This document contains a table of borings for a geotechnical subsurface investigation. The Western Federal Lands Highway Division of the Federal Highway Administration is conducting the investigation on the Grand Loop Road in Yellowstone National Park, Wyoming in support of a project to widen and reconstruct a portion of the road from the Golden Gate Viaduct to a point at approximately 44.8469, -110.7353. The table lists 58 proposed boring locations along the road corridor, providing details on the purpose and specifications of each boring such as the latitude and longitude, estimated depths, sampling intervals, and access requirements. It also outlines the general standards for standard penetration testing, rock coring methods, and measures to minimize environmental impacts. An optional additional set of borings is included for alternative bridge and boardwalk alignments.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base ‐ Table of Borings ‐ 2020 Norris to Golden Gate Phase 3 ‐ Subsurface Investigation
Boring Purpose of Boring Latitude Longitude Station and Offset from
CTL
Estimated Feet of Auger
Estimated Feet of Casing
Advancer
Estimated Feet of HQ
Core
Max. Hole Diameter
(in)
Minimum Depth (ft)
Possible Maximum Depth (ft)
Expected No. of SPTs
Possible Addit.
SPTs
Possible Shelby Samples
Vane Shear Tests
Comments: Drill Type, Access, Instruments, Etc.
NG20‐24 Rock cut 44.93501° ‐110.72580° 869+00
160' LT
10 10 130 8 130 150 5 10 ‐ ‐ Helicopter. Downhole televiewer surveys including optical and acoustic are required from the top of bedrock to final depth of the boring.
NG20‐25
West Abutment of Pedestrian Bridge
44.93317° ‐110.72710° 861+15
46' RT
20 20 10 8 30 50 13 2 1 ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐29
Possible Alternative
Trail Location 44.93284° ‐110.72752°
859+00
62' RT
10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from roadway. Avoid tracking over or drilling into historic waterline.
NG20‐30
Possible Alternative
Trail Location 44.93253° ‐110.7279°
857+80
46' RT
20 20 10 8 30 50 13 2 1 ‐ Track or truck mounted drill rig from roadway or existing Bunsen Peak parking lot. Avoid tracking over or drilling into historic waterline.
NGSG20‐
Subgrade for Proposed Parking Lot
44.93152° ‐110.72864° 854+00
57' RT
5 ‐ ‐ 16 5 5 2 1 1 ‐ Track or truck mounted drill rig from roadway or existing Bunsen Peak parking lot. Avoid tracking over or drilling into historic waterline.
NG20‐32
Wall to Reduce Impact to Wetland ID 007
44.92433° ‐110.73260° 825+00
32' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐33
Wall to Reduce Impact to Wetland ID 007
44.92377° ‐110.73252° 823+00
38' LT
10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐34
Wall to Reduce Impact to Wetland ID 007
44.92296° ‐110.73250° 820+00
80' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐35
Wall to Reduce Impact to Wetland ID 007
44.92239° ‐110.73219° 818+00
39' LT
10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐36
Wall to Reduce Impact to Wetland ID 007
44.92186° ‐110.73205° 816+00
44' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐37
Wall to Reduce Impact to Wetland ID 007
44.91974° ‐110.73144° 808+00
32' LT
10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐38
Wall to Reduce Impact to Wetland ID 007
44.91917° ‐110.73139° 806+00
56' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
WY NPS YELL 10(24)
RFQ 69056720Q000018
Attacheent 2
Station and Offset from
CTL
Estimated Feet of Auger
Estimated Feet of Casing
Advancer
Estimated Feet of HQ
Core
Max. Hole Diameter
(in)
Minimum Depth (ft)
Possible Maximum Depth (ft)
Expected No. of SPTs
Possible Addit.
SPTs
Possible Shelby Samples
Vane Shear Tests
Comments: Drill Type, Access, Instruments, Etc.
NG20‐39
Wall to Reduce Impact to Wetland ID 007
44.91866° ‐110.73125° 804+00
43' LT
10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐40
Wall to Reduce Impact to Wetland ID 007
44.91810° ‐110.73113° 802+00
35' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐41
Wall to Reduce Impact to Wetland ID 007
44.91756° ‐110.73105° 800+00
40' LT
10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐42
Wall to Reduce Impact to Wetland ID 007
44.91702° ‐110.73097° 798+00
40' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐43
Wall to Reduce Impact to Wetland ID 007
44.91646° ‐110.73088° 796+00
28' LT
10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐44
Wall to Reduce Impact to Wetland ID 007
44.91592° ‐110.73080° 794+00
37' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from existing pullout or roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐45
Wall to Reduce Impact to Wetland ID 009
44.91066° ‐110.73100° 774+50
30' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐46
Wall to Reduce Impact to Wetland ID 009
44.910172° ‐110.73126° 772+50
42' LT
10 5 5 8 20 20 9 1 1 ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐47
Wall to Reduce Impact to Wetland ID 009
44.90975° ‐110.73143° 771+00
32' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐48
Wall to Reduce Impact to Wetland ID 022
44.89086° ‐110.73416° 701+50
32' RT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐49
Wall to Reduce Impact to Wetland ID 023
44.89068° ‐110.73437° 701+00
35' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐50 Cut 44.88901° ‐110.73348° 644+50
35' LT
10 ‐ 15 8 20 25 4 6 ‐ ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐51 Cut 44.88883° ‐110.73303° 693+50
35' RT
10 ‐ 15 8 20 25 4 6 ‐ ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
WY NPS YELL 10(24)
RFQ 69056720Q000018
Station and Offset from
CTL
Estimated Feet of Auger
Estimated Feet of Casing
Advancer
Estimated Feet of HQ
Core
Max. Hole Diameter
(in)
Minimum Depth (ft)
Possible Maximum Depth (ft)
Expected No. of SPTs
Possible Addit.
SPTs
Possible Shelby Samples
Vane Shear Tests
Comments: Drill Type, Access, Instruments, Etc.
NGSG20‐
Subgrade Investigation of Native
Soils 44.88811° ‐110.73228°
696+20
100' RT
5 ‐ ‐ 16 5 5 2 1 1 ‐ Truck mounted drill rig
NGSG20‐
Subgrade Investigation of
Existing Pavement 44.89017° ‐110.73056°
695+00
827' RT
5 ‐ ‐ 16 5 5 2 1 1 ‐ Truck mounted drill rig
NG20‐54
Wall to Reduce Impact to Wetland ID 34 44.88321° ‐110.73182°
672+00
31' RT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐55
Wall to Reduce Impact to Wetland ID 029C
44.88234° ‐110.73265° 668+25
38' LT
10 5 5 8 20 20 9 1 1 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐56
Wall to Reduce Impact to Wetland ID 037S
44.88008° ‐110.73445° 658+50
30' RT
20 5 5 8 30 30 11 1 2 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐57 New Alignment/Cut 44.87088° ‐110.73824° 622+80 30'R
10 5 5 8 20 20 8 1 1 ‐ Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐58
Wall to Reduce Impact to Wetland ID 47 44.86698° ‐110.73773°
608+50
42' LT
20 5 5 8 30 30 11 1 2 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
NG20‐59
Wall to Reduce Impact to Wetland ID 034B
44.86561° ‐110.73749° 603+50
39' LT
20 5 5 8 30 30 11 1 2 1 Track mounted drill rig from roadway. Utilize tracking pads at all times in wetlands to minimize disturbance.
TOTALS 365 175 305 288 775 845 275 54 33 16
NOTES:
2) STP testing and sampling intervals for subgrade borings (prefix NGSG): At depths of 2.0' and 5'. Collect additonal bulk samples as described in Section F of the SOW.
3) HQ3 for all rock coring unless a portable rig is required. Rock coring performed at a location that requires a portable rig can be NQ3.
5) Minimize brushing and vegetation removal to the extent practical, brush plants several inches above ground level if required.
4) Borings NG20‐25, NG20‐29, and NG20‐30 are subject to change based on alterations to the proposed bridge and boardwalk alignment. These borings may be moved up to 50 feet away from their current location.
1) STP testing and sampling intervals for geotechnical borings (prefix NG): Every 2.5' from 0' to 20'; every 5' from 20' to bottom of hole or to competent bedrock. Competant bedrock is rock with a blowcount of 50 blow for 6" or more.
WY NPS YELL 10(24)
RFQ 69056720Q000018
Option 1 ‐ Table of Borings ‐ 2020 Norris to Golden Gate Phase 3 ‐ Subsurface Investigation
Station and Offset from
CTL
Estimated Feet of Auger
Estimated Feet of Casing
Advancer
Estimated Feet of HQ
Core
Max. Hole Diameter
(in)
Minimum Depth (ft)
Possible Maximum Depth (ft)
Expected No. of SPTs
Possible Addit.
SPTs
Possible Shelby Samples
Vane Shear Tests
Comments: Drill Type, Access, Instruments, Etc.
NG20‐26
East Abutment of Pedestrian Bridge
44.93311° ‐110.72703° 861+10
75' RT
20 20 10 8 30 50 13 2 1 ‐ Helicopter
NG20‐27 Pedestrian Boardwalk 44.93261° ‐110.72711° 859+50
164' RT
10 20 30 8 30 60 9 8 ‐ ‐ Helicopter.
NG20‐28 Pedestrian Boardwalk 44.93241° ‐110.72717° 858+80
198' RT
10 10 30 8 20 50 7 8 ‐ ‐ Helicopter.
TOTALS 40 50 70 24 80 160 29 18 1 0
NOTES:
1) STP testing and sampling intervals for geotechnical borings (prefix NG): Every 2.5' from 0' to 20'; every 5' from 20' to bottom of hole or to competent bedrock. Competant bedrock is rock with a blowcount of 50 blow for 6" or more.
2) HQ3 for all rock coring unless a portable rig is required. Rock coring performed at a location that requires a portable rig can be NQ3.
3) Borings are subject to change based on alterations to the proposed bridge and boardwalk alignment. These borings may be moved up to 50 feet away from their current location.
4) Minimize brushing and vegetation removal to the extent practical, brush plants several inches above ground level if required.
WY NPS YELL 10(24)
RFQ 69056720Q000018
| Attachment 2 - NGG3 Phase 2 Table of Borings Spring 2020 |
| Attachment 2 O - NGG3 Phase 2 Table of Borings Spring 2020 |
File details come from the government source that posted it. Updated .