Attachment 2 Maps Drawings Daymon_Hardin_ConstPlans.pdf
PDF 2 MB Posted
- Solicitation number
- 12FPC325Q0055
About this file
These detailed engineering plans are for the Daymon ACEP-WRE Restoration project located in Hardin County, Illinois, within the Shawnee National Forest. The project involves constructing a wetland berm with specific technical specifications, including an in-line control structure, 12" PVC pipe, anti-seep collars, and an auxiliary spillway. The engineering drawings provide comprehensive details such as a location map, typical berm cross-section, proposed dike profile, and precise installation specifications for pipe and flange components. The project involves approximately 670 cubic yards of embankment earthfill, 77 linear feet of 12" PVC pipe, and requires a mandatory pre-construction meeting with the contracting officer before work can proceed. The design includes specific elevation measurements, slope requirements, and structural elements to ensure proper water management and erosion control in the wetland restoration area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DETAIL PLANS FOR
DAYMON ACEP-WRE RESTORATION
NRCS REQUIRES A MANDATORY
PRE-CONSTRUCTION MEETING BEFORE
CONSTRUCTION BEGINS. PLEASE
CONTACT THE CONTRACT/NG OFFICER :S
REPRESENTATIVE TO SCHEDULE BEFORE
WORK PROCEEDS.
----PROJECT LOCATION
HARDIN COUNTY /LL/NOIS
LOCATION MAP
LOCATION MAP - 1" = 1000'
ENGINEERING JOB CLASS: II
1.
2.
3.
4.
5.
TABLE OF CONTENTS:
COVER SHEET
PLAN MAP
PLAN FOR WETLAND BERM
PROFILE AND CROSS
SECTION
ANTI-SEEP COLLARS AND
FLANGES
IS
a call CONTRACTOR OR Before YouDig LANDOWNER IS
--•••--RESPONSIBLE FOR CALLING
,-'LIE ILLINOIS J.U.L.I.E.
� 811 or 1-800-892-0123
L- ILLINOIS
ONE-CALL SYSTE.M www.illinois1call.com 7/20/16 J:IJ PM Sheet I of 13
File details come from the government source that posted it. Updated .