This file comprises technical construction plans and specifications prepared by the Illinois Department of Natural Resources (IDNR) for the Repair Round Bluff Hiking Trail project at Ferne Clyffe State Park in Johnson County, Illinois (IDNR File No. 5-24-018). The project involves the installation of water bar and step assemblies along the existing Round Bluff Trail to improve drainage and hiking safety. The primary scope of work requires contractors to install ten (10) typical water bar/step assemblies constructed from 6x6x8-foot rough sawn treated wood timbers, secured with number 6 rebar anchors and exterior coated wood screws, with each assembly featuring a minimum 9-inch tread width and water diversion features. An additional option bid allows for the installation of fifteen (15) individual water bar/step assemblies. The work area is located between stations 44+08 and 51+50 on the trail, with all locations to be field staked by IDNR prior to construction. The contract date is listed as May 26, 2026.

Contractors are required to coordinate all activities with IDNR ownership, maintain the project site free of construction debris, field verify all existing dimensions and conditions, and notify IDNR of any discrepancies affecting work outcomes. Contractors shall not scale drawings; all dimensions are provided for general information only. Minor adjustments to plans are permitted as necessary based on field conditions. No additional costs will be authorized for procedures, clearances, or access requirements to existing facilities, as these are considered incidental to the contract. The drawing index includes ten sheets of technical specifications and site plans detailing existing conditions, proposed step configurations, detailed assembly instructions, and water management features.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTP REPAIR POST OAK TRAIL

SITE: FERNE CLYFFE STATE PARK

90 OFFICE DRIVE, GOREVILLE, IL

JOHNSON COUNTY, IL.

IDNR FILE NO. 5-24-018

RTP PROJECT: S026

STATE MAP

0.5 2 Miles

REVISIONS DRA\1,1,1 BY PREPARED

I-

NO

REM

AR

KS

D

AlE

M'

PR

O'IED----1 BY

CHECKED M'PRO'IED

t----1------------+-+------tBY BY lRACED BY M'PRO'IED t----1------------+-+------t BY

Ferne Clyffe State Park Project Location Map Repair Round Bluff Trail

CONTRACTOR NOTES:

1. CONTRACTOR SHALL COORDINATE WITH OWNER FOR ALL ACTIVITY, PROCEDURES,

CLEARANCES, AND REQUIREMENTS TO ACCESS THE EXISTING FACILITIES. SUCH PROCEDURES

ARE INCIDENTAL TO THE CONTRACT AND SHALL NOT RESULT IN EXTRA COSTS WITH OWNER.

2. CONTRACTORS SHALL COORDINATE ALL WORK WITH THE OWNER.

3. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AND MAKE

MINOR ADJUSTMENTS AS NECESSARY. NOTIFY IDNR OF ANY DISCREPANCIES WHICH MAY

AFFECT THE OUTCOME OF WORK.

4. DO NO SCALE DRAWINGS. DIMENSIONS NOTED ON THE DRAWINGS ARE FOR GENERAL

INFORMATION ONLY.

5. CONTRACTOR SHALL MAINTAIN PROJECT SITE FREE FROM CONSTRUCTION DEBRIS.

ILLINOIS

DEPARTMENT OF

NATURAL RESOURCES

DRAWING INDEX

A-1 TITLE SHEET

C-1 OVERALL SITE PLAN

C-2 EXISTING CONDITIONS PLAN VIEW

C-3 EXISTING CONDITIONS STEPS NO. 1 AND 2

C-4 EXISTING CONDITIONS STEPS NO. 3

C-5 NEW STEPS NO. 1

C-6 NEW STEPS NO. 2

C-7 NEW STEPS NO. 3

C-8 STEP DETAILS

C-9 STEP DETAILS

C-10 ADDITIONAL OPTION BID

FERNE CL YFFE STATE PARK

REPAIR ROUND BLUFF HIKING TRAIL

FERNE CLYFFE STATE PARK

JOHNSON COUNTY, ILLINOIS

I.D.N.R. FILE NO.

5-24-018

DATE

5/26/2026

SHEET NO.1

A-1 OF___fil:IEETS kyle.schweizer Callout Project Location

NO. 6 REBAR X 2'-0" ANCHORSS

TYP. INSTALL FLUSH WITH TOP

OF TIMBER.

2 (¾" DIA. X 12") EXTERIOR

COATED WOOD SCREWS (TYP.)

TIMBER TREAD MIN. 9"

WIDTH

NO. 6 REBAR X 24" DRIVE

FLUSH WITH TOP OF

_,, ____ TIMBER {TYP.)

6 x 6 x 8'-0" ROUGH SAWN

TREATED WOOD TIMBERS

(3)REQUIRED PER STEP

ASSEMBLY

PLAN VIEW-WATER BAR

9"

MIN. 9" TREAD

6 x 6 x 8' ROUGH SAWN TIMBER WATER

/ / BAR TO DIRECT WATER OFF TRAIL.

ALLOW FOR 2" OF EXPOSED EDGE ON UPSIDE

OF TIMBER TO CATCH AND DISSIPATE WATER OFF

TRAIL.

6 x 6 x 8' ROUGH SAWN TIMBERS TO FORM

STEP, FASTEN TO EACH

WITH MIN. OF (6) ¾" X 12"

COATED SCREWS PER INDIVIDUAL TIMBER

� EXISTING GRADE OF

TRAIL

NO. 6 REBAR X 2'-0" ANCHORSS

TYP. INSTALL FLUSH WITH TOP

OF TIMBER.

2 SECTION VIEW -WATER BAR

AND STEP ASSEMBLY (TYP. 10

LOCATIONS) TO BE FIELD

STAKED BY IDNR BETWEEN

STATIONS 44+08 AND 51+50

C-10 AND STEP ASSEMBLY (TYP. 10

NOTE: CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND SHALL BE FULLY RESPONSIBLE FOR SAME.

1--,--___,;

R

EV

ISIO

NS

;.___----I

DRAWN:

REMARKS # DATE

1--1----+-------I CHECKED,

1--1----+-------I APPROVED:

I]

ILLINOIS DEPARTMENT OF NATURAL RESOURCES

REGION 5 OFFICE

11731 NORTH HIGHWAY37

BENTON, IL 62812

FERNE CLYFFE STATE PARK

JOHNSON COUNTY, ILLINOIS

LOCATIONS) TO BE FIELD

STAKED BY IDNR BETWEEN

STATIONS 44+08 AND 51+50

BY ADDITIONAL OPTION BID NO. 1 -

PROVIDE AND INSTALL FIFTEEN (15)

INDIVIDUAL WATER BAR/STEP

ASSEMBLIES

·coUNTY

T'N, R'E, SEC•

ADDITIONAL OPTION BID SHEET

REPAIR ROUND BLUFF HIKING TRAIL IDNR

FILE #:5-24-018

DATE:

APRIL 2026

SHEET#:

C-10

SHEET 10 OF 10

Cover Sheet FERNE CLYFEE 2026_recover Layout1 (1).pdf
Ferne_Clyffe_RTP2026 Sheet C-1.pdf
Ferne_Clyffe_RTP2026 Sheet C-2 .pdf
Ferne_Clyffe_RTP2026 Sheet C-3.pdf
Ferne_Clyffe_RTP2026 Sheet C-4.pdf
Ferne_Clyffe_RTP2026 Sheet C-5.pdf
Ferne_Clyffe_RTP2026 Sheet C-6.pdf
Ferne_Clyffe_RTP2026 Sheet C-7.pdf
Ferne_Clyffe_RTP2026 Sheet C-8.pdf
Ferne_Clyffe_RTP2026 Sheet C-9.pdf
Ferne_Clyffe_RTP2026 Sheet C-10.pdf

File details come from the government source that posted it. Updated .