Attachment 2--Greenhouse Concrete Details.pdf

PDF 143 KB Posted

Attached to
Install Concrete Floor for Greenhouse Federal contract opportunity
Solicitation number
12805B21Q0345
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

View the file

Other files for this federal contract opportunity

Other files attached to Install Concrete Floor for Greenhouse, newest first.
File Type Posted
Solicitation 12805B21Q0345.pdf PDF
Attachment 4 New Center Wall.pdf PDF
Attachment 8 ARS-372.pdf PDF
Attachment 6 Wage Determination TX20210235.pdf PDF
Attachment 7 ARS-371.pdf PDF
Attachment 5 Scope of Work (SOW).pdf PDF
Attachment 1 - Greenhouse Dimensions Existing.pdf PDF
Attachment 3 - Trench Installation in Concrete.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24’

96’

Existing Concrete perimeter beam 12” wide

Slope direction

Trench drain 8” off center opposites sides.

Settling tank

New Concrete perimeter beam

12” wide

New concrete with slope direction to new trench drains

12’

New Exterior concrete pad

ATTACHMENT 2

New interior center beam detail

Perimeter beam detail

Interior concrete detail.

12”

24”

#3 stirrups on 24” centers

#5 rebars (6)

4 mil liner

12’ slip dowel using epoxy spaced every 12”

4 mil moisture liner

2” compacted stabilized sand

#4 rebar 12” OCEW tied together.

4 mil liner beneath

Chairs used to support rebar

18” lap for rebar

5 ½ “ – 6” thick concrete

2’ compacted Stabilized sand bed beneath

Expansion joint with removable cap

Sediment\holding pump tank and system.

Exterior concrete slab detail.

#4 rebar 12” OCEW tied together.

Chairs used to support rebar.

18” lap for rebar.

2’ compacted Stabilized sand bed beneath.

5 ½” thick (minimum) concrete.

Slab will be 1” below greenhouse polycarbonate wall.

Sump pump removable

500 gallon minimum

Set at depth to allow trench drains to drain.

Precast concrete.

Means to remove sump pump.

Serviceable by pump truck.

Provide vent for tank.

Electrical

Level indication

\alarm

Discharge line

Inlet from trench drains

Vent line Access extension if necessary

File details come from the government source that posted it. Updated .