About this file
This file comprises technical construction plans and specifications prepared by the Illinois Department of Natural Resources (IDNR) for the Repair Round Bluff Hiking Trail project at Ferne Clyffe State Park in Johnson County, Illinois (IDNR File No. 5-24-018). The project involves the installation of water bar and step assemblies along the existing Round Bluff Trail to improve drainage and hiking safety. The primary scope of work requires contractors to install ten (10) typical water bar/step assemblies constructed from 6x6x8-foot rough sawn treated wood timbers, secured with number 6 rebar anchors and exterior coated wood screws, with each assembly featuring a minimum 9-inch tread width and water diversion features. An additional option bid allows for the installation of fifteen (15) individual water bar/step assemblies. The work area is located between stations 44+08 and 51+50 on the trail, with all locations to be field staked by IDNR prior to construction. The contract date is listed as May 26, 2026.
Contractors are required to coordinate all activities with IDNR ownership, maintain the project site free of construction debris, field verify all existing dimensions and conditions, and notify IDNR of any discrepancies affecting work outcomes. Contractors shall not scale drawings; all dimensions are provided for general information only. Minor adjustments to plans are permitted as necessary based on field conditions. No additional costs will be authorized for procedures, clearances, or access requirements to existing facilities, as these are considered incidental to the contract. The drawing index includes ten sheets of technical specifications and site plans detailing existing conditions, proposed step configurations, detailed assembly instructions, and water management features.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B-53786 offer-to-the-state-of-illinois-v-25-3-2-24-25.pdf | ||
| ipg-active-registered-vendor-disclosure-formerly-forms-b-v-26-1-8-26-2025-1~51.docx | DOCX document | |
| B53786 invitation-for-bid-vendor-instructions-and-requirements-v26-1.docx | DOCX document | |
| vendor-disclosure-formerly-forms-a-v27-1-2026-0624~4.docx | DOCX document | |
| Attachment 1 - Project Manual~2.pdf | ||
| B53786 contract-template-v-25-4~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RTP REPAIR POST OAK TRAIL
SITE: FERNE CLYFFE STATE PARK
90 OFFICE DRIVE, GOREVILLE, IL
JOHNSON COUNTY, IL.
IDNR FILE NO. 5-24-018
RTP PROJECT: S026
STATE MAP
0.5 2 Miles
REVISIONS DRA\1,1,1 BY PREPARED
I-
NO
REM
AR
KS
D
AlE
M'
PR
O'IED----1 BY
CHECKED M'PRO'IED
t----1------------+-+------tBY BY lRACED BY M'PRO'IED t----1------------+-+------t BY
Ferne Clyffe State Park Project Location Map Repair Round Bluff Trail
CONTRACTOR NOTES:
1. CONTRACTOR SHALL COORDINATE WITH OWNER FOR ALL ACTIVITY, PROCEDURES,
CLEARANCES, AND REQUIREMENTS TO ACCESS THE EXISTING FACILITIES. SUCH PROCEDURES
ARE INCIDENTAL TO THE CONTRACT AND SHALL NOT RESULT IN EXTRA COSTS WITH OWNER.
2. CONTRACTORS SHALL COORDINATE ALL WORK WITH THE OWNER.
3. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AND MAKE
MINOR ADJUSTMENTS AS NECESSARY. NOTIFY IDNR OF ANY DISCREPANCIES WHICH MAY
AFFECT THE OUTCOME OF WORK.
4. DO NO SCALE DRAWINGS. DIMENSIONS NOTED ON THE DRAWINGS ARE FOR GENERAL
INFORMATION ONLY.
5. CONTRACTOR SHALL MAINTAIN PROJECT SITE FREE FROM CONSTRUCTION DEBRIS.
ILLINOIS
DEPARTMENT OF
NATURAL RESOURCES
DRAWING INDEX
A-1 TITLE SHEET
C-1 OVERALL SITE PLAN
C-2 EXISTING CONDITIONS PLAN VIEW
C-3 EXISTING CONDITIONS STEPS NO. 1 AND 2
C-4 EXISTING CONDITIONS STEPS NO. 3
C-5 NEW STEPS NO. 1
C-6 NEW STEPS NO. 2
C-7 NEW STEPS NO. 3
C-8 STEP DETAILS
C-9 STEP DETAILS
C-10 ADDITIONAL OPTION BID
FERNE CL YFFE STATE PARK
REPAIR ROUND BLUFF HIKING TRAIL
FERNE CLYFFE STATE PARK
JOHNSON COUNTY, ILLINOIS
I.D.N.R. FILE NO.
5-24-018
DATE
5/26/2026
SHEET NO.1
A-1 OF___fil:IEETS kyle.schweizer Callout Project Location
NO. 6 REBAR X 2'-0" ANCHORSS
TYP. INSTALL FLUSH WITH TOP
OF TIMBER.
2 (¾" DIA. X 12") EXTERIOR
COATED WOOD SCREWS (TYP.)
TIMBER TREAD MIN. 9"
WIDTH
NO. 6 REBAR X 24" DRIVE
FLUSH WITH TOP OF
_,, ____ TIMBER {TYP.)
6 x 6 x 8'-0" ROUGH SAWN
TREATED WOOD TIMBERS
(3)REQUIRED PER STEP
ASSEMBLY
PLAN VIEW-WATER BAR
9"
MIN. 9" TREAD
6 x 6 x 8' ROUGH SAWN TIMBER WATER
/ / BAR TO DIRECT WATER OFF TRAIL.
ALLOW FOR 2" OF EXPOSED EDGE ON UPSIDE
OF TIMBER TO CATCH AND DISSIPATE WATER OFF
TRAIL.
6 x 6 x 8' ROUGH SAWN TIMBERS TO FORM
STEP, FASTEN TO EACH
WITH MIN. OF (6) ¾" X 12"
COATED SCREWS PER INDIVIDUAL TIMBER
� EXISTING GRADE OF
TRAIL
NO. 6 REBAR X 2'-0" ANCHORSS
TYP. INSTALL FLUSH WITH TOP
OF TIMBER.
2 SECTION VIEW -WATER BAR
AND STEP ASSEMBLY (TYP. 10
LOCATIONS) TO BE FIELD
STAKED BY IDNR BETWEEN
STATIONS 44+08 AND 51+50
C-10 AND STEP ASSEMBLY (TYP. 10
NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND SHALL BE FULLY RESPONSIBLE FOR SAME.
1--,--___,;
R
EV
ISIO
NS
;.___----I
DRAWN:
REMARKS # DATE
1--1----+-------I CHECKED,
1--1----+-------I APPROVED:
I]
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
REGION 5 OFFICE
11731 NORTH HIGHWAY37
BENTON, IL 62812
FERNE CLYFFE STATE PARK
JOHNSON COUNTY, ILLINOIS
LOCATIONS) TO BE FIELD
STAKED BY IDNR BETWEEN
STATIONS 44+08 AND 51+50
BY ADDITIONAL OPTION BID NO. 1 -
PROVIDE AND INSTALL FIFTEEN (15)
INDIVIDUAL WATER BAR/STEP
ASSEMBLIES
·coUNTY
T'N, R'E, SEC•
ADDITIONAL OPTION BID SHEET
REPAIR ROUND BLUFF HIKING TRAIL IDNR
FILE #:5-24-018
DATE:
APRIL 2026
SHEET#:
C-10
SHEET 10 OF 10
| Cover Sheet FERNE CLYFEE 2026_recover Layout1 (1).pdf |
| Ferne_Clyffe_RTP2026 Sheet C-1.pdf |
| Ferne_Clyffe_RTP2026 Sheet C-2 .pdf |
| Ferne_Clyffe_RTP2026 Sheet C-3.pdf |
| Ferne_Clyffe_RTP2026 Sheet C-4.pdf |
| Ferne_Clyffe_RTP2026 Sheet C-5.pdf |
| Ferne_Clyffe_RTP2026 Sheet C-6.pdf |
| Ferne_Clyffe_RTP2026 Sheet C-7.pdf |
| Ferne_Clyffe_RTP2026 Sheet C-8.pdf |
| Ferne_Clyffe_RTP2026 Sheet C-9.pdf |
| Ferne_Clyffe_RTP2026 Sheet C-10.pdf |
File details come from the government source that posted it. Updated .