This Performance Work Statement (PWS) details the installation of a Paxton Access Control System in Building 6000 at Barksdale Air Force Base. The project requires installing 15 Paxton Access Control Units (ACUs), Net2 Plus POE keypads, electric strikes, and associated hardware at specific door locations as determined by the facility manager. The contractor must be a Paxton certified installer with at least 3 years of experience and provide three references from similar completed jobs.

Key specifications include using all new parts compatible with the existing Paxton system, professionally installing equipment with proper cable management, and completing the entire project within 30 days after the award date. The work will be performed during normal duty hours (0700-1630, Monday-Friday) at 1200 Chappie James Rd, Barksdale AFB, LA 71110. The 2nd Security Forces Squadron (2 SFS) will coordinate contractor base access and test each installation location to verify 100% serviceability. No permits are required, and no old equipment will be removed during the installation.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA460825QS032

Attachment 2

Performance Work Statement Install Paxton Access Control in Security Forces Building (Bldg. 6000)

OBJECTIVE: Install turn-key Paxton Access Control System throughout Bldg. 6000 as outlined below.

All parts shall be new, used or refurbished strictly prohibited. Parts and pieces must be compatible with existing Paxton system.

QUALIFICATIONS:

1. Paxton certified installer with minimum 3 years of experience.

2. Provide (3) references from recently completed similar jobs.

SCOPE OF WORK:

1. Install (15) Paxton Access Control Units (ACU’s) and Net2 Plus POE keypads at door locations where Facility Manager deems necessary

2. Install Electric Strikes where needed

3. Proposed ACU locations will be discussed with facility manager prior to doing any installs.

MATERIALS

1. Parts to be used:

Nomenclature/Part# UI Qty US Net2 Pro Software (To be turned over to 2 SFS) EA 1 Cabling and Misc Hardware EA 15 US Net2 Plus with POE EA 15 US Proximity Keypad KP75 EA 15 Electric Strike HES 9600 EA 9 Electric Strike HES 9600 EA 6 Black Box Network Services - supplies plug-and-play PoE injectors to power wireless access points for door systems without network reconfiguration LPJ016A-T-R2

EA 2

2. Submittals required on all parts and pieces.

3. An area will be provided on or near work site as required to store contractors LOM.

SPECIFICS:

1. Install ACU, keypad and wire to MLR trigger provided by customer at the Facility Manager’s requested locations.

2. Install ACU, keypad and wire to ET provided by customer at Facility Manager’s requested locations.

3. Cut-in electric door strikes (ES’) and install ACU, keypad and applicable wiring harness at Facility

Manager’s requested locations.

4. There’s no old equipment to be removed from new ACU install locations.

5. Facility ceilings are suspended type.

6. No computers required.

7. No UPS’s required.

8. No CAD design required.

FA460825QS032

Attachment 2

INSTALLATION

1. Each ACU installation location shall be discussed and approved by the facility manager prior to install.

2. Installation will be done in a neat and professional manner, to include but not limited to the use of mounting hardware and cable management.

3. Any damage to the facility caused by the contractor will be repaired by the contractor in conjunction with 2 CES.

INSPECTION, TESTING and CERTIFICATION:

1. Each install location will be tested by 2 SFS facility manager to verify 100 percent serviceability.

WORKSITE LOCATION:

1. 1200 Chappie James Rd

(B6000) Barksdale AFB, LA 71110

2. Contractor Working Days/Hours:

a. Normal duty time M-F, 0700-1630

b. Days and hours can be adjusted as required with prior approval from 2 CONS and 2

SFS 48 hrs prior to a proposed change.

2 SFS Shall:

1. Coordinate contractor base access as required to complete project.

PERMITS:

1. No permits required for this project.

PERIOD OF PERFORMANCE:

1. Completed NLT thirty {30) days after period start date.

2. 2 CONS and contractor will determine award date when funding becomes available

ACRONYMS

1. POE Power over Ethernet

2. ES Electrified Strike

3. EL Electrified Lock

4. ET Electrified Trim

5. MLR Motorized Latch Retraction

QUALIFICATIONS:
SCOPE OF WORK:
MATERIALS
SPECIFICS:
INSTALLATION
INSPECTION, TESTING and CERTIFICATION:
WORKSITE LOCATION:
2 SFS Shall:
PERMITS: