This is a Past Performance Risk Assessment Questionnaire template (Section J, Attachment 15) for solicitation number W912DY-23-R-0004. The template is designed to evaluate contractor performance across multiple areas including quality, schedule/timeliness, customer satisfaction, management/personnel/labor, cost/financial management, safety/security, and general performance.
The questionnaire uses a rating scale of Exceptional (E), Very Good (VG), Satisfactory (S), Marginal (M), Unsatisfactory (U), and Not Applicable (N). It is divided into two sections - one to be completed by the contractor (basic contract information, work performed details, project descriptions) and one to be completed by the client (performance ratings across various categories). The form includes detailed rating definitions and requires specific evaluations of items like technical performance, schedule compliance, customer satisfaction, management effectiveness, cost control, safety adherence, and overall contractor performance. The completed questionnaire is to be submitted by the client directly to either the Offeror or USACE as part of the contractor evaluation process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MDAE5 PreSynopsis Conference Presentation 19 Feb 2025 R1.pptx | PPTX presentation | |
| MDAE5 IDC Attendee List 19 Feb 25.xlsx | XLSX spreadsheet | |
| Registration Form for MDAE IDC Presynopsis Conference.docx | DOCX document | |
| Synopsis MD AE 400M Gen 5_ 2 Jan 25 DRAFT.docx | DOCX document | |
| Attachment 1 Statement of Work 2 Jan 25 DRAFT.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J, ATTACHMENT 15
PAST PERFORMANCE RISK ASSESSMENT QUESTIONNAIRE
Solicitation Number W912DY-23-R-0004
CONTRACT INFORMATION (Contractor to complete #1-4)
1. Contractor Information:
Firm Name:
Address:
Cage Code:
DUNS Number:
Phone Number:
Email Address:
Point of Contact:
Contact Phone Number:
2. Work Performed as:
___ Prime Contractor ___Subcontractor ___Joint Venture ___Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Firm name/phone #):
3. Contract Information:
Contract Number:
Delivery/ Task Order Number (if applicable):
Contract Type: ___ Firm Fixed-Price ___Cost Reimbursement ___ Other (Please Specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work: ___High ___Med ___Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete #5-8)
5. Client Information:
Name:
Title:
Phone Number:
Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed:
8. Client’s Signature: ______________________________________
NOTE: USACE requests that the client complete the questionnaire and submit directly back to the
Offeror. The Offeror will submit the completed questionnaire to USACE with its proposal, and may duplicate this questionnaire for future submissions on USACE solicitations. Clients are highly encouraged to submit questionnaires directly to the Offeror. However, questionnaires may be submitted directly to USACE. Please contact the Offeror for USACE POC information. The Government reserves the right to verify any and all information on this form.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR
EVALUATION OF THE CONTRACTOR’S PERFORMANCE
Rating Definition Note
(E) Exceptional Performance meets contractual requirements and exceeds may to the Government’s/
Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/
Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been no significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/
Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/
Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the Contractor recovered from without impact to the contract. There should have been no significant weaknesses identified. Per DoD policy, a fundamental principle of assigned ratings is that
Contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the Contractor had trouble overcoming which impacted the
Government/ Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the
Contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the Contractor had trouble overcoming and which impacted the Government/ Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an Unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract.
Rating will be neither positive nor negative.
**TO BE COMPLETED BY CLIENT**
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR
EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/ report preparation efforts E VG S M U
N
b) Ability to meet quality standards specified for technical performance E VG S M U
N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U
N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U
N
2. SCHEDULE/ TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones (If liquidated damages were assessed or the schedule was not met, please address below.)
E VG S M U
N
b) Rate the Contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U
N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U
b) Contractor was reasonable and cooperative in dealing with your staff
(including the ability to successfully resolve disagreements/ disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U
N
c) To what extent was the Contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U
N
d) How well did the Contractor meet your system reliability expectations?
E VG S M U
N
e) Overall customer satisfaction E VG S M U
N
4. MANAGEMENT/ PERSONNEL/ LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force
E VG S M U
N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U
N
c) Government Property Control E VG S M U
N
d) Knowledge/ expertise demonstrated by Contractor personnel E VG S M U
N
e) Utilization of Small Business concerns E VG S M U
N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U
N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U
N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U
N
5. COST/ FINANCIAL MANGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U
N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefitted the client
E VG S M U
N
c) If this is/was a Government cost-type contract, please rate the
Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate backup documentation, monthly status reports/ budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U
N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience and are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action, in Remarks section.
Yes No
f) Have there been any indications that the Contractor has financial problems? If yes, please explain in Remarks section.
Yes No
6. SAFETY/ SECURITY
a) To what extent was the Contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the user’s rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U
N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U
N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations
(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
E VG S M U
N
b) Compliance with contractual terms/ provisions (explain if specific issues)
E VG S M U
N
c) Would you hire or work with this firm again? If no, please explain below.
Yes No
d) In summary, provide an overall rating for the work performed by this
Contractor.
E VG S M U
Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
File details come from the government source that posted it. Updated .