Attachment 2 Perfomance Work Statement Ungulate Control.pdf

PDF 883 KB Posted

Attached to
Ungulate Control Service at DMC, Tirrenia, Pisa
Solicitation number
W912PF25QUNGU
Issued by

About this file

This Performance Work Statement (PWS) details a contract for Ungulate Control Services at the U.S. Army Garrison (USAG) in Italy, specifically targeting Fallow Deer and Wild Boar populations in the Pisa Ammunition and Supply Area (PASA). The primary objectives are to reduce animal population density, mitigate infrastructure damage, and comply with Park Authority guidelines, with specific population targets of 12 Fallow Deer and 2 Wild Boar per 100 hectares.

The contract includes comprehensive animal management services such as trap placement, maintenance, animal capture, transportation, and relocation. The base year and four option years will run from September 2025 to September 2030, with annual capture goals decreasing from 600 Fallow Deer and 35 Wild Boar in the base year to 200 Fallow Deer and 9 Wild Boar in later years. The contractor is responsible for all aspects of animal handling, health monitoring, and transportation, with animals becoming contractor property once removed from the installation. Reporting requirements include monthly and annual documentation of capture activities, animal demographics, and population census.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version – September 2024 Page 1 of 37

PERFORMANCE WORK STATEMENT (PWS)

Ungulate Control, USAG-Italy, Darby Military Community June 2025

Part 1

General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide ungulates control at U.S. Army Garrison (USAG) - Italy.

1.2 Background: USAG-Italy is required to contain Fallow Deer and Wild Boars, from the 847 hectares of the Pisa Ammunition and Supply Area (PASA), which is part of the Camp Darby Military Community (DMC). The service is required to reduce mission-critical infrastructure damage and to comply with Park Authority prescriptions. This will promote the long-term sustained use of the installation for its mission requirements while protecting the existing natural resources to the greatest extent possible.

1.3 Scope: The Contractor shall provide non-personal service(s) to complete the tasks described in this contract, specifically trapping of Fallow Deer and Wild Boar which reside in the PASA and removal to an off-site location in accordance with all local and regional requirements. The contractor shall provide semi-annual progress updates via email and annual status report electronically, to include events of the previous period, results of trapping and relocation services, and annual census. Contractor shall coordinate with DMC DPW for coordination of any non-contract personnel to assist in driving Fallow Deer to areas more suitable for future trapping.

1.4 Objectives: The objective of this contract is to reduce the density of Fallow Deer and Wild Boar to numbers more suitable for the PASA ecosystem and in accordance with Park Authority guidance. Specifically:

• Fallow Deer – maximum of 12 head per 100 ha

• Wild Boar – maximum of 2 per 100 ha Annual goals are given here:

These are maximum numbers to be captured each year. For each option year the goals may be changed based on the previous year’s capture and the annual census results.

BASE YEAR OPTION 1 OPTION 2 OPTION 3 OPTION 4

Fallow Deer 600 400 300 200 200 Wild Boar 35 29 21 9 9

UNGULATE CAPTURE GOALS BY CONTRACT YEAR

Version – September 2024 Page 2 of 37

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award (Deliverable A.001). The Government (COR and Quality Assurance Specialist, KO) will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall then have three (3) days to submit a Final QCP. After receipt of the Final QCP, the Contractor will receive the Contracting Officer’s acceptance in writing.

Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the KO (through the COR) no later than thirty (30) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP shall include and answer the following to be acceptable:

a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.

b. How the Contractor will monitor work to ensure that performance complies with all deliverables (timelines, deadlines, goals, etc.)

c. How the Contractor will monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses.

d. How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance.

e. How the Contractor will ensure all keys issued will remain controlled items (Paragraph

1.15 Key Control).

f. How the Contractor will inventory and track maintenance of all Government Provided Equipment / Materials (Paragraph 1.32, part 3.4 & 3.5).

g. How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future.

h. How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.

Version – September 2024 Page 3 of 37

1.5.1.1 Optional addendum to the QCP: Reserved.

1.5.1.2 Quality Issues: The Contractor shall inform the COR of issues or potential issues that might affect the performance within four (4) work hours of identifying those issues. Verbal reports shall be followed up by written reports within two (2) days (Deliverable A.002).

1.5.1.3 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.6 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.

1.6.1 U.S. Holidays: Work shall not be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Day 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Labor Day 1st Monday in September Independence Day July 4th Veteran’s Day November 11th Columbus Day 2nd Monday in October Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.6.2 Host Nation Holidays: Work shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.

New Year’s Day January 1st Epiphany (Three Kings Day) January 6th Easter Sunday Easter Monday Liberation Day April 25th International Worker’s Day May1st Republic Day June 2nd Assumption Day August 15th All Saints’ Day November 1st Immaculate Conception December 8th Christmas Day December 25th St Stephen’s Day December 26th

1.7 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

Version – September 2024 Page 4 of 37

1.7.1 Government Facility Office Hours: The Government facility office hours are 0800 to 1700, Monday through Friday except U.S. holidays identified in paragraph 1.6.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.7.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0700 and 1800 Monday through Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.

1.7.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0800 and 1700, Monday through Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. If workload requires the Contractor may need to work outside these normal support hours. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.8 Contractor Work Plan: Reserved.

1.9 Military Work Schedule: The military work schedule may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants (through the COR) will be necessary or the work in affected facilities shall be rescheduled.

1.10 Place of Performance: The work to be performed under this contract will be performed at Camp Darby located in Livorno, Italy.

1.11 Security Requirements: The following information is provided on security related matters.

1.11.1 Security Program: Reserved.

1.11.2 Personnel Security Clearance Requirements: Reserved.

1.11.3 Background Checks: Army in Europe (AE) Regulation 604-1 provides guidance pertaining to background checks for U.S. and Host Nation Contractors.

Here is a link to the publications: https://media.defense.gov/2015/Aug/26/2001922060/-1/- 1/0/AER604-1.pdf.

1.11.4 United States Citizen: Reserved.

1.11.5 Local Nationals and Third Country Nationals: Reserved.

https://media.defense.gov/2015/Aug/26/2001922060/-1/-1/0/AER604-1.pdf https://media.defense.gov/2015/Aug/26/2001922060/-1/-1/0/AER604-1.pdf

Version – September 2024 Page 5 of 37

1.12 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use.

1.12.1 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.

1.13 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Italy specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedent.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

AE Reg 190-16 can be found on the following website:

https://media.defense.gov/2017/Apr/27/2001921546/-1/-1/0/AER190-16.pdf

1.13.1 Installation Pass Log: The Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within three (3) calendar days after contract award (Deliverable A.003). The log must at a minimum contain the following information: Name (Last, first, middle), Organization and vehicle. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log (Deliverable A.004).

1.13.2 Installation Pass Collection: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated. The contractor shall return installation access pass to the issuing office within five (5) days (Deliverable # A.005).

1.14 Common Access Cards (CAC): Reserved.

1.14.1 CAC Log: Reserved.

https://media.defense.gov/2017/Apr/27/2001921546/-1/-1/0/AER190-16.pdf

Version – September 2024 Page 6 of 37

1.15 Key Control: Reserved.

1.16 Post Award Conference: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5 and Army Regulation 70-13. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government has assessed the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.16.1 Periodic Progress Meetings: The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may end outside of regular duty hours. The Contractor shall submit meeting minutes notes to the COR for review within ten (10) days of the day of the meeting, (Deliverable # A.006). The COR will review and either notify the Contractor in writing of acceptance of the meeting minutes or return with their comments to the Contractor within seven (7) days. If the Government has provided comments, the Contractor shall have three (3) days) to submit a Final meeting minutes.

1.17 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the KO, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the KO. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.18 Key Personnel: The following personnel are considered key personnel by the Government: Contract Manager and Alternate Contract Manager. The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Contract Manager, who shall act for the Contractor when the

Version – September 2024 Page 7 of 37

Program/Contract Manager is absent, shall be provided in writing to the Contracting Officer no later than five (5) days after contract award (Deliverable # A.007). The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 08:15 am to 17:00 pm Monday through Friday.

1.19 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.19.1 Contractor’s Workspace: Reserved.

1.19.2 Contractor Identification: The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification. The badge shall include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts shall require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the COR prior to the contract performance date and updated as needed to reflect Contractor personnel changes, (Deliverable # A.008).

1.20 Contractor Travel: Reserved.

1.21 Other Direct Costs (ODCs): Reserved.

1.22 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.23 Non-Disclosure Requirements: Reserved.

1.23.1 Non-Disclosure Statements: Reserved.

1.24 DoD Commercial Use of Imagery Guidelines: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., http://www.dimoc.mil/resources/limitations/

Version – September 2024 Page 8 of 37 contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.25 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI (Deliverable A.009). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.26 Phase In /Phase Out Period: Reserved.

1.27 Safety: The following provides information pertaining to Safety and Accident Prevention:

1.27.1 Host Nation Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S.

Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.

The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:

a. Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Deliverable A.010). Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

b. Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).

c. The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

d. The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent

Version – September 2024 Page 9 of 37 information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within 15 calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than 15 calendar days prior to initiation of work on each major phase.

e. In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

i. Short sleeve shirt.

ii. Long trousers.

iii. Steel-toed safety boots.

iv. Hard hat.

1.27.2 Accident Prevention: In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal, State and Local requirements governing safety and health protection on construction sites and any other applicable occupational safety codes. The Contractor shall coordinate all work at the site, including development of plans and providing advance notices.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:

a. Conditions of construction and operational activities to be considered include but are not limited to:

i. For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).

b. The Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required. The SIGE shall be submitted two weeks prior to mobilization. In addition, the Contractor shall

Version – September 2024 Page 10 of 37 appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.

c. The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:

i. Maintenance of tools and equipment.

ii. Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.

iii. Modifying performance periods for such work, taking into consideration the site conditions.

iv. Organizing cooperation between different employers and Contractors without employees.

v. Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.

1.27.3 Safety Notifications: The Contractor shall complete and provide safety notifications required by host nation authorities and shall provide documented proof to the Contracting Officer via the COR, no later than 7 (seven) working days (Deliverable A.011) that such notifications were made.

1.27.4 Italian Safety Law Decreto Legislativo (DLGS) 528/99: Testo Unico sulla Sicurezza 81/2008.

1.28 Environmental Compliance Plan and Program: The Contractor shall ensure that all of its operations and activities conform to the USAG Italy’s environmental policy requirements.

The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on USAG Italy installations are conducted in accordance with the USAG Italy Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards-Italy, and applicable Italy environmental laws/standards.

1.28-1 Hazardous Material / Substances: Reserved.

1.28-2 Contract Completion: Reserved.

1.28-2 Contract Clean-up: The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor shall

Version – September 2024 Page 11 of 37 immediately report any hazardous substance spills to the Garrison Fire Department and COR within 30 minutes and written follow-up within 24 hours.

1.29 Required Training: The following provides information on training requirements.

1.29.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within thirty (30) days of contract award date or effective date of incorporation of this requirement into the contract, whichever applies, or thirty (30) days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion (Deliverable A.012) for each affected Contractor employee and subcontractor employee to the COR (or to the KO, if a COR is not assigned) within five (5) days of completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training (Deliverable A.013) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies.

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.

Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within five (5) days of completion of the training (Deliverable A.014).

1.29.2 OPSEC Training: IAW AR 530-1, All Contractor employees, including subcontractors, shall complete Level I OPSEC training within thirty (30) days of employment under this contract after contract award date. Verification of the training shall be provided to the COR within five (5) days of completion of the training (Deliverable A.015). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel shall complete refresher training (IAW AR). Verification of the training shall be provided to the COR within five (5) days of completion of the training (Deliverable A.016).

If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.

Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within five (5) days of completion of the training (Deliverable A.017).

1.29.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer). This training shall be completed within fifteen (15) calendar days of contract award and within ten (10) calendar days of new employees commencing performance with the results reported to the COR NLT ten (10) calendar days after contract award (Deliverable # A.018). Training slides can be found on the Defense Visual Information Distribution Service website: https://www.dvidshub.net/video/583923/iwatch-2018.

https://jkodirect.jten.mil/ http://www.cdse.edu/catalog/elearning/GS130.html https://www.dvidshub.net/video/583923/iwatch-2018

Version – September 2024 Page 12 of 37

1.29.4 Information Assurance (IA) Training: Reserved.

1.29.4.1 Cyber Awareness Training: Reserved.

1.29.4.2 Information Technology (IT)/IA: Reserved.

1.29.4.3 Army Training Certification Tracking System (ATCTS): Reserved.

1.29.4.4 Network Access Training: Reserved.

1.29.5 Personally Identifiable Information (PII): Reserved.

1.29.6 Threat Awareness and Reporting Program (TARP): Contractor employees, including subcontractors, performing services under this contract with access to Government installations shall complete TARP training within thirty (30) days of employment. Contractor personnel shall complete refresher training every twelve (12) months. The Contractor shall provide the COR a copy of the training certificate(s) within seven (7) calendar days of completion (Deliverable # A.019). CORs will need to contact local military intelligence group to coordinate face to face training (https://usacac.army.mil/organizations/902d-military-intelligence-group/annual-training-requirements), if this is not feasible training (CAC required) is available at:

https://learn.atis.army.mil/moodle/.

1.30 Notice to Proceed: Reserved.

1.31 Electromagnetic Compatibility Directive Reserved.

1.32 Government Property and Services: Reserved.

1.33 Conventional Forces Europe (CFE) Treaty Verification Inspection: Reserved

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms:

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer (KO) – means a person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

https://usacac.army.mil/organizations/902d-military-intelligence-group/annual-training-requirements https://usacac.army.mil/organizations/902d-military-intelligence-group/annual-training-requirements https://learn.atis.army.mil/moodle/

Version – September 2024 Page 13 of 37

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. Department of Defense Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, contracting officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line-item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing support personnel to assist the COR, “These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the KO as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired property – means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

Government-furnished property – means property furnished to the contractor the Government and subsequently furnished to the Contractor for performance of a contract.

Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Government property – means all property owned or leased by the Government.

Government property includes both Government-furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Industrial Property Management Specialist (Property Administrator) – means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

https://www.acquisition.gov/dfars/part-202-definitions-words-and-terms#DFARS_202.101

Version – September 2024 Page 14 of 37

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Workday – The number of hours per day the Contractor provides services in accordance with the contract.

Work Week – Monday through Friday, unless otherwise specified.

Version – September 2024 Page 15 of 37

2.2 Acronyms: Although not inclusive of every term used within this PWS, the following provides a list of acronyms used throughout this PWS or commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AQL Acceptable Quality Level AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf CS/KS Contracting Specialist DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DISS Defense Information Security System DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IACS Installation Access Control System IACO Installation Access Control Office ID Identification IGE Independent Government Estimate IT Information Technology JTR Joint Travel Regulation KO/CO Contracting Officer MP ICAM Mission Partner Identity and Access Management OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security

Version – September 2024 Page 16 of 37

PA Property Administrator PDF Portable Document Format PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SETAF-AF Southern European Task Force, Africa SIGE Safety and Health Protection Plan STD Standard TE Technical Exhibit USAREUR-AR U.S. Army Europe - Africa UOM Unit of Measure

Version – September 2024 Page 17 of 37

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services:

3.1 Services: Reserved.

3.2 Facilities: Reserved.

3.3 Utilities: Reserved.

3.4 Equipment: Reserved.

3.5 Special Tooling and Test Equipment: Reserved.

3.6 Materials: Reserved.

Version – September 2024 Page 18 of 37

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents.

4.2 Secret Facility Clearance: Reserved.

4.3 Materials: Reserved.

4.4 Vehicles and Equipment: Any vehicle or piece of equipment entering USAG Italy is subjected to inspection by authorized authority at any time.

Version – September 2024 Page 19 of 37

PART 5

SPECIFIC TASKS

5.1 Basic Services: The Contractor shall provide services for trapping and removal of Ungulates, specifically Wild Boar and Fallow Deer, from USAG Italy. All tasks shall be carried out in compliance with Host Nation, Tuscany, and local requirements, specifically:

- Directive 92/43/EEC - Directive “2009/147/EC - EU Implementing Decision No.

C(2021) 18;

- Italian Law 394/91, Management and Transportation of Animals withing Protected Areas;

- Tuscany Region Regulations, L.R. 30/2015 (as amended by LR 48/2016);

- Park Authority Norms: Park Territorial Plan and Second Management Plan for the Tombolo and Coltano Estates - Park Regulations;

For only Wild Boar:

- Provisions issued by the Italian Authority (ASL of Pisa) due to the measures to contain the spread of the African Swine Fever Virus (ASF) in Italy.

The activities will consist of the placement of traps, foraging and maintenance of traps, recovery of captured animals, transport of animals to the barn (Wild Boar) and the corral (Deer) on the installation in order to allow their preservation and full health, and follow-on transportation of the live animals off the installation. Once transported off the installation the animals become contractor property outside of the purview of USAG Italy. The Contractor is responsible for strictly respecting the Italian Laws and Norms that regulate the health, wellness, care and handling, and shipping of captured animals.

5.2. Tasks:

Tasks consist of the following:

5.2.1 Maintain and repair ungulate corrals and traps in the PASA, feed captured animals until removal, bait traps, perform regular checks. In order to ensure the efficiency of the traps, the contractor shall perform the following activities:

• Repair any fencing required for traps to function correctly

• Remove all vegetation surrounding each trap and along the path leading to that in order to avoiding any disturb to animal during the capturing and removing phase

• Put in place warning signs stating "catches on going”

• Shield the trap with shade cloth or vegetation, door positioning and activation of the tripping device

• Maintain in perfect condition the tripping device and replace traps damaged parts if required.

Foddering: Foddering purpose is to attract ungulates to the traps and it shall use corn or other vegetables palatable to the animals. This is normally conducted 2 to 3 weeks prior to trapping.

The employment of different foddering is subject to Park Authority approval. For this operation, Version – September 2024 Page 20 of 37 personnel and transportation means of the company will be used in sufficient number to complete the foraging in a single day.

Catching Deer and Wild Boar: The activation of the trap trigger mechanism, or of the door shutter mechanism, will be carried out only after having found an adequate level of confidence of the animals within the traps themselves. The trap activation will be performed mostly in the hours preceding the sunset, period in which an increase in the activity of the animals is recorded and the presence of man is reduced within the ASA. In the first two hours following the sunset, or at most three, the operators will have the task of visiting all the sites of pre-armed catching to check for the presence of animals trapped. The traps that will be found empty will be left armed until the next morning, when the same operators will proceed to the new verification.

5.2.2 Remove of captured animals from DMC and transport to off-site location. Perform all required veterinary/health testing of captured animals in compliance with Host Nation, Tuscany, and ASL Pisa Veterinary requirements.

Transfer Animals to Storage Sites: Within 24 hours of capturing, the animal shall be transported from the traps to the approved housing sites on the installation, i.e., corral for the Fallow Deer and barn for the Wild Boar. The contractor will approach the traps taken with caution, trying to cause the least possible stress to the trapped animals. The wild boar will be made to enter crates and subsequently loaded on suitable means for transporting animals and transported to relaying places. The movement of animals shall be carried out in accordance with the competent veterinary police regulations. The animal transportation and permanence in the housing places shall respect the Italian Laws and Norms that regulate their health, wellness and care in order to ensure the minimum stress to ungulates. The contractor is responsible for supplying the ungulates daily with food and water and periodically cleaning of the housing sites through all the period they stay on the installation.

Handling Animals: From the storage sites, the live animals will be loaded on suitable means of transport to be transferred outside the territory of the Base. The departure of the means of transport loaded with animals from the Base to the places of destination will take place after authorization of the staff of the AUSL 5 of Pisa and, in any case, in compliance with the current regulation of the Veterinary police, behind the self-declaration of the company entrusted.

Efforts shall be made to capture 200 to 600 ungulates annually with higher per-head compensation rates for higher annual capture numbers. Wild Boar and Fallow Deer will have separate compensation rates. The upper limit on captured ungulates may change in Option Years based on the previous year’s Annual Census.

5.2.3 For the base year of this task, monthly payment shall be determined based on the total number of animals captured in the current contract year as follows:

Fallow Deer

5.2.3.1. For deer 1 to 100 the cost will be the offer unit cost, adequate to cover basic fees/costs, in euro per deer.

5.2.3.2. For deer 101 to 200 the cost will be the offer unit cost from 5.2.2.1 multiplied by 1.33, in euro per deer.

Version – September 2024 Page 21 of 37

5.2.3.3. For deer 201 to 300 the cost will be the offer unit cost from 5.2.2.1 multiplied by 1.5, in euro per deer.

5.2.3.4. For deer 301 to 600 the cost will be the offer unit cost from 5.2.2.1 multiplied by 1.67, in euro per deer.

Wild Boar

5.2.3.5. For boar 1 to 5 the cost will be the offer unit cost, adequate to cover basic fees/costs, in euro per boar.

5.2.3.6. For boar 6 to 10 the cost will be the offer unit cost from 5.2.2.6 multiplied by 1.5, in euro per boar.

5.2.3.7. For boar 11 to 16 the cost will be the offer unit cost from 5.2.2.6 multiplied by 1.6, in euro per boar.

5.2.3.8. For boar 16 to 30 the cost will be the offer unit cost from 5.2.2.6 multiplied by 1.8, in euro per boar.

The objective is to capture up to 600 deer and 30 boar during the contract base year. For the option years the cost per deer and boar will be the same as the base year but the number of animals to be captured will be proportional to the remaining quantity of each based on the annual census (task 5.2.4).

Note: Fallow Deer cannot be trapped between 15 March and 01 July each year due to breeding season.

5.2.4 Base Year activity. Rebuild one (1) heavily damaged corral and repair one (1) other corral during contract Base Year. See attachment 7.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .