Attachment 2-Dwgs-McCallSmokejumperBaseResiding(2022.3.25).pdf
PDF 3 MB Posted
- Attached to
- McCall Smoke Jumper Base Residing Federal contract opportunity
- Solicitation number
- 1240LS23R0001
- Issued by
- Department of Agriculture Forest Service
About this file
This document contains details for a federal solicitation seeking a contractor to replace siding on buildings at the McCall Smokejumper Base in Idaho. The Payette National Forest is soliciting bids to replace cedar siding with new cedar and corrugated metal panel siding as indicated on identified buildings. The contractor will furnish all labor, equipment, materials, fuel, transportation and incidentals to complete the project, which will start in summer 2023. The estimated value of construction is between $500,000 and $1,000,000. This is a total small business set aside opportunity. Questions about the solicitation are due by May 3, 2023. Interested contractors must be registered in the System for Award Management and monitor the site for any amendments. The solicitation number is 1240LS23R0001 and is being conducted by the Department of Agriculture Forest Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2-Dwgs-McCallSmokejumperBaseResiding(1986.6.13)-Revised 5-22-2023.pdf | ||
| Amendment 2-McCall Smoke Jumper Base Residing.pdf | ||
| Amendment 1-McCall Smoke Jumper Base Residing.pdf | ||
| Questions and Answers-McCall Smoke Jumper Base Residing 1240LS23R0001.pdf | ||
| Attachment 3-Photos-McCallSmokejumperBaseResiding(2022.3.25).pdf | ||
| Attachment 4-Wage Determination-Building-Valley County Idaho-9-9-2022.pdf | ||
| Attachment 1-Specifications and Submittals.pdf | ||
| 1240LS23R0001-McCall Smoke Jumper Base Residing-Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
samuelpthompson Callout Administrative building and tower samuelpthompson Callout Pilot Offices/Showers samuelpthompson Callout Weight Rm samuelpthompson Callout Motor Sheds samuelpthompson Line samuelpthompson
Bike Storage
Replace w/ fiber cement soffit samuelpthompson
Replace w/ fiber cement soffit replace w/ fiber cement soffit
Replace w/ fiber cement soffit samuelpthompson Callout Replace w/ fiber cement soffit samuelpthompson
Replace w/ fiber cement soffit
Replace w/ fiber cement siding samuelpthompson
Replace w/ fiber cement siding
Install peel and stick membrane on plywood. Air barrier over.
samuelpthompson Callout Sheet metal flashing to match drip edge, under peel/stick samuelpthompson Line samuelpthompson Line samuelpthompson Callout Sheet metal flashing to match drip edge, under peel/stick samuelpthompson Callout Install peel and stick membrane on plywood. Air barrier over.
samuelpthompson Line
Line
File details come from the government source that posted it. Updated .