Attachment 2 GA Power Service Manual.pdf
PDF 9 MB Posted
- Solicitation number
- 36C24724Q0777
About this file
This document is a Sources Sought Notice from the Department of Veterans Affairs, Veterans Health Administration (VHA), Network Contracting Office (NCO) 7. The notice is conducting market research to determine the availability and capability of Service-Disabled Veteran Owned Small Businesses (SDVOSB) for a project to upgrade the electrical transformer in Building 135 at the Atlanta VA Health Care System.
The project requires the contractor to furnish all labor, tools, equipment, personnel, supervision, materials, supplies and transportation necessary to perform secondary work on a relocated transformer. This includes installing conduit, pulling cable, removing the existing customer-owned transformer, installing a secondary termination cabinet, and providing concrete work and bollards. The NAICS code for this work is 238210. Interested vendors are requested to submit a capability statement outlining their ability to fulfill this requirement by 1:00pm EST on June 14, 2024. Site visits are scheduled for June 10th and June 14th. This is not a formal solicitation, and the government will use the information for market research purposes only.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24724Q0777.docx | DOCX document | |
| Attachment 1 Statement of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLUEBOOK
FOR
ELECTRICAL SERVICE
Edition
BlueBook 2017 – Revision Date: April 4th, 2018 Page 2 ©2018 Southern Company. All Rights Reserved.
NOTICE:
THIS DOCUMENT IS SUBJECT TO CHANGE AT ANY TIME.
FOR THE LATEST REVISION TO THE BLUEBOOK OR THE BLUEBOOK LITE
PLEASE VISIT:
www.georgiapower.com/builder
Applications for Service:
Customer Care Center Builders Line: 1-877-365-3276
Residential Needs: 1-888-660-5890 Business Needs: 1-888-655-5888
Outage Reporting: 1-888-891-0938
COPYRIGHT NOTICE: Copyright ©2017 Southern Company. All Rights Reserved.
All materials are the copyrighted property of Southern Company, its subsidiaries, affiliated companies and/or third-party licensors. All trademarks, service marks, and trade names are proprietary to Southern Company, or its subsidiaries or affiliated companies and/or third-part licensors. The materials may not be modified, copied, distributed, transmitted, displayed, performed, reproduced, published, licensed, nor derivative works created, without the expressed, written permission from Southern Company.
http://www.georgiapower.com/builder http://www.georgiapower.com/builder
BlueBook 2017 – Revision Date: April 4th, 2018 Page 3
POLICY STATEMENT
BLUEBOOK FOR ELECTRICAL SERVICE AND METER INSTALLATIONS
This book represents the present policies and objectives of the Georgia Power Company within the revenue metering area. It is intended to provide guidance only regarding the design and installation of electric services and revenue metering equipment on the Georgia Power Company system. This book is not intended as a design specification or as an instruction manual. The accuracy and safety of each installation should be considered on a case by case basis.
SAFETY TAKES PRECEDENCE OVER ALL OTHER REQUIREMENTS.
Make each job a NO ACCIDENT JOB.
The policies and procedures in this book are generally broad enough to meet our customer’s needs, while ensuring prompt service and accurate metering. It is impossible, however, to cover all circumstances that may be encountered in providing electric service to our customers. It is necessary that common sense and good engineering practices be used where specific situations are not addressed by this book, or where customer service is adversely affected by these procedures. If rules within this document conflict with the Rates, Rules and Regulations filed with the Public Service Commission; the Rates, Rules and Regulations shall take precedence.
While every effort has been made to ensure that the policies and procedures in this book are up to date at the time of publication, circumstances such as legal considerations, new technology, or changes in Company policy, may require modifications from time to time.
Approved:
Steve E. Pigford Russell L. Mullennix Distribution Ops & Services GM Metering Services Manager Distribution Operations & Services Metering Services
BlueBook 2017 – Revision Date: April 4th, 2018 Page 4
There may be two or more methods of service from which to choose. Before selecting a particular method, purchasing, or installing any equipment the Company and the customer should thoroughly discuss the alternatives to be sure the method selected is in the best interest of all concerned. Open, two-way communication between the Company and our customers is the best way to prevent misunderstandings, delays, and unnecessary expense.
While every effort has been made to ensure that the policies and procedures in this book are up to date at the time of publication, circumstances such as legal considerations, new technology, revisions to the National Electrical Code, National Electrical Safety Code, or changes in Company policy, may require modifications to be made from time to time.
For proposed changes, please submit via e-mail at:
gpcbluebook@southernco.com
BlueBook 2017 Committee Members
Russell L. Mullennix, Manager, Metering Services Mark Leach, Manager, Metering Services Engineering
Travis Jimperson, BlueBook Committee Chairman
Keith Reese Bill Mulkey
Roger McDaniel Will Ellis Trent Christian Neal Price Scott Gentry Steve Owens
Joseph Redmond Ronnie Burton Mike McCowen Mitch Johnson
John Foust Jennifer Santander James Pulliam Terry Penn
James Whitlock mailto:gpcbluebook@southernco.com
BlueBook 2017 – Revision Date: April 4th, 2018 Page 5
TABLE OF CONTENTS
SECTION (CLICK ANYWHERE ON THE LINK(S) BELOW TO ADVANCE DIRECTLY TO THAT SECTION) PAGE
1.0 Definitions 8
2.0 General Information 12
Connections between Company and Customer 12 Inspections 12
3.0 Bonding & Grounding of Meter Equipment 14
Grounding Terminology 16 Customer Equipment Grounding (Within 30’ of Disconnect) 17 Services at Secondary Distribution Voltages 18 Metering Installations at Secondary Distribution Voltages 19
4.0 Temporary Installations, Single Phase (400 Amps or Less) 26 OH Service, Typical Temporary Installation 27 UD Service, Typical Temporary Installation 28
5.0 Residential Specifications 30
OH Service Clearances 30 Residential Underground Service Installation 31 3-Wire, OH Service, (120/240V), (225A or Less) 32
6.0 Overhead Company Owned Sockets 34
2-Wire, OH Service, (120V), (100A or Less) 35 3-Wire, OH Service, (120V-240V), (225A or Less), “Residential Only” 36 3-Wire, OH Service, (120V-240V), (226A to 400A) 37 3-Wire, OH Service, (120V-240V), (401A to 600A) 38 3-Wire, OH Service, (120V-240V), (225A or Less), “Commercial Only” 39 4-Wire, 3-Phase, OH Service, (225A or Less) 40 4-Wire, 3-Phase, Delta OH Service (Typical) 42 4-Wire, 3-Phase, OH Service, Class 320, Self-Contained 43
7.0 Underground Company Owned Sockets 44
2-Wire, UD Service, (120V), (100A or Less) 45 3-Wire, UD Service, (10-240V or 120-208V), (225A or Less) 46 3-Wire, UD Service, (120V-240V), (226A to 400A) 47 3-Wire, UD Service, (120V-240V), (401A to 600A) 48 3-Wire, UD Service, (120V-240V), (225A or Less), “Commercial Only” 49 4-Wire, 3-Phase, UD Service, (225A or Less) 50 4-Wire, 3-Phase, UD Service, Class 320, Self-Contained 53
8.0 Overhead Customer Owned Sockets 54
3-Wire, OH/UD Service, (120V-240V), (225A or Less), Side-by-Side Construction 55 3-Wire, OH/UD Service, (120V-240V), (225A or Less), OH/UD Construction 56 3-Wire, OH Service, (120V-240V), (225A or Less) 57
9.0 Underground Customer Owned Sockets 58
3-Wire, OH/UD Service, (120V-240V), (225A or Less), Side-by-Side Construction 59 3-Wire, OH/UD Service, (120V-240V), (225A or Less), OH/UD Construction 60 3-Wire, UD Service, Customer Furnished, (120V-240V) 61 3-Wire, UD Service, (120V-240V), (225A or Less) 62
10.0 Duplex Sockets, OH/UD 64
3-Wire, OH Service, Duplex Socket, (120/240V or 120/208V) 65 3-Wire, UD Service, Duplex Socket, (120/240V or 120/208V) 66 3-Wire, OH Service, Duplex Socket, (120/240V), (225A or Less) 67
11.0 Multifamily Single Phase Section 68
3-Wire, OH Service, (120V-240V), (2-6 Positions) 68 3-Wire, UD Service, (120V-240V), (2-6 Positions) 69
BlueBook 2017 – Revision Date: April 4th, 2018 Page 6
3-Wire, UD Service, (120V-240V), (Above 6 Pos.) 71 1-Phase, UD Service, Termination Facilities for Multi-Position Socket Installations 73 Clearance for Customer Owned Meter Centers 74
12.0 4-Wire, 3-Phase, Transockets, OH/UD Service 76 4-Wire, 3-Phase, Transocket, OH Service (401A to 600A) 77 4-Wire, 3-Phase, OH to OH, Customer Pole 78 4-Wire, 3-Phase, OH to UD, Customer Pole 79 4-Wire, 3-Phase, CT Transocket, on Pedestal 80 4-Wire, 3-Phase, Transocket, (400A – 600A) 81
13.0 Renewable Generation 82
Residential Option #1 83 Residential Option #2 84 Residential Option #3 85 Residential Bi-Directional Contract 86 Commercial (Self-Contained) 87 Commercial (Transformer Rated) 88 Commercial Bi-Directional Contract 89 Label for Distribution Generation Enclosures 90 4-Wire, 3-Phase, Commercial Solar 91
14.0 4-Wire, 3-Phase CT Installation, OH/UD Service (Above 600A) 92 4-Wire, 3-Phase, OH Service Mast Mounted CT's (Above 600A) 93 4-Wire, 3-Phase, OH Service CT's on Building (Above 600A) 94 4-Wire, 3-Phase, OH to OH CT Installation (Above 600A) 95 4-Wire, 3-Phase, OH to OH and OH to UD CT Installation (Above 600A) 96 4-Wire, 3-Phase, Mounting of Meter Cabinet 97 4-Wire, 3-Phase, UD Service using CTs (Above 600A) 98 4-Wire, 3-Phase, CT Padmount Transformer (Above 600A) 99
15.0 3-Wire, 3-Phase OH Service (240V or 480V), (225A or Less) 100 3-Wire, 3-Phase, OH Meter Socket, Ungrounded 101 3-Wire, 3-Phase, OH Service Transocket Wall Mounted, Ungrounded 102 3-Wire, 3-Phase, OH Service, Mast Mounted, Ungrounded 103 3-Wire, 3-Phase, OH CT's and PT's on Building, Ungrounded 104 3-Wire, 3-Phase, OH Service, Customer Owned Pole, Ungrounded 105 3-Wire, 3-Phase, OH Service, Customer Owned Pole, Ungrounded 106
16.0 3-Phase Meter Installation, Common Distribution Point 108 3-Phase, Meter Installation Distribution Point 109
17.0 Meter Compartment in Switch Gear, (Customer Owned Facilities) 110 Customer Switchgear 111
18.0 Metering Installations at Primary Distribution Voltages 112 Primary Metering Cubicle 113 Standard Pad for Primary Cubicle 114
19.0 GPC Meter and Socket Reference Documents 116
GPC Meter & Socket Selection Chart 116 1-Phase, GPC Meter Base Socket Guide 117 3-Phase, GPC Meter Base Socket Guide 118 Socket and Cabinet Sizes Table 119
BlueBook 2017 – Revision Date: April 4th, 2018 Page 7
NOTES
BlueBook 2017 – Revision Date: April 4th, 2018 Page 8
1.0 Definitions
Abandonment: If equipment is abandoned, a mutual agreement shall be reached between the Customer and the Company relinquishing ownership of this equipment to the Customer. The Customer shall agree to accept ownership and responsibility for any abandoned equipment.
Bi-Directional: Using Customer’s Generation to offset kwh’s purchased from Georgia Power and deliver and sell excess kwh’s to Georgia Power.
Approved: Acceptable to a qualified Georgia Power Company employee.
Company: Georgia Power Company.
Customer: The corporation, municipality, governmental agency, association, partnership or individual using or planning to use electric service supplied by the Company or the architect, engineer or electrical contractor acting as the Customer’s agent.
Fifth Terminal Meter Jaw: The extra jaw that shall be installed in a single phase meter socket to allow metering 120/208V services. This fifth terminal meter jaw shall be located in the 6 or 9 o’clock position. This fifth terminal is available for Company issued meter sockets. It must be provided by the Electrician for Customer owned meter sockets or multi-position meter centers.
Final Grade Level: Ground levels after all construction and landscaping procedures have been completed.
Fire Pump Service: The service dedicated to fire pump equipment.
Grounded Conductor: A system or circuit conductor that is intentionally grounded.
Grounding Electrode Conductor: A conductor used to connect equipment or the grounded conductor (neutral) of a wiring system to a grounding electrode.
Grounding Conductor, Equipment: The conductor used to connect non-current carrying metal parts of equipment, raceways and other enclosures to the system grounded conductor and/or the grounding electrode conductor at the service equipment.
Isolated: Not readily accessible to persons unless special means for access are used.
Joint Agreement: The understanding of two or more parties having the same consent, vision and commitment for solution of a particular situation or circumstance.
Line Side: The top of any meter sockets used on GPC system.
Load Side: The bottom of any meter sockets used on GPC system.
Listed: Equipment or materials included in a list published by an organization acceptable to the authority having jurisdiction and concerned with product evaluation that maintains periodic inspection of production of listed equipment or material meets appropriate standards or has been tested and found suitable for use in a specified manner.
Manufactured Home: A single or multi-sectional structure built on a permanent chassis on or after June 15, 1976. Since it is built on a permanent chassis, it is considered re-locatable.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 9
Master Meter: Company supplies electricity for entire load for the Customer through one metering point.
Metal Anchor: Metal device designed by manufacturer to mount equipment to masonry or concrete. Plastic anchors are not permitted.
Mobile Home: A single or multi-sectional structure built on a permanent chassis prior to June 15, 1976. Since it is built on a permanent chassis, it is considered re-locatable.
Modular Home: A structure consisting of sections built at a factory then transported and assembled at the permanent location. This structure is not considered re-locatable since it is not built on a permanent chassis.
Permanent Marking: Permanent letters or numbers in enamel paint at least 1 inch in height using a contrasting color. Permanent plastic or metal labels are acceptable, at least 1 inch in height. Permanent Ink Markers, such as Sharpies, are not acceptable.
Primary Voltage: A voltage magnitude of more than 600 volts phase to phase or phase to ground.
NEC: National Electrical Code.
NESC: National Electrical Safety Code.
Qualified Employee: A Georgia Power Company employee responsible for company safety, regulations, construction, application and operation of the equipment involved.
Readily Accessible: Capable of being reached easily without requiring tools or the removal of obstacles.
Secondary Voltage: A voltage magnitude of 600 volts or less, phase to phase.
Service: The conductors and equipment for delivering energy from the electricity supply system to the wiring system of the premises served.
Service Drop: The overhead service conductors from the last pole or other aerial support to and including the splices, if any, connecting to the service entrance conductors at the building or other structure.
Service Entrance Conductors - Overhead System: The service conductors between the terminals of the service equipment and a point usually outside the building, clear of building walls, where joined by tap or splice to the service drop.
Service Entrance Conductor - Underground System: The service conductors between the terminals of the service equipment and the point of connection to the service lateral.
Service Equipment: The necessary equipment, usually consisting of a circuit breaker or switch and fuses, and their accessories located near the point of entrance of supply conductors to a building or other structure or an otherwise defined area intended to constitute the main control and a means of disconnecting the supply.
Service Lateral: The underground service conductors between the street main, including any risers at a pole or other structure from transformers, and the first point of connection to the service entrance conductors in a terminal box, meter socket or other enclosure with adequate space, inside or outside the building wall. Where there is no terminal box, meter socket or other enclosure with adequate space, the point of connection shall be considered the point of entrance of the service conductor into the building.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 10
Service Point: The point of connection between the Company’s facilities and the Customer’s facilities.
Single Directional: Delivering and selling 100% of generation to Georgia Power through an approved program.
Solidly Grounded System: System that has at least one conductor or point intentionally grounded.
Structurally Solid Enclosures: An enclosure constructed of materials that allow no access or penetration of foreign objects from any direction or intrusion except through an approved entry point. Material types may vary but will always be sound, firm and well-constructed, not affected by weathering, water or high heat exposure. Examples are concrete, masonry, and steel.
Sub-Metering: The metering of individual loads within a facility for billing or load control purposes. For billing applications, usually the facility is metered by a master meter and the property owner desires to meter and charge individual tenants for their portion of the electricity consumed. This equipment is Customer owned and maintained.
Temporary Service: Defined as service where the Company is only required to provide a service drop and a meter socket to construction jobs, fairs, carnivals, fruit stands, Christmas tree stands, and to similar locations and structures where such service is required for a specified time usually twelve (12) months or less.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 11
BlueBook 2017 – Revision Date: April 4th, 2018 Page 12
2.0 General Information
A. Application for Service, Availability and Classification of Service:
1. When contacting the Company regarding new service, be prepared to provide any and all information related to phase requirements, voltage, loading, etc., including any information on special requirements.
2. Application for service can be made at any local office or through the Builders Line. The application should be made well in advance of the required service date. A list of the Company’s local offices can be found at the following link:
Customer Service Locations
OR
www.georgiapower.com/builders
3. The Company shall connect only one service drop or service lateral to a building or structure for each class of service, except as permitted by the National Electrical Code. For the purpose of this rule, a communication tower shall be treated as a single structure. Refer to Section 3.4.H for additional information.
4. Only one watt-hour meter shall be installed per Customer per class of service except as explained in Section 2.A.3 above. IN NO CASE SHALL METER READINGS OF TWO OR MORE
WATT-HOUR METERS BE COMBINED FOR BILLING PURPOSES.
5. Installations that qualify to be placed on an unmetered rate shall have a meter socket equipped with a bypass handle, NEMA Type 4 enclosure, or enclosure approved by the Customer Field Service Supervisor. A lockable disconnect shall be installed on the load side of the meter socket or enclosure.
6. Services that require metering shall have control relaying installed on the load side of the metering equipment.
Connections between Company and Customer
Final connections at the service point shall be made by the Company. Customer owned devices shall not be installed between the service point and Customer’s meter socket. The electric service and metering equipment are designed to serve the Customer’s load as it exists when connected to the Company’s distribution system. The Company will not accept more than one conductor under one pressure device.
Inspections
A. In areas where electrical inspection is provided, the Public Service Commission requires that all wiring and equipment in or upon the premises of the Customer to the point of the service connection shall have the approval of an inspector from the constituted authority (cities and counties, for example) prior to connecting the Customer service to the Company’s system. Also, the Service Regulations of the Company on file with the Georgia Public Service Commission shall be met.
https://customerservice.southerncompany.com/OfficeLocations/Locations.aspx?mnuOpco=gpc&mnuType=res?WT.svl=loc2&hp=bm_hs_find_an_office https://www.georgiapower.com/business/specialty-links/new-construction-services/builder/home.cshtml
BlueBook 2017 – Revision Date: April 4th, 2018 Page 13
B. For Customers that may be exempt from the local inspecting authority, such as some federal, state, and local governmental agencies or self-inspecting entities, or in areas where an electrical inspector does not exist; a letter should be obtained from an individual or entity qualified to make the statement that all wiring has been completed according to the National Electrical Code (NEC) before service is connected.
C. Regardless of whether a city or county employs inspectors, the Company, through a qualified employee, has the right to make the final determination about connecting the service. The Company shall not connect any service where an unsafe condition is observed. The Customer shall be notified of the unsafe condition and service will be provided when corrected by the Customer.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 14
3.0 Bonding & Grounding of Meter Equipment
The Customer shall install a grounding electrode system and bond service equipment in accordance with the National Electrical Code (NEC) and local codes before requesting the Company to energize the service. Failure to comply with the appropriate codes may result in personal injury or damage to property.
A. Solidly Grounded Systems
1. Bonding Supply-Side Metering Equipment:
(a) Non-current carrying metal parts of metering equipment shall be bonded to the service grounded (neutral) conductor in a manner that establishes an effective ground-fault current path.
(b) In all cases where the metering equipment is on the supply-side of the service disconnect, the metal enclosure shall be bonded to the grounded (neutral) conductor within the enclosure.
(c) No additional equipment grounding conductors (bond wires) or bonding jumpers are required, nor allowed to effectively bond the metal meter enclosure to adjacent service entrance equipment.
(d) Company personnel are responsible for bonding current transformer cabinets and transformer rated sockets.
2. Bonding Load-Side Metering Equipment:
(a) To prevent parallel neutral paths, metering equipment shall not be simultaneously bonded to the grounded (neutral) conductor and the Customer’s equipment grounding conductor (bond wire).
(b) Where metering equipment is located on the load-side of a service disconnect that does not have equipment ground-fault protection and where the metering equipment is located within 30 feet of the service disconnect, the meter enclosure shall be bonded to the grounded (neutral) conductor within the enclosure.
(c) Where metering equipment is located on the load-side of equipment ground-fault protection or where load-side metering equipment is not located within 30 feet of the service disconnect, it shall be the responsibility of the Customer to coordinate a joint agreement between the AHJ (Authority Having Jurisdiction) and the Company for the proper isolation of the equipment grounding conductor and the service grounded (neutral) conductor within the meter enclosure.
(d) The Customer shall be responsible for bonding all non-current carrying metal equipment, located on the load-side of the metering equipment.
3. Grounding of Meter Equipment:
(a) To facilitate meeting NEC grounding requirements, the Company will allow a single grounding electrode conductor to be terminated in a self-contained meter socket or a transocket where a factory installed grounding connector is attached to the neutral bus.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 15
(b) The grounding electrode conductor shall be routed directly to the grounding electrode without passing through any other enclosure.
(c) The meter enclosure shall not be used as a junction point for bonding together different components of the Customer’s grounding electrode system.
4. External Ground Wires Attached to Meter Equipment:
(a) Company metering equipment shall not be used as a point of grounding by the Customer or other utilities. Ground wires for cable TV, antennas, phone equipment, etc., shall not be connected to metering sockets, metering cabinets, and metal conduits housing meter control cable.
(b) Any ground wire as described in Section 3.4.A that interferes with Company personnel accessing the meter or that creates a hazard for Company personnel, will be subject to removal.
B. Ungrounded Systems:
1. All ungrounded systems shall be metered with the use of instrument transformers provided by the Company.
2. Company issued transockets intended for use on a 3-wire ungrounded service are equipped with a removable bonding strap. The bonding strap shall be removed so that the service common phase conductor will be isolated from the socket enclosure.
3. All metering equipment shall be grounded to a driven grounding electrode, provided and installed by the Customer.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 16
Grounding Terminology
BlueBook 2017 – Revision Date: April 4th, 2018 Page 17
Customer Equipment Grounding (Within 30’ of Disconnect)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 18
Services at Secondary Distribution Voltages
A. Overhead Services:
1. The service type should be confirmed prior to construction.
2. The location of the service attachment point shall be determined by agreement with a representative of the Company. The Customer shall provide suitable means of supporting service wires to the building which will provide clearances as required shown in Section 4.1 (Service Clearances) and provided by Part II of the National Electric Safety Code.
3. When necessary to install a service mast to obtain the clearance required, the mast shall not be less than 2 inch trade size rigid metal conduit. A service mast exceeding 3 feet in height above the roof or last means of support shall be adequately guyed to withstand the strain imposed by the service drop. See Section 4.1 for clearance requirements for a service drop attached to a mast.
Service mast shall be surface mounted on exterior wall. At the point that the service mast conduit passes upward through a roof overhang, at its soffit or through any enclosed fascia area, the service mast conduit shall be one continuous section, with no conduit couplings. No conduit coupling shall be a part of the service mast conduit at any point above the roofline of the building.
4. The Company will furnish hardware necessary for attaching the service drop to a building. The
Customer is responsible for installing the hardware in a secure manner.
5. Service entrance conductors connected to the Company’s service drop shall comply with the National Electric Code (NEC), unless the inspection authority having jurisdiction has granted an exception.
6. Conductors carrying unmetered energy shall not be contained in the same raceway, trough, or conduit with conductors carrying metered energy.
7. Customer’s service entrance conductors shall extend not less than 3 feet out of weatherhead.
8. For safety reasons, the grounded conductor of service entrance conductors shall be clearly marked unless it is white, gray, or bare.
9. For proper metering of a 4-Wire, 3-Phase delta service, the phase having the highest voltage to ground (high leg) must be in the right hand or "C" phase position in the meter socket. To ensure proper connections, the (high leg) shall be clearly marked at the weatherhead.
B. Underground Services:
1. The service type should be confirmed prior to construction.
2. Due to space limitations, the number of runs of Customer owned underground service cables in a
3-Phase padmount transformer shall be agreed upon between the Customer and a qualified Company employee prior to installation.
3. Metering equipment shall be located outside. Inside locations shall be approved by a Metering
Services Field Supervisor.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 19
4. Company owned service laterals may be terminated in factory assembled metering centers owned by the Customer. Metering centers shall be equipped with connectors satisfactory to the Company for termination. Adequate wireway space shall be provided for these laterals. See Section 9.3, Section 11.31, and Section 11.6.
5. If metering a padmount transformer, it shall be considered dedicated and can only serve one
Customer. Any other arrangement must be approved by an Metering Services Supervisor. Meter sockets shall be mounted on Company supplied meter pedestal, Company approved structure or the Customer’s building. Instrument transformers shall not be installed in single phase padmount transformers. No bonding/equipment ground wire shall be installed from the Customer’s service equipment to the Company’s transformer.
C. For multi-level residential premises the following will apply:
1. The preferred method is for Company owned metering equipment to be located at ground floor level for all residential units.
2. On high-rise installations (as defined by the NEC), Company owned metering equipment may be located on more than one level (as approved by the local Metering Services Field Supervisor).
(a) All metering equipment installations and locations shall satisfy the requirements as described in Section 3.3 and Section 3.4 and of the Company’s “BlueBook for Electrical Service and Metering Installations”.
(b) If a fire pump is required by local authority, a separate fire pump meter shall be installed as described in Section 3.4.1.
(c) Riser diagrams shall be provided to the local Metering Services Field Supervisor and Engineering before construction begins.
(d) If the property owner desires to meter and charge individual tenants for their portion of electricity consumed, (see Sub-Metering in Definitions Section) an alternate method (as approved by the local Metering Services Field Supervisor) is for one “master” meter to be installed in a switch gear, current transformer cabinet or at an underground padmount transformer as described in Section 3.3 and Section 3.4. The individual tenant metering equipment shall be Customer owned and maintained.
D. In cases where service voltage is 277/480V or higher, the Company will meter at the service voltage only (first transformation point).
1. The Customer has the option to sub-meter beyond any step-down transformer(s) with Customer owned and Customer maintained sub-metering equipment.
Metering Installations at Secondary Distribution Voltages
A. General:
1. The Company shall furnish, install, test and maintain metering equipment to accurately measure the Customer’s use of electric energy.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 20
2. Metering equipment (meter sockets, meter cabinets, etc.) furnished by the Company to be installed by the Customer will be supplied in good operating condition. This equipment is the property of the Company and shall be used for metering the Company’s customers. The Company owned equipment shall not be altered or modified. The Company will not accept more than one conductor under one pressure device. Abandoned equipment shall become the responsibility of the Customer.
3. Company owned meter sockets or metering cabinets shall not be used as junction boxes for the connection of branch circuits, feeder conductors or the connection of subsets of service conductors supplying separate service locations for the same or different premises. This does not apply if the equipment has been abandoned by the Company.
NOTICE: ALL GPC ISSUED METERING EQUIPMENT MUST BE USED TO
METER GPC CUSTOMER LOCATIONS ONLY. IF THE ADDRESS LISTED
IS NOT A GPC CUSTOMER OR IF THE EQUIPMENT IS NOT USED AT THE
ADDRESS LISTED THE CONTRACTOR/PERSON RECEIVING
EQUIPMENT WILL BE RESPONSIBLE FOR RETURNING THE UNUSED
EQUIPMENT. IF MISUSE OF GPC EQUIPMENT IS DETERMINED THE
ELECTRICAL CONTRACTOR RECEIVING EQUIPMENT WILL BE
RESPONSIBLE FOR ALL ASSOCIATED GPC LABOR AND MATERIAL
COST.
4. Connections to all meters, instrument transformers and other equipment affecting the accuracy of these devices shall be made by a qualified Company employee.
B. Mounting and Labeling of Meter Sockets and Metering Cabinets:
1. Meter sockets, metering cabinets and conduit straps shall be installed with:
(a) Metal anchors - brick or solid concrete.
(b) Toggle bolts - other masonry siding.
(c) Wood screws - solid wood.
(d) All mounting hardware shall be ¼ inch (minimum) stainless steel.
(e) Minimum of (4) fasteners shall be used to install any socket or cabinet unless specifically stated otherwise.
(f) Conduit Straps: Conduit must be securely fastened to the wall within 12 inches of the meter socket and 6 inches of final grade level. Conduit straps shall be fastened to walls with the same type fasteners as meter sockets. Refer to Section 4.2.
C. Metering Equipment Locations:
1. Metering equipment shall be located outdoors. For indoor installations, written consent shall be obtained from the local Metering Services Field Supervisor.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 21
2. Metering equipment for secondary voltages shall not be located on utility owned poles. For pole type installation, the equipment shall be installed on Customer owned pole or a free standing structure adjacent to the utility pole.
3. Metering equipment shall be located where it is readily accessible to Company employees. If metering equipment is to be located behind a locked door, the lock shall be keyed for a Georgia Power Meter Room key.
4. Single position and duplex meter sockets shall be located so the center of the meter shall not be higher than 5 feet 6 inches or lower than 3 feet 6 inches, above final grade level.
5. Multi position meter centers shall be located so the center of the upper most meter shall not exceed 5 feet 6 inches above final grade level, and the center of the lowest meter shall be not less than 3 feet 6 inches above final grade level.
6. Safety dictates metering equipment shall be located so Company personnel are provided level, unobstructed working space. This working space shall extend a minimum distance of 3 feet in front and 18 inches to either side of the equipment, and a height of 7 feet from final grade level.
7. A clearance of at least 6 feet shall be provided from machinery or devices having moving parts that are not physically isolated.
8. Where written consent is obtained to locate metering equipment indoors, adequate lighting shall be provided to allow safe installation, maintenance and testing. One light per 8 feet of wall space or portion thereof.
9. Metering equipment shall not be installed in a room, closet or any enclosed space with gas meters or appliances.
10. If necessary to locate metering equipment adjacent to a driveway, walkway, parking lot or any location that will subject the meter to damage, written consent shall be obtained from a qualified Company employee who will have the option to require the Customer to furnish and install protective barriers.
D. General Requirements including Customer Furnished Sockets, Single Position, Multi Position and
Combination Units (1-Phase & 3-Phase):
1. If a Customer chooses to use meter sockets not furnished by the Company, he shall notify the Company well in advance of required service date.
2. Customer purchased equipment shall be UL listed. The label, symbol or other identifying mark used by the testing laboratory shall be affixed to the unit.
3. All Customer and Company furnished sockets shall be a ringless type.
4. Each meter position's cover shall be removable without having to remove any other cover(s).
5. Each meter position shall have a lockable load side disconnect for the Company’s use.
6. All meter spade jaws on residential Customer owned sockets shall be spring reinforced and rated at no less than 200 amps.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 22
7. All Class 320 meter sockets and all sockets used on commercial applications shall have a lever by-pass handle.
8. If the Customer furnishes multi-position meter centers and the supply source is 120/208V Wye service, the Customer shall furnish and install a grounded Fifth Terminal Meter Jaw mounted in the 6 o’clock or 9 o’clock position in each meter socket.
9. If meter sockets are installed one above the other, a minimum 2 inches space shall be maintained between any two units.
10. Conduit for underground service laterals shall extend vertically downward 2 feet below final grade level and conduit ends shall be equipped with a bushing to protect the conductors. The Customer shall extend the conduit below or beyond the concrete footing to provide a minimum 6 inches clearance between the concrete and the conduit end.
11. Conduit must be securely fastened to the wall within 12 inches of the meter socket and 6 inches of final grade level. Conduit straps shall be fastened to walls with the same type fasteners as meter sockets.
12. Safety dictates all meter positions shall be properly covered before the unit is energized.
13. Where service is 277/480V, a load side disconnect shall be installed immediately adjacent to meter socket. The disconnect shall be rated not less than the load to be carried and must have an interrupting rating at system voltage sufficient for the current that must be interrupted. The disconnect shall accept a Company lock in the off position
14. Point of Connection Requirements:
(a) Single position, multi position, combination units, and Customer owned meter sockets shall be constructed so the dedicated line side wiring compartment is separate from breakers, disconnects and compartments housing service equipment or meter sockets and is accessible without having to remove any meter(s).
(b) Company owned service laterals may be terminated in factory assembled metering centers owned by the Customer. Adequate wire way space shall be provided for these laterals.
(c) Line side connectors of meter socket assemblies connected to Company service laterals shall be of a type satisfactory to the Company.
(d) Line side service termination facilities shall be designed to meet the NEMA spaced stud requirements shown in Section 11.7. Installations above 1600 amps shall require approval by a Company engineer.
(e) Any exposed buss work or connections must have a protective barrier.
E. Metering Installations Greater Than 225 Amperes and Less Than 400 Amperes:
1. On Single Phase service: Where the service ampacity rating is greater than 225 amperes, but not over 400 amperes, a self-contained class 320 ampere meter socket furnished by the Company shall be used on 1-Phase 120/240 or 120/208 volt service. When the service ampacity rating is
BlueBook 2017 – Revision Date: April 4th, 2018 Page 23 greater than 400 amperes, but not exceeding 600 amperes, the preferred method of metering is a transocket.
F. Metering Installations In Mobile Home Parks:
1. Overhead Installations:
(a) The metering pole must be of sufficient height to provide service drop clearances as shown in
Section 4.3 and Section 10.3.
(b) The Company’s preferred method for multi-position metering is to furnish the meter sockets.
If a Customer purchases meter socket assemblies, the Customer shall be solely responsible for all maintenance.
(c) The mobile home feeder assembly shall terminate at the mobile home service equipment located adjacent to the mobile home. The feeder assembly shall not terminate in the meter socket.
(d) The grounded conductor (neutral) and grounding conductor shall be bonded together at the service equipment according to the National Electrical Code.
2. Underground Installations:
(a) Mobile homes served by underground distribution must provide meter pedestals for the connection of service laterals and watt-hour meters. Refer to Section 9.3.
(b) A separate meter shall serve each mobile home.
(c) Meter pedestals must be manufactured by an approved manufacturer. Meter pedestals must be approved by the Company before the meter pedestals are installed. The Company does not assume ownership of meter pedestals and is not responsible for maintenance.
(d) Grounding should be in compliance with the National Electric Code (NEC) and applicable state or local codes.
(e) Service equipment and metering socket may be installed on a (manufactured) home, provided it is installed to the requirements of National Electric Code (NEC).
G. Town Home Meter Installation, (Two options are allowed):
1. Gang Metering and Customer Owned Meter Centers:
(a) Ganged meter sockets and Customer owned meter centers shall be mounted on the side of the building, on a pedestal just off the building, or in a kiosk. Customer conduit and conductors (either feeder conductors or service-entrance conductors, underground system) to each townhouse panel board shall be installed according the National Electrical Code (NEC).
(b) Developer will file a private easement with the county for the Customer owned conduit and service cable and conductors before construction will begin where applicable. This easement shall also include permission to install any Customer owned service equipment or any associated gang metering equipment, especially if this electrical equipment is mounted directly
BlueBook 2017 – Revision Date: April 4th, 2018 Page 24 on the building wall. If not mounted on the building, the metering equipment shall be mounted on a durable structure consisting of 6 inches galvanized channel iron or masonry substance of similar strength located in a common space of the association.
2. Service in the Front:
(a) Individual meter sockets shall be mounted on the front of each of the dwellings for service.
Any installation shall be approved before the project begins by a local qualified Company employee.
(b) Unrestricted access to metering equipment and service conductors is required.
H. Communication Tower Meter Installations:
1. A minimum of one, six position gang meter socket, shall be provided on all new communication tower services. A qualified Company employee will determine location for this initial installation.
2. A qualified Company employee shall determine the metering requirements for additional service(s) to existing communication towers.
3. All Meter positions shall have a lever bypass handle.
I. Fire Pumps
1. Fire pump services are not required by the Company to have a disconnect.
2. All fire pump services shall be metered with current transformers.
3. All fire pump metering points shall be clearly identified with permanent letters and/or numbers at least 1 inch in height.
4. All identification requirements are the responsibility of the Customer. Transockets may not be allowed by all local authorities having jurisdiction. On 4-wire 3-Phase services a neutral must be provided at the metering service point.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 25
BlueBook 2017 – Revision Date: April 4th, 2018 Page 26
4.0 Temporary Installations, Single Phase (400 Amps or Less)
1. OVERHEAD TEMPORARY SERVICES
A. General Notes:
1. A 6x6 inch post or pole with a minimum of 5 inches at top, shall be installed by Customer.
The depth shall be no less than 3 feet.
2. Overhead services shall have 16 feet clearance over public driveways, alleys, roads, and construction areas, or any other area where truck traffic is expected.
3. Conductors, conduit, conduit straps, locking nut bushings, connectors, and miscellaneous mounting hardware furnished and installed by Customer.
4. No uninsulated portion of the entrance cable shall come into contact with the meter socket, except at designated termination points.
5. Steel guy to be furnished by Customer if necessary.
6. Connections to all meters, instrument transformers and other equipment affecting the accuracy of these devices shall be made by a qualified employee or contractor.
7. Disconnection of service and removal of service laterals shall be made by Company only.
8. For Temporary Services, meter sockets shall be permanently marked, both internally and externally, with the address number in at least 1 inch high letters and/or numbers using enamel paint in a contrasting color. Plastic or metal labels of at least 1 inch in height are also acceptable. Permanent Ink Markers, such as Sharpies, are not acceptable.
9. All meter sockets shall be ringless.
OH Temporary Service Installation
BlueBook 2017 – Revision Date: April 4th, 2018 Page 27
OH Service, Typical Temporary Installation
BlueBook 2017 – Revision Date: April 4th, 2018 Page 28
UD Service, Typical Temporary Installation
1. There shall be a 4x4 inch post installed by the Customer.
2. Conduit shall be 2½ inch minimum trade size furnished and installed by Customer.
3. Installation to be within 3 feet – 5 feet of power source.
4. All underground service connections shall be made by the Company only.
5. Where aluminum conductors are terminated in meter sockets or other Company owned equipment, inhibitor of the non-grit type shall be used in each conductor connector and around the circumference of each conductor including the grounded conductor (neutral).
6. Disconnections of all underground services shall be made by Company only.
7. For Temporary Services, meter sockets shall be permanently marked, both internally and externally, with the address number in at least 1 inch high letters and/or numbers using enamel paint in a contrasting color. Plastic or metal labels of at least 1 inch in height are also acceptable.
Permanent Ink Markers, such as Sharpies, are not acceptable.
8. All meter sockets shall be ringless.
UD Temporary Service Installation
BlueBook 2017 – Revision Date: April 4th, 2018 Page 29
UD Service, Typical Temporary Installation
BlueBook 2017 – Revision Date: April 4th, 2018 Page 30
5.0 Residential Specifications
OH Service Clearances
BlueBook 2017 – Revision Date: April 4th, 2018 Page 31
Residential Underground Service Installation
BlueBook 2017 – Revision Date: April 4th, 2018 Page 32
3-Wire, OH Service, (120/240V), (225A or Less)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 33
BlueBook 2017 – Revision Date: April 4th, 2018 Page 34
6.0 Overhead Company Owned Sockets
1. Overhead services shall have 16 feet clearance over public driveways, alleys, roads, and construction areas, or any other areas where truck traffic is expected.
2. Conductors, conduit, conduit straps, locking nut bushings, connectors, and miscellaneous
3. All service laterals and connections shall be made by Company only.
5. Where aluminum conductors are terminated in meter sockets or other Company owned
4. Disconnection of service laterals and removal of service connections shall be made by Company only.
5. Meter sockets shall be permanently marked, both internally and externally, with the address number in at least 1 inch high letters and/or numbers using enamel paint in a contrasting color.
Plastic or metal labels of at least 1 inch in height are also acceptable. Permanent Ink Markers, such as Sharpies, are not acceptable.
6. All meter sockets shall be ringless.
200 Amp, Self-Contained Single-Phase Residential Socket - Maximo # 432728
BlueBook 2017 – Revision Date: April 4th, 2018 Page 35
2-Wire, OH Service, (120V), (100A or Less)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 36
3-Wire, OH Service, (120V-240V), (225A or Less), “Residential Only”
BlueBook 2017 – Revision Date: April 4th, 2018 Page 37
3-Wire, OH Service, (120V-240V), (226A to 400A)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 38
3-Wire, OH Service, (120V-240V), (401A to 600A)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 39
3-Wire, OH Service, (120V-240V), (225A or Less), “Commercial Only”
BlueBook 2017 – Revision Date: April 4th, 2018 Page 40
4-Wire, 3-Phase, OH Service, (225A or Less)
1. When this socket is utilized for 277/480Y volt, service, restrictions apply.
2. A load side disconnect shall be used with this socket and be located immediately adjacent to the socket. The disconnecting means shall be rated not less than the load to be carried and shall have interrupting rating at system voltage sufficient for the current that must be interrupted.
3. If service ground fault protection is installed ahead of the meter, the Customer shall be metered with instrument transformers.
4. Overhead services shall have 16 feet clearance over public driveways, alleys, roads, and construction areas, or any other areas where truck traffic is expected.
5. Conductors, conduit, conduit straps, locking nut bushings, connectors, and miscellaneous
6. All service laterals and connections shall be made by Company only.
7. Where aluminum conductors are terminated in meter sockets or other Company owned
8. Disconnection of service laterals and removal of service connections shall be made by Company
9. Meter sockets shall be permanently marked, both internally and externally, with the address
10. All meter sockets shall be ringless.
BlueBook 2017 – Revision Date: April 4th, 2018 Page 41
4-Wire, 3-Phase, OH Service, (225A or Less)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 42
4-Wire, 3-Phase, Delta OH Service (Typical)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 43
4-Wire, 3-Phase, OH Service, Class 320, Self-Contained
BlueBook 2017 – Revision Date: April 4th, 2018 Page 44
7.0 Underground Company Owned Sockets
1. Conduit shall be 2½ inch minimum trade size furnished and installed by Customer.
2. Panel installed adjacent to home where required is furnished by Customer.
3. All underground service connections shall be made by the Company only.
4. Disconnections of all underground services shall be made by Company only.
320 Amp, Self-Contained Single-Phase
Residential or Commercial Socket - Maximo # 432777
BlueBook 2017 – Revision Date: April 4th, 2018 Page 45
2-Wire, UD Service, (120V), (100A or Less)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 46
3-Wire, UD Service, (10-240V or 120-208V), (225A or Less)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 47
3-Wire, UD Service, (120V-240V), (226A to 400A)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 48
3-Wire, UD Service, (120V-240V), (401A to 600A)
BlueBook 2017 – Revision Date: April 4th, 2018 Page 49
3-Wire, UD Service, (120V-240V), (225A or Less), “Commercial Only”
BlueBook 2017 – Revision Date: April 4th, 2018 Page 50
4-Wire, 3-Phase, UD Service, (225A or Less)
1. When this socket is utilized for 277/480Y volt service, restrictions apply.
2. A load side disconnect shall be used with this socket and be located immediately adjacent to the socket. The disconnecting means shall be rated not less than the load to be carried and shall have interrupting rating at system voltage sufficient for the current that must be interrupted.
3. If service ground fault protection is installed ahead of the meter, Customer shall be metered with instrument transformers.
4. Conduit shall be 2½ inch minimum trade size furnished and installed by Customer.
5. Panel installed adjacent to home where required is furnished by Customer.
6. All underground service connections shall be made by the Company only.
7. Disconnections of all underground services shall be made by Company only.
8. Meter sockets shall be permanently marked, both internally and externally, with the address
9. All meter sockets shall be ringless
BlueBook 2017 – Revision Date: April 4th, 2018 Page…