This document is a set of architectural and engineering construction drawings for the Fergus Falls Maintenance Building project located in Fergus Falls, Minnesota, managed by the U.S. Fish and Wildlife Service (USFW), Midwest Region. The project number is 19-RF-009, and the Infrastructure Management Division, 4604 American Boulevard West, Bloomington, Minnesota 55437 is listed as the responsible entity.
The drawings include comprehensive design specifications across civil, structural, mechanical, and electrical disciplines. Key building features include a maintenance facility with vehicle bays, carpenter shop, mechanical/electrical rooms, office space, storage areas, and mezzanine level. The structural design incorporates steel framing with insulated metal panel systems, concrete slab-on-grade construction, rigid insulation (R-25 minimum), and vapor barriers. Foundation details include spread footings, concrete piers for various equipment pads, and proper drainage provisions. The building is approximately 135 feet long with four vehicle bays and includes specialized areas for pesticide storage, welding, equipment maintenance, and administrative functions. Mechanical systems consist of split air conditioning units, unit heaters, boilers, air compressors, hose reels, radiant mixing blocks, and various pumps and exhaust equipment. Electrical infrastructure includes multiple panelboards (L, M, and P), dedicated circuits for specialized equipment, GFCI receptacles, and detailed power distribution schedules. The construction documents are dated January 26, 2022, and are prepared by licensed professionals including architects, civil, structural, mechanical, and electrical engineers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_Provisions_and_Clauses.docx | DOCX document | |
| Attachment_5_-_Brand_Name_Justification.pdf | ||
| Attachment_4_-_Quote_Schedule.docx | DOCX document | |
| Attachment_1_-_SOW.pdf | ||
| Attachment_3_-_WD_MN20260082.pdf | ||
| Attachment_6_-_Brand_Name_Equipment_Details.pdf | ||
| Sol_140FC226Q0022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FERGUS FALLS MAINTENANCE BUILDING
FERGUS FALLS
WETLAND MANAGEMENT DISTRICT
PROJECT LOCATION
PROJECT LOCATION
SITE MAP
NO SCALE
COUNTY MAP
NO SCALE
DRAWING INDEX
B
IM
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
Fe rg u s Fa lls
M a in t.
B ld g
A .r vt
1/
:0 :1 P M
# SHEET NAME CADD Number A10 FINISHES AND INTERIOR DETAILS FFW351A4.dwg P1 PLUMBING SYMBOLS AND ABBREVIATIONS FFW352P4.dwg P2 SANITARY PLANS FFW353P0.dwg P3 DOMESTIC WATER, COMPRESSED AIR, AND GAS PLAN FFW354P0.dwg P4 PLUMBING SCHEDULES AND DETAILS FFW355P4.dwg P5 RISER DIAGRAMS FFW356P4.dwg M1 MECHANICAL SYMBOLS AND ABBREVIATIONS FFW357M4.dwg M2 HVAC PLANS FFW358M0.dwg M3 ENLARGED PLANS AND DETAILS FFW359M0.dwg M4 MECHANICAL SCHEDULES FFW360M4.dwg M5 MECHANICAL SCHEDULES & DETAILS FFW361M4.dwg E1 ELECTRICAL NOTES AND ABBREVIATIONS FFW362E4.dwg E2 ELECTRICAL SYMBOL LEGEND FFW363E4.dwg E3 STANDARD INSTALLATION REQUIREMENTS FFW364E4.dwg E4 ELECTRICAL SITE PLAN FFW365E0.dwg E5 LEVEL 1 AND MEZZANINE LIGHTING PLANS FFW366E0.dwg E6 LEVEL 1 AND MEZZANINE POWER PLANS FFW367E0.dwg E7 ENLARGED ELECTRICAL PLANS & DETAILS FFW368E0.dwg E8 ELECTRICAL DIAGRAMS FFW369E4.dwg E9 ELECTRICAL SCHEDULES FFW370E4.dwg E10 ELECTRICAL SCHEDULES FFW371E4.dwg E11 ELECTRICAL SCHEDULES FFW372E4.dwg T1 LEVEL 1 AND MEZZANINE TECHNOLOGY PLANS FFW373T0.dwg
# SHEET NAME CADD Number G1 PROJECT TITLE SHEET FFW321G4.dwg G2 PROJECT TITLE SHEET FFW322G4.dwg G3 STANDARD MOUNTING HEIGHTS FFW323G4.dwg G4 CODE PLAN FFW324G4.dwg C1 CIVIL CONSTRUCTION NOTES AND LEGEND FFW325C4.dwg C2 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FFW326C4.dwg C3 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FFW327C4.dwg C4 REMOVALS PLAN FFW328C0.dwg C5 GRADING AND EROSION CONTROL PLAN FFW329C0.dwg C6 SITE PLAN FFW330C0.dwg C7 UTILITY PLAN FFW331C0.dwg C8 CONSTRUCTION DETAILS FFW332C2.dwg C9 CONSTRUCTION DETAILS FFW333C2.dwg S1 STRUCTURAL NOTES FFW334S4.dwg S2 STRUCTURAL NOTES FFW335S4.dwg S3 SCHEDULES & TYPICAL DETAILS FFW336S4.dwg S4 STRUCTURAL FOUNDATION FFW337S0.dwg S5 MEZZANINE FRAMING PLAN & DETAILS FFW338S0.dwg S6 STRUCTURAL DETAILS FFW339S2.dwg S7 STRUCTURAL DETAILS FFW340S2.dwg S8 STRUCTURAL DETAILS FFW341S2.dwg A1 LEVEL 1 AND MEZZANINE FLOOR PLANS FFW342A0.dwg A2 ROOF PLAN & DETAILS FFW343A0.dwg A3 LEVEL 1 REFLECTED CEILING PLAN FFW344A0.dwg A4 EXTERIOR ELEVATIONS FFW345A1.dwg A5 BUILDING SECTIONS FFW346A2.dwg A6 WALL SECTIONS & DETAILS FFW347A2.dwg A7 ENLARGED PLANS & INTERIOR ELEVATIONS FFW348A1.dwg A8 DETAILS & PARTITION TYPES FFW349A2.dwg
A9 DOOR/OPENING SCHEDULE, DOOR/HM FRAME TYPE
ELEVATIONS
FFW350A4.dwg
B
IM
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
M a vi s M a in te n a n c e
S h o p
S .r vt
1/
:5 :0
A M
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
M a vi s M a in te n a n c e
S h o p
S .r vt
1/
:5 :1
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
M a vi s M a in te n a n c e
S h o p
S .r vt
1/
:5 :1
A4
A42
A4
A4 4
10' - 0" 40' - 0"
5'
- 0
6'
- 2
4"
3"
4"
5'
- 3
4"
6'
- 8
4"
6'
- 8
4"
7'
- 1
1" 3'
- 4
1"
9' - 2 1/2" 23' - 9 1/2" 3' - 4" 3' - 0"
4"
1' - 8"
12' - 7" 14' - 11" 3' - 6" 4' - 0" 4' - 0"
BAY #1
BAY #2
BAY #4
BAY #3
NUTS/BOLTS
AND ETC
STORAGE
WELDING W/
METAL
RACKING
102.1
2.2
2.3
2.4
2.5
1.1
1.3
2.6
2.7
1.2
H
J
K
E
F
D
B
4 62
8 1 /2"
8' - 10 1/2"
PE
ST
IC
ID
E
CA
BI
NE
T
2 3
2"
4 1
/2"
4 1
/2"
4"
9'
- 2
1/ 2"
6 1 /2"
2' - 2" 4' - 0" 1' - 3"
5' - 10"
A6
A6
A3 A
A3
A3 A
A3
A3
A6
A6 A
F3
9'
- 0
F2
A6 A
KEYED SHEET NOTES#
1 BOLLARD, TYP; SEE STRUCTURAL
2 FLOOR DRAIN, SEE MECHANICAL
3 EYE WASH & SHOWER, SEE MECHANICAL
4 VEHICLE LIFT, ADDITIVE BID ITEM
5 WASHER / DRYER COMBINED UNIT, ADDITIVE BID
ITEM
6 LOCKERS, SEE ELEVATION
7 JIB CRANE, ADDITIVE BID ITEM
8 HOSE REEL UNIT, SEE MECHANICAL
9 GREASE INTERCEPTOR, SEE MECHANICAL
10 DUST COLLECTOR, SEE MECHANICAL
11 ALIGN MTL STUD WALL WITH COLUMN TYP, SEE
STRUCTURAL
12 CLEAN OUT, SEE MECHANICAL
13 REFRIGERATOR/FREEZER CFCI. OTHER
APPLIANCES, FURNITURE AND FURNISHINGS
GFGI UNLESS NOTED OTHERWISE
14 CONTAINMENT PIT W/ METAL GRATE, SEE
STRUCTURAL
A. GENERAL NOTES APPLY TO ALL DRAWING SHEETS.
B. COORDINATE THIS ARCHITECTURAL PLAN WITH PLANS BY
ALL OTHER DISCIPLINES IN THE DOCUMENTS, SUCH AS
CIVIL, STRUCTURAL, MECHANICAL, PLUMBING,
ELECTRICAL, FIRE PROTECTION PLANS, AND OTHERS AS
NECESSARY. NOTE: SYMBOLS USED IN PLANS BY OTHER
DISCIPLINES MAY DIFFER FROM ARCHITECTURAL
SYMBOLS.
C. REFER TO THE CODE ANALYSIS ON SHEET G4 FOR
REQUIRED FIRE RATINGS, TYPES AND LOCATIONS OF
RATED ASSEMBLIES.
D. TYPICAL INTERIOR PARTITION IS A3 WALL TYPE UNLESS
NOTED OTHERWISE. REFER TO WALL TYPES ON SHEET A8
E. TYPICAL INTERIOR FURRING PARTITION IS F3 UNLESS
NOTED OTHERWISE. REFER TO WALL TYPES ON SHEET A8
F. DIMENSIONS OF INTERIOR WALLS ARE TO FACE OF STUD,
FACE OF CMU, FACE OF CONCRETE, UNLESS NOTED
OTHERWISE.
G. DIMENSIONS OF EXTERIOR WALLS ARE TO EXTERIOR
FACE OF SHEATHING, OR EXTERIOR FACE OF CMU OR
CONCRETE UNLESS NOTED OTHERWISE.
H. AT “ALIGN” NOTE, FINISH FACE OF WALLS TO ALIGN
I. INSTALL ACOUSTIC BATT INSULATION IN ALL RESTROOM
WALLS AND WALLS CONTAINING PLUMBING PIPES.
J. REFER TO ENLARGED PLANS, WHEN PROVIDED, FOR
ADDITIONAL INFORMATION TO SUPPLEMENT THE FLOOR
PLANS.
K. SEE SHEET G3 FOR STANDARD AND ACCESSIBLE
MOUNTING HEIGHTS OF FIXTURES AND ACCESSORIES.
L. REFER TO PLUMBING PLANS FOR FLOOR DRAINS AND
CLEANOUTS.
M. SEE ROOM FINISH SCHEDULE FOR ROOMS WHERE
WINDOW TREATMENTS ARE TO BE INSTALLED
N. PROVIDE METAL AND/OR FIRE-RESISTANT WOOD
BLOCKING AT ALL WALL MOUNTED FIXTURES, FURNITURE,
EQUIPMENT, ACCESSORIES, AND OTHER SPECIALTIES.
O. OWNER SUPPLIED FURNITURE AND EQUIPMENT SHOWN
AS DASHED. NOT IN CONTRACT UNLESS NOTED
OTHERWISE.
P. ALL EXPOSED PIPES, VENTS, AND CONDUIT PENETRATING
WALLS, FLOORS, OR CEILINGS SHALL HAVE FINISHED
TRIM RINGS (ESCUTCHEONS).
Q. ALL NEW AND EXISTING GYPSUM BOARD SURFACES
WITHIN THE CONSTRUCTION LIMITS TO RECEIVE PAINT
UNLESS NOTED OTHERWISE.
R. EXTERIOR LANDINGS, STOOPS, BALCONIES, AND
PORCHES SHALL BE LEVEL ACROSS DOORWAYS AND
SHALL SLOPE AWAY FROM THE BUILDING AT 1/4" PER
FOOT.
S. EXISTING STRUCTURE LOCATIONS ARE APPROXIMATE
AND BASED ON INFORMATION PROVIDED BY THE OWNER.
FIELD VERIFY AS REQUIRED.
GENERAL SHEET NOTES
A4
A4 4
H
J
K
E
F
D
B
4 62
A7
OPEN TO
BELOW
OPEN TO
BELOW
A8
A8
B
IM
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
Fe rg u s Fa lls
M a in t.
B ld g
A .r vt
1/
:0 :5
P M
PLAN
NORTH
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
GROUND LEVEL
100' - 0"
MEZZANINE LEVEL
110' - 10"
TOP OF WALL
120' - 0"
H J KE FDB
102101
GROUND LEVEL
100' - 0"
MEZZANINE LEVEL
110' - 10"
TOP OF WALL
120' - 0"
HJK EF D B
103 101A
GROUND LEVEL
100' - 0"
MEZZANINE LEVEL
110' - 10"
TOP OF WALL
120' - 0"
4 62
3'
- 5
2'
- 6
3' - 0"
18' - 0" 18' - 0"
0"
1' - 8"
1'
- 9
GROUND LEVEL
100' - 0"
MEZZANINE LEVEL
110' - 10"
TOP OF WALL
120' - 0"
4 6
101101A
K
STEEL ANGLE, SEE STRUCTURAL
CONTINUOUS SEALANT, TYP.
INSULATED METAL PANEL
SYSTEM, TYP.
STEEL GIRT, SEE STRUCTURAL
CONCRETE SLAB,
SEE STRUCTURAL
RIGID INSULATION, TYP
R-25 MIN .
2 "
4' - 0"
VAPOR BARRIER, TYP. 2" PREFINISHED METAL
SHEET COVER
SEALANT, TYP.
SEALANT, TYP.
SEALANT, TYP.
EXPANSION MATERIAL AT SLAB EDGE, TYP.
2" RIGID INSULATION TO
TOP OF FOOTING, TYP.
AROUND BLDG PERIMETER
RUN GYP. PAST FACE OF STEEL COLUMN BEYOND
FOUNDATION WALL, SEE
STRUCTURAL
STEEL COLUMN, SEE STRUCTURAL
100' - 5 1/2" T.O.S.
100' - 0"
GRADE
100' - 1" SEE CIVIL
L
B
IM
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
Fe rg u s Fa lls
M a in t.
B ld g
A .r vt
1/
:0 :5
P
J
J J EPO
GFCI
42"
WP
GFCI
24"
WP
GFCI
24"
WP
GFCI
24"
WP
GFCI
24"
VL
WP
GFCI
24"
WP
GFCI
24"
WP
GFCI
24"
WP
GFCI
24"
WP
GFCI
24"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
WP
GFCI
48"48"48"
48"
48"
48" 48" 48"
48" 48"
GFCI
GFCI
42"
43 43
WP
GFCI
24"
WP
GFCI
48" WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
WP
GFCI
48"
B
IM
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
M a vi s M a in t S h o p
M E P .r vt
1/
:1 :2
EPO
GB
GB
GFCI
GFCI
GFCI
GFCI
AC
GFCI
AC
GFCI
60"
GFCI
48"
CTL
CTL
CTL
CTL
B
IM
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
M a vi s M a in t S h o p
M E P .r vt
1/
:1 :2
CTS CTS CTS
IM
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
M a vi s M a in t S h o p
M E P .r vt
1/
:1 :2
M ELECTRICAL EQUIPMENT SCHEDULE
U S F W
F e rg u s F a lls
M a in te n a n c e
S h o p
U S F W
M a vi s M a in t S h o p
M E P .r vt
1/
:1 :2
P M
PANELBOARD: L PANELBOARD: M
PANELBOARD: P
| G1 pdf |
| S4 pdf |
| S6 pdf |
| S7 pdf |
| A1 pdf |
| A5 pdf |
| E6 pdf |
| E7 pdf |
| E10 pdf |
| E11 pdf |
File details come from the government source that posted it. Updated .