This document is a Proposed Performance Based Milestone Payment Plan for Solicitation N66604-25-R-0361, covering DT-511C and DT-592D Hydrophones. The milestone payment plan is structured across two Contract Line Item Numbers (CLINs): CLIN 0001 (First Article) and CLIN 0002 (Production), with detailed milestone requirements and corresponding payment percentages. For CLIN 0001, the milestone payments are tied to four key events: Preliminary Configuration Review (20%), Final Configuration Review (20%), First Article material receipt (20%), and First Article transducer delivery (20%), totaling 80% of the allocated budget. The CLIN 0002 Production milestones include drawing and documentation release (15%), material ordering (15%), and 90% material line item receipt (20%), totaling 50% of the production budget. Each milestone has specific verification methods, including technical point of contact (TPOC) review, documentation acceptance, and internal reporting to government representatives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation N6660425R03610003.pdf | ||
| Solicitation N6660425R03610002002.pdf | ||
| Solicitation N6660425R03610001.pdf | ||
| Exhibit A CDRLS.pdf | ||
| Exhibit B CDRLS.pdf | ||
| Attachment 4 Cost Summary Spreadsheet.xlsx | XLSX spreadsheet | |
| Solicitation - N6660425R0361.pdf | ||
| Attachment 1 Pricing Tables.docx | DOCX document | |
| Attachment 3 DD254.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 Milestones (First Article) Severable/Cumulative Percent CLIN 0001
Price Total Value for SLIN Milestone Completion Verification Method
1. Preliminary Configuration Review (PCR) Completion Severable 20% No more than $TBD total
($TBD per unit)
PCR is conducted IAW the SOW. TPOC receives, reviews, and accepts contractor-submitted PCR presentation package and supporting technical documentation.
2. Final Configuration Review (FCR) Completion Cumulative - based on milestone #1 20% Cumulative Payment, no more than $TBD total
($TBD per unit)
FCR is conducted IAW the SOW. TPOC receives, reviews, and accepts contractor-submitted FCR presentation package and supporting technical documentation.
3. First Article material received Cumulative - based on milestones #1 and #2. 20% Cumulative Payment, no more than $TBD total
($TBD per unit)
Contractor provides internal report to TPOC which provides proof of purchased material receipt (receipt report and date received).
4. Delivery of First Article transducers Cumulative - based on milestones #1, #2, and #3. 20% Cumulative Payment, no more than $TBD total
($TBD per unit) Contractor delivers First Article transducers and the Government receives them.
TOTAL: 80% $TBD total
PRODUCTION CLIN: 0002 Milestones Severable/Cumulative Percent CLIN Price Total Value for SLIN Milestone Completion Verification Method
1. Drawings and Production Documentation released. Severable 15% No more than $TBD total
($TBD per unit)
TPOC receives, reviews, and accepts contractor-submitted Product Baseline Drawing listing and supporting technical documentation. Contractor provides internal report to DCMA representative which provides proof of release of production documentation.
2. Material Ordered Cumulative - based on milestone #1 15% Cumulative Payment, no more than $TBD total
($TBD per unit)
Contractor provides internal report to DCMA representative which provides proof that the material was ordered (to include PO number(s), PO Dollar Amount(s) and Date(s) Issued).
3. 90% of material line items received. Cumulative - based on milestones #1 and #2 20% Cumulative Payment, no more than $TBD total
($TBD per unit)
Contractor provides internal report to DCMA representative which provides proof that the material was received against the purchase orders (PO) which were placed.
TOTAL: 50%
$TBD total
($TBD per unit)
Solicitation N66604-25-R-0361 for DT-511C and DT-592D Hydrophones
Proposed Performance Based Milestone Payment Plan
Solicitation N66604-25-R-0361 for DT-511C and DT-592D Hydrophones
Proposed Performance Based Milestone Payment Plan