About this file

This document is an IDIQ pricing attachment for a federal contract opportunity related to providing engine overhaul, repair, conversion, and modification services for various turbine engines used on Department of State aircraft.

The key details are:

  • The contract has a 5-year period of performance from September 14, 2024 to September 13, 2029.
  • It covers engine types including T700-GE-700, PT6T-3B, PT6A-67D, and PT6A-114A.
  • Pricing is provided for a variety of fixed-price and cost-reimbursable contract line items, including engine overhaul, repair, hot section inspection, performance runs, and labor/material rates.
  • The contractor must be an OEM-approved source capable of performing work to the latest OEM, FAA, and military specifications.
  • The contracting agency is the Department of State Office of Acquisition Management.

View the file

Other files for this federal contract opportunity

Other files attached to PRATT & WHITNEY & GENERAL ELECTRIC ENGINE REPAIR, newest first.
File Type Posted
ATTACHMENT 2 - IDIQ Pricing for Base Year and Options Rev1.xlsx XLSX spreadsheet
19AQMM24R0143 AMEND 001.pdf PDF
Attachment 3 Past Performance Questionnaire 143_FINAL.docx DOCX document
19AQMM24R0143.pdf PDF
ATTACHMENT 1 - STATEMENT OF WORK 19AQMM24R0143 FINAL.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total FFP

Engine Type Total Pricing

T700 $ - 0

PT6T-3B $ - 0

PT6A-114A $ - 0

PT6A-67D $ - 0

Total FFP $ - 0

19AQMM24R0143 ATTACHMENT 2 &P OF &N

T700-GE-701 series (H-60)

Base YearOption Year OneOption Year TwoOption Year ThreeOption Year FourColumn1
CLINT700-GE-700 (series) (H-60)Unit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalTotal
001

Ubbink, John:

Overhaul Engine - T700-GE-701 (series) This is a Firm-Fixed Priced (FFP) CLIN for a Basic T700-GE-700 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Overhaul Aircraft Engine (FFP) 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:

"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:

"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:

"On Condition" repair cycle. 1 $ - 0 $ - 0 Ubbink, John: Ubbink, John:

"On Condition" repair cycle.1$ - 0$ - 0
002

Ubbink, John:

Engine Repair & Return to Service - T700-GE-700 (series) This is a FFP CLIN for the inspection and repair of T700-GE-700 engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection of the T700-GE-700; Induction test cell performance run as may be required with USG written approval; Tear-down evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; post repair engine test cell run(s) and adjustments; all consumables including fuel: any hardware used; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029

Ubbink, John: Ubbink, John:

"On Condition" repair cycle.

Ubbink, John: Ubbink, John:

"On Condition" repair cycle.Engine Repair & Return to Service (FFP)
Cold Section$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Accessory Gearbox$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Hot Section$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Power Turbine Module$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0

Ubbink, John:

Test Cell (Induction run) This is a Firm Fixed Price (FFP) CLIN to perform Induction test cell run(s). Includes pre test cell run inspection and evaluation; pre-run cleaning; all consumables including fuel; any hardware used; FOD checks, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Test Cell (Induction run)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
003

Ubbink, John: Hot Section Inspection - T700-GE-700 (series) This is a Firm-fixed price CLIN to perform engine hot section inspections (HSI). HSI will be performed IAW original manufacturer manual criteria detailed in the Engine Inspection Section of each appropriate engine type Maintenance Manual. Price includes workscope labor, 100% parts and testing where applicable.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:

"On Condition" repair cycle.Engine Hot Section Inspection (HSI) (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
004

Ubbink, John:

Engine Conversion T700-GE-701C to 701D This is a FFP CLIN for the conversion and return to service of a T700-GE-701C engine to a T700-GE-701D engine. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection of the T700-GE-700 (series) engine; Induction test cell performance run as may be required with USG written approval; Tear-down evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; post repair engine test cell run(s) and adjustments; all consumables including fuel: any hardware used; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:

"On Condition" repair cycle.Engine Conversion: T700-GE-701C to 701D (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Kit 1945T16G02$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Kit 1945T16G03$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
005

Ubbink, John:

Engine Performance Run - T700-GE-700 (series) This is a Firm Fixed Price (FFP) CLIN to perform Engine Performance test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables including fuel; any hardware used; engine test cell run(s); post test cell run FOD check, filter(s) replacement, oil sampling and results; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Performance Run - T700-GE-700 (series) (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
006

Ubbink, John:

Over & Above Labor - T700-GE-700 (series) This is a Firm-Fixed Priced (FFP) hourly rate CLIN, reimbursable by actual hours incurred for Overhaul/Analysis at the fully loaded hourly Labor rate per man-hour for any additional work required outside the basic engine overhaul/Repair to complete and make ready to issue (RFI).

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above Labor - T700-GE-700 (series) p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
007

Ubbink, John:

Demil & Property Disposal - T700-GE-700 (series) This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Ubbink, John: Ubbink, John:

"On Condition" repair cycle.Demil & Property Disposal - T700-GE-700 (series) p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
008

Ubbink, John:

Over & Above Materials - T700-GE-700 (series) This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul/repair CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 70% of OEM published catalog prices.

The new parts price is the Manufacturer’s List Price plus 10%. The overhauled parts price is the Manufacturer’s List Price less a discount of 0%. The subcontract rate is 17%.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above Materials - T700-GE-700 (series) (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
009

Ubbink, John:

Over & Above Repair and Rework - T700-GE-700 (series) This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLINs. This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.

The new parts price is the Manufacturer’s List Price less a discount of 0%. The overhauled parts price is Manufacturer’s List Price less a discount of 0%. The subcontract rate is 17%

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above (labor) Repair and Rework - T700-GE-700 (series) (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
010

Ubbink, John:

Over & Above Property Disposal Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. Contractor shall provide an estimate for Government approval prior to disposal.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above Property Disposal (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
011

Haughton, Stephen M CTR:

Purchase of Engine - T700-GE-700 (series) This is a Firm Fixed Price CLIN for the purchase of a new/repaired/overhauled engine. Contractor shall submit a proposal for each engine request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. New/Repaired/Overhauled engines must meet the most recent Original Equipment Manufacturer (OEM) et al criteria as described in Section 2 - Scope of the Statement of Work. Also included with the engine shall be a serviceable condition metal engine shipping and storage container. All engines purchased shall be covered under the warranty plan as described under Section 3.3 – Warranty of the Statement of Work. The Contractor shall provide all relevant documentation and historical logs for each engine.

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Purchase of Engine - T700-GE-700 (series) (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
012

Ubbink, John:

Shipping Container Refurbishment This is a FFP CLIN for refurbishing metal containers specifically designed and used for shipment of T700-GE-700 (series) engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repairs including welding; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Shipping Container Refurbishment (FFP) - T700-GE-700 (series) (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
013

Ubbink, John:

Off-site Field Services This is a Firm-fixed priced CLIN at a field service fully burdened per man hour rate to provide on-demand technical and logistics support services at CONUS, OCONUS and austere locations. This includes but is not limited to evaluations, trobleshooting, scheduled inspections, repair, rework and/or warranty work.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Off-site Field Services p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
014

Ubbink, John:

Engineering, Training, and System Safety This is a Cost Reimbursable CLIN to perform Engineering studies and prepare technical documentation, training in the classroom and or field, and participate in Accident and Incident analysis, on a demand basis, at CONUS, OCONUS and austere locations when required at the fully loaded labor rate p/hr.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engineering, Training, and System Safety p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
015

Ubbink, John:

Contractor Travel This is a Not-to-Exceed Cost Reimbursable CLIN, in accordance with JTR rates, for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Contractor Travel (NTE Cost) $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0

$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

PT6T-3B series (UH-1ST)

Base YearOption Year 1Option Year 2Option Year 3Option Year 4Total
CLINPWC PT6T-3B (UH-1ST)Unit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotal
016

Ubbink, John:

Engine Repair & Return to Service - PWC PT6T-3B This is a FFP CLIN for the inspection and repair of PWC PT6T-3B engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection of the PWC PT6T-3B; Induction test cell performance run as may be required with USG written approval; Tear-down evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Repair & Return to Service (RTS) - PT6T-3B1$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
17

Ubbink, John:

Test Cell (Induction run) This is a Firm Fixed Price (FFP) CLIN to perform Induction test cell run(s). Includes pre test cell run inspection and evaluation; pre-run cleaning; all consumables including fuel; any hardware used; FOD checks, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Test Cell (Induction run)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
18

Ubbink, John:

Engine HSI PW-123E (series) This is a Firm-fixed price CLIN to perform engine hot section inspections (HSI). HSIs will be performed IAW criteria detailed in the Engine Inspection Section (72-00-00) of each appropriate engine type Maintenance Manual. Price includes workscope labor, 100% parts, and applicable testing.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Hot Section Inspection (HSI) PT6T-3B (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
19

Ubbink, John:

Overhaul Aircraft Engine (4000hr) PT6T-3B This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6T-3B Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Overhaul Aircraft Engine (4000Hr) PT6T-3B (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
20

Ubbink, John:

Over and Above Labor PT6T-3B This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine repair, HSI or overhaul to complete and make ready for issue (RFI).

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over and Above Labor PT6T-3B p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
21

Ubbink, John:

Over and Above Materials PT6T-3B This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The new parts price is the Manufacturer's List Price less a discount of 30%. The overhauled parts price is the Manufacturer's List Price less a discount of 45%. The subcontract rate is 12%.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over and Above Materials PT6T-3B (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
22

Ubbink, John:

Over and Above Outside Vendor Repair and Rework PT6T-3B This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN. This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repair and rework performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided using the Over and Above CLINs.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above (labor) Repair and Rework PT6T-3B (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
23

Ubbink, John:

Engine Performance Run This is a Firm Fixed Price (FFP) CLIN to perform Engine Performance test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables including fuel; any hardware used; engine test cell run(s) and evaluation; post test cell run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Performance Run PT6T-3B (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
24

Ubbink, John:

Demilitarization and Property Disposal This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Demil/Disposal PT6T-3B p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
25

Ubbink, John:

Over and Above Property Disposal Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. Contractor shall provide an estimate for Government approval prior to disposal.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above Property Disposal (labor)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
26

Haughton, Stephen M CTR:

Purchase of Engine - PT6T-3B (series) This is a Firm Fixed Price CLIN for the purchase of a new/repaired/overhauled engine. Contractor shall submit a proposal for each engine request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. New/Repaired/Overhauled engines must meet the most recent Original Equipment Manufacturer (OEM) et al criteria as described in Section 2 - Scope of the Statement of Work. Also included with the engine shall be a serviceable condition metal engine shipping and storage container. All engines purchased shall be covered under the warranty plan as described under Section 3.3 – Warranty of the Statement of Work. The Contractor shall provide all relevant documentation and historical logs for each engine.

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Purchase of Engine - PT6T-3B (series) (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
27

Ubbink, John:

Shipping Container Refurbishment Not to exceed This is a FFP CLIN for refurbishing metal containers used for shipment of PT6T-3B (series) engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repairs including welding; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Shipping Container Refurb PT6T-3B (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
28

Ubbink, John:

Off-site Field Services This is a Firm-fixed priced CLIN at a field service fully burdened per man hour rate to provide on-demand technical and logistics support services at CONUS, OCONUS and austere locations. This includes but is not limited to evaluations, trobleshooting, scheduled inspections, repair, rework and/or warranty work.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Off-site Field Services p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
29

Ubbink, John:

Engineering, Training, and System Safety This is a Cost Reimbursable CLIN to perform Engineering studies and prepare technical documentation, training in the classroom and or field, and participate in Accident and Incident analysis, on a demand basis, at CONUS, OCONUS and austere locations when required at the fully loaded labor rate p/hr.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engineering, Training, and System Safety p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
30

Ubbink, John:

Contractor Travel This is a Not-to-Exceed Cost Reimbursable in accordance with JTR rates. CLIN for approved Offeror's travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Contractor Travel PT6T-3B (NTE Cost) $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0

$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

19AQMM24F0143 ATTACHMENT 2

PT6A-114A series (C-208)

Base YearOption Year 1Option Year 2Option Year 3Option Year 4Total
CLINPT6A-114A (C-208)Unit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotal
31

Ubbink, John:

Engine Repair & Return to Service - PT6A-114A (series) (FFP) This is a FFP CLIN for the inspection and repair of PT6A-114A (series) engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection of the PWC PT6T-3B; Induction test cell performance run as may be required with USG written approval; Tear-down evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Repair & Return to Service - PT6A-114A (series) (FFP)1$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
32

Ubbink, John: Ubbink, John:

Test Cell (Induction run) This is a Firm Fixed Price (FFP) CLIN to perform Induction test cell run(s). Includes pre test cell run inspection and evaluation; pre-run cleaning; all consumables including fuel; any hardware used; FOD checks, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Test Cell (Induction run)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
33

Ubbink, John: Ubbink, John:

Engine HSI PT6A-114A (series) This is a Firm-fixed price CLIN to perform engine hot section inspections (HSI). HSIs will be performed IAW criteria detailed in the Engine Inspection Section (72-00-00) of each appropriate engine type Maintenance Manual. Price includes workscope labor, 100% parts, and applicable testing.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Hot Section Inspection (HIS) PT6A-114A (series) (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
34

Ubbink, John:

Overhaul Aircraft Engine PT6A-114A This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-114A Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Overhaul Aircraft Engine PT6A-114A (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
35

Ubbink, John:

Over and Above Labor PT6A-114A This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready for issue.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over and Above Labor PT6A-114A p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
36

Ubbink, John:

Over and Above Materials PT6A-114A This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready for issue. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The new parts price is the Manufacturer's List Price less a discount of 30%. The overhauled parts price is the Manufacturer's List Price less a discount of 45%. The subcontract rate is 12%.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over and Above Materials PT6A-114A (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
37

Ubbink, John:

Over and Above Repair and Rework PT6A-114A This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN. This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above CLINs AD and AE respectively.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above (labor) Repair and Rework PT6A-114A (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
38

Ubbink, John:

Engine Performance Run This is a Firm Fixed Price (FFP) CLIN to perform Engine Performance test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables including fuel; any hardware used; engine test cell run(s); post test cell run FOD check, filter(s) replacement, oil sampling and results; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Performance Run PT6A-114A (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
39

Ubbink, John:

Demilitarization and Property Disposal This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Demil/Disposal PT6A-114A $144 p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
40

Ubbink, John:

Over and Above Property Disposal Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. Contractor shall provide an estimate for Government approval prior to disposal.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above Property Disposal (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
41

Ubbink, John:

Purchase of Engine - PT6A-114A (series) This is a Firm Fixed Price CLIN for the purchase of a new/repaired/overhauled engine. Contractor shall submit a proposal for each engine request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. New/Repaired/Overhauled engines must meet the most recent Original Equipment Manufacturer (OEM) et al criteria as described in Section 2 - Scope of the Statement of Work. Also included with the engine shall be a serviceable condition metal engine shipping and storage container. All engines purchased shall be covered under the warranty plan as described under Section 3.3 – Warranty of the Statement of Work. The Contractor shall provide all relevant documentation and historical logs for each engine.

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Purchase of Engine - PT6A-114A (series) (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
42

Ubbink, John:

This is a FFP CLIN for refurbishing metal containers used for shipment of PT6A-114A (series) engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repairs including welding; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Shipping Container Refurb PT6A-114A (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
43

Ubbink, John:

Off-site Field Services This is a Firm-fixed priced CLIN at a field service fully burdened per man hour rate to provide on-demand technical and logistics support services at CONUS, OCONUS and austere locations. This includes but is not limited to evaluations, trobleshooting, scheduled inspections, repair, rework and/or warranty work.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Off-site Field Services p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
44

Ubbink, John:

Engineering, Training, and System Safety This is a Cost Reimbursable CLIN to perform Engineering studies and prepare technical documentation, training in the classroom and or field, and participate in Accident and Incident analysis, on a demand basis, in both CONUS and austere OCONUS when required at the fully loaded labor rate p/hr

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engineering, Training, and System Safety p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
45

Ubbink, John:

Contractor Travel This is a Not-to-Exceed Cost Reimbursable in accordance with JTR rates. CLIN for approved Offeror's travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Contractor Travel PT6A-114 (NTE Cost) $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0

$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

19AQMM24R0143 ATTACHMENT 2

&P of &N

PT6A-67D (B-1900)

Base YearOption Year 1Option Year 2Option Year 3Option Year 4Total
CLINPT6A-67D (B-1900)Unit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotalUnit PriceQtyTotal
46

Ubbink, John:

Engine Repair & Return to Service - PT6A-67D (series) (FFP) This is a FFP CLIN for the inspection and repair of PT6A-114A (series) engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection of the PWC PT6T-3B; Induction test cell performance run as may be required with USG written approval; Tear-down evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Repair & Return to Service - PT6A-67D (series) (FFP)1$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
47

Ubbink, John: Ubbink, John:

Test Cell (Induction run) This is a Firm Fixed Price (FFP) CLIN to perform Induction test cell run(s). Includes pre test cell run inspection and evaluation; pre-run cleaning; all consumables including fuel; any hardware used; FOD checks, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Test Cell (Induction run)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
48Engine Hot Section Inspection (HIS) PT6A-67D (series) (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
49

Ubbink, John:

Overhaul Aircraft Engine PT6A-67D This is a Firm-Fixed Priced (FFP) CLIN for a Basic PT6A-114A Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; post repair engine test cell run(s) and adjustments; post test run FOD check, filter(s) replacement, oil sampling and results; post test cell run evaluation results report and documentation; preserve and secure engine in shipping container; documentation; and return shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Overhaul Aircraft Engine PT6A-67D (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
50

Ubbink, John:

Over and Above Labor PT6A-67D This is a Firm-Fixed Priced (FFP) CLIN for Overhaul/Analysis fully loaded Labor rate per man-hour for any additional work required outside the basic engine overhaul to complete and make ready for issue.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over and Above Labor PT6A-67D p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
51

Ubbink, John:

Over and Above Materials PT6A-67D This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN to complete and make ready for issue. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The new parts price is the Manufacturer's List Price less a discount of 30%. The overhauled parts price is the Manufacturer's List Price less a discount of 45%. The subcontract rate is 12%.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over and Above Materials PT6A-67D (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
52

Ubbink, John:

Over and Above Repair and Rework PT6A-67D This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN. This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs). Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above CLINs AD and AE respectively.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above (labor) Repair and Rework PT6A-67DA (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
53

Ubbink, John:

Engine Performance Run This is a Firm Fixed Price (FFP) CLIN to perform Engine Performance test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables including fuel; any hardware used; engine test cell run(s); post test cell run FOD check, filter(s) replacement, oil sampling and results; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engine Performance Run PT6A-67D (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
54

Ubbink, John:

Demilitarization and Property Disposal This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Demil/Disposal PT6A-67D p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
55

Ubbink, John:

Over and Above Property Disposal Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. Contractor shall provide an estimate for Government approval prior to disposal.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Over & Above Property Disposal (T&M)$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0
56

Ubbink, John:

Purchase of Engine - PT6A-67D (series) This is a Firm Fixed Price CLIN for the purchase of a new/repaired/overhauled engine. Contractor shall submit a proposal for each engine request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. New/Repaired/Overhauled engines must meet the most recent Original Equipment Manufacturer (OEM) et al criteria as described in Section 2 - Scope of the Statement of Work. Also included with the engine shall be a serviceable condition metal engine shipping and storage container. All engines purchased shall be covered under the warranty plan as described under Section 3.3 – Warranty of the Statement of Work. The Contractor shall provide all relevant documentation and historical logs for each engine.

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Purchase of Engine - PT6A-67D (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
57

Ubbink, John:

This is a FFP CLIN for refurbishing metal containers used for shipment of PT6A-114A (series) engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repairs including welding; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Shipping Container Refurb PT6A-67D (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
58

Ubbink, John:

Off-site Field Services This is a Firm-fixed priced CLIN at a field service fully burdened per man hour rate to provide on-demand technical and logistics support services at CONUS, OCONUS and austere locations. This includes but is not limited to evaluations, trobleshooting, scheduled inspections, repair, rework and/or warranty work.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Off-site Field Services (FFP) p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
59

Ubbink, John:

Engineering, Training, and System Safety This is a Cost Reimbursable CLIN to perform Engineering studies and prepare technical documentation, training in the classroom and or field, and participate in Accident and Incident analysis, on a demand basis, in both CONUS and austere OCONUS when required at the fully loaded labor rate p/hr

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029Engineering, Training, and System Safety p/hr fully loaded (FFP)$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
60

Ubbink, John:

Contractor Travel This is a Not-to-Exceed Cost Reimbursable in accordance with JTR rates. CLIN for approved Offeror's travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.

Taxes included:

Delivery Date (Start to End) Date FOB: 09/14/2024 to 09/13/2029 Contractor Travel PT6A-67D (NTE Cost) $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0 0 $ - 0 $ - 0

$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

19AQMM24R0143 ATTACHMENT 2

File details come from the government source that posted it. Updated .