Attachment 2 Env Checklist for Heat Treat Oven.pdf

PDF 251 KB Posted

Attached to
Heat Treat Oven Federal contract opportunity
Solicitation number
sp330020q5038
Issued by
Defense Logistics Agency Distribution

View the file

Other files for this federal contract opportunity

Other files attached to Heat Treat Oven, newest first.
File Type Posted
Post Award Notice 20F0882.pdf PDF
Amendment 0001 Heat Chamber Oven POP ext QA.pdf PDF
SITE VISIT ROSTER 27Aug20.pdf PDF
RFQ chamber oven Synopsis Solicitation.pdf PDF
Attachment 1 Statement of Work for Heat Treat Oven.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENVIRONMENTAL CHECKLIST

Project proponent completes all sections. Please print clearly or type. Submit to Environmental Division for review. Any questions Call Environmental Management Division Chief: 839-4077.

Section 1: General Information Project# Date:

Project Title:

Phone:

Phone:

Proponent/Department:

Project POC:

Section 2: Project Information

Planned Start Date: Planned Completion Date:

Purpose of the project (include any description of operations, functions, and activities associated with the project which will change or occur due to the project):

Attach any Statement of Work, Maps, Drawings or other relevant information.

Page 1 of 3 Env Checklist 8 Apr 2020

Describe the location and area of the proposed project:

Section 3: Specific Project Questions (Check positive responses.)

Facility/Building demolition, renovation, alteration or retrofit?

Installation, repair or removal of fuel storage tanks or distribution facilities?

New heating units or boilers?

Emergency generators or other stationary internal combustion engines?

New sources of air emissions (e.g. paint booths, blasting operations)?

New drinking water services?

Generation or Disposal of domestic wastewater (e.g. rinsewater, washdowns, pressure washing, etc.)?

Installation or removal of potable water backflow prevention devices?

Use or storage of Hazardous materials:

Concrete?

Disposal of Solid wastes such as:

Asphalt?

Topsoil?

Electrical equipment?

Recyclable materials (e.g. steel, cardboard, wood, etc.)?

Asbestos or Asbestos containing building materials?

Disturbance or use of Hazardous substances such as:

Mercury?

PCBs?

Lead Based Paint?

Other?

Cleaners or solvents?

< 1 acre?

Hazardous material storage required?

Storage of HM more than 55 gal?

Will there be temporary or permanent storage of HM?

Page 2 of 3 Env Checklist 8 Apr 2020

Project located in area of Land Use Controls? (See Land Use Control Implementation Plan) Potential to cause any concerns from the neighbors (e.g. dust, noise > 70dB, view)?

Cumulative excavation, trenching, or disturbance of soils?

> 1 acre but < 5 acres?

> 5 acres?

Environmental Requirements/ comments:

Date:

ENVIRONMENTAL REQUIREMENTS

This page to be completed and returned by the Environmental Division.

Page 3 of 3 Env Checklist 8 Apr 2020

Project# Project Title:

Environmental Officer review

While performing work at Defense Distribution Depot San Joaquin the contractor shall comply with all Federal, State and Local environmental protection laws and regulations, the controls of this document, and all specific requirements stated elsewhere in contract specifications.

Phone: 209-839-4534
Check Box3: Yes
POC: David Tank
Proponent: dm-fjif
POC Phone: 209-839-4534
Description: This heat-treat oven is required to meet trans-shipment ISPM 15 Requirements. The existing oven will be processed and disposed of by DDJC.
Location: North of B22-1 where the existing unit is currently located.
Project Title: Heat Treat Oven
Environmental requirements:
Check Box1: Off
Check Box2: Off
Check Box4: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box12: Off
Check Box11: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Yes
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box5: Off
Check Box27: Off
other:
Project#: Non-Capital Equipment Purchase
completiondate: 11/30/20
startdate: 8/31/20
Date1: 4/29/20

File details come from the government source that posted it. Updated .