The file is an Excel spreadsheet (Attachment 2) detailing a HVAC Schedule with Periods of Performance for a temporary HVAC and exhaust system rental solicitation by the Department of the Navy Naval Sea Systems Command. The schedule outlines multiple HVAC equipment components with specific rental periods across base and optional performance periods from February 2026 to April 2028. Required equipment includes Triple/Double Coil HVAC units, Exhaust Blowers, 230 Ton Chillers, Chilled Water (CHW) Pumps, various CHW hoses and elbows, CHW Manifolds, Adapters, and E-Stop Equipment. Optional equipment includes Electric Fan Coil Units with intermittent rental periods primarily during cooler months. The solicitation (N3904026Q3045) covers rental periods that are segmented into base periods and up to three option periods, with some equipment having more limited rental windows, particularly the chiller and related chilled water infrastructure components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIECE NO. Component Required Equip. vs. Optional Equip. Base Period of Performance Option 1 Period of Performance Option 2 Period of Performance Option 3 Period of Performance End

V -01/02Triple/Double Coil HVACRequired2/4/2026 -to- 2/2/20272/3/2027 -to- 2/1/20282/2/2028 -to- 3/28/20283/29/2028 -to- 4/27/2028
V -01/02Triple/Double Coil HVACRequired2/4/2026 -to- 2/2/20272/3/2027 -to- 2/1/20282/2/2028 -to- 3/28/20283/29/2028 -to- 4/27/2028
V -01/02Triple/Double Coil HVACRequired2/4/2026 -to- 2/2/20272/3/2027 -to- 2/1/20282/2/2028 -to- 3/28/20283/29/2028 -to- 4/27/2028
V -03Exhaust BlowerRequired2/4/2026 -to- 2/2/20272/3/2027 -to- 2/1/20282/2/2028 -to- 3/28/20283/29/2028 -to- 4/27/2028
V -03Exhaust BlowerRequired2/4/2026 -to- 2/2/20272/3/2027 -to- 2/1/20282/2/2028 -to- 3/28/20283/29/2028 -to- 4/27/2028
V -03Exhaust BlowerRequired2/4/2026 -to- 2/2/20272/3/2027 -to- 2/1/20282/2/2028 -to- 3/28/20283/29/2028 -to- 4/27/2028
V -03Exhaust BlowerRequired2/4/2026 -to- 2/2/20272/3/2027 -to- 2/1/20282/2/2028 -to- 3/28/20283/29/2028 -to- 4/27/2028
V -04Electric Fan Coil UnitOptional10/1/2026 -to- 4/28/20279/4/2027 -to- 2/4/20282/5/2028 -to- 3/3/20283/4/2028 -to- 3/31/20284/1/2028 -to- 4/28/2028
V -04Electric Fan Coil UnitOptional10/1/2026 -to- 4/28/20279/4/2027 -to- 2/4/20282/5/2028 -to- 3/3/20283/4/2028 -to- 3/31/20284/1/2028 -to- 4/28/2028
V -04Electric Fan Coil UnitOptional10/1/2026 -to- 4/28/20279/4/2027 -to- 2/4/20282/5/2028 -to- 3/3/20283/4/2028 -to- 3/31/20284/1/2028 -to- 4/28/2028
V -04Electric Fan Coil UnitOptional10/1/2026 -to- 4/28/20279/4/2027 -to- 2/4/20282/5/2028 -to- 3/3/20283/4/2028 -to- 3/31/20284/1/2028 -to- 4/28/2028
V -04Electric Fan Coil UnitOptional10/1/2026 -to- 4/28/20279/4/2027 -to- 2/4/20282/5/2028 -to- 3/3/20283/4/2028 -to- 3/31/20284/1/2028 -to- 4/28/2028
V -04Electric Fan Coil UnitOptional10/1/2026 -to- 4/28/20279/4/2027 -to- 2/4/20282/5/2028 -to- 3/3/20283/4/2028 -to- 3/31/20284/1/2028 -to- 4/28/2028
V -04Electric Fan Coil UnitOptional10/1/2026 -to- 4/28/20279/4/2027 -to- 2/4/20282/5/2028 -to- 3/3/20283/4/2028 -to- 3/31/20284/1/2028 -to- 4/28/2028
V -05230 Ton ChillerRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -05230 Ton ChillerRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V-06CHW Pump 600 gpmRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V-06CHW Pump 600 gpmRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -076 IN Dia CHW HoseRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -086 IN Dia 90° ElbowRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -094 IN Dia CHW HoseRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -104 IN Dia 90° ElbowRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -11CHW X ManifoldRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -11CHW X ManifoldRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -11CHW X ManifoldRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -12CHW AdapatorsRequired3/19/2026 -to- 9/16/20263/24/2027-to-9/21/2027N/AN/A
V -13E-Stop EquipmentRequired2/4/2026 -to- 2/2/20272/3/2027 -to- 2/1/20282/2/2028 -to- 3/28/20283/29/2028 -to- 4/27/2028