Attachment 2 - NGG3 Phase 2 Table of Borings Spring 2020.pdf

PDF 758 KB Posted

Attached to
Geotechnical Investigation WY NPS YELL 10(24)
Solicitation number
69056720Q000018
Issued by

About this file

This document contains a table of borings for a geotechnical subsurface investigation. The Western Federal Lands Highway Division of the Federal Highway Administration is conducting the investigation on the Grand Loop Road in Yellowstone National Park, Wyoming in support of a project to widen and reconstruct a portion of the road from the Golden Gate Viaduct to a point at approximately 44.8469, -110.7353. The table lists 58 proposed boring locations along the road corridor, providing details on the purpose and specifications of each boring such as the latitude and longitude, estimated depths, sampling intervals, and access requirements. It also outlines the general standards for standard penetration testing, rock coring methods, and measures to minimize environmental impacts. An optional additional set of borings is included for alternative bridge and boardwalk alignments.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base ‐ Table of Borings ‐ 2020 Norris to Golden Gate Phase 3 ‐ Subsurface Investigation

Boring Purpose of Boring Latitude Longitude Station and Offset from

CTL

Estimated Feet of Auger

Estimated Feet of Casing

Advancer

Estimated Feet of HQ

Core

Max. Hole Diameter

(in)

Minimum Depth (ft)

Possible Maximum Depth (ft)

Expected No. of SPTs

Possible Addit.

SPTs

Possible Shelby Samples

Vane Shear Tests

Comments: Drill Type, Access, Instruments, Etc.

NG20‐24 Rock cut 44.93501° ‐110.72580° 869+00

160' LT

10 10 130 8 130 150 5 10 ‐ ‐ Helicopter. Downhole televiewer surveys including optical and acoustic are required from the top of bedrock to final depth of the boring.

NG20‐25

West Abutment of Pedestrian Bridge

44.93317° ‐110.72710° 861+15

46' RT

20 20 10 8 30 50 13 2 1 ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐29

Possible Alternative

Trail Location 44.93284° ‐110.72752°

859+00

62' RT

10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from roadway. Avoid tracking over or drilling into historic waterline.

NG20‐30

Possible Alternative

Trail Location 44.93253° ‐110.7279°

857+80

46' RT

20 20 10 8 30 50 13 2 1 ‐ Track or truck mounted drill rig from roadway or existing Bunsen Peak parking lot. Avoid tracking over or drilling into historic waterline.

NGSG20‐

Subgrade for Proposed Parking Lot

44.93152° ‐110.72864° 854+00

57' RT

5 ‐ ‐ 16 5 5 2 1 1 ‐ Track or truck mounted drill rig from roadway or existing Bunsen Peak parking lot. Avoid tracking over or drilling into historic waterline.

NG20‐32

Wall to Reduce Impact to Wetland ID 007

44.92433° ‐110.73260° 825+00

32' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐33

Wall to Reduce Impact to Wetland ID 007

44.92377° ‐110.73252° 823+00

38' LT

10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐34

Wall to Reduce Impact to Wetland ID 007

44.92296° ‐110.73250° 820+00

80' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐35

Wall to Reduce Impact to Wetland ID 007

44.92239° ‐110.73219° 818+00

39' LT

10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐36

Wall to Reduce Impact to Wetland ID 007

44.92186° ‐110.73205° 816+00

44' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐37

Wall to Reduce Impact to Wetland ID 007

44.91974° ‐110.73144° 808+00

32' LT

10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐38

Wall to Reduce Impact to Wetland ID 007

44.91917° ‐110.73139° 806+00

56' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

WY NPS YELL 10(24)

RFQ 69056720Q000018

Attacheent 2

Station and Offset from

CTL

Estimated Feet of Auger

Estimated Feet of Casing

Advancer

Estimated Feet of HQ

Core

Max. Hole Diameter

(in)

Minimum Depth (ft)

Possible Maximum Depth (ft)

Expected No. of SPTs

Possible Addit.

SPTs

Possible Shelby Samples

Vane Shear Tests

Comments: Drill Type, Access, Instruments, Etc.

NG20‐39

Wall to Reduce Impact to Wetland ID 007

44.91866° ‐110.73125° 804+00

43' LT

10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐40

Wall to Reduce Impact to Wetland ID 007

44.91810° ‐110.73113° 802+00

35' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐41

Wall to Reduce Impact to Wetland ID 007

44.91756° ‐110.73105° 800+00

40' LT

10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐42

Wall to Reduce Impact to Wetland ID 007

44.91702° ‐110.73097° 798+00

40' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐43

Wall to Reduce Impact to Wetland ID 007

44.91646° ‐110.73088° 796+00

28' LT

10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐44

Wall to Reduce Impact to Wetland ID 007

44.91592° ‐110.73080° 794+00

37' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐45

Wall to Reduce Impact to Wetland ID 009

44.91066° ‐110.73100° 774+50

30' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐46

Wall to Reduce Impact to Wetland ID 009

44.910172° ‐110.73126° 772+50

42' LT

10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐47

Wall to Reduce Impact to Wetland ID 009

44.90975° ‐110.73143° 771+00

32' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐48

Wall to Reduce Impact to Wetland ID 022

44.89086° ‐110.73416° 701+50

32' RT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐49

Wall to Reduce Impact to Wetland ID 023

44.89068° ‐110.73437° 701+00

35' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐50 Cut 44.88901° ‐110.73348° 644+50

35' LT

10 ‐ 15 8 20 25 4 6 ‐ ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐51 Cut 44.88883° ‐110.73303° 693+50

35' RT

10 ‐ 15 8 20 25 4 6 ‐ ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

WY NPS YELL 10(24)

RFQ 69056720Q000018

Station and Offset from

CTL

Estimated Feet of Auger

Estimated Feet of Casing

Advancer

Estimated Feet of HQ

Core

Max. Hole Diameter

(in)

Minimum Depth (ft)

Possible Maximum Depth (ft)

Expected No. of SPTs

Possible Addit.

SPTs

Possible Shelby Samples

Vane Shear Tests

Comments: Drill Type, Access, Instruments, Etc.

NGSG20‐

Subgrade Investigation of Native

Soils 44.88811° ‐110.73228°

696+20

100' RT

5 ‐ ‐ 16 5 5 2 1 1 ‐ Truck mounted drill rig

NGSG20‐

Subgrade Investigation of

Existing Pavement 44.89017° ‐110.73056°

695+00

827' RT

5 ‐ ‐ 16 5 5 2 1 1 ‐ Truck mounted drill rig

NG20‐54

Wall to Reduce Impact to Wetland ID 34 44.88321° ‐110.73182°

672+00

31' RT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐55

Wall to Reduce Impact to Wetland ID 029C

44.88234° ‐110.73265° 668+25

38' LT

10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐56

Wall to Reduce Impact to Wetland ID 037S

44.88008° ‐110.73445° 658+50

30' RT

20 5 5 8 30 30 11 1 2 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐57 New Alignment/Cut 44.87088° ‐110.73824° 622+80 30'R

10 5 5 8 20 20 8 1 1 ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐58

Wall to Reduce Impact to Wetland ID 47 44.86698° ‐110.73773°

608+50

42' LT

20 5 5 8 30 30 11 1 2 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

NG20‐59

Wall to Reduce Impact to Wetland ID 034B

44.86561° ‐110.73749° 603+50

39' LT

20 5 5 8 30 30 11 1 2 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.

TOTALS 365 175 305 288 775 845 275 54 33 16

NOTES:

2) STP testing and sampling intervals for subgrade borings (prefix NGSG): At depths of 2.0' and 5'. Collect additonal bulk samples as described in Section F of the SOW.

3) HQ3 for all rock coring unless a portable rig is required. Rock coring performed at a location that requires a portable rig can be NQ3.

5) Minimize brushing and vegetation removal to the extent practical, brush plants several inches above ground level if required.

4) Borings NG20‐25, NG20‐29, and NG20‐30 are subject to change based on alterations to the proposed bridge and boardwalk alignment. These borings may be moved up to 50 feet away from their current location.

1) STP testing and sampling intervals for geotechnical borings (prefix NG): Every 2.5' from 0' to 20'; every 5' from 20' to bottom of hole or to competent bedrock. Competant bedrock is rock with a blowcount of 50 blow for 6" or more.

WY NPS YELL 10(24)

RFQ 69056720Q000018

Option 1 ‐ Table of Borings ‐ 2020 Norris to Golden Gate Phase 3 ‐ Subsurface Investigation

Station and Offset from

CTL

Estimated Feet of Auger

Estimated Feet of Casing

Advancer

Estimated Feet of HQ

Core

Max. Hole Diameter

(in)

Minimum Depth (ft)

Possible Maximum Depth (ft)

Expected No. of SPTs

Possible Addit.

SPTs

Possible Shelby Samples

Vane Shear Tests

Comments: Drill Type, Access, Instruments, Etc.

NG20‐26

East Abutment of Pedestrian Bridge

44.93311° ‐110.72703° 861+10

75' RT

20 20 10 8 30 50 13 2 1 ‐ Helicopter

NG20‐27 Pedestrian Boardwalk 44.93261° ‐110.72711° 859+50

164' RT

10 20 30 8 30 60 9 8 ‐ ‐ Helicopter.

NG20‐28 Pedestrian Boardwalk 44.93241° ‐110.72717° 858+80

198' RT

10 10 30 8 20 50 7 8 ‐ ‐ Helicopter.

TOTALS 40 50 70 24 80 160 29 18 1 0

NOTES:

1) STP testing and sampling intervals for geotechnical borings (prefix NG): Every 2.5' from 0' to 20'; every 5' from 20' to bottom of hole or to competent bedrock. Competant bedrock is rock with a blowcount of 50 blow for 6" or more.

2) HQ3 for all rock coring unless a portable rig is required. Rock coring performed at a location that requires a portable rig can be NQ3.

3) Borings are subject to change based on alterations to the proposed bridge and boardwalk alignment. These borings may be moved up to 50 feet away from their current location.

4) Minimize brushing and vegetation removal to the extent practical, brush plants several inches above ground level if required.

WY NPS YELL 10(24)

RFQ 69056720Q000018

Attachment 2 - NGG3 Phase 2 Table of Borings Spring 2020
Attachment 2 O - NGG3 Phase 2 Table of Borings Spring 2020

File details come from the government source that posted it. Updated .