Attachment-2_Performance Requirements Summary (PRS)_20-Q-0037.pdf
PDF 127 KB Posted
- Attached to
- Building 580 Security System Maintenance Federal contract opportunity
- Solicitation number
- W911RX-20-Q-0037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment-2_Solictation (RFQ)_W911RX-20-Q-0037.pdf | ||
| Amendment-1_Solictation (RFQ)_W911RX-20-Q-0037.pdf | ||
| Exhibit-A_Submittals (Example)_20-Q-0037.pdf | ||
| Attachment-1_Performance Work Statement (PWS)_20-Q-0037.pdf | ||
| Attachment-3_Wage Determination (WD 5343r13 03JUN20)_20-Q-0037.pdf | ||
| Exhibit-B_Preventative Maintenance Schedule for Building 580_20-Q-0037.pdf | ||
| Solicitation (RFQ)_W911RX-20-Q-0037.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment-2, Performance Requirements Summary (PRS)
REQUIRED
SERVICE
(Include paragraph number reference)
STANDARD
(Include paragraph number reference)
MAXIMUM
ALLOWABLE
DEGREE OF
DEVIATION
(AQL)
METHOD OF
SURVEILLANCE
THE PROPORTION (%) OF
REQUIRED SERVICE TO
TOTAL
PWS para 5.1.1: The Contractor and its employees shall be licensed, certified, and trained on the operations and maintenance of the Lenel Onguard security system.
Contractor and its employees shall be licensed and certified by Lenel Onguard for work required under this contract
AQL of 100%
100% inspection of business license and employee 's certifications
Deduct 2% of Contract Line Item Number (CLIN) 0002, 1002, 2002, &/or 3002 (if applicable) for each occurrence of rejection
PWS para 5.3.1: The Contractor shall provide preventive maintenance checks and services for all elements of the FROC security system.
Contractor shall perform maintenance checks and services in accordance with
PWS
5.3.1 and Exhibit B to ensure sufficient physical security of the FROC and out laying areas.
AQL of 95% Random Sampling.
Review of documents to assure they contain the required information and task are performed in a timely manner
Deduct 2% of Contract Line Item Number (CLIN) 0002, 1002, 2002, &/or 3002 (if applicable) for each occurrence of rejection
PWS para 5.3.2: The Contractor shall accept routine service calls and provide assistant outside of the SUSP normal operating hours to maintain normal system operation.
Contractor shall accept and respond to all service calls in a manner that is consistent with PWS para 5.3.2. and sub-paragraphs
AQL of 90%
Random Sampling.
Review of documents to assure they contain the required information and task are performed in a timely manner.
Deduct 2% of Contract
Line Item Number (CLIN) 0002, 1002, 2002 &/or 3002 (Service Call) for each occurrence of rejection
Attachment-2, Performance Requirements Summary (PRS)
PWS para 5.4 Special Projects
The Contractor will submit a Quote and
Exhibit-A, Submittals in response to the RFQ that is deemed fair and reasonable and presents the best value to the Government.
AQL of 100% 100% inspection on occurrence
Withhold 100% of Modification cost for CLIN 0003 (1003, 2003 & 3003, as applicable)
PWS para 5.5 The Contractor shall complete
Contract Manpower Reporting as identified within the PWS.
Contractor shall complete Contract
Manpower Reporting (CMR) on an annual basis.
AQL of 100%
100% inspection on an annual basis
Deduct 10% of Contract Line Item Number (CLIN) 0004, 1004, 2004, &/or
3004 (if applicable) for each late submission or withhold final payment in the event the CMR CLIN is unfunded
File details come from the government source that posted it. Updated .