Attachment_2_Price_Breakout.pdf
PDF 181 KB Posted
- Attached to
- SPRNCA BOUNDARY FENCE RECONSTRUCTION PHASE 1A Federal contract opportunity
- Solicitation number
- 140L0624R0055
About this file
This document is a Pricing Breakout for a federal contract opportunity for the San Pedro Riparian National Conservation Area (SPRNCA) Boundary Fence Reconstruction project, Phases 1A, 2A, and Additive Phase 2C.
The Pricing Breakout contains two separate price breakouts. Pricing Breakout 1 covers Phases 1A and 2A, and includes line items for fence removal and disposal, construction of new 4-wire fence, various fence components, and related materials. Pricing Breakout 2 covers the Additive Phase 2C, which may or may not be awarded depending on funding availability. This phase includes similar line items for fence removal, new fence construction, and related materials.
The federal contract opportunity is solicitation number 140L0624R0055, issued by the Department of the Interior Bureau of Land Management National Office for the SPRNCA Boundary Fence Reconstruction project. Offerors must complete both Pricing Breakout 1 and Pricing Breakout 2 to be eligible for award consideration. Pricing shall include all applicable federal, state, and local taxes, as well as bonds, insurance, overhead, and profit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0624R0055_Amd_0001.pdf | ||
| Attachment_8_QuestionsAnswers1_21Aug2024_0001.pdf | ||
| Attachment_9_Site_Visit_Roster_0001.pdf | ||
| Attachment_7_Davis_Bacon_Act_WD_AZ20240009_0001.pdf | ||
| Attachment_4_Limitations_on_SubContractor_Breakout.pdf | ||
| Attachment_5_RFI_Form.xlsx | XLSX spreadsheet | |
| Attachment_6_SF1442_Completion_Instructions.pdf | ||
| Attachment_1_SPRNCA_Boundary_Fence_Specs___Drawings_-_Final.pdf | ||
| Attachment_3_Davis_Bacon_Act_WD__AZ20240007.pdf | ||
| Sol_140L0624R0055.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F G H I J K
^ This pricing breakout document contains two Pricing Breakouts: Pricing Breakout 1 is Phases 1A and 2A and Pricing Breakout 2 is Additive Phase 2C.
San Pedro Riparian National Conservation Area (SPRNCA) Boundary Fence Reconstruction - Phases 1A & 2A
Tucson Field Office - Cochise County, AZ
Solicitation No.: 140L0624R0055
Item No. Description Payment Quantity Unit Unit Price Amount
1 Mobilization / Demobilization Lump Sum 1 LS $ - $ -
2 *Fence Removal and Disposal Lump Sum 35211 LF $ - $ -
3 *Construct New 4-Wire Fence Lump Sum 57711 LF $ - $ -
4 *3-Post Corner Panels or Double H-brace Lump Sum 5 EA $ - $ -
5 *H-braces Lump Sum 221 EA $ - $ -
6 *End Panel Lump Sum 10 EA $ - $ -
6 *Large Water Gaps Lump Sum 15 EA $ - $ -
7 *Small Water Gaps Lump Sum 65 EA $ - $ -
8 *Steel Frame Gate Lump Sum 9 EA $ - $ -
9 *Smooth Wire 12.5 Lump Sum 44 EA $ - $ -
10 *Barbed Wire 12.5 Lump Sum 132 EA $ - $ -
11 *T posts 1.33 6’ Lump Sum 3650 EA $ - $ -
San Pedro Riparian National Conservation Area (SPRNCA) Boundary Fence Reconstruction - Phase 2C
Tucson Field Office - Cochise County, AZ
Solicitation No.: 140L0624R0055
Item No. Description Payment Quantity Unit Unit Price Amount
1 *Fence Removal and Disposal Lump Sum 5000 LF $ - $ -
2 *Construct New 4-Wire Fence Lump Sum 31000 LF $ - $ -
3 *3-Post Corner Panels or Double H-brace Lump Sum 11 EA $ - $ -
4 *H-braces Lump Sum 28 EA $ - $ -
5 *End Panel Lump Sum 2 EA $ - $ -
6 *Large Water Gaps Lump Sum 6 EA $ - $ -
7 *Small Water Gaps Lump Sum 19 EA $ - $ -
8 *Steel Frame Gate Lump Sum 5 EA $ - $ -
9 *Smooth Wire 12.5 Lump Sum 24 EA $ - $ -
10 *Barbed Wire 12.5 Lump Sum 72 EA $ - $ -
11 *T posts 1.33 6’ Lump Sum 2000 EA $ - $ -
**Total price shall include all applicable Federal, State and Local taxes.
***Only include amounts over and above Price Breakout 1
ATTACHMENT 2: PRICE BREAKOUT
^ Both Pricing Sheets shall be completed to be eligible for consideration of award.
Profit
***Bonds and Insurance
PRICE BREAKOUT 1: DEPARTMENT OF THE INTERIOR | BUREAU OF LAND MANAGEMENT - PHASES 1A
AND 2A
Price Breakout 1
TOTAL PRICE BREAKOUT 1
Bonds and Insurance
Profit
Overhead
**Total
Additive PHASE 2C - May or May Not be awarded depending on availability of funding. Determination will be made at time of award
PRICE BREAKOUT 2: DEPARTMENT OF THE INTERIOR | BUREAU OF LAND MANAGEMENT - ADDITIVE
PHASE 2C
Price Breakout 2
**Total
Overhead
^ Pricing Breakout-Additive Phase 2C may or may not be awarded depending on availability of funding - Determination will be made at time of award.
TOTAL PRICE BREAKOUT 2
File details come from the government source that posted it. Updated .