Attachment-2_Performance Requirements Summary (PRS)_20-Q-0037.pdf

PDF 127 KB Posted

Attached to
Building 580 Security System Maintenance Federal contract opportunity
Solicitation number
W911RX-20-Q-0037
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment-2, Performance Requirements Summary (PRS)

REQUIRED

SERVICE

(Include paragraph number reference)

STANDARD

(Include paragraph number reference)

MAXIMUM

ALLOWABLE

DEGREE OF

DEVIATION

(AQL)

METHOD OF

SURVEILLANCE

THE PROPORTION (%) OF

REQUIRED SERVICE TO

TOTAL

PWS para 5.1.1: The Contractor and its employees shall be licensed, certified, and trained on the operations and maintenance of the Lenel Onguard security system.

Contractor and its employees shall be licensed and certified by Lenel Onguard for work required under this contract

AQL of 100%

100% inspection of business license and employee 's certifications

Deduct 2% of Contract Line Item Number (CLIN) 0002, 1002, 2002, &/or 3002 (if applicable) for each occurrence of rejection

PWS para 5.3.1: The Contractor shall provide preventive maintenance checks and services for all elements of the FROC security system.

Contractor shall perform maintenance checks and services in accordance with

PWS

5.3.1 and Exhibit B to ensure sufficient physical security of the FROC and out laying areas.

AQL of 95% Random Sampling.

Review of documents to assure they contain the required information and task are performed in a timely manner

Deduct 2% of Contract Line Item Number (CLIN) 0002, 1002, 2002, &/or 3002 (if applicable) for each occurrence of rejection

PWS para 5.3.2: The Contractor shall accept routine service calls and provide assistant outside of the SUSP normal operating hours to maintain normal system operation.

Contractor shall accept and respond to all service calls in a manner that is consistent with PWS para 5.3.2. and sub-paragraphs

AQL of 90%

Random Sampling.

Review of documents to assure they contain the required information and task are performed in a timely manner.

Deduct 2% of Contract

Line Item Number (CLIN) 0002, 1002, 2002 &/or 3002 (Service Call) for each occurrence of rejection

Attachment-2, Performance Requirements Summary (PRS)

PWS para 5.4 Special Projects

The Contractor will submit a Quote and

Exhibit-A, Submittals in response to the RFQ that is deemed fair and reasonable and presents the best value to the Government.

AQL of 100% 100% inspection on occurrence

Withhold 100% of Modification cost for CLIN 0003 (1003, 2003 & 3003, as applicable)

PWS para 5.5 The Contractor shall complete

Contract Manpower Reporting as identified within the PWS.

Contractor shall complete Contract

Manpower Reporting (CMR) on an annual basis.

AQL of 100%

100% inspection on an annual basis

Deduct 10% of Contract Line Item Number (CLIN) 0004, 1004, 2004, &/or

3004 (if applicable) for each late submission or withhold final payment in the event the CMR CLIN is unfunded