Attachment 1 Pricing Worksheet Ungulate Control.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Ungulate Control Service at DMC, Tirrenia, Pisa
- Solicitation number
- W912PF25QUNGU
About this file
This is a Pricing Worksheet for an Ungulate Control Service contract issued by the Department of the Army Materiel Command Army Contracting Command. The solicitation (W912PF25QUNGU) seeks a contractor to provide wildlife management services at the Darby Military Community in Tirrenia, Pisa, Italy, specifically focusing on controlling Wild Boar and Fallow Deer populations. The contract is structured with a base year and four option years, each running from September 30 to September 29, with multiple Contract Line Item Numbers (CLINs) covering tasks such as ungulate control, corral repair, animal capture and removal, and large-scale deer roundups.
The pricing structure includes detailed unit pricing for different animal capture ranges, with separate pricing for Fallow Deer (01-600 animals) and Wild Boar (01-35 animals). The contract is a firm fixed-price, non-personal service agreement under FAR Parts 12 and 13.5, categorized under NAICS code 541620 for Special Studies/Analysis-Animal/Fisheries. The contractor will be responsible for trap placement, animal recovery, transportation, and ensuring compliance with Italian laws regarding animal health, welfare, and handling. The solicitation is open for full and open competition on SAM.gov, with no specific set-aside provisions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Worksheet PRICING WORKSHEET "Ungulate Control Service"
| BASE YEAR | |||||
| CLIN | Description | Unit | Quantity | Unit Price ( € ) | Total Price ( € ) |
| 0001 | DMC Ungulate Control, |
in accordance with the attached Performance Work Statement (Attachment 2), at paragraphs 1.5.1. Quality Control Plan (QCP), 1.16 Post Award Conferences-Periodic Progress Meetings , 1.27.2 Accident Prevention, 5.2.1 and 5.2.2 Tasks, 5.2.5 Annual Census, 5.2.6 Reporting and 7.1 Performance Requirements Summary.
Monthly Amount ______________ x 12 months = Amount ________________
NOTE:
The Quoter shall include all costs associated with the operations as described in the above sections of the Performance Work Statement.
| The Unit Price and the Total Price will be the amount for twelve (12) months, as indicated in the description of the Line Item. | JOB | 1 | € 0.00 | |||
| 0002 | Rebuild/Repair Corrals, in accordance with the Performance Work Statement (Attachment 2), at paragraph 5.2.4 Base year Activity. | JOB | 1 | € 0.00 | ||
| 0003 | Fallow Deer Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.3. |
From 01 to 100 each (100 ea): Unit Price: ____________ x 100 each = Amount __________ From 101 to 200 each (100 ea): Unit Price: ___________ x 100 each = Amount __________ From 201 to 300 each (100 ea): Unit Price: ___________ x 100 each = Amount _________ From 301 to 600 each (300): Unit Price: ____________ x 300 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| JOB | 1 | € 0.00 | |
| 0004 | Wild Boar Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), paragraph 5.2.3. |
From 01 to 5 each (5 ea): Unit Price: ________________ x 5 each = Amount __________ From 6 to 10 each (5 ea): Unit Price: __________________ x 5 each = Amount __________ From 11 to 15 each (5 ea): Unit Price: _________________ x 5 each = Amount _________ From 16 to 35 each (20 ea): Unit Price: _______________ x 20 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| JOB | 1 | € 0.00 | |||
| 0005 | (Option) Fallow Deer “Round Up”, | ||||
| to coordinate large scale event to drive deer into Buffer Area, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.7 Option - Fallow Deer "Round-Up", | JOB | 1 | € 0.00 | ||
| TOTAL AMOUNT THE BASE YEAR | € 0.00 |
| OPTION YEAR ONE | |||||
| CLIN | Description | Unit | Quantity | Unit Price ( € ) | Total Price ( € ) |
| 1001 | DMC Ungulate Control, |
in accordance with the attached Performance Work Statement (Attachment 2), at paragraphs 1.5.1. Quality Control Plan (QCP), 1.16 Post Award Conferences-Periodic Progress Meetings , 1.27.2 Accident Prevention, 5.2.1 and 5.2.2 Tasks, 5.2.5 Annual Census, 5.2.6 Reporting and 7.1 Performance Requirements Summary.
Monthly Amount ______________ x 12 months = Amount ________________
NOTE:
The Quoter shall include all costs associated with the operations as described in the above sections of the Performance Work Statement.
| The Unit Price and the Total Price will be the amount for twelve (12) months, as indicated in the description of the Line Item. | JOB | 1 | € 0.00 | ||
| 1002 | This CLIN does not apply to this Year and shall not be quoted. | € 0.00 | |||
| 1003 | Fallow Deer Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.3. |
From 01 to 100 each (100 ea): Unit Price: ____________ x 100 each = Amount __________ From 101 to 200 each (100 ea): Unit Price: ___________ x 100 each = Amount __________ From 201 to 300 each (100 ea): Unit Price: ___________ x 100 each = Amount _________ From 301 to 600 each (300): Unit Price: ____________ x 300 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| JOB | 1 | € 0.00 | |
| 1004 | Wild Boar Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), paragraph 5.2.3. |
From 01 to 5 each (5 ea): Unit Price: ________________ x 5 each = Amount __________ From 6 to 10 each (5 ea): Unit Price: __________________ x 5 each = Amount __________ From 11 to 15 each (5 ea): Unit Price: _________________ x 5 each = Amount _________ From 16 to 35 each (20 ea): Unit Price: _______________ x 20 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| JOB | 1 | € 0.00 | |||||
| 1005 | (Option) Fallow Deer “Round Up”, | ||||||
| to coordinate large scale event to drive deer into Buffer Area, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.7 Option - Fallow Deer "Round-Up", | JOB | 1 | € 0.00 | ||||
| TOTAL AMOUNT THE OPTION YEAR ONE | € 0.00 | ||||||
| OPTION YEAR TWO | |||||||
| CLIN | Description | Unit | Quantity | Unit Price ( € ) | Total Price ( € ) | ||
| 2001 | DMC Ungulate Control, |
in accordance with the attached Performance Work Statement (Attachment 2), at paragraphs 1.5.1. Quality Control Plan (QCP), 1.16 Post Award Conferences-Periodic Progress Meetings , 1.27.2 Accident Prevention, 5.2.1 and 5.2.2 Tasks, 5.2.5 Annual Census, 5.2.6 Reporting and 7.1 Performance Requirements Summary.
Monthly Amount ______________ x 12 months = Amount ________________
NOTE:
The Quoter shall include all costs associated with the operations as described in the above sections of the Performance Work Statement.
| The Unit Price and the Total Price will be the amount for twelve (12) months, as indicated in the description of the Line Item. | JOB | 1 | € 0.00 | ||
| 2002 | This CLIN does not apply to this Year and shall not be quoted. | € 0.00 | |||
| 2003 | Fallow Deer Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.3. |
From 01 to 100 each (100 ea): Unit Price: ____________ x 100 each = Amount __________ From 101 to 200 each (100 ea): Unit Price: ___________ x 100 each = Amount __________ From 201 to 300 each (100 ea): Unit Price: ___________ x 100 each = Amount _________ From 301 to 600 each (300): Unit Price: ____________ x 300 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| JOB | 1 | € 0.00 | |
| 2004 | Wild Boar Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), paragraph 5.2.3. |
From 01 to 5 each (5 ea): Unit Price: ________________ x 5 each = Amount __________ From 6 to 10 each (5 ea): Unit Price: __________________ x 5 each = Amount __________ From 11 to 15 each (5 ea): Unit Price: _________________ x 5 each = Amount _________ From 16 to 35 each (20 ea): Unit Price: _______________ x 20 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| JOB | 1 | € 0.00 | |||||
| 2005 | (Option) Fallow Deer “Round Up”, | ||||||
| to coordinate large scale event to drive deer into Buffer Area, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.7 Option - Fallow Deer "Round-Up", | JOB | 1 | € 0.00 | ||||
| TOTAL AMOUNT THE OPTION YEAR TWO | € 0.00 | ||||||
| OPTION YEAR THREE | |||||||
| CLIN | Description | Unit | Quantity | Unit Price ( € ) | Total Price ( € ) | ||
| 3001 | DMC Ungulate Control, |
in accordance with the attached Performance Work Statement (Attachment 2), at paragraphs 1.5.1. Quality Control Plan (QCP), 1.16 Post Award Conferences-Periodic Progress Meetings , 1.27.2 Accident Prevention, 5.2.1 and 5.2.2 Tasks, 5.2.5 Annual Census, 5.2.6 Reporting and 7.1 Performance Requirements Summary.
Monthly Amount ______________ x 12 months = Amount ________________
NOTE:
The Quoter shall include all costs associated with the operations as described in the above sections of the Performance Work Statement.
| The Unit Price and the Total Price will be the amount for twelve (12) months, as indicated in the description of the Line Item. | JOB | 1 | € 0.00 | ||
| 3002 | This CLIN does not apply to this Year and shall not be quoted. | € 0.00 | |||
| 3003 | Fallow Deer Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.3. |
From 01 to 100 each (100 ea): Unit Price: ____________ x 100 each = Amount __________ From 101 to 200 each (100 ea): Unit Price: ___________ x 100 each = Amount __________ From 201 to 300 each (100 ea): Unit Price: ___________ x 100 each = Amount _________ From 301 to 600 each (300): Unit Price: ____________ x 300 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| JOB | 1 | € 0.00 | |
| 3004 | Wild Boar Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), paragraph 5.2.3. |
From 01 to 5 each (5 ea): Unit Price: ________________ x 5 each = Amount __________ From 6 to 10 each (5 ea): Unit Price: __________________ x 5 each = Amount __________ From 11 to 15 each (5 ea): Unit Price: _________________ x 5 each = Amount _________ From 16 to 35 each (20 ea): Unit Price: _______________ x 20 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| EA | 2 | € 0.00 | |||||
| 3005 | (Option) Fallow Deer “Round Up”, | ||||||
| to coordinate large scale event to drive deer into Buffer Area, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.7 Option - Fallow Deer "Round-Up", | EA | 1 | € 0.00 | ||||
| TOTAL AMOUNT THE OPTION YEAR THREE | € 0.00 | ||||||
| OPTION YEAR FOUR | |||||||
| CLIN | Description | Unit | Quantity | Unit Price ( € ) | Total Price ( € ) | ||
| 4001 | DMC Ungulate Control, |
in accordance with the attached Performance Work Statement (Attachment 2), at paragraphs 1.5.1. Quality Control Plan (QCP), 1.16 Post Award Conferences-Periodic Progress Meetings , 1.27.2 Accident Prevention, 5.2.1 and 5.2.2 Tasks, 5.2.5 Annual Census, 5.2.6 Reporting and 7.1 Performance Requirements Summary.
Monthly Amount ______________ x 12 months = Amount ________________
NOTE:
The Quoter shall include all costs associated with the operations as described in the above sections of the Performance Work Statement.
| The Unit Price and the Total Price will be the amount for twelve (12) months, as indicated in the description of the Line Item. | JOB | 1 | € 0.00 | ||
| 4002 | This CLIN does not apply to this Year and shall not be quoted. | € 0.00 | |||
| 4003 | Fallow Deer Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.3. |
From 01 to 100 each (100 ea): Unit Price: ____________ x 100 each = Amount __________ From 101 to 200 each (100 ea): Unit Price: ___________ x 100 each = Amount __________ From 201 to 300 each (100 ea): Unit Price: ___________ x 100 each = Amount _________ From 301 to 600 each (300): Unit Price: ____________ x 300 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| JOB | 1 | € 0.00 | |
| 4004 | Wild Boar Capture and Removal, in accordance with the attached Performance Work Statement (Attachment 2), paragraph 5.2.3. |
From 01 to 5 each (5 ea): Unit Price: ________________ x 5 each = Amount __________ From 6 to 10 each (5 ea): Unit Price: __________________ x 5 each = Amount __________ From 11 to 15 each (5 ea): Unit Price: _________________ x 5 each = Amount _________ From 16 to 35 each (20 ea): Unit Price: _______________ x 20 each = Amount ________
NOTE:
The Quoter shall include all costs associated with the operations as decribed in the above paragraphs of the Performance Work Statement. The Quoter shall indicate the Unit Price and the Amount for each range, as specified in the description of the Line item and in accordance with paragraph 5.2.3 of the Performance Work Statement. The unit Price and the Amount of this Line item will be the sum of the detailed amount priced in the description of the Line Item.
| EA | 2 | € 0.00 | |||
| 4005 | (Option) Fallow Deer “Round Up”, | ||||
| to coordinate large scale event to drive deer into Buffer Area, in accordance with the attached Performance Work Statement (Attachment 2), at paragraph 5.2.7 Option - Fallow Deer "Round-Up", | EA | 1 | € 0.00 | ||
| TOTAL AMOUNT THE OPTION YEAR FOUR | € 0.00 |
File details come from the government source that posted it. Updated .