Attachment 2 - KrS26 BLS Order Form.xlsx
XLSX spreadsheet 111 KB Posted
- Solicitation number
- W91QVP26Q0301
About this file
This is an order form and pricing template for Base Life Support (BLS) services supporting Keris Strike 26, a military exercise in Sabah, Malaysia, scheduled for July 3-August 3, 2026.
The document details line items across nine locations (L1-L9) including the LSA (Life Support Area), APOD/Terminal 2, KB Airstrip, Malay MP, Camp Paradise, LTTI, KB Airstrip Role II, KB Airstrip Aviation AO, and Z6. Services required include transportation (12-passenger vans with drivers and 4x4 SUVs), temporary facilities (portable latrines, handwash stations, showers with hot water), power generation, lighting (outdoor and indoor), furniture (chairs, tables, heavy-duty tables), tents of various types (admin, sleeping, multipurpose, cooling, feeding, academy, hospital, CP/supply, and forward CP tents), ice and coolers, reefers, fans, laundry services, trash and dumpster removal, cots, sandbags, and HAZMAT disposal. Most tent specifications require air conditioning, overhead lighting, outlets, power generation (ranging from 15KW to 100KW+), fire extinguishers, and smoke/CO2 detectors. The form includes columns for item number, schedule of supplies/services, location, quantity, unit of measure, period of performance dates, number of days, unit price per day, and total price, with all pricing fields currently showing $0.00. Contractors must provide separate pricing for tent components and power generation/lighting/A/C services as indicated in the form instructions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overall Total
| CLIN 0001 | BLS | $0.00 |
| CLIN 0002 | DBA | $0.00 |
| TOTAL CONTRACT TOTAL | $0.00 |
DBA
NAME OF COMPANY SUBMITTING OFFER:
| ITEM # | SCHEDULE OF SUPPLIES/SERVICES | LOCATION | UNITS (UM) | POP | DAYS | UNIT PRICE PER DAY | TOTAL |
| 1 | DBA | 0 | 3JUL-3AUG 26 | 0 | [$USD] 0.00 | ||
| TOTAL | [$USD] 0.00 |
Transportation NAME OF COMPANY SUBMITTING OFFER: TRANSPORTATION The unit of measure is Days. The planning factor below are the amount of vehicles that are planned for during the PoP. However the planning factor is subject to change and only provided for predictablility and planning purposes.
| Item # | Schedule of Supplies/ Services | Vehicle | UNIT | POC: email/phone number | Description | GRID | QTY | UNIT: | UM | UNIT PRICE | Total | START | END | Planning Factor: Number of Vehicles: | Planning Factor: Number of Days: |
| 1 | 12-Passenger VAN |
Leased with driver; shall be capable of seating twelve passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times.
12 PAX Van w/ Driver ALL
SI/Accountability (Transport) and Transport to and from Terminal 1 & 2 30 pax 50N LM 94969 54702
| Terminal 1 | 3 | 6 | Day | $ - 0 | $ - 0 | 10-Jul-26 | 11-Jul-26 | 3 | 2 |
| 2 | 12-Passenger VAN |
Leased with driver; shall be capable of seating twelve passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times.
12 PAX Van w/ Driver 709th MCAS
CASEVAC vehicle for patient transport. 50NLM9535456525
| Terminal 2 | 1 | 19 | Day | $ - 0 | $ - 0 | 10-Jul-26 | 28-Jul-26 | 1 | 19 |
| 3 | 12-Passenger VAN |
Leased with driver; shall be capable of seating twelve passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times.
| 12 PAX Van w/ Driver | GUARNG | |
| Daily transport around KK/KB | 50N LM 94969 54702 |
| Terminal 1 | 7 | 189 | Day | $ - 0 | $ - 0 | 4-Jul-26 | 30-Jul-26 | 7 | 27 |
| 4 | 12-Passenger VAN |
Leased with driver; shall be capable of seating twelve passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times.
| 12 PAX Van w/ Driver | GUARNG | |
| Daily transport around KB | IVO 50N MN 41529 03579 |
| KB Airstrip/LSA | 6 | 120 | Day | $ - 0 | $ - 0 | 11-Jul-26 | 30-Jul-26 | 6 | 20 |
| 5 | 12-Passenger VAN |
Leased with driver; shall be capable of seating twelve passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times.
| 12 PAX Van w/ Driver | JPMRC-LTP | Chris Johnson | • | 10 Jul: transport coaches from Kota Kinabalu to Kota Belud training site/hotel | |
| • | 11-19 Jul: transport to/from Kota Belud hotel site to training site | ||||
| • | 19 Jul: transport 5 coaches w/ luggage from Kota Belud to Kota Kinabalu (LeMeridien Hotel or airport) | IVO 50N MN 41529 03579 |
| KB Airstrip/LSA | 1 | 11 | Day | $ - 0 | $ - 0 | 10-Jul-26 | 20-Jul-26 | 1 | 11 |
| 6 | 12-Passenger VAN |
Leased with driver; shall be capable of seating twelve passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times.
12 PAX Van w/ Driver 17 ESC QASAS IVO 50N MN 41529 03579
| KB Airstrip/LSA | 1 | 29 | Day | $ - 0 | $ - 0 | 6-Jul-26 | 3-Aug-26 | 1 | 29 |
| 7 | 12-Passenger VAN |
Leased with driver; shall be capable of seating twelve passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times.
| 12 PAX Van w/ Driver | GUARNG | WO1 Santos, Francis | |
| Daily transport around KB | IVO 50N MN 41529 03579 |
| KB Airstrip/LSA | 1 | 5 | Day | $ - 0 | $ - 0 | 8-Jul-26 | 12-Jul-26 | 1 | 5 |
| 8 | 12-Passenger VAN |
Leased with driver; shall be capable of seating twelve passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times.
| 12 PAX Van w/ Driver | 921st CBn | |
| Daily transport around KB and KK | 50N LM 94969 54702 |
| Terminal 1 | 1 | 4 | Day | $ - 0 | $ - 0 | 19-Jul-26 | 22-Jul-26 | 1 | 4 |
| 9 | 4x4 SUV (AWD) | ||||||||
| Leased with driver; shall be capable of seating six to seven passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times. | 4x4 SUV AWD w/ Driver | 921st CBn | In and Around Mvt in KB (Transportation) | IVO 50N MN 41529 03579 |
KB Airstrip/LSA
| 1 | 21 | Day | $ - 0 | $ - 0 | 6-Jul-26 | 26-Jul-26 | 1 | 21 | |
| 10 | 4x4 SUV (AWD) | ||||||||
| Leased with driver; shall be capable of seating six to seven passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times. | 4x4 SUV AWD w/ Driver | 1 CORP, G2X | CW4 David Clark | FORCE PROTECTION SUPPORT TEAM-2 personnel & vehicles will head to KB o/a 8 Julyand remain mobile throughout area, they will not stay at the LSA or Camp Paradise in and around the training area daily. Other personnel & vehicle will be based primarily at KK but remain mobile throughout the exercise to be responsive to events. | IVO 50N MN 41529 03579 |
KB Airstrip/LSA
| 3 | 90 | Day | $ - 0 | $ - 0 | 3-Jul-26 | 1-Aug-26 | 3 | 30 | |
| 11 | 4x4 SUV (AWD) | ||||||||
| Leased with driver; shall be capable of seating six to seven passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times. | 4x4 SUV AWD w/ Driver | USARPAC Safety | Will transport exercise safety across all daily exercise events. | IVO 50N MN 41529 03579 |
| KB Airstrip/LSA | 1 | 21 | Day | $ - 0 | $ - 0 | 8-Jul-26 | 28-Jul-26 | 1 | 21 |
| 12 | 4x4 SUV (AWD) | ||||||||
| Leased with driver; shall be capable of seating six to seven passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times. | 4x4 SUV AWD w/ Driver | 74TH OD CO (EOD) | Duration of exercise, used as a response vehicle for LFX support | IVO 50N MN 41529 03579 |
| KB Airstrip/LSA | 2 | 30 | Day | $ - 0 | $ - 0 | 12-Jul-26 | 26-Jul-26 | 2 | 15 |
| 13 | 4x4 SUV (AWD) | ||||||||
| Leased with driver; shall be capable of seating six to seven passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times. | 4x4 SUV AWD w/ Driver | OKARNG | In and Around Mvt in KB (Transportation) | IVO 50N MN 41529 03579 |
| KB Airstrip/LSA | 4 | 80 | Day | $ - 0 | $ - 0 | 11-Jul-26 | 30-Jul-26 | 4 | 20 |
| 14 | 4x4 SUV (AWD) | ||||||||
| Leased with driver; shall be capable of seating six to seven passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times. | 4x4 SUV AWD w/ Driver | JPMRC-LTP | Chris Johnson | • | 10 Jul: transport coaches from Kota Kinabalu to Kota Belud training site/hotel | ||||
| • | 11-22 Jul: transport coaches to from Kota Belud hotel site to training site | ||||||||
| • | 22 Jul: transport 3 coaches w/ luggage from Kota Belud to Kota Kinabalu (airport) | IVO 50N MN 41529 03579 |
| KB Airstrip/LSA | 1 | 13 | Day | $ - 0 | $ - 0 | 10-Jul-26 | 22-Jul-26 | 1 | 13 |
| 15 | 4x4 SUV (AWD) | ||||||||
| Leased with driver; shall be capable of seating six to seven passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must be fully functional at all times. | 4x4 SUV AWD w/ Driver | JPMRC | Transportation of MB to and around KB Airstirp/LSA for JPMRC Personnel and in the training areas | IVO 50N MN 41529 03579 |
| KB Airstrip/LSA | 8 | 120 | Day | $ - 0 | $ - 0 | 10-Jul-26 | 24-Jul-26 | 8 | 15 | ||
| Total | [$USD] 0.00 | [$USD] 0.00 |
COR will coordinate daily locations and vehicle usage daily. Must vehicles available during the period of performance.Vehicle w/ driver will be on standby on site designated by the COR during PoP. Operating hours will be communicated prior to execution for actual timeframe. Vehicles will not exceed 300 km travel per day.
L1 SPOD
NAME OF COMPANY SUBMITTING OFFER:
| ITEM # | SCHEDULE OF SUPPLIES/SERVICES | LOCATION | QTY | UNITS (UM) | START DATE | END DATE | #DAYS | UNIT PRICE PER DAY | TOTAL |
| 1 | Portable Latrines (PWS PARA 5.2.1) |
must with outside/on-the-ground flooring to mitigate mud and slippage. Contractor will include daily cleaning and resupply. Support 30-35 PAX.
| Requestor: GUARNG | 50N LM 98341 62748 | 2 | EA | July 7, 2026 | July 10, 2026 | 4 | [$USD] 0.00 |
| 2 | Portable Latrines (PWS PARA 5.2.1) |
must with outside/on-the-ground flooring to mitigate mud and slippage. Contractor will include daily cleaning and resupply. Support 30-35 PAX.
| Requestor: GUARNG | 50N LM 98341 62748 | 2 | EA | July 27, 2026 | August 1, 2026 | 6 | [$USD] 0.00 |
| 3 | Handwash Stations (PWS PARA 5.2.2) |
Includes services for washing and grooming services to include water supply, grey water removal, daily cleaning, and supplies. Support 30-35 PAX.
| Requestor: GUARNG | 50N LM 98341 62748 | 2 | EA | July 7, 2026 | July 10, 2026 | 4 | [$USD] 0.00 |
| 4 | Handwash Stations (PWS PARA 5.2.2) |
Includes services for washing and grooming services to include water supply, grey water removal, daily cleaning, and supplies. Support 30-35 PAX.
| Requestor: GUARNG | 50N LM 98341 62748 | 2 | EA | July 27, 2026 | August 1, 2026 | 6 | [$USD] 0.00 |
| # | Showers (PWS PARA 5.2.3) |
The Contractor Shall not clean between:
Hot Water is not required
| Units: QTY of Shower Stalls | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Showers with Hot Water (PWS PARA 5.2.3) |
The Contractor Shall not clean between:
Units: QTY of Shower Stalls
(PWS PARA 5.2.3) w/ Flooring The Contractor Shall not clean between: 1700 and 2000 or 0500 and 0730.
| Hot Water, daily cleaning and services, power generation, fuel/refueling required. Supports up to 800 pax. Must have enough space for individual to change, must include platform for hygeine items, hooks for towels, and caddy for hygeine items. | 32 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Generator (PWS PARA 5.2.4) |
Type: XXX K Generator Power Chords:
| Power Chords Min Length: | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Generator Capability (PWS PARA 5.2.4) | ||||
| The Contractor Shall provide power generation to power ________ | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Light Sets (PWS PARA 5.2.5) | ||||
| Includes Fuel IAW 5.2.4 | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Reefers (PWS PARA 5.2.6) 20ft |
Includes Fuel IAW 5.2.4
| 1 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Ice (PWS PARA 5.2.7) |
Frequency: COR will determine refill quantities as needed. Ice bags will be stored in Reefer.
| 500 | EA | ERROR:#NUM! | ERROR:#VALUE! | |||||
| # | Coolers (PWS PARA 5.2.7) | |||||||
| Coolers only. Coolers will be stored in feeding tent. | 20 | EA | ERROR:#NUM! | ERROR:#VALUE! | ||||
| # | Air Conditioning with Power Generation (PWS 5.2.8) | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | |||
| # | Air Conditioning Capability (PWS 5.2.8) |
The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8 and 5.2.4, to include fuel. The Contractor Shall provide A/C and Power Generation to cool:
Building:______ Hours on Per Day:_____ Room (1) Size: SQT Feet: ____ Hight from Floor to Ceiling:____ Room (2) Size: SQT Feet: ____ Hight from Floor to Ceiling:___
| Building:_______ Hours on Per Day: Room (1) Size: SQT Feet: ____ Hight from Floor to Ceiling:____ | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Fans (PWS PARA 5.2.9) Large Industrial | ||||
| Includes all accessories for normal operation. | 6 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| Outdoor Light Sets (PWS PARA 5.2.5) | |||||
| Contractor will provide lightset with power source, fuel/refueling service, cables, spill reposnse if applicable, and HAZMAT waste removal if applicable, and repair part/accessory replacement should a part fail during operation. Lights must provide 30,000 lumens minimum and be tall enough to support llife support areas or be an adjustable height of a minimum of 20 feet. | 14 | EA | ERROR:#NUM! | ||
| # | Indoor Light Sets (PWS PARA 5.2.10) |
Must include cableing and accessories neccesary to provide services.
| Power Chords Min Length: 20-30 FT | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Iindoor Lighting Capability (PWS PARA 5.2.10) | ||||
| The Contractor Shall provide lighting for ______ | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Chairs (PWS PARA 5.2.11) |
50 chairs per admin tent unless specified by COR.
| 50 chairs per multipurpose tent unless specified by COR. | 450 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Tables (PWS PARA 5.2.11) |
12 tables per admin tent unless specified by COR.
| 5 tables per multipurpose tent unless specified by COR. | 87 | EA | ERROR:#NUM! | ERROR:#VALUE! | |
| # | Heavy Duty Tables (PWS PARA 5.2.11) |
12 tables per admin tent unless specified by COR.
| 5 tables per multipurpose tent unless specified by COR. | 87 | EA | ERROR:#NUM! | ERROR:#VALUE! | Price of Tent | Price of Power Gen, lights, A/C, and Services | |
| # | Furniture (PWS PARA 5.2.11) | ||||||
| Furniture Type: | 0 | EA | ERROR:#NUM! | ERROR:#VALUE! | Price of Tent | Price of Power Gen, lights, A/C, and Services | |
| # | Tent (PWS PARA 5.2.12) |
Tent Specs: ADMIN TENTS GP Medium Tents 16x32 ft.
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 50 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather. Must have 2 fire extinguishers. Must have 2x 10 BC fire extinguishers and 1x C02 Smoke Detectors per tent. Provide how much WATT needed for generator within 24 hr period. Projector with Screen with HDMI Compatibility. Screen Size or any more infor needed.
| 6 | EA | ERROR:#NUM! | ERROR:#VALUE! | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | ||||
| EA | ERROR:#NUM! | Price of Tent | Price of Power Gen, lights, A/C, and Services | |||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs: SLEEPING TENTS around 70x30ft for 100 PAX
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 50 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather.Must have 2x 10 BC fire extinguishers and 2x C02 Smoke Detectors per tent. Possible changing corner?
| 8 | EA | ERROR:#NUM! | ERROR:#VALUE! | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | |||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||
| 5 | Tent (PWS PARA 5.2.12) |
Tent Specs: Cooling Tent GP Medium 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must have 2x 10 BC fire extinguishers. Support 30-35 PAX. 15KW Generator required
Requestor: GUARNG
| 50N LM 98341 62748 | 1 | EA | July 7, 2026 | July 10, 2026 | 4 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns N and O respectively. |
| 6 | Tent (PWS PARA 5.2.12) |
Tent Specs: Cooling Tent GP Medium 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must have 2x 10 BC fire extinguishers. Support 30-35 PAX. 15KW Generator required
Requestor: GUARNG
| 50N LM 98341 62748 | 1 | EA | July 27, 2026 | August 1, 2026 | 6 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns N and O respectively. | ||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs: MULTIPURPOSE TENTS 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 20 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather. Must have 2x 10 BC fire extinguishers and 1x C02 Smoke Detectors per tent.
| 3 | 0 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | ||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs:FEEDING TENT
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. . The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. **Must have tables and chairs to feed 800 PAX (400 PAX per tent) Include serving table and chairs. Provide pest control measures. MUST HAVE CLASS K FIRE EXTINGUISHER (ADD TO PWS)Must include walkways and platforms for inclement weather.
2 0 [$USD] 0.00 Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, tables, chairs, and services in Columns L and M respectively.
# Dumpsters (PWS PARA 5.2.13) Emptying Frequency: 48 hrs or specified by the COR 24 hrs prior Unit Price shall include daily rental rate and emptying of dumpsters
| 4 | 0 | [$USD] 0.00 | ||
| # | Trash (PWS PARA 5.2.14) |
Emptying Frequency: Daily
| Unit Price shall include daily rental rate and emptying of trash | 36 | 0 | [$USD] 0.00 | ||
| # | HAZMAT (PWS PARA 5.2.15) |
Quantity of HAZMAT Bags:
Emptying Frequency:
| Unit Price shall include daily rental rate and emptying of trash | 0 | [$USD] 0.00 | |||
| # | Grey Water Tank (PWS PARA 5.2.16) | ||||
| Minimum Size: | 0 | 0 | [$USD] 0.00 | ||
| # | Laundry (PWS PARA 5.2.17) |
Loads Per Pick/Up: 400 (10 pieces per person) Drop off every 48 hrs Pick up every 24 hrs Pick up and drop off times between 0800 and 1000 daily.
Must have proper accountability of individual clothing (slips)
| Wash/Dry/ Fold. | 250 | 0 | [$USD] 0.00 | ||
| # | MHE (PWS PARA 5.2.19) | ||||
| Type: | 0 | 0 | [$USD] 0.00 | ||
| # | MHE Capability (PWS PARA 5.2.19) | ||||
| The Contractor Shall provide MHE to _____ | 0 | 0 | [$USD] 0.00 | ||
| # | Sandbags (PWS PARA 5.2.20) | ||||
| Sandbag Size: | 0 | 0 | [$USD] 0.00 | ||
| # | Cots / Comparable Bed Furniture (PWS PARA 5.2.21) |
100 cots per large sleeping tents.
| COR will designate all other cot placements on other tents. | 800 | 0 | [$USD] 0.00 | ||
| TOTAL | [$USD] 0.00 |
L2 APOD; T2
NAME OF COMPANY SUBMITTING OFFER:
| ITEM # | SCHEDULE OF SUPPLIES/SERVICES | LOCATION | QTY | UNITS (UM) | START DATE | END DATE | #DAYS | UNIT PRICE PER DAY | TOTAL |
| 1 | Portable Latrines (PWS PARA 5.2.1) |
must with outside/on-the-ground flooring to mitigate mud and slippage. Contractor will include daily cleaning and resupply. Support 70 PAX
| Requestor: 2 CAB/ADF | 50NLM9535456525 | 4 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 |
| 2 | Handwash Stations (PWS PARA 5.2.2) |
Includes services for washing and grooming services to include water supply, grey water removal, daily cleaning, and supplies.Support 70 PAX
| Requestor: 2 CAB/ADF | 50NLM9535456525 | 2 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 |
| # | Showers (PWS PARA 5.2.3) |
The Contractor Shall not clean between:
Hot Water is not required
| Units: QTY of Shower Stalls | 0 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |
| # | Showers with Hot Water (PWS PARA 5.2.3) |
The Contractor Shall not clean between:
Units: QTY of Shower Stalls
(PWS PARA 5.2.3) w/ Flooring The Contractor Shall not clean between: 1700 and 2000 or 0500 and 0730.
| Hot Water, daily cleaning and services, power generation, fuel/refueling required. Supports up to 800 pax. Must have enough space for individual to change, must include platform for hygeine items, hooks for towels, and caddy for hygeine items. | 32 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |
| # | Generator (PWS PARA 5.2.4) |
Type: XXX K Generator Power Chords:
| Power Chords Min Length: | 0 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |
| # | Generator Capability (PWS PARA 5.2.4) | ||||||
| The Contractor Shall provide power generation to power ________ | 0 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |
| # | Light Sets (PWS PARA 5.2.5) | ||||||
| Includes Fuel IAW 5.2.4 | 0 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |
| # | Reefers (PWS PARA 5.2.6) 20ft |
Includes Fuel IAW 5.2.4
| 1 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |
| # | Ice (PWS PARA 5.2.7) |
Frequency: COR will determine refill quantities as needed. Ice bags will be stored in Reefer.
| 500 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | ||||
| # | Coolers (PWS PARA 5.2.7) | ||||||||
| Coolers only. Coolers will be stored in feeding tent. | 20 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |||
| # | Air Conditioning with Power Generation (PWS 5.2.8) | 0 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | ||
| # | Air Conditioning Capability (PWS 5.2.8) |
The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8 and 5.2.4, to include fuel. The Contractor Shall provide A/C and Power Generation to cool:
Building:______ Hours on Per Day:_____ Room (1) Size: SQT Feet: ____ Hight from Floor to Ceiling:____ Room (2) Size: SQT Feet: ____ Hight from Floor to Ceiling:___
| Building:_______ Hours on Per Day: Room (1) Size: SQT Feet: ____ Hight from Floor to Ceiling:____ | 0 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |
| # | Fans (PWS PARA 5.2.9) Large Industrial | ||||||
| Includes all accessories for normal operation. | 6 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | |
| 3 | Outdoor Light Sets (PWS PARA 5.2.5) |
Contractor will provide lightset with power source, fuel/refueling service, cables, spill reposnse if applicable, and HAZMAT waste removal if applicable, and repair part/accessory replacement should a part fail during operation. Lights must provide 30,000 lumens minimum and be tall enough to support llife support areas or be an adjustable height of a minimum of 20 feet. Must have wheels for manual transfer.
| Requestor: 2 CAB/ADF | 50NLM9535456525 | 3 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 |
| # | Indoor Light Sets (PWS PARA 5.2.10) |
Must include cableing and accessories neccesary to provide services.
| Power Chords Min Length: 20-30 FT | 0 | July 10, 2026 | July 28, 2026 | 0 | [$USD] 0.00 | ||
| # | Iindoor Lighting Capability (PWS PARA 5.2.10) | ||||||
| The Contractor Shall provide lighting for ______ | 0 | July 10, 2026 | July 28, 2026 | 0 | [$USD] 0.00 | ||
| # | Chairs (PWS PARA 5.2.11) |
50 chairs per admin tent unless specified by COR.
| 50 chairs per multipurpose tent unless specified by COR. | 12 | July 10, 2026 | July 28, 2026 | 0 | [$USD] 0.00 | ||||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||||
| # | Furniture (PWS PARA 5.2.11) | ||||||||||
| Furniture Type: | 0 | July 10, 2026 | July 28, 2026 | 0 | [$USD] 0.00 | Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||
| 4 | Tent (PWS PARA 5.2.12) |
Tent Specs: COOLING TENT Terminal 2 - GP Medium 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must have 2x 10 BC fire extinguishers. Support 70 PAX 15KW Generator required
Requestor: 2 CAB/ADF
| 50NLM9535456525 | 1 | EA | July 10, 2026 | July 28, 2026 | 19 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns N and O respectively. | ||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||
| 5 | Tent (PWS PARA 5.2.12) |
Tent Specs: TOC Terminal 2 - GP Medium 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 20 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must have 2x 10 BC fire extinguishers. 15KW Generator required.
Requestor: 2 CAB/ADF 50NLM9535456525 2 EA July 10, 2026 July 28, 2026 19 [$USD] 0.00 Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns N and O respectively.
# Tent (PWS PARA 5.2.12) Tent Specs: SLEEPING TENTS GP Medium 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather. Must have 2x 10 BC fire extinguishers and 1x C02 Smoke Detectors per tent.
| 3 | 0 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | ||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs: MULTIPURPOSE TENTS 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 20 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather. Must have 2x 10 BC fire extinguishers and 1x C02 Smoke Detectors per tent.
| 3 | 0 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | ||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs:FEEDING TENT
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. . The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. **Must have tables and chairs to feed 800 PAX (400 PAX per tent) Include serving table and chairs. Provide pest control measures. MUST HAVE CLASS K FIRE EXTINGUISHER (ADD TO PWS)Must include walkways and platforms for inclement weather.
2 0 [$USD] 0.00 Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, tables, chairs, and services in Columns L and M respectively.
# Dumpsters (PWS PARA 5.2.13) Emptying Frequency: 48 hrs or specified by the COR 24 hrs prior Unit Price shall include daily rental rate and emptying of dumpsters
| 4 | 0 | [$USD] 0.00 | ||
| # | Trash (PWS PARA 5.2.14) |
Emptying Frequency: Daily
| Unit Price shall include daily rental rate and emptying of trash | 36 | 0 | [$USD] 0.00 | ||
| # | HAZMAT (PWS PARA 5.2.15) |
Quantity of HAZMAT Bags:
Emptying Frequency:
| Unit Price shall include daily rental rate and emptying of trash | 0 | [$USD] 0.00 | |||
| # | Grey Water Tank (PWS PARA 5.2.16) | ||||
| Minimum Size: | 0 | 0 | [$USD] 0.00 | ||
| # | Laundry (PWS PARA 5.2.17) |
Loads Per Pick/Up: 400 (10 pieces per person) Drop off every 48 hrs Pick up every 24 hrs Pick up and drop off times between 0800 and 1000 daily.
Must have proper accountability of individual clothing (slips)
| Wash/Dry/ Fold. | 250 | 0 | [$USD] 0.00 | ||
| # | MHE (PWS PARA 5.2.19) | ||||
| Type: | 0 | 0 | [$USD] 0.00 | ||
| # | MHE Capability (PWS PARA 5.2.19) | ||||
| The Contractor Shall provide MHE to _____ | 0 | 0 | [$USD] 0.00 | ||
| # | Sandbags (PWS PARA 5.2.20) | ||||
| Sandbag Size: | 0 | 0 | [$USD] 0.00 | ||
| # | Cots / Comparable Bed Furniture (PWS PARA 5.2.21) |
100 cots per large sleeping tents.
| COR will designate all other cot placements on other tents. | 800 | 0 | [$USD] 0.00 | ||
| TOTAL | [$USD] 0.00 |
L3 KB AIRSTRIP; LSA
NAME OF COMPANY SUBMITTING OFFER:
| ITEM # | SCHEDULE OF SUPPLIES/SERVICES | LOCATION | QTY | UNITS (UM) | START DATE | END DATE | #DAYS | UNIT PRICE PER DAY | TOTAL | |
| 1 | Portable Latrines (PWS PARA 5.2.1) | |||||||||
| must come with outside/on-the-ground flooring to mitigate mud and slippage. Support 800 PAX. | IVO 50N MN 41529 03579 | 70 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | |||
| 2 | Handwash Stations (PWS PARA 5.2.2) | |||||||||
| Includes services for washing and grooming services to include daily cleaning and supplies. Hand wash stations must have mirrors. Handwash stations MAY USE DIRECT PLUMBING FROM NEARBY WATER TOWER AND DOES NOT NEED TO BE SELF CONTAINED WATER. | IVO 50N MN 41529 03579 | 40 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | |||
| 3 | Showers with Hot Water (PWS PARA 5.2.3) |
Units: QTY of Shower Stalls
(PWS PARA 5.2.3) w/ Flooring The Contractor Shall not clean between: 1700 and 2000 or 0500 and 0730.
| SHOWERS MAY USE DIRECT PLUMBING FROM NEARBY WATER TOWER. Supports up to 800 pax. Must have enough space for individual to change, must include platform for hygeine items, hooks for towels, and caddy for hygeine items. | IVO 50N MN 41529 03579 | 55 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 |
| # | Generator (PWS PARA 5.2.4) |
Type: XXX K Generator Power Chords:
| Power Chords Min Length: | IVO 50N MN 41529 03579 | 0 | EA | 7/5/26 | 7/30/26 | 26 | [$USD] 0.00 | Price of Tent | Price of Power Gen, lights, A/C, and Services | |
| # | Generator Capability (PWS PARA 5.2.4) | |||||||||
| The Contractor Shall provide power generation to power ________ | IVO 50N MN 41529 03579 | 0 | EA | 7/5/26 | 7/30/26 | 26 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns N and O respectively. | ||
| # | Light Sets (PWS PARA 5.2.5) | |||||||||
| Includes Fuel IAW 5.2.4 | IVO 50N MN 41529 03579 | 0 | EA | 7/5/26 | 7/30/26 | 26 | [$USD] 0.00 | |||
| 4 | Reefers (PWS PARA 5.2.6) 20ft |
Includes Fuel IAW 5.2.4
| IVO 50N MN 41529 03579 | 1 | EA | 7/10/26 | 7/30/26 | 21 | [$USD] 0.00 | Price of 1 bag of ice |
| 5 | Ice (PWS PARA 5.2.7) |
Frequency: COR will determine refill quantities as needed. Ice bags will be stored in Reefer.
| IVO 50N MN 41529 03579 | 500 | EA | 7/11/26 | 7/30/26 | 20 | [$USD] 0.00 | |||
| 5 | Ice and Coolers (PWS PARA 5.2.7) | ||||||||
| 45-65qt Sized coolers to be completely filled each morning. | IVO 50N MN 41529 03579 | 15 | EA | 7/11/26 | 7/30/26 | 20 | [$USD] 0.00 | ||
| # | Air Conditioning with Power Generation (PWS 5.2.8) | IVO 50N MN 41529 03579 | 0 | EA | 1 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Ice and Reefer in Columns N and O respectively. | ||
| # | Air Conditioning Capability (PWS 5.2.8) |
The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8 and 5.2.4, to include fuel. The Contractor Shall provide A/C and Power Generation to cool:
Building:______ Hours on Per Day:_____ Room (1) Size: SQT Feet: ____ Hight from Floor to Ceiling:____ Room (2) Size: SQT Feet: ____ Hight from Floor to Ceiling:___
| Building:_______ Hours on Per Day: Room (1) Size: SQT Feet: ____ Hight from Floor to Ceiling:____ | IVO 50N MN 41529 03579 | 0 | EA | 1 | [$USD] 0.00 | ||
| 6 | Fans (PWS PARA 5.2.9) Large Industrial | ||||||
| Includes all accessories for normal operation. | IVO 50N MN 41529 03579 | 6 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 |
| 7 | Outdoor Light Sets (PWS PARA 5.2.5) | ||||||
| Contractor will provide lightset with power source, fuel/refueling service, cables, spill response if applicable, and HAZMAT waste removal if applicable, and repair part/accessory replacement should a part fail during operation. Lights must provide 30,000 lumens minimum and be tall enough to support llife support areas or be an adjustable height of a minimum of 20 feet. | IVO 50N MN 41529 03579 | 14 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 |
| # | Indoor Light Sets (PWS PARA 5.2.10) |
Must include cableing and accessories neccesary to provide services.
| Power Chords Min Length: 20-30 FT | IVO 50N MN 41529 03579 | 0 | EA | 7/5/26 | 7/30/26 | 26 | [$USD] 0.00 |
| # | Iindoor Lighting Capability (PWS PARA 5.2.10) | ||||||
| The Contractor Shall provide lighting for ______ | IVO 50N MN 41529 03579 | 0 | EA | 7/5/26 | 7/30/26 | 26 | [$USD] 0.00 |
| 8 | Chairs (PWS PARA 5.2.11) |
50 chairs per admin tent unless specified by COR.
| 50 chairs per multipurpose tent unless specified by COR. | IVO 50N MN 41529 03579 | 450 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 |
| # | Tables (PWS PARA 5.2.11) |
12 tables per admin tent unless specified by COR.
| 5 tables per multipurpose tent unless specified by COR. | IVO 50N MN 41529 03579 | 87 | EA | 7/5/26 | 7/30/26 | 26 | [$USD] 0.00 |
| 9 | Heavy Duty Tables (PWS PARA 5.2.11) |
12 tables per admin tent unless specified by COR.
| 5 tables per multipurpose tent unless specified by COR. | IVO 50N MN 41529 03579 | 87 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | Price of Tent | Price of Power Gen, lights, A/C, and Services | |
| # | Furniture (PWS PARA 5.2.11) | |||||||||
| Furniture Type: | IVO 50N MN 41529 03579 | 0 | EA | 7/5/26 | 7/30/26 | 26 | [$USD] 0.00 | Price of Tent | Price of Power Gen, lights, A/C, and Services | Price of Power Gen, lights, A/C, and Services |
| 10 | Tent (PWS PARA 5.2.12) |
Tent Specs: ADMIN TENTS GP Medium Tents 16x32 ft.
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8. Contractor will provide power generation for the A/C, overhead lights and 20 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather outside the entry/exit points of the tent. Must have 2x 10-BC fire extinguishers per tent. 15KW Generator. 1x Projector with Screen with HDMI Compatibility per tent (provide screen size here or any more info needed).
| IVO 50N MN 41529 03579 | 6 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, fire extinguishers and services in Columns M and N respectively. | ||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||
| 11 | Tent (PWS PARA 5.2.12) |
Tent Specs: SLEEPING TENTS around 100x40ft for 100 PAX
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8. Contractor will provide power generation for the A/C, overhead lights and 50 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather outside the entry/exit points of the tent. Must have 4x 10-BC fire extinguishers per tent. Must have 2x smoke detectors and 2x Co2 detectors per tent. 40KW Generator required
| IVO 50N MN 41529 03579 | 8 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, fire extinguishers and services in Columns M and N respectively. | ||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||
| 12 | Tent (PWS PARA 5.2.12) |
Tent Specs: SLEEPING TENTS GP Medium 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather outside the entry/exit points of the tent. Must have 2x 10-BC fire extinguishers per tent. Must have 1x smoke detectors and 1x Co2 detectors per tent. 15KW Generator required
| IVO 50N MN 41529 03579 | 3 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, fire extinguishers and services in Columns M and N respectively. | ||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||
| 13 | Tent (PWS PARA 5.2.12) |
Tent Specs: MULTIPURPOSE TENTS 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 20 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather outside the entry/exit points of the tent. Must have 2x 10-BC fire extinguishers per tent. 15KW Generator.
| IVO 50N MN 41529 03579 | 3 | EA | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, fire extinguishers and services in Columns M and N respectively. | ||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||
| 14 | Tent (PWS PARA 5.2.12) |
Tent Specs:FEEDING TENT
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. **Must have tables and chairs to feed 800 PAX (400 PAX per tent) Include serving tables. Provide pest control measures. MUST HAVE 1x CLASS K FIRE EXTINGUISHER per tent Must include walkways and platforms for inclement weather outside the entry/exit points of the tent. 40KW Generator required
| IVO 50N MN 41529 03579 | 2 | 2 | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, fire extinguishers and services in Columns M and N respectively. | ||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||
| 15 | Tent (PWS PARA 5.2.12) |
Tent Specs: ACADEMY TENT around 100x40ft for 100 PAX
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8. Contractor will provide power generation for the A/C, overhead lights and 50 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather outside the entry/exit points of the tent. Must have 4x 10-BC fire extinguishers per tent. 40KW Generator required.
| IVO 50N MN 41529 03579 | 1 | 1 | 7/10/26 | 7/30/26 | 21 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, fire extinguishers and services in Columns M and N respectively. | ||
| 1 | [$USD] 0.00 | ||||||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||||
| 16 | Tent (PWS PARA 5.2.12) |
Tent Specs: CP TENT around 18ftx52ft for 40 PAX
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8. Contractor will provide power generation for the A/C, overhead lights and 50 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather outside the entry/exit points of the tent. Must have 4x 10-BC fire extinguishers per tent. . 20KW generator required Requestor: 1-294
| IVO 50N MN 41529 03579 | 1 | 1 | 7/9/26 | 7/30/26 | 22 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, fire extinguishers and services in Columns M and N respectively. |
| 17 | Chairs (PWS PARA 5.2.11) |
| Requestor: 1-294 | IVO 50N MN 41529 03579 | 40 | 40 | 7/9/26 | 7/30/26 | 22 | [$USD] 0.00 |
| 18 | Tables (PWS PARA 5.2.11) |
| Requestor: 1-294 | IVO 50N MN 41529 03579 | 20 | 20 | 7/9/26 | 7/30/26 | 22 | [$USD] 0.00 |
| 16 | Heavy Duty Tables (PWS PARA 5.2.11) |
12 tables per admin tent unless specified by COR.
| 5 tables per multipurpose tent unless specified by COR. | 87 | 87 | 7/13/26 | 7/30/26 | 18 | [$USD] 0.00 | |
| 19 | Trash (PWS PARA 5.2.14) |
Emptying Frequency: Daily Unit Price shall include daily rental rate and emptying of trash
| 50 gal | IVO 50N MN 41529 03579 | 36 | 36 | 7/9/26 | 7/30/26 | 22 | [$USD] 0.00 |
| # | HAZMAT (PWS PARA 5.2.15) |
Quantity of HAZMAT Bags:
Emptying Frequency:
| Unit Price shall include daily rental rate and emptying of trash | IVO 50N MN 41529 03579 | 1 | [$USD] 0.00 | ||
| # | Grey Water Tank (PWS PARA 5.2.16) | ||||
| Minimum Size: | IVO 50N MN 41529 03579 | 0 | 0 | 1 | [$USD] 0.00 |
| 20 | Laundry (PWS PARA 5.2.17) |
Loads Per Pick/Up: 200 (10 pieces per load) Drop off every 48 hrs Pick up every 24 hrs Pick up and drop off times between 0800 and 1000 daily.
Must have proper accountability of individual clothing (slips)
| Wash/Dry/ Fold. COR will coordinate pickup and delivery. | IVO 50N MN 41529 03579 | 200 | 200 | 7/11/26 | 7/30/26 | 20 | [$USD] 0.00 |
| # | MHE (PWS PARA 5.2.19) | ||||||
| Type: | IVO 50N MN 41529 03579 | 0 | 0 | 1 | [$USD] 0.00 | ||
| # | MHE Capability (PWS PARA 5.2.19) | ||||||
| The Contractor Shall provide MHE to _____ | IVO 50N MN 41529 03579 | 0 | 0 | 1 | [$USD] 0.00 | ||
| # | Sandbags (PWS PARA 5.2.20) | ||||||
| Sandbag Size: | IVO 50N MN 41529 03579 | 0 | 0 | 1 | [$USD] 0.00 | ||
| 21 | Cots / Comparable Bed Furniture (PWS PARA 5.2.21) |
100 cots per large sleeping tents with mosquito nets.
| COR will designate all other cot placements on other tents. | IVO 50N MN 41529 03579 | 800 | 800 | 7/8/26 | 7/30/26 | 23 | [$USD] 0.00 | ||
| TOTAL | [$USD] 0.00 |
L4 Malay MP
NAME OF COMPANY SUBMITTING OFFER:
| ITEM # | SCHEDULE OF SUPPLIES/SERVICES | LOCATION | QTY | UNITS (UM) | START DATE | END DATE | #DAYS | UNIT PRICE PER DAY | TOTAL | |
| 1 | Portable Latrines (PWS PARA 5.2.1) | |||||||||
| must with outside/on-the-ground flooring to mitigate mud and slippage. Contractor will include daily cleaning and resupply.150 PAX | 50N MN 41346 03087 | 6 | EA | July 12, 2026 | July 20, 2026 | 9 | [$USD] 0.00 | |||
| 2 | Handwash Stations (PWS PARA 5.2.2) | |||||||||
| Includes services for washing and grooming services to include water supply, grey water removal, daily cleaning, and supplies. Hand wash stations must have mirrors 150 PAX | 50N MN 41346 03087 | 3 | EA | July 12, 2026 | July 20, 2026 | 9 | [$USD] 0.00 | |||
| # | Showers (PWS PARA 5.2.3) |
The Contractor Shall not clean between:
Hot Water is not required
| Units: QTY of Shower Stalls | 0 | 0 | [$USD] 0.00 | ||
| # | Showers with Hot Water (PWS PARA 5.2.3) |
The Contractor Shall not clean between:
Units: QTY of Shower Stalls
(PWS PARA 5.2.3) w/ Flooring The Contractor Shall not clean between: 1700 and 2000 or 0500 and 0730.
| Hot Water, daily cleaning and services, power generation, fuel/refueling required. Supports up to 800 pax. Must have enough space for individual to change, must include platform for hygeine items, hooks for towels, and caddy for hygeine items. | 32 | 0 | [$USD] 0.00 | ||
| # | Generator (PWS PARA 5.2.4) |
Type: XXX K Generator Power Chords:
| Power Chords Min Length: | 0 | 0 | [$USD] 0.00 | ||
| # | Generator Capability (PWS PARA 5.2.4) | ||||
| The Contractor Shall provide power generation to power ________ | 0 | 0 | [$USD] 0.00 | ||
| # | Light Sets (PWS PARA 5.2.5) | ||||
| Includes Fuel IAW 5.2.4 | 0 | 0 | [$USD] 0.00 | ||
| # | Reefers (PWS PARA 5.2.6) 20ft |
Includes Fuel IAW 5.2.4
| 1 | 0 | [$USD] 0.00 | ||
| # | Ice (PWS PARA 5.2.7) |
Frequency: COR will determine refill quantities as needed. Ice bags will be stored in Reefer.
| 500 | 0 | [$USD] 0.00 | |||||
| # | Coolers (PWS PARA 5.2.7) | ||||||
| Coolers only. Coolers will be stored in feeding tent. | 20 | 0 | [$USD] 0.00 | ||||
| # | Air Conditioning with Power Generation (PWS 5.2.8) | 0 | 0 | [$USD] 0.00 | |||
| # | Air Conditioning Capability (PWS 5.2.8) |
The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8 and 5.2.4, to include fuel. The Contractor Shall provide A/C and Power Generation to cool:
Building:______ Hours on Per Day:_____ Room (1) Size: SQT Feet: ____ Hight from Floor to Ceiling:____ Room (2) Size: SQT Feet: ____ Hight from Floor to Ceiling:___
| Building:_______ Hours on Per Day: Room (1) Size: SQT Feet: ____ Hight from Floor to Ceiling:____ | 0 | 0 | [$USD] 0.00 | ||
| # | Fans (PWS PARA 5.2.9) Large Industrial | ||||
| Includes all accessories for normal operation. | 6 | 0 | [$USD] 0.00 | ||
| Outdoor Light Sets (PWS PARA 5.2.5) | |||||
| Contractor will provide lightset with power source, fuel/refueling service, cables, spill reposnse if applicable, and HAZMAT waste removal if applicable, and repair part/accessory replacement should a part fail during operation. Lights must provide 30,000 lumens minimum and be tall enough to support llife support areas or be an adjustable height of a minimum of 20 feet. | 14 | ||||
| # | Indoor Light Sets (PWS PARA 5.2.10) |
Must include cableing and accessories neccesary to provide services.
| Power Chords Min Length: 20-30 FT | 0 | 0 | [$USD] 0.00 | ||
| # | Iindoor Lighting Capability (PWS PARA 5.2.10) | ||||
| The Contractor Shall provide lighting for ______ | 0 | 0 | [$USD] 0.00 | ||
| # | Chairs (PWS PARA 5.2.11) |
50 chairs per admin tent unless specified by COR.
| 50 chairs per multipurpose tent unless specified by COR. | 450 | 0 | [$USD] 0.00 | ||
| # | Tables (PWS PARA 5.2.11) |
12 tables per admin tent unless specified by COR.
| 5 tables per multipurpose tent unless specified by COR. | 87 | 0 | [$USD] 0.00 | ||
| # | Heavy Duty Tables (PWS PARA 5.2.11) |
12 tables per admin tent unless specified by COR.
| 5 tables per multipurpose tent unless specified by COR. | 87 | 0 | [$USD] 0.00 | Price of Tent | Price of Power Gen, lights, A/C, and Services | ||
| # | Furniture (PWS PARA 5.2.11) | ||||||
| Furniture Type: | 0 | 0 | [$USD] 0.00 | Price of Tent | Price of Power Gen, lights, A/C, and Services | ||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs: ADMIN TENTS GP Medium Tents 16x32 ft.
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 50 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather. Must have 2 fire extinguishers. Must have 2x 10 BC fire extinguishers and 1x C02 Smoke Detectors per tent. Provide how much WATT needed for generator within 24 hr period. Projector with Screen with HDMI Compatibility. Screen Size or any more infor needed.
| 6 | 0 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | ||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs: SLEEPING TENTS around 70x30ft for 100 PAX
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 50 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather.Must have 2x 10 BC fire extinguishers and 2x C02 Smoke Detectors per tent. Possible changing corner?
| 8 | 0 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | ||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs: Cooling Tent GP Medium 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must have 2x 10 BC fire extinguishers and 1x C02 Smoke Detectors per tent.
| 1 | 0 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | ||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs: MULTIPURPOSE TENTS 16x32 ft
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 20 outlets. The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. Must include walkways and platforms for inclement weather. Must have 2x 10 BC fire extinguishers and 1x C02 Smoke Detectors per tent.
| 3 | 0 | [$USD] 0.00 | Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C and services in Columns L and M respectively. | ||||
| Price of Tent | Price of Power Gen, lights, A/C, and Services | ||||||
| # | Tent (PWS PARA 5.2.12) |
Tent Specs:FEEDING TENT
Tent to come with walls, two entry/exit ways, wooden/rubber flooring, air conditioning IAW 5.2.8, over head lights, and outlets. Contractor will provide power generation for the A/C, overhead lights and 10 outlets. . The contractor is responsibile for ensuring continuous operations IAW PWS 5.2.8, 5.2.10 and 5.2.4, to include fuel. **Must have tables and chairs to feed 800 PAX (400 PAX per tent) Include serving table and chairs. Provide pest control measures. MUST HAVE CLASS K FIRE EXTINGUISHER (ADD TO PWS)Must include walkways and platforms for inclement weather.
2 0 [$USD] 0.00 Contractors shall also provide the Separate Price of the Tent, and Price of Power Gen, lights, A/C, tables, chairs, and services in Columns L and M respectively.
# Dumpsters (PWS PARA 5.2.13) Emptying Frequency: 48 hrs or specified by the COR 24 hrs prior Unit Price shall include daily rental rate and emptying of dumpsters
| 4 | 0 | [$USD] 0.00 | ||
| # | Trash (PWS PARA 5.2.14) |
Emptying Frequency: Daily
| Unit Price shall include daily rental rate and emptying of trash | 36 | 0 | [$USD] 0.00 | ||
| # | HAZMAT (PWS PARA 5.2.15) |
Quantity of HAZMAT Bags:
Emptying Frequency:
| Unit Price shall include daily rental rate and emptying of trash | 0 | [$USD] 0.00 | |||
| # | Grey Water Tank (PWS PARA 5.2.16) | ||||
| Minimum Size: | 0 | 0 | [$USD] 0.00 | ||
| # | Laundry (PWS PARA 5.2.17) |
Loads Per Pick/Up: 400 (10 pieces per person) Drop off every 48 hrs Pick up every 24 hrs Pick up and drop…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .