Attachment_4_Limitations_on_SubContractor_Breakout.pdf

PDF 39 KB Posted

Attached to
SPRNCA BOUNDARY FENCE RECONSTRUCTION PHASE 1A Federal contract opportunity
Solicitation number
140L0624R0055
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document is an attachment titled "Limitations on Subcontractor Breakout" related to Solicitation Number 140L0624R0055 for the "SPRNCA BOUNDARY FENCE RECONSTRUCTION PHASE 1A" federal contract opportunity.

The attachment outlines the required self-performance percentage of 25% and provides a table for the contractor to report amounts paid to small business subcontractors (SSS) and large business subcontractors (LBS). The total amount proposed, total material cost, and total labor cost must be provided, along with the limitation on subcontracting percentage, which must be greater than the required self-performance percentage of 25%. The attachment also provides definitions and notes related to the calculation of these values.

View the file

Other files for this federal contract opportunity

Other files attached to SPRNCA BOUNDARY FENCE RECONSTRUCTION PHASE 1A, newest first.
File Type Posted
Sol_140L0624R0055_Amd_0001.pdf PDF
Attachment_8_QuestionsAnswers1_21Aug2024_0001.pdf PDF
Attachment_9_Site_Visit_Roster_0001.pdf PDF
Attachment_7_Davis_Bacon_Act_WD_AZ20240009_0001.pdf PDF
Sol_140L0624R0055.pdf PDF
Attachment_1_SPRNCA_Boundary_Fence_Specs___Drawings_-_Final.pdf PDF
Attachment_2_Price_Breakout.pdf PDF
Attachment_3_Davis_Bacon_Act_WD__AZ20240007.pdf PDF
Attachment_5_RFI_Form.xlsx XLSX spreadsheet
Attachment_6_SF1442_Completion_Instructions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D

Solicitation Number

Type of Set-Aside

Performance Period

Required Self-Performance

(D) Small Business Subcontractor (SSS)

Labor3

Total Amount Paid to [Insert First SSS Name]

Total Amount Paid to [Insert Second SSS Name]

Total Amount Paid to [Insert Third SSS Name]

Total Amount Paid to [Insert Fourth SSS Name]

Total Amount Paid to [Insert Fifth SSS Name]

Total Amount Paid to [Insert Sixth SSS Name]

Total Amount Paid to SSS Companies $0.00

(E) Large Business Subcontractor (LBS)

Labor Total Amount Paid to [Insert First LBS Name]

Total Amount Paid to [Insert Second LBS Name]

Total Amount Paid to [Insert Third LBS Name]

Total Amount Paid to [Insert Fourth LBS Name]

Total Amount Paid to [Insert Fifth LBS Name]

Total Amount Paid to [Insert Sixth LBS Name]

Total Amount Paid to LBS Companies $0.00

$0.00

#DIV/0!

*Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost

*Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1.

Limitations on Subcontracting Breakout

FAR 52.219-14(e)(3) or (4)

(A) Total Amount Proposed¹

(B) Total Material Cost2

140L0624R0055

Small Business

365 plus 90(if additve awarded)

*Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage.

25%

(F) Total Labor Cost4

(G) Limitation on Subcontracting Percentage5

(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost

(C) Self Performed Labor

*Note 4: Total labor costs consist of all contractual costs other than material.

*Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor.