes
DLA TOTAL:
GROUND TOTAL:
Quantity (KG) Unit Cost Total
C001AA Bolo Point 1007A 1 1,000 205 10 MEN As Required 4,000
301 10 MEN 1 4,000
302 10 MEN 1 4,000
C001AC Emergency Calls All Bldgs As Required 6,200
19,200
Chimuwan Tank 111 10 MEN 1 4,000 Farm#1 & 2 112 16 MEN 1 6,600
201 10 MEN 1 4,000
C001AE Emergency Calls All Bldgs As Required 6,200
20,800 40,000
Price Exhibit C CLIN 2001
Type
C001 Army Facilities Storage Type
C001AB
Chimu-wan Tank Farm#2 & 3 Septic Tank
Sanitary Sewer Septic Tanks and Manholes
ARMY TOTAL:
DLA Energy Okinawa
C001AD
Septic Tank
Sanitary Sewer Septic Tanks and Manholes
Quantity (KG) Unit Cost Total
D001AA Bolo Point 1007A 1 1,000 205 10 MEN As Required 4,000
301 10 MEN 1 4,000
302 10 MEN 1 4,000
D001AC Emergency Calls All Bldgs As Required 6,200
19,200
Chimuwan Tank 111 10 MEN 1 4,000 Farm#1 & 2 112 16 MEN 1 6,600
201 10 MEN 1 4,000
D001AE Emergency Calls All Bldgs As Required 6,200
20,800 40,000
Price Exhibit D CLIN 3001
Type
D001 Army Facilities Storage Type
D001AB
Chimu-wan Tank Farm#2 & 3 Septic Tank
Sanitary Sewer Septic Tanks and Manholes
ARMY TOTAL:
DLA Energy Okinawa
D001AD
Septic Tank
Sanitary Sewer Septic Tanks and Manholes
Quantity (KG) Unit Cost Total
E001AA Bolo Point 1007A 1 1,000 205 10 MEN As Required 4,000
301 10 MEN 1 4,000
302 10 MEN 1 4,000
E001AC Emergency Calls All Bldgs As Required 6,200
19,200
Chimuwan Tank 111 10 MEN 1 4,000 Farm#1 & 2 112 16 MEN 1 6,600
201 10 MEN 1 4,000
E001AE Emergency Calls All Bldgs As Required 6,200
20,800 40,000
Price Exhibit E CLIN 4001
Type
E001 Army Facilities Storage Type
E001AB
Chimu-wan Tank Farm#2 & 3 Septic Tank
Sanitary Sewer Septic Tanks and Manholes
DLA TOTAL:
GROUND TOTAL:
Sanitary Sewer Septic Tanks and Manholes
ARMY TOTAL:
DLA Energy Okinawa
E001AD
Septic Tank
File details come from the government source that posted it. Updated .