Attachment 1 SOW Specifications-Daymon Construction 12FPC325Q0055.pdf
PDF 2 MB Posted
- Solicitation number
- 12FPC325Q0055
About this file
This document is a Statement of Work (SOW) and Construction Specifications for the Rick Daymon Floodplain Easement Restoration project in Hardin County, Illinois, issued by the USDA Natural Resources Conservation Service. The project involves multiple construction activities, including excavation of 300 cubic yards for a Wetland Berm, placing 77 feet of 12-inch diameter aluminum corrugated metal pipe with a water control structure, and seeding the constructed berm with Tall Fescue and Red Clover.
The project includes five primary bid items: Mobilization and Demobilization, Excavation, Water Control Structure with Corrugated Metal Pipe, Earthfill for the Wetland Berm, and Tall Fescue and Red Clover Seeding. Specific requirements include Class C compaction for earthfill, placement of anti-seep collars, manual compaction near pipe structures, and seeding at specific rates (12 lbs/ac Tall Fescue, 8 lbs/ac Red Clover) with blown straw mulch at 2,600 lbs/ac. The seeding is to be performed on 0.4 acres during designated periods (Late Winter to 5/15 and 8/1 to 9/20). The solicitation number is 12FPC325Q0055, and the project is located in Marion, Illinois.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Marion Area Office 502 Comfort Dr Suite E Marion, IL 62959
Rick Daymon Floodplain Easement Restoration Hardin County, Illinois
INDEX OF CONSTRUCTION SPECFICIATIONS
Spec # Description 8 Mobilization and Demobilization
21 Excavation
51 Corrugated Metal Pipe
552 Material Specification 552 – Aluminum Corrugated Pipe
23 Earthfill
6 Seeding, Sprigging, and Mulching
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
ACEP-WRE Restoration R Daymon Site Prep Hardin Co, IL
Construction Specification 8—Mobilization and Demobilization
1. Scope
The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract.
Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material
Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment
Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
4. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details thereof are:
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
A. Bid Item #1, Mobilization and Demobilization
1. This item shall consist of the mobilization and demobilization of the contractor’s forces and equipment as well as all permitting, bonding, and insurance requirements necessary to perform the work required under this contract.
2. During all operation it will be the contractor’s responsibility to keep all public roads open.
3. All earthmoving equipment utilized for the work shall meet the requirements of OSHA, Paragraph 1926.602. In addition, roll-over protection and safety belts shall be installed, maintained, and utilized regardless of the equipment age or struck capacity. This includes earthmoving equipment as mentioned in Part 1926, Subpart 0, Sections 1926.602 and
Subpart W, Sections 1000, 1001, and 1002, to include skid-steer and self-propelled compactor equipment.
4. Prior to commencement of construction, the contractor is responsible for contracting
Melissa Alvey-Pennell, COR, at 618-998-6124 a minimum of 48 hours before operations on-site begin. Alternate COR contact is Clayton Houghland, COR, at 618-998-6123 or
Kenneth Rexing, Construction Inspector, at 618-998-6122.
5. All invoices submitted by the contractor shall be subject to the approval of the Contracting
Officer.
6. The contractor shall perform the work in such a manner as control erosion and minimize the production of sediments and other pollutants to the water and air during construction operations.
7. The contractor should take all precautions necessary to protect existing utilities, including proper notifications of the Illinois 1-call system.
8. Access to the construction area shall be as documented at the post-award meeting.
9. Payment for Bid Item #1, Mobilization and Demobilization shall be lump sum. Such payment shall constitute full compensation for all labor, equipment, materials, tools, and other items necessary to complete the work.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Construction Specification 21—Excavation
The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials.
2. Classification Excavation is classified as common excavation, rock excavation, or unclassified excavation in accordance with the following definitions.
Common excavation is defined as the excavation of all materials that can be excavated, transported, and unloaded using heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped into place or loaded onto hauling equipment by excavators having a rated capacity of one cubic yard or larger and equipped with attachments (shovel, bucket, backhoe, dragline, or clam shell) appropriate to the material type, character, and nature of the materials.
Rock excavation is defined as the excavation of all hard, compacted, or cemented materials that require blasting or the use of ripping and excavating equipment larger than defined for common excavation. The excavation and removal of isolated boulders or rock fragments larger than 1 cubic yard encountered in materials otherwise conforming to the definition of common excavation shall be classified as rock excavation. The presence of isolated boulders or rock fragments larger than 1 cubic yard is not in itself sufficient cause to change the classification of the surrounding material.
For the purpose of these classifications, the following definitions shall apply:
Heavy ripping equipment is a rear-mounted, heavy duty, single-tooth, ripping attachment mounted on a track type tractor having a power rating of at least 250 flywheel horsepower unless otherwise specified in section 10.
Wheel tractor-scraper is a self-loading (not elevating) and unloading scraper having a struck bowl capacity of at least 12 cubic yards.
Pusher tractor is a track type tractor having a power rating of at least 250 flywheel horsepower equipped with appropriate attachments.
Unclassified excavation is defined as the excavation of all materials encountered, including rock materials, regardless of their nature or the manner in which they are removed.
3. Blasting The transportation, handling, storage, and use of dynamite and other explosives shall be directed and supervised by a person(s) of proven experience and ability who is authorized and qualified to conduct blasting operations.
Blasting shall be done in a manner as to prevent damage to the work or unnecessary fracturing of the underlying rock materials and shall conform to any special requirements in section 10 of this specification.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
When specified in section 10, the contractor shall furnish the engineer, in writing, a blasting plan before blasting operations begin.
4. Use of excavated material Method 1—To the extent they are needed, all suitable material from the specified excavations shall be used in the construction of required permanent earthfill or rockfill. The suitability of material for specific purposes is determined by the engineer. The contractor shall not waste or otherwise dispose of suitable excavated material.
Method 2—Suitable material from the specified excavations may be used in the construction of required earthfill or rockfill. The suitability of material for specific purposes is determined by the engineer.
5. Disposal of waste materials Method 1—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of at the locations shown on the drawings.
Method 2—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of by the contractor at sites of his own choosing away from the site of the work. The disposal shall be in an environmentally acceptable manner that does not violate local rules and regulations.
6. Excavation limits Excavations shall comply with OSHA Construction Industry Standards (29CFR Part 1926) Subpart P, Excavations, Trenching, and Shoring. All excavations shall be completed and maintained in a safe and stable condition throughout the total construction phase. Structure and trench excavations shall be completed to the specified elevations and to the length and width required to safely install, adjust, and remove any forms, bracing, or supports necessary for the installation of the work. Excavations outside the lines and limits shown on the drawings or specified herein required to meet safety requirements shall be the responsibility of the contractor in constructing and maintaining a safe and stable excavation.
7. Borrow excavation When the quantities of suitable material obtained from specified excavations are insufficient to construct the specified earthfills and earth backfills, additional material shall be obtained from the designated borrow areas. The extent and depth of borrow pits within the limits of the designated borrow areas shall be as specified in section 10 or as approved by the engineer.
Borrow pits shall be excavated and finally dressed to blend with the existing topography and sloped to prevent ponding and to provide drainage.
8. Overexcavation Excavation in rock beyond the specified lines and grades shall be corrected by filling the resulting voids with portland cement concrete made of materials and mix proportions approved by the engineer. Concrete that will be exposed to the atmosphere when construction is completed shall meet the requirements of concrete selected for use under Construction Specification 31, Concrete for Major Structures, or 32, Structure Concrete, as appropriate.
Concrete that will be permanently covered shall contain not less than five bags of cement per cubic yard.
The concrete shall be placed and cured as specified by the engineer.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Excavation in earth beyond the specified lines and grades shall be corrected by filling the resulting voids with approved, compacted earthfill. The exception to this is that if the earth is to become the subgrade for riprap, rockfill, sand or gravel bedding, or drainfill, the voids may be filled with material conforming to the specifications for the riprap, rockfill, bedding, or drainfill. Before correcting an overexcavation condition, the contractor shall review the planned corrective action with the engineer and obtain approval of the corrective measures.
9. Measurement and payment For items of work for which specific unit prices are established in the contract, the volume of each type and class of excavation within the specified pay limits is measured and computed to the nearest cubic yard by the method of average cross-sectional end areas or by methods outlined in section 10 of this specification. Regardless of quantities excavated, the measurement for payment is made to the specified pay limits except that excavation outside the specified lines and grades directed by the engineer to remove unsuitable material is included. Excavation required because unsuitable conditions result from the contractor's improper construction operations, as determined by the engineer, is not included for measurement and payment.
Method 1—The pay limits shall be as designated on the drawings.
Method 2—The pay limits shall be defined as follows:
a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.
b. The lower and lateral limits shall be the neat lines and grades shown on the drawings.
Method 3—The pay limits shall be defined as follows:
a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.
b. The lower and lateral limits shall be the true surface of the completed excavation as directed by the engineer.
Method 4—The pay limits shall be defined as follows:
a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.
b. The lower limit shall be at the bottom surface of the proposed structure.
c. The lateral limits shall be 18 inches outside of the outside surface of the proposed structure or shall be vertical planes 18 inches outside of and parallel to the footings, whichever gives the larger pay quantity, except as provided in d below.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
d. For trapezoidal channel linings or similar structures that are to be supported upon the sides of the excavation without intervening forms, the lateral limits shall be at the underside of the proposed lining or structure.
e. For the purposes of the definitions in b, c, and d, above, any specified bedding or drainfill directly beneath or beside the structure will be considered to be a part of the structure.
All methods—The following provisions apply to all methods of measurement and payment.
Payment for each type and class of excavation is made at the contract unit price for that type and class of excavation. Such payment will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to the performance of the work except that extra payment for backfilling overexcavation will be made in accordance with the following provisions.
Payment for backfilling overexcavation, as specified in section 8 of this specification, is made only if the excavation outside specified lines and grades is directed by the engineer to remove unsuitable material and if the unsuitable condition is not a result of the contractor's improper construction operations as determined by the engineer.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 10 of this specification.
10. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details thereof are:
A. Bid Item #2, Excavation
1. This item shall consist of excavation in order to construct the Wetland Berm to the depth and grade as shown on the plans. Measurement and payment for Bid Item #2 are as shown below.
a. Excavation of Wetland Berm – 300 cu yds
2. All excavation in this contract is anticipated to meet the definition of common excavation as described in Section 2 of this specification.
3. The Contractor shall take great care to not overexcavate beyond the specified maximum depth in the areas required for berm construction.
4. The measurement and payment for Bid Item #2 – Excavation shall be by Method 2. No separate payment shall be made for this item. All compensation for all work, tools, and equipment shall fall under Bid Item 2, Earthfill.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Construction Specification 51—Corrugated Metal Pipe
The work consists of furnishing and placing circular, arched, or elliptical corrugated metal pipe and the necessary fittings.
2. Material Pipe and fittings shall conform to the requirements of Material Specification 551, Coated Corrugated Steel Pipe, or Material Specification 552, Aluminum Corrugated Pipe, whichever is specified.
Unless otherwise specified in section 11 of this specification, perforated pipe furnished shall conform to the requirements for Class I perforations as described in ASTM A 760 or A 762.
3. Coupling bands and hardware Pipe joint coupling bands shall be provided meeting the requirements specified in section 11 of this specification.
Hardware consisting of coupling bands and band fastening devices, such as connecting bolts, rods, lugs, and angles used in conjunction with zinc-coated iron or steel pipe, shall be galvanized by the hot-dip method. Hardware used in conjunction with aluminum pipe and aluminum or aluminum-zinc alloy-coated iron and steel pipe shall be of the same material as the pipe except that hot-dip galvanized or cadmium-plated fasteners may be used. The surface of all band-fastening devices for pipe specified with bituminous or polymer coating shall be coated with asphalt-mastic material meeting the requirements of ASTM A
849. The coupling band shall be coated similar to that specified for the pipe unless otherwise specified in section 11 of this specification.
Coupling bands shall be installed to provide straight alignment of the connecting pipe ends. Unless otherwise specified in section 11 of this specification, the bandwidth shall be as specified in ASTM A 760 and A 762. The bands shall be positioned to overlap adjacent pipe ends equally. The coupling bands shall be corrugated to match the corrugations of the pipe section ends being connected.
4. Fabrication Fabrication of appurtenant sections shall be performed as shown on the drawings and described in section 11 of this specification. The items may consist of inlet sections, outlet sections, end sections, elbows, skew or beveled sections, rod reinforced ends, cut-off collars, or headwalls. Fabrication of these appurtenant sections shall be made from metallic-coated material identical to that from which the attached pipe is fabricated. Fabrication shall be of a quality and finished workmanship equal to that required for the pipe.
5. Handling the pipe The contractor shall furnish equipment as necessary to install the pipe without damaging the pipe or coating. The pipe shall be transported and handled in a manner to prevent damage to the pipe and coating.
6. Laying and bedding the pipe Unless otherwise specified, the pipe shall be installed in accordance with the manufacturer's recommendations. Pipe shall be installed so no reversal of grade between joints results unless otherwise
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs shown on the drawings. The pipe shall be installed with the outside laps of circumferential joints pointing upstream and with longitudinal laps at the sides near the vertical mid-height of the pipe.
Field welding of corrugated galvanized iron or steel pipe is not permitted. The pipe sections shall be joined with fabricator-supplied coupling bands meeting the specified joint requirements. The coupling shall be installed as recommended by the fabricator.
The pipe shall be firmly and uniformly bedded throughout its full length to the depth and in the manner specified on the drawings.
Perforated pipe shall be installed with the perforations down and oriented symmetrically about a vertical centerline. Perforations shall be clear of any obstructions at the time the pipe is installed in its final position.
The pipe shall be loaded sufficiently during backfilling to prevent displacement from line and grade and to maintain full contact with the bedding during the placement operations.
7. Strutting When required, struts or horizontal ties shall be installed in the manner specified on the drawings. Struts and ties shall remain in position until the backfill has been placed above the top of the pipe to a height of 5 feet or the pipe diameter, whichever is greater, or to the surface of the completed earth backfill when the fill height is less than 5 feet above the top of the pipe. The contractor shall remove the struts or ties following completion of the earth backfill requirements that apply.
8. Embedment in concrete Special treatment shall be provided to the pipe surface when embedded or attached to concrete and the pipe material is aluminum or aluminum-coated and aluminum-zinc alloy-coated. Potential contact surfaces in contact with concrete and masonry surfaces shall be coated with two coats of a bituminous paint of the cutback type. Placement of the pipe shall be such that direct metal-to-metal contact with other metallic material, such as embedded steel reinforcement or water control gates, is prevented.
9. Repair of damaged coating Any damage to the metallic coating shall be repaired by cleaning the damaged surface area by sand blasting, power disk sanding, or wire brushing. All loose and cracked coating, dirt, and any products of corrosion shall be removed before application of paint. Oil and grease material shall be removed by use of a solvent. The surface shall be clean and dry during the painting period and until the coating has completely dried.
Painting shall be accomplished by one of the following options based upon installed exposure conditions of the pipe as determined by the engineer.
Normal exterior or interior atmospheric exposure:
a. Zinc dust - zinc oxide primer, ASTM D 79 and D 520
b. Single package, moisture cured urethane prime in silver metallic color, or
c. Zinc-rich cold galvanized compound, brush, or aerosol application
Submergence in water exposure:
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
a. Zinc dust - zinc oxide primer, ASTM D 79 and D 520
b. Zinc dust paint, ASTM D 4146
When the metallic coating is damaged in any individual area larger than 12 square inches or if more than
0.2 percent of the total surface area of a single pipe section is damaged, that section of pipe will be rejected.
Breaks or scuffs in bituminous coatings that are less than 36 square inches in area shall be repaired by applying two coats of hot-asphaltic paint or a coating of cold-applied bituminous mastic. The repair coating shall be a minimum of 0.05 inch thick after hardening and shall bond securely and permanently to the pipe and coating. The material shall meet the minimum physical requirements for bituminous coating in ASTM A 849 and A 885. Whenever individual breaks exceed 36 square inches in area or when the total area of breaks exceeds 0.5 percent of the total surface area of an individual pipe section, that section of pipe will be rejected.
Bituminous coating damaged by welding of coated pipe or pipefittings shall be repaired as specified in this section for breaks or scuffs in bituminous coatings.
Breaks or scuffs in polymer coatings that are less than 36 square inches in area shall be repaired by the application of a polymer material similar to and compatible with the durability, adhesion, and appearance of the original polymer coating, as described in ASTM A 849, paragraph 6.8. The repair coating shall be a minimum thickness of 0.010 inch (10 mils) after drying. Whenever individual breaks exceed 36 square inches in area or when the total area of breaks exceeds 0.5 percent of the total surface area of the individual pipe section, that section of pipe will be rejected.
10. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the quantity of each type, class, size, and gauge of pipe is determined to the nearest 0.1 foot by measurement of the laid length of the pipe along the centerline of the pipe. Payment for each type, class, size, and gauge of pipe is made at the contract unit price for that type, class, size and gauge of pipe. Such payment constitutes full compensation for furnishing, transporting, and installing the pipe and fittings and all other items necessary and incidental to the completion of the work except items designated as special fittings. Special fittings are those sections of pipe requiring special fabrication to meet layout requirements. Payment for special fittings is made at the contract unit price for special fittings (CMP).
Method 2—For items of work for which specific unit prices are established in the contract, the quantity of each type, class, size, and gauge of pipe is determined as the sum of the nominal laying lengths of the pipe sections installed. Payment for each type, class, size, and gauge of pipe is made at the contract unit price for that type, class, size, and gauge of pipe. Such payment constitutes full compensation for furnishing, transporting, and installing the pipe and fittings and all other items necessary and incidental to the completion of the work except items designated as special fittings. Special fittings are those sections of pipe requiring special fabrication to meet layout requirements. Payment for special fittings is made at the contract unit price for special fittings (CMP).
Method 3—For items of work for which specific lump sum prices are established in the contract, payment for corrugated metal pipe structures is made at the contract lump sum price. Such payment constitutes full compensation for furnishing, fabricating, transporting, and installing the pipe structure complete with
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs metal pipe, fittings, and appurtenances, and all other items necessary and incidental to completion of the work, which includes, except as otherwise specified, required excavation, dewatering, and earth backfill.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 11 of this specification.
11. Items of work and construction details
A. Bid Item #3, Water Control Structure – Corrugated Metal Pipe (CMP)
1. Bid Item #3 shall consist of placing 77 ft of 12-inch diameter 16ga(0.06”) 2-2/3” x ½” corrugation Aluminum CMP as specified in Material Specification 552 and 3 each 5ft x 5ft anti-seep collars with flanged rings at designated area with the depth and grade as shown on the drawings. Measurement and payment for Bid Item #3 are as shown below.
2. Bid Item #3 shall also consist of an inline stoplog water control structure for 12-inch diameter pipe, 4ft of height, and 16-inch weir length with 12-inch animal guard and 12-inch heavy duty trash rack as shown on drawings.
3. The materials and manufacture of water control structures, pipe, and coupling bands, coatings, and other appurtenances must conform to the NRCS material specifications.
4. Place water control structure and pipe couplers on a stable base. The base may be compacted earth, compacted fill sand, or concrete pad. Extend the stable base no less than 1 foot around structure.
Install structure with all stop boards in tracks. Place impervious backfill material around the structure and other appurtenances by hand and in layers not more than four (4) inches thick before compaction. Thoroughly compact each layer by means of hand tamping, to the same density requirements as specified for the adjacent embankment. Achieve proper compaction around structure without the use of mechanical compaction. Increase height of fill at approximately the same rate on all sides of the structure. Heavy equipment must not be operated within 6 feet of any structure. Lay the pipe to the lines, grades and elevations shown on the drawings and bed the pipe firmly and uniformly throughout the entire length. Install the pipe according to the manufacturer’s instructions. Select anti-seep collars composed of materials compatible with that of the pipe and install anti-seep collars so that they are watertight. Install pipe with the outside laps of circumferential joints pointing upstream and with longitudinal laps on the sides at approximately the vertical mid-height of the pipe. Join pipe sections with coupling bands or other approved methods, as shown on the construction drawings. All pipe connections must be watertight.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
5. The measurement and payment for Bid Item #3 shall be by Method 3.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Material Specification 552—Aluminum Corrugated Pipe
A. Scope This specification covers the quality of aluminum corrugated pipe and fittings.
B. Pipe Aluminum corrugated pipe and fittings shall conform to the requirements of ASTM B745, B746, or B790 for the specified pipe sheet thickness, shape type, fabrication methods, and the following additional requirements when close-riveted pipe is specified:
1. Pipe shall be fabricated with circumferential seam rivet spacing that does not exceed 3 inches except those 12 rivets are sufficient to secure the circumferential seams in 12-inch pipe.
2. Longitudinal seams that will be within the coverage area of a coupling band, the rivets shall have flat heads, or the rivets and holes shall be omitted and the seams shall be connected by welding to provide a minimum of obstruction to the seating of the coupling bands.
C. Coatings Bituminous coatings, when specified, shall conform to the requirements of ASTM A849.
D. Couplings Bands
1. Coupling bands are to be provided for each section of pipe. The hardware for fastening the coupling band tightly to the connecting pipe shall be fabricated to permit tightening sufficiently to provide the required joint tensile strength and, if required, watertightness without failure of its fastening.
2. Gaskets, if specified, are to be provided for each coupling band. The fabrication shall also be sufficient to provide the required gasket seating without warping, twisting, or bending.
3. Gaskets provided with connecting bands meeting requirements for special joints in erodible soil conditions shall be as specified in ASTM A762.
E. Fittings
1. Fittings shall be fabricated from sheet aluminum meeting the requirements contained in
ASTM B744. The coating for fittings shall be the same as that specified for the contiguous corrugated aluminum pipe.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
2. Fittings that are welded during fabrication shall be accomplished in a good workmanship like manner resulting in a continuous smooth surface finish. Aluminum welding electrodes used shall conform to the requirements of American Welding Society (AWS) specification
AWS A5.10, "Specification for Aluminum and Aluminum Alloy Welding Rods and Bare
Electrodes." Welded surfaces and adjacent surfaces damaged during welding shall be treated by removing all weld splatter. The affected surface shall be cleaned to bright metal by sand blasting, power disk sanding, or wire brushing. The cleaned area shall extend at least 0.5 inch into the undamaged section of coated area. Within 24 hours of completion of surface preparation all treated surfaces shall be painted with two coats of a chromate rich primer and allowed to fully dry before exposure to weathering conditions.
3. Aluminum surfaces fabricated that will have contact with steel, iron, or other metals shall be coated with a zinc-chromate primer and allowed to fully dry before final installation.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Construction Specification 23—Earthfill
The work consists of the construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications.
Earthfill is composed of natural earth materials that can be placed and compacted by construction equipment operated in a conventional manner.
Earth backfill is composed of natural earth material placed and compacted in confined spaces or adjacent to structures (including pipes) by hand tamping, manually directed power tampers or vibrating plates, or their equivalent.
2. Material All fill material shall be obtained from required excavations and designated borrow areas. The selection, blending, routing, and disposition of material in the various fills shall be subject to approval by the engineer.
Fill materials shall contain no frozen soil, sod, brush, roots, or other perishable material. Rock particles larger than the maximum size specified for each type of fill shall be removed prior to compaction of the fill.
The types of material used in the various fills shall be as listed and described in the specifications and drawings.
3. Foundation preparation Foundations for earthfill shall be stripped to remove vegetation and other unsuitable material or shall be excavated as specified.
Except as otherwise specified, earth foundation surfaces shall be graded to remove surface irregularities and shall be scarified parallel to the axis of the fill or otherwise acceptably scored and loosened to a minimum depth of 6 inches. The moisture content of the loosened material shall be controlled as specified for the earthfill, and the surface material of the foundation shall be compacted and bonded with the first layer of earthfill as specified for subsequent layers of earthfill.
Earth abutment surfaces shall be free of loose, uncompacted earth in excess of 2 inches in depth normal to the slope and shall be at such a moisture content that the earthfill can be compacted against them to produce a good bond between the fill and the abutments.
Rock foundation and abutment surfaces shall be cleared of all loose material by hand or other effective means and shall be free of standing water when fill is placed upon them. Occasional rock outcrops in earth foundations for earthfill, except in dams and other structures designed to restrain the movement of water, shall not require special treatment if they do not interfere with compaction of the foundation and initial layers of the fill or the bond between the foundation and the fill.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Foundation and abutment surfaces shall be no steeper than one horizontal to one vertical unless otherwise specified. Test pits or other cavities shall be filled with compacted earthfill conforming to the specifications for the earthfill to be placed upon the foundation.
4. Placement Earthfill shall not be placed until the required excavation and foundation preparation have been completed and the foundation has been inspected and approved by the engineer. Earthfill shall not be placed upon a frozen surface nor shall snow, ice, or frozen material be incorporated in the earthfill matrix.
Earthfill shall be placed in approximately horizontal layers. The thickness of each layer before compaction shall not exceed the maximum thickness specified in section 10 or shown on the drawings. Materials placed by dumping in piles or windrows shall be spread uniformly to not more than the specified thickness before being compacted.
Hand compacted earth backfill shall be placed in layers whose thickness before compaction does not exceed the maximum thickness specified for layers of earth backfill compacted by manually directed power tampers.
Earth backfill shall be placed in a manner that prevents damage to the structures and allows the structures to assume the loads from the earth backfill gradually and uniformly. The height of the earth backfill adjacent to a structure shall be increased at approximately the same rate on all sides of the structure.
Earthfill and earth backfill in dams, levees, and other structures designed to restrain the movement of water shall be placed to meet the following additional requirements:
(a) The distribution of materials throughout each zone shall be essentially uniform, and the earthfill shall be free from lenses, pockets, streaks, or layers of material differing substantially in texture, moisture content, or gradation from the surrounding material. Zone earthfills shall be constructed concurrently unless otherwise specified.
(b) If the surface of any layer becomes too hard and smooth for proper bond with the succeeding layer, it shall be scarified parallel to the axis of the fill to a depth of not less than 2 inches before the next layer is placed.
(c) The top surface of embankments shall be maintained approximately level during construction with two exceptions: A crown or cross-slope of about 2 percent shall be maintained to ensure effective drainage, or as otherwise specified for drainfill or sectional zones.
(d) Dam embankments shall be constructed in continuous layers from abutment to abutment except where openings to facilitate construction or to allow the passage of streamflow during construction are specifically authorized in the contract.
(e) Embankments built at different levels as described under (c) or (d) above shall be constructed so that the slope of the bonding surfaces between embankment in place and embankment to be placed is not steeper than 3 feet horizontal to 1 foot vertical. The bonding surface of the embankment in place shall be stripped of all material not meeting the requirements of this specification and shall be scarified, moistened, and recompacted when the new earthfill is placed against it. This ensures a good bond with the new earthfill and obtains the specified moisture content and density at the contact of the in place and new earthfills.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
5. Control of moisture content During placement and compaction of earthfill and earth backfill, the moisture content of the material being placed shall be maintained within the specified range.
The application of water to the earthfill material shall be accomplished at the borrow areas insofar as practicable. Water may be applied by sprinkling the material after placement on the earthfill, if necessary.
Uniform moisture distribution shall be obtained by disking.
Material that is too wet when deposited on the earthfill shall either be removed or be dried to the specified moisture content prior to compaction.
If the top surface of the preceding layer of compacted earthfill or a foundation or abutment surface in the zone of contact with the earthfill becomes too dry to permit suitable bond, it shall either be removed or scarified and moistened by sprinkling to an acceptable moisture content before placement of the next layer of earthfill.
6. Compaction Earthfill—Earthfill shall be compacted according to the following requirements for the class of compaction specified:
Class A compaction—Each layer of earthfill shall be compacted as necessary to provide the density of the earthfill matrix not less than the minimum density specified in Section 10 or identified on the drawings. The earthfill matrix is defined as the portion of the earthfill material finer than the maximum particle size used in the compaction test method specified.
Class B compaction—Each layer of earthfill shall be compacted to a mass density not less than the minimum density specified.
Class C compaction—Each layer of earthfill shall be compacted by the specified number of passes of the type and weight of roller or other equipment specified or by an approved equivalent method. Each pass shall consist of at least one passage of the roller wheel or drum over the entire surface of the layer.
Earth backfill—Earth backfill adjacent to structures shall be compacted to a density equivalent to that of the surrounding inplace earth material or adjacent required earthfill or earth backfill. Compaction shall be accomplished by hand tamping or manually directed power tampers, plate vibrators, walk-behind, miniature, or self-propelled rollers. Unless otherwise specified heavy equipment including backhoe mounted power tampers or vibrating compactors and manually directed vibrating rollers shall not be operated within 2 feet of any structure. Towed or self-propelled vibrating rollers shall not be operated within 5 feet of any structure. Compaction by means of drop weights operating from a crane or hoist is not permitted.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
The passage of heavy equipment will not be allowed:
• Over cast-in-place conduits within 14-days after placement of the concrete
• Over cradled or bedded precast conduits within 7 days after placement of the concrete cradle or bedding
• Over any type of conduit until the backfill has been placed above the top surface of the structure to a height equal to one-half the clear span width of the structure or pipe or 2 feet, whichever is greater, except as may be specified in section 10.
Compacting of earth backfill adjacent to structures shall not be started until the concrete has attained the strength specified in section 10 for this purpose. The strength is determined by compression testing of test cylinders cast by the contractor's quality control personnel for this purpose and cured at the work site in the manner specified in ASTM C 31 for determining when a structure may be put into service.
When the required strength of the concrete is not specified as described above, compaction of earth backfill adjacent to structures shall not be started until the following time intervals have elapsed after placement of the concrete.
Structure Time interval (days)
Vertical or near-vertical walls with earth loading on one side only 14 Walls backfilled on both sides simultaneously 7 Conduits and spillway risers, cast-in-place (with inside forms in place) 7 Conduits and spillway risers, cast-in-place (inside forms removed) 14 Conduits, pre-cast, cradled 2 Conduits, pre-cast, bedded 1 Cantilever outlet bents (backfilled both sides simultaneously) 3
7. Reworking or removal and replacement of defective earthfill Earthfill placed at densities lower than the specified minimum density or at moisture contents outside the specified acceptable range of moisture content or otherwise not conforming to the requirements of the specifications shall be reworked to meet the requirements or removed and replaced by acceptable earthfill.
The replacement earthfill and the foundation, abutment, and earthfill surfaces upon which it is placed shall conform to all requirements of this specification for foundation preparation, approval, placement, moisture control, and compaction.
8. Testing During the course of the work, the engineer will perform quality assurance tests required to identify material; determine compaction characteristics; determine moisture content; and determine density of earthfill in place. Tests performed by the engineer will be used to verify that the earthfills conform to contract requirements of the specifications and not as a replacement for the contractor's quality control program.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Densities of earthfill requiring Class A compaction will be determined in accordance with ASTM D 1556, D 2167, D 2922, or D 2937 except that the volume and moist weight of included rock particles larger than those used in the compaction test method specified for the type of fill will be determined and deducted from the volume and moist weight of the total sample before computation of density or, if using the nuclear gauge, added to the specified density to bring it to the measure of equivalent composition for comparison (See ASTM D 4718). The density so computed is used to determine the percent compaction of the earthfill matrix. Unless otherwise specified, moisture content is determined by one of the following methods:
ASTM D 2216, D 3017, D 4643, D 4944, or D 4959.
9. Measurement and payment For items of work for which specific unit prices are established in the contract, the volume of each type and compaction class of earthfill and earth backfill within the specified zone boundaries and pay limits is measured and computed to the nearest cubic yard by the method of average cross-sectional end areas.
Unless otherwise specified in section 10, no deduction in volume is made for embedded items, such as, but not limited to, conduits, inlet structures, outlet structures, embankment drains, sand diaphragm and outlet, and their appurtenances.
The pay limits shall be as defined below, with the further provision that earthfill required to fill voids resulting from overexcavation of the foundation, outside the specified lines and grades, will be included in the measurement for payment only under the following conditions:
• Where such overexcavation is directed by the engineer to remove unsuitable material, and
• Where the unsuitable condition is not a result of the contractor's improper construction operations as determined by the engineer.
Earthfill beyond the specified lines and grades to backfill excavation required for compliance with OSHA requirements will be considered subsidiary to the earthfill bid item(s).
Method 1—The pay limits shall be as designated on the drawings.
Method 2—The pay limits shall be the measured surface of the foundation when approved for placement of the earthfill and the specified neat lines of the earthfill surface.
Method 3—The pay limits shall be the measured surface of the foundation when approved for placement of the earthfill and the measured surface of the completed earthfill.
Method 4—The pay limits shall be the specified pay limits for excavation and the specified neat lines of the earthfill surface.
Method 5—The pay limits shall be the specified pay limits for excavation and the measured surface of the completed earthfill.
Method 6—Payment for each type and compaction class of earthfill and earth backfill is made at the contract unit price for that type and compaction class of earthfill. Such payment will constitute full compensation for all labor, material, equipment, and all other items necessary and incidental to the performance of the work.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Method 7—Payment for each type and compaction class of earthfill and earth backfill is made at the contract unit price for that type and compaction class of earthfill. Such payment will constitute full compensation for all labor, material, equipment, and all other items necessary and incidental to the performance of the work except furnishing, transporting, and applying water to the foundation and earthfill material.
All methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 10 of this specification.
10. Items of work and construction details
A. Bid Item #4 Earthfill – Wetland Berm
1. Bid Item #4 shall consist of furnishing and placing earthfill material and earthfill backfill materials as required to construct the structures listed below and as shown on the drawings, including backfilling of areas where topsoil was stripped and settlement allowances.
• Wetland Berm – 970 cu yds (Settled yards including stripping)
2. Earthfill shall be placed and graded so that the contours conform to the existing contours at the edges and form a mowable condition along the base of the dikes. A minimum of 6 inches of topsoil/vegetation must be stripped from existing berm location as shown on the drawings before fill placement.
3. The existing vegetation and topsoil from the footprints of the proposed berm shall be stripped six
(6) inches and stockpiled for placement on the constructed berm prior to seeding.
4. Earthfill shall be obtained only from the designated borrow areas shown on the drawings unless otherwise approved by the CO. If the contractor encounters unsuitable material for earthfill operations, then the CO should immediately be notified, and a decision will be made regarding the location of obtaining earthfill for dike construction.
5. Coarse fragments larger than 1-inch diameter shall not be used in the earthfill operations.
6. Class C compaction is required as specified in Section 6. The earthfill shall be placed in 9-inch maximum lifts, and shall be traversed by a sheepsfoot roller, providing a contact pressure of not less than 200 psi, until the pads on the equipment walk out of the placed earthfill or a minimum of two passes. Earthfill backfill within 6 feet of pipe structures as shown on the drawings shall be manually tamped with a power tamper or other methods as approved by the CO.
7. The moisture content of the earthfill shall be such that a ball will not readily separate when made in the hand. Moisture content will be considered too high for earthfill operations when conditions will not allow for efficient equipment and compaction operations.
8. Under Section 9 - Measurement and payment, payment shall be by Method 7 for Bid Item #4
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
9. No additional compensation for the removal of topsoil, creation of auxiliary spillway, excavation of core trench, or borrow area excavation is included. This work shall be performed subsidiary to work included in this specification.
Solicitation Number: 12FPC325Q0055 Attachment 1, SOW & Specs
Construction Specification 6—Seeding, Sprigging, and Mulching
The work consists of preparing the area for treatment;…