Attachment 2 Performance Based Milestone Plan.pdf

PDF 164 KB Posted

Attached to
DT-511C and DT-592D Hydrophones and Spare Parts
Solicitation number
N6660425R0361
Issued by

About this file

This document is a Proposed Performance Based Milestone Payment Plan for Solicitation N66604-25-R-0361, covering DT-511C and DT-592D Hydrophones. The milestone payment plan is structured across two Contract Line Item Numbers (CLINs): CLIN 0001 (First Article) and CLIN 0002 (Production), with detailed milestone requirements and corresponding payment percentages. For CLIN 0001, the milestone payments are tied to four key events: Preliminary Configuration Review (20%), Final Configuration Review (20%), First Article material receipt (20%), and First Article transducer delivery (20%), totaling 80% of the allocated budget. The CLIN 0002 Production milestones include drawing and documentation release (15%), material ordering (15%), and 90% material line item receipt (20%), totaling 50% of the production budget. Each milestone has specific verification methods, including technical point of contact (TPOC) review, documentation acceptance, and internal reporting to government representatives.

View the file

Other files

File Type Posted
Solicitation N6660425R03610003.pdf PDF
Solicitation N6660425R03610002002.pdf PDF
Solicitation N6660425R03610001.pdf PDF
Exhibit A CDRLS.pdf PDF
Exhibit B CDRLS.pdf PDF
Attachment 4 Cost Summary Spreadsheet.xlsx XLSX spreadsheet
Solicitation - N6660425R0361.pdf PDF
Attachment 1 Pricing Tables.docx DOCX document
Attachment 3 DD254.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 Milestones (First Article) Severable/Cumulative Percent CLIN 0001

Price Total Value for SLIN Milestone Completion Verification Method

1. Preliminary Configuration Review (PCR) Completion Severable 20% No more than $TBD total

($TBD per unit)

PCR is conducted IAW the SOW. TPOC receives, reviews, and accepts contractor-submitted PCR presentation package and supporting technical documentation.

2. Final Configuration Review (FCR) Completion Cumulative - based on milestone #1 20% Cumulative Payment, no more than $TBD total

($TBD per unit)

FCR is conducted IAW the SOW. TPOC receives, reviews, and accepts contractor-submitted FCR presentation package and supporting technical documentation.

3. First Article material received Cumulative - based on milestones #1 and #2. 20% Cumulative Payment, no more than $TBD total

($TBD per unit)

Contractor provides internal report to TPOC which provides proof of purchased material receipt (receipt report and date received).

4. Delivery of First Article transducers Cumulative - based on milestones #1, #2, and #3. 20% Cumulative Payment, no more than $TBD total

($TBD per unit) Contractor delivers First Article transducers and the Government receives them.

TOTAL: 80% $TBD total

PRODUCTION CLIN: 0002 Milestones Severable/Cumulative Percent CLIN Price Total Value for SLIN Milestone Completion Verification Method

1. Drawings and Production Documentation released. Severable 15% No more than $TBD total

($TBD per unit)

TPOC receives, reviews, and accepts contractor-submitted Product Baseline Drawing listing and supporting technical documentation. Contractor provides internal report to DCMA representative which provides proof of release of production documentation.

2. Material Ordered Cumulative - based on milestone #1 15% Cumulative Payment, no more than $TBD total

($TBD per unit)

Contractor provides internal report to DCMA representative which provides proof that the material was ordered (to include PO number(s), PO Dollar Amount(s) and Date(s) Issued).

3. 90% of material line items received. Cumulative - based on milestones #1 and #2 20% Cumulative Payment, no more than $TBD total

($TBD per unit)

Contractor provides internal report to DCMA representative which provides proof that the material was received against the purchase orders (PO) which were placed.

TOTAL: 50%

$TBD total

($TBD per unit)

Solicitation N66604-25-R-0361 for DT-511C and DT-592D Hydrophones

Proposed Performance Based Milestone Payment Plan

Solicitation N66604-25-R-0361 for DT-511C and DT-592D Hydrophones

Proposed Performance Based Milestone Payment Plan

File details come from the government source that posted it. Updated .