Attachment 2_Drawings.pdf

PDF 23 MB Posted

Attached to
XTLF 15-1018 Repair AA and E Storage at F527
Solicitation number
FA3029-25-R-0007
Issued by

About this file

This document is a comprehensive set of architectural and engineering drawings for a construction project at Vance Air Force Base in Enid, Oklahoma. The project, identified as XTLF 15-1018, involves repairing the Security Forces (SFS) Arms, Ammunition, and Explosives (AA&E) Storage in Building 527. The drawings include detailed plans for architectural modifications, structural reinforcements, electrical systems, mechanical systems, and fire alarm installations.

Key technical details include replacing the entry door with a GSA Class 5 door, installing new epoxy floor coating, reinforcing interior walls with steel and plywood layers, adding a new acoustical drop ceiling, and relocating electrical circuits to a new panel outside the room. The renovation aims to comply with UFC 04-026-01 and MIL-HNDBK 1013/1A standards, specifically addressing forced entry resistance requirements for AA&E storage. The project involves removing and reinstalling existing fixtures, replacing window fasteners with tamper-resistant versions, and installing a dehumidifier with specific mounting and condensate drainage requirements. The drawings are dated September 15, 2023, with multiple discipline-specific sheets covering architectural, structural, mechanical, electrical, and fire alarm system modifications.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME:

PROJECT INFORMATION

PROJECT NUMBER:

Project Location:

Project Status: ISSUE DATE:

REFERENCES:

UNITED STATES AIR FORCE

AIR EDUCATION TRAINING COMMAND

ENID OKLAHOMA

140 CHANNEL ST.

VANCE AFB, OK 73705

P: (580) 213-7787

CA# 8716 EXPIRES: 30 JUNE 2024

EXECUTION OF WORK

DESCRIBED WITHIN THIS

PROJECT PLANS AND

SPECIFICATIONS SHALL

OCCUR IAW 48CFR SUBPART

25.2 BUY AMERICAN -

CONSTRUCTION MATERIALS.

IRP REMEDIATION PROGRAM (IRP)

THERE IS KNOWN CONTAMINATION IN

THE PROJECT AREA. SPECIAL

REQUIREMENTS ARE NEEDED.

THERE IS NO KNOWN CONTAMINATION IN

THE PROJECT AREA.

IRP - REMEDIATION PROJECT MANAGER DATE

LEAD BASED PAINT (LBP)

THERE IS NO KNOWN LBP MATERIALS IN THE

PROJECT

THIS FACILITY CONTAINS LBP MATERIALS;

HOWEVER, NOT IN THE AREA OF CONSTRUCTION.

THIS FACILITY CONTAINS LBP MATERIALS THAT

WILL BE ABANDON IN PLACE FOR THIS PROJECT.

THIS FACILITY CONTAINS LBP MATERIALS THAT

WILL BE REMOVED BY ACM/LBP REMOVAL

CONTRACTOR.

THIS FACILITY CONTAINS LBP MATERIALS THAT

WILL BE REMOVED BY THE GOVERNMENT.

THIS FACILITY CONTAINS LBP MATERIALS THAT

WILL BE REMOVED IAW THIS PROJECT PLANS AND

SPECIFICATIONS.

BASE ENVIRONMENTAL ENGINEER DATE

ASBESTOS CONTAINING MATERIAL (ACM) INITIAL APPLICABLE

CONDITION

THERE IS NO KNOWN ACM MATERIALS IN THE

PROJECT

THIS FACILITY CONTAINS ACM MATERIALS;

HOWEVER, NOT IN THE AREA OF CONSTRUCTION.

THIS FACILITY CONTAINS LBP MATERIALS THAT

WILL BE REMOVED BY ACM/LBP REMOVAL

CONTRACTOR.

THIS FACILITY CONTAINS LBP MATERIALS THAT

WILL BE REMOVED BY THE GOVERNMENT.

THIS FACILITY CONTAINS LBP MATERIALS THAT

WILL BE REMOVED IAW THIS PROJECT PLANS AND

SPECIFICATIONS.

USER / FACILITY

MANAGER

71ST S5X - ATPM

AFFS/CEN

CHIEF ENGINEER

71 ISS/CE

PROJECT NUMBER: PROJECT NAME:

PROJECT ACCEPTANCE SIGNATURES

BASE ENVIRONMENTAL ENGINEER DATE

INITIAL APPLICABLE

CONDITION

INITIAL APPLICABLE

CONDITION

VANCE AFB, ENID OK

ORGANIZATION ORGANIZATION

REPRESENTATIVE

SIGNATURE DATE

XTLFXTLF15-1018 15-1018 REPAIR SFS AA&E STORAGE, B527

15-1018 REPAIR SFS AA&E STORAGE, B527

XTLF15-1018

09/15/2023FOR CONSTRUCTION

Christopher Wheeler

Christopher Taylor, PE

James Kite

Maj. Zachary Jarvis

SHEET INDEX

Sheet Number Sheet Name

G-001 COVER

G-002 HAUL ROUTE, ABBREVIATIONS, AND COMMON SYMBOLOGY

A-101 FLOOR PLAN, DETAILS, AND DECONSTRUCTION NOTES

S-101 STRUCTURAL RCP, STRUCTURAL WALL SECTIONS, AND STRUCTURAL NOTES

FA-101 FIRE ALARM - PLAN

M-101 MECHANICAL PLAN

ED-101 ELECTRICAL DECONSTRUCTION PLANS AND DETAILS

E-101 ELECTRICAL POWER AND LIGHTING PLANS

E-601 ELECTRICAL PLANS - RISER AND SCHEDULE

E-602 ELECTRICAL PLANS - RISER AND SCHEDULE

18 Sept 2023

18 Sept 23

21 Sep 23

21 Sep 23

2Oct2023

3 Oct 23

IRP SIGNATURE NOT REQUIRED. ALL WORK DESCRIBED

HEREIN IS INTERIOR TO EXISTING FACILITY.

NA

NA

PRIMARY SITE ACCESS

ROUTE

SECONDARY BASE ENTRY AND

ALL VEHICLE EXIT ROUTE

POV BASE ENTRY ONLY

(RESTRICTED HOURS)

PROJECT LOCATION

SECONDARY HAUL ROUTE TO BE USED ONLY

WHEN PRIMARY GATE IS CLOSED

POV ONLY LANE

PROJECT LOCATION, BUILDING 527

BUILDING 288, CIVIL ENGINEERING INCLUDING

CONSTRUCTION MANAGEMENT

BUILDING 500, GOVERNMENT CONTRACTING

BUILDING 72, VISITOR'S CENTER. USE FOR PASS

APPROVAL PRIOR TO BEGINNING WORK

BUILDING 75, COMMERCIAL VEHICLE INSPECTION

9 CONTRACTOR STAGING AREA

PRIMARY HAUL ROUTE

ARCHITECTURAL DRAFTING CONVENTIONS

Room name

150 SF

View Name

SCALE: 1/8" = 1'-0"

G012

DETAIL VIEW NUMBER

SHEET ON WHICH DETAIL

APPEARS

VIEW NUMBER

NUMBER

DESIGNATION

LETTER/NUMBER

DESIGNATION

A-101

DIRECTION OF VIEW FOR ELEVATION

SHEET ON WHICH ELEVATION APPEARS

ELEVATION VIEW NUMBER

HEIGHT

DESIGNATION

10'-0"

NUMBER

DESIGNATION

HEIGHT DESIGNATION

LETTER/NUMBER

DESIGNATION

NAME DESIGNATION

ROOM NAME/NUMBER SYMBOL

PARTITION TYPE SYMBOL

SPOT/CEILING ELEVATION SYMBOL

DOOR SYMBOL

ELEVATION SYMBOL

GRID SYMBOL

VIEW TITLE

EXTERIOR ELEVATION MARKER

INTERIOR ELEVATION MARKER

BUILDING / WALL SECTION MARKER

DETAIL MARKER

A-101

SIM

8' 4' 0 8'

SCALE: 1/8" = 1'-0"

LEVEL 30

24'-0"

MATCHLINE SYMBOL

1 / A-121

1 / A-122

LETTER/NUMBER

DESIGNATION OF

FLOOR PLAN(S)

DIRECTION OF ELEVATION VIEW

ELEVATION VIEW NUMBER

SHEET ON WHICH ELEVATION APPEARS

A101

SIM SIMILAR (IF APPLICABLE)

CENTERLINE SYMBOL =

DIRECTION OF SECTION VIEW

SECTION VIEW NUMBER

SHEET ON WHICH SECTION APPEARS

A101

SIM SIMILAR (IF APPLICABLE)

GRAPHIC SCALE SYMBOL

NORTH ARROW

SIMILAR (IF APPLICABLE)

PLAN NORTH

ARROW DIRECTION

EXISTING NEW

MILLWORK ELEVATION MARKER

DIRECTION OF ELEVATION VIEW

ELEVATION VIEW NUMBER / SHEET NUMBER1 / A-101

N

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

G-002

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

H A

U L

R O

U

TE

, A B

B R

E V

IA

TI

O N

S , A

N D

C O

M M

O N

S Y

M B

O

LO

G Y

B. DECOCQ

09/15/2023

XTLF15-1018

BCD

DATE: 09/15/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

GENERAL NOTES

1. APPROVED HAUL AND ACCESS ROUTES ARE NOTED ON

THE PLAN. THE CONTRACTOR SHALL ONLY USE ACCESS

ROUTES THAT HAVE BEEN PREVIOUSLY APPROVED BY

CONSTRUCTION MANAGEMENT.

2. CONSTRUCTION MANAGER'S OFFICE IS LOCATED ON THE

FIRST FLOOR, NORTH-WEST CORNER OF BLDG 288.

3. GOVERNMENT CONTRACTINGIS LOCATED ON THE SECOND

FLOOR, NORTH -WEST CORNER OF BLDG 500.

4. LOCAL PURCHASE IS LOCATED ON THE FIRST FLOOR,

SOUTH-WEST CORNER OF BLDG 200.

LEGEND

KEY NOTES

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

1" = 400'-0"1 Map

F527

A

@ AT

A AMPERES

A/C AIR CONDITIONING

AA&E ARMS, AMMUNITION and

EXPLOSIVES

AB ANCHOR BOLT

ABI ADDITIVE BID ITEM

ACT ACOUSTICAL CEILING TILE

ADJ ADJACENT, ADJUSTABLE

ADV ADVANTOR SYSTEM

AFF ABOVE FINISH FLOOR

AFL ATHLETIC FLOORING

AGGR AGGREGATE

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM, AL ALUMINUM

AP ACRYLIC PANEL

APPROX APPROXIMATE

APVD APPROVED

ARCH ARCHITECT, ARCHITECTURAL

ATTEN ATTENUATOR, ATTENUATION

AWP ACOUSTIC WALL PANEL

B

BB BASE BID

BD BOARD

BITUM BITUMINOUS

BLDG BUILDING

BLKG BLOCKING

BOD BASIS OF DESIGN

BOT, BTM BOTTOM

BRG BEARING

BRK BRICK

BSMT BASEMENT

C

C TO C CENTER TO CENTER

CAB CABINET

CBB CEMENTITIOUS BACKER BOARD

CC CONTRACTOR CONNECT

CF CONTRACTOR FURNISHED

CFM COLD-FORMED METAL

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

CI CONTRACTOR INSTALLED

CJ CONSTRUCTION CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CPT CARPET

CR CONTRACTOR ROUGH-IN

CT CERAMIC TILE

D

DB DOUBLE

DEG DEGREES

DEMO DEMOLITION, DEMOLISH

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DN, DWN DOWN

DP DAMPPROOFING

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING

DWP DECORATIVE WALL PANEL

DWR DRAWER

E

EA EACH

EF EXHAUST FAN

EIFS EXTERIOR INSULATION & FINISH

SYSTEM

ELEC ELECTRICAL

ELEV ELEVATION

EPC EPOXY COATING

EQ EQUAL

EQPT EQUIPMENT

ES EMERGENCY SHOWER

EW EYE WASH

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION, EXPOSED

EXP JT,

EJ

EXPANSION JOINT

EXT EXTERIOR

F

F FAHRENHEIT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FHS FIRE HOSE STATION

FIN FINISHED

FLR FLOOR

FPRF FIREPROOF

FRP FIBER-REINFORCED PLASTIC

FT FOOT, FEET

FTG FOOTING

FURR FURRED, FURRING

FWC FABRIC WALL COVERING

G

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GF-GI GOVERNMENT

FURNISHED-GOVERNMENT

INSTALLED

GFCI GROUND-FAULT CURRENT

INTERRUPTER

GL GLASS, GLAZING

GRT GROUT

GT GLASS TILE

GWB GYPSUM WALLBOARD

GYP GYPSUM

H

HB HOSE BIB

HC HANDICAPPED

HC HOLLOW CORE

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HMB HORIZONTAL METAL BLINDS

HORIZ HORIZONTAL

HPL HIGH PRESURE LAMINATE

HT HEIGHT

HTR HEATER

HVAC HEATING, VENTILATING, AND

AIR CONDITIONING

Hz HERTZ

I

ID INSIDE DIAMETER

IN INCH

INSUL INSULATION

INT INTERIOR

J

JST JOIST

JT JOINT

L

LAM LAMINATE

LAV LAVATORY

LB POUND

LBL LABEL

LED LIGHT EMITTING DIODE

LF LINEAL FEET

LN LINOLEUM

LVR LOUVER

LVT LUXURY VINYL TILE

LWT LIGHTWEIGHT

M mA MILLIAMP

MACH MACHINE

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MBR MEMBER

MC MEDICINE CABINET

MC METAL CLAD

MCB MAIN CIRCUIT BREAKER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MEZZ MEZZANINE

MFR MANUFACTURE, MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MK MARK

ML METAL LOCKER

MLDG MOLDING

MO MASONRY OPENING

MSNRY MASONRY

MSP METAL SPLASH PAN

MT METAL THRESHOLD

MTD MOUNTED

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WEATHERPROOFING

N

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NPRN NEOPRENE

NTS NOT TO SCALE

O

OA OVERALL, OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

OZ OUNCE

P

PART PARTIAL

PL PLATE, PLASTIC

PLAS PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PNL PANEL, PANELBOARD

PREFAB PREFABRICATED

PREFIN PREFINISHED

PRJ PROJECTION

PROP PROPERTY

PSI POUNDS PER SQ IN

PT PAINT

PTD PAINTED

PTDD PAPER TOWEL DISPENSER /

DISPOSAL

PTN PARTITION

PVC POLYVINYL CHLORIDE

Q

QT QUARRY TILE

QZ QUARTZ MATERIAL

R

RA RETURN AIR

RAF RAISED ACCESS FLOORING

RB RUBBER BASE

RD ROAD, ROOF DRAIN

RECT RECTANGULAR

REF, RE REFER, REFERENCE

REINF REINFORCE, REINFORCED

REP REPRESENTATIVE

REQD REQUIRED

RFG ROOFING

RFL RUBBER FLOORING

RH ROBE HOOK

RH RELATIVE HUMIDITY

RM ROOM

RND ROUND

RS ROLLER SHADES

RST RUBBER STAIR TREADS

S

S SIGNAGE

SB SPLASH BLOCK

SBP SACRIFICIAL BARRIER PANEL

SC SEALED CONCRETE

SCHED SCHEDULE

SCN STAINED CONCRETE

SD SOAP DISPENSER

SECT SECTION

SEQ SEQUENCE

SHT SHEET

SIM SIMILAR

SJ STUCCO JOINT, SAWN JOINT

SMC SUSPENDED METAL CEILING

SND SANITARY NAPKIN DISPENSER

SPD SURGE PROTECTION DEVICE

SPECS CONTRACT SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

SSM SOLID SURFACE MATERIAL

ST STAIN

STD STANDARD

STL STEEL

STN NATURAL STONE

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SWC SUSPENDED WOOD CEILING

T

T TREAD

TAB TESTING ADJUSTING AND

BALANCING

TC TOWEL DISPENSER

TFMR TRANSFORMER

THK THICK

THRU THROUGH

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TP TOILET PARTITION

TS FLOORING TRANSITION

TT TILE TRIM

TTD TOILET TISSUE DISPENSER

TYP TYPICAL

TZ TERRAZZO

U

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

UNO UNLESS NOTED OTHERWISE

UR URINAL

V

VAC VOLTS, ALTERNATING CURRENT

VB VINYL BASE, VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VF VINYL FLOORING

VP VENT PIPE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W

W/ WITH (COMB. FORM)

W/O WITHOUT

WB WOOD BASE

WC WATER CLOSET

WD WIDTH, WINDOW DIMENSION, WOOD

WDW WINDOW

WF WOOD FLOORING

WH WATER HEATER

WM WALK-OFF MAT

WP WATERPROOF

WR WASTE RECEPTACLE

WS WEATHERSTRIPPING

WT WINDOW TILE

ABBREVIATIONS

N

A-101

A-101

A-101

NEW GSA CLASS 5 DOOR,

NEW EPOXY FLOOR COATING

A-101

3' - 0" 12' - 4"

WEAPONS STORAGE LOCKER, GF-GI,

REPAIR ALL EXISTING FLOOR

PENETRATIONS PRIOR TO APPLYING

NEW FLOOR FINISH SYSTEM

20' - 10"

A-1018

S im

LOCATION

PHOTO

PANEL BOARD

CLEARANCE

1' - 8"

0' - 3"

REMOVE AND

REINSTALL

EXISTING BULLET

CATCH DEVICE.

REINSTALL IN

SAME LOCATION

AS PREVIOUS.

MECH ROOM

ELECT. ROOM

AA&E

NEW ACOUSTICAL

DROP CEILING, 24" X

24"

EXISTING CMU

WALL

NEW GSA CLASS 5

DOOR FRAME

SBP

HEAVY DUTY CORNER

TRIM, MATCH METAL

GAGE OF TRIM PIECE

6/A101

30# FELT, WRAP AT EDGE

OF ROUGH OPENING

0' - 3"

SBP

J-CHANNEL AT EDGE,

SECURE TO HAT

CHANNEL, (TYP. ALL

SIDES)

EXISTING ISSUE

WINDOW FRAME

EXISTING

CMU

7/8" HAT CHANNEL

IMPACT RESISTANT

GWB

30# FELT

V E

R

IF

Y

NOTE THIS VIEW:

1. REMOVE EXISTING ENTRY DOOR

2. PREPARE JAMB AT HINGE SIDE TO

RECEIVE NEW MOUNT.

3. SAW- CUT CMU WALL AT LATCH SIDE

TO MEET REQUIRED ROUGH OPENING

WIDTH FOR NEW GSA DOOR

A-1012

DROP CEILING

8' - 0"

4" COVE BASE

7/8" HAT CHANNEL, 24"

O.C., ADHERE TO SBP WITH

SELF DRILLING SCREWS,

12" O.C., STAGGERED

IMPACT

RESISTANT GWB

SUSPENDED CEILING

WALL ANGLE

CEILING TILE

SBP @ WALL, RE: 2/S-101 FOR

CONNECTION DETAILS

SBP @ CEILING, RE: 2/S-101

FOR CONNECTION DETAILS

1/2" GAP BETWEEN BOTTOM

OF WALL PANELS AND

EXISTING CONCRETE FLOOR

ADHERE 30# FELT TO

SURFACE OF CMU WALL,

RUN FROM FLOOR TO 6"

ABOVE SBP AT CEILING

SECURE UNISTRUT 24" O.C.

E.W. TO SBP AT CEILING

WITH SELF DRILLING 3/4"

SCREWS, 12" O.C.

UNISTRUT HANGAR

"T", SECURE

CEILING GRID SYSTEM

SURFACE MOUNTED

RECEPTACLE

HANGAR WIRE

SHELF ANGLE AT PERIMETER

(TYP.), RE: S-1O1

METAL INSIDE X CORNER

MOULDING

IMPACT RESISTANT GWB

7/8" HAT CHANNEL , RUN

HORIZONTAL, 24" O.C.

S B

P

SBP

ADHERE 30# FELT TO

EXISTING CMU WALL, (TYP.)

1. REMOVE EXISTING VCT FLOORING AND WALL BASE FROM PROJECT AREA, PREPARE EXISTING CONCRETE FLOOR TO RECEIVE

NEW EPOXY COATING.

2. REMOVE EXISTING DROP CEILING, INCLUDING ALL EXISTING HANGARS, TRACK AND EDGE TRACK FASTENERS. REFERE TO

MECHANICAL AND ELECTRICAL SHOTS FOR CEILING MOUNTED FIXTURES AND EQUIPMENT

3. USER TO RELOCATE ALL FURNITURE AND EQUIPMENT PRIOR TO CONTRACTOR WORK BEGINS.

DECONSTRUCTION NOTES; REFERENCE

KEY PLAN FOR PROJECT AREA:

EXISTING INTERIOR PARTITION

SCH. 10 STEEL SLEEVE, SIZED

1.5X'S THE DIA. OF THE PASS-THRU

PIPE. ENDS OF SLEEVE SHALL BE

FLUSH W/ EACH SURFACE OF THE

WALL.

PACK W/ MIN. 4 PCF MINERAL

WOOL BATT INSULATION. RECESS

FROM BOTH SIDES TO

ACCOMMODATE FILL MATERIAL.

ESCUTCHEON PLACE IN SEALANT

FLUSH AGAINST WALL

MIN. 1-1/4" UL LISTED SEALANT,

FLUSH WITH BOTH SIDES OF

WALL

PASS-THROUGH PIPE, RE:

INDIVIDUAL SHEETS FOR SIZE

CALL-OUT

SBP

ESCUTCHEON, SEAL

AROUND OUTER

EDGE AND PAINT

5'8" GWB, RE: TO

DETERMINE REQUIREMENT

BY PENETRATION HEIGHT

AT GWB PENETRATIONS

CENTER A 1'-0" LENGTH OF

HAT CHANNEL ABOVE AND

BELOW PENETRATION

/5 A-101

HVAC SUPPLY

REGISTER

LED RECESSED 24" x 24" LIGHT

CEILING MOUNT HORN STROBE

HVAC RETURN

REGISTER

HEAT DETECTOR

WALL RECEPTACLE, RE: E-101

PANEL BOARD, RE: E-101

REPLACE EXISTING FASTENERS

ALONG EXTERIOR OF WEAPONS

PASS-THROUGH WITH NON-

REVERSING TAMPER RESISTANT

FASTENERS, (TYP.)

NOTE THIS VIEW:

1. REMOVE ALL EXISTING PAINT FROM

PASS-THROUGH WELDED WIRE

MESH

2. REPAINT WELDED WIRE MESH AND

FRAME TO MATCH COLOR OF NEW

DOOR.

REMOVE EXISTING

DOOR AND FRAME

SAWCUT AND REMOVE CMU

AS NEEDED FOR

INSTALLATION OF NEW

DOOR. CONFIRM CLEAR

OPENING REQUIREMENTS

WITH MANUFACTURER

PRIOR TO CUTTING AND

REMOVAL OF CMU.

DOOR INSTALLATION NOTES

1. DELIVERY OF THE CLASS 5 DOOR MUST BE COORDINATED WITH CONSTRUCTION MANAGER.

2. MANUFACTURERS REP MUST BE ON-SITE FOR INSTALLATION.

3. CONTRACTOR TO PROTECT EXISTING CONSTRUCTION AND FINISHES. DAMAGES RESULTING

FROM THIS WORK MUST BE REPAIRED TO THE SATISFACTION OF THE AFFS CONSTRUCTION

MANAGER AT NO COST TO THE GOVERNMENT..

4. ANY DISASSEMBLY OF STRUCTURE BY THE CONTRACTOR TO AID DOOR DELIVERY OR

INSTALLATION WILL BE RETURNED TO EXISTING CONDITION OR REPLACED WITH NEW

MATERIALS OF THE SAME DIMENSION, QUALITY, AND COLOR AT NO ADDITIONAL COST TO

THE GOVERNMENT.

ARCHITECTURAL GENERAL NOTES

1. THE CONTRACTOR TO IMMEDIATELY NOTIFY THE CONSTRUCTION MANAGER OF ANY

DISCREPANCIES BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, AND/OR BETWEEN

THE CONSTRUCTION DOCUMENTS AND ACTUAL JOB CONDITIONS WHICH WILL AFFECT THE

EXECUTION OF THE WORK AS INDICATED.

2. ALL ROMS ADJACENT TO CONSRTUCTION AREA MUST REMAIN ACCESSIBLE BY FACILITY

EMPLOYEES. DO NOT BLOCK DOORWAYS.

3.

4. CONTRACTOR TO VERIFY AND ALL DIMENSIONS DURING THE CONSTRUCTION LAYOUT OF

THE WORK. THE FOLLOWING GUIDANCE APPLIES TO DIMENSIONS USED ON THE

ARCHITECTURAL DRAWINGS:

A. THE CONTRACTOR WILL USE DIMENSIONS INDICATED ON THE DRAWINGS.

B. DO NOT SCALE FROM THE DRAWINGS.

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

A-101

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

FL

O

O R

P

LA

N , D

E

TA

IL

S

, A N

D D

E C

O N

S

TR

U C

TI

O

N N

O

TE

S

B. DECOCQ

09/15/2023

XTLF15-1018

J MORGAN

DATE: 09/15/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

3/8" = 1'-0"3

COMPOSITE FLOOR PLAN AA&E 128

2'1' 4'0

SCALE: 1/2" = 1'-0" KEY PLAN3/8" = 1'-0"4

REFLECTED CEILING PLAN AA&E 128

3" = 1'-0"9

GSA DOOR JAMB/HEADER DETAIL

3" = 1'-0"7

WALL DETAIL @ ISSUE WINDOW

1/2" = 1'-0"1

DECONSTRUCTION @ DOOR

1 1/2" = 1'-0"5

WALL DETAIL (TYP.)

3" = 1'-0"6

INSIDE CORNER DETAIL

1'0 6"3"

SCALE: 3" = 1'-0"

2'0 1'6"

SCALE: 1 1/2" = 1'-0"

3" = 1'-0"10

INTERIOR WALL PENETRATION

N

PLAN LEGEND

NTS8

ISSUE WINDOW RENOVATION

DECONSTRUCTION

1/2" = 1'-0"2

ELEVATION AT DOOR

N

N

0 2' 4' 8'

SCALE: 3/8" = 1'-0"

S-101

SCHEMATIC DIAGRAM TO SHOW

PANEL ORIENTATION TO TRUSS

AND FASTENER LAYOUT.

CONTRACTOR TO VERIFY JOIST

LOCATIONS AND DETERMINE

ACTUAL PANEL EDGE LOCATIONS.

EXISTING TRUSS, TYP.

4' X 8' SBP PANEL, TYP.

LONG EDGE PERPENDICULAR TO

TRUSS CORD.

STAGGER PANEL EDGES

6 x 3-1/2 x 3/8" PERIMETER

SHELF ANGLE, CONTINUOUS,

MITER AT CORNERS.

3/8" X 2" CARRIAGE BOLT, TAMPER

RESISTANT HEAD, 24" O.C., SECURE SBP

TO TOP OF SHELF ANGLE, NUT SIDE

DOWN.

SBP AT CEILING

SQUARE U-BOLT, STRADDLE

BOTTOM CHORD OF TRUSS.

SECURE PANEL THROUGH

CHANNEL WITH A STEEL LOCK

WASHER AND NUT.

EXISTING TRUSS

EXISTING CMU WALL

2'1' 4'0

SCALE: 3/4" = 1'-0"

1'0 6"3"

SCALE: 3" = 1'-0"N

2" TYP2"

TYP, MAY SHIFT BOLT UP TO 6" FROM

PANEL EDGE AS REQUIRED TO CLEAR

JOIST WEB INTERFERENCE. 3/8" X 4" CARBON STEEL

LARGE DIAMETER CONCRETE

ANCHORS, 24" O.C.

3/16"X 2-3/4" CONCRETE HEX

HEAD SCREW ANCHORS 24"

O.C. EACH WAY ALONG PANEL

EDGES AND FIELD.

0' - 6" MAXIMUM

S-101

NN

STRUCTURAL NOTES FOR CEILING PANELS:

1. ALL PANELS SHALL RUN THE LONG EDGE

PERPENDICULAR TO DIRECTION OF TRUSS.

2. PANEL SHORT EDGE SHALL ALIGN WITH CENTER

LINE OF BOTTOM CHORD OF TRUSS.

3. PANEL PERIMETER EDGE SHALL BE SECURED TO

SHELF ANGLE. MAINTAIN A 1/4" GAP BETWEEN

EDGE AND WALL FACE.

MECH ROOM

ELECT. ROOM

AA&E

3/8"-16 THREAD SIZE, 4"

INSIDE WIDTH, 3" HEIGHT

SQUARE U-BOLT, 22" O.C.

ALONG JOIST.

EXISTING TRUSS

SBP AT CEILING

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

S-101

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

S

TR

U C

TU

R

A L

R C

P , S

T R

U C

TU

R

A L

W A

LL

S

E C

TI

O

N S

, A N

D S

TR

U

C

TU

R A

L N

O

TE

S

B. DECOCQ

09/15/2023

XTLF15-1018

C. TAYLOR

DATE: 09/15/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

3/4" = 1'-0"1

AA&E 128 CEILING PANEL PLAN- STRUCTURAL

3" = 1'-0"2

SBP WALL AND CEILING CONNECTIONS IN AA&E 128

3" = 1'-0"3

SECTION AT TRUSS, (TYP.)

H F

J

STO

OFFICE

OFFICE

MECH ROOM

RECEPTION

OFFICE

120A

DETENTION

AA&E

CORRIDOR

DUTY DESK

LOBBY

AA&E

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

FA-101

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

F

IR

E A

L A

R M

P

L A

N

MICHAEL

JORDAN

08/29/2023

XTLF15-1018

CODY HANEY

DATE: 08/29/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

FIRE ALARM NOTES

EXISTING FIRE ALARM JUNCTION BOX MUST REMAIN.

EXISTING HORN STROBE AND SMOKE DETECTOR MUST BE REMOVED, STORED AND

REINSTALLED.

PULL WIRING BACK TO JUNCTION BOX AND RECONNECT DEVICES IN HALLWAY DURING

CONSTRUCTION.

DURING CONSTRUCTION, INSTALL A MC CABLE THROUGH 3/4" CONDUIT WALL

PENETRATION IN A ROOM AFTER WALLS HAVE BEEN REINFORCED.

1/8" = 1'-0"1

FIRE ALARM AA&E 128

NTS2

FIRE ALARM

JUNCTION BOX

REMOVE AND STORE HORN PROBE

REMOVE AND STORE HEAT SENSOR

FIRE ALARM

PENETRATION

GENERAL NOTES

1. CONTRACTOR MUST VERIFY LOCATION AND DISTANCE OF EQUIPMENT AND

WIRING ON THIS SHEET IN THE FIELD.

2. REFER TO SHEET A-101 FOR DETAILS ON WALL PENETRATION.

3. CONTRACTOR MUST VERIFY IN FIELD EQUIPMENT LOCATION AND WIRING TO JUNCTION

BOX.

4. REINSTALL IN SAME GENERAL LOCATION AS PRIOR TO CONSTRUCTION START.

COORDINATE FIRE ALARM EQUIPMENT LOCATIONS WITH LED LIGHTING AND HVAC

REGISTERS.

5. FIRE ALARM CONTROL PANEL IS LOCATED IN THE GENERATOR ROOM.

KEY PLAN

N

8'4' 16'0

SCALE: 1/8"=1'-0"

STO

INTERR.

OFFICE

OFFICE

MECH ROOM

RECEPTION

ROUTE CONDENSATE LINE

UNDER RETURN PLENUM

TO FLOOR DRAIN.

ROUND TAP INTO BOTTOM OF

ZONE 5 SUPPLY DUCT.

DH

DC

INSTALL DEHUMIDIFIER

CONTROLLER. WIRE TO THE

DEHUMIDIFIER IN THE MECHANICAL

ROOM. RE: SHEET A-101 FOR WALL

PENETRATION DETAIL.

INCLUDE THE MIN.

REQUIRED LENGTH OF

FLEX DUCT AT

DEHUMIDIFIER INLET

AND OUTLET FOR

VIBRATION ISOLATION.

AIR

HANDLING

UNIT

RETURN

TRUNK

ZONE 5 SUPPLY DUCT

ROUND TAP INTO RETURN PLENUM

M-101

10"ø 10"ø

M-101

T

CAP EXISTING

DUCT

COORDINATE WITH

ARCHITECTURAL TO

ALIGN CEILING GRID IN

ORDER TO CENTER

SUPPLY DIFFUSER

UNDER EXISTING DUCT.

16"x7"

30"x8"

16"x8"

12" ROUND TAP INTO

EXISTING DUCT. 12"

FLEXIBLE DUCT TO

REGISTER.

EXISTING

THERMOSTAT

TO REMAIN.

THIS DUCT SERVES OTHER PARTS

OF THE BUILDING. DISASSEMBLE

AND REINSTALL BACK TO EXISTING

CONDITION. COORDINATE

DOWNTIME OF OTHER AREAS WITH

CONSTRUCTION MANAGER.

SD-1

400 CFM

RG-1

100 CFM

100 CFM1

USE EXISTING

DAMPERS FOR

TAB.

CAP

EXISTING

DUCT AA&E

DH

FLEX.

DUCT

ROUTE

CONDENSATE

LINE UNDER

RETURN

PLENUM TO

FLOOR DRAIN.

AIR

HANDLING

UNIT

ZONE 5 SUPPLY DUCT

RETURN

PLENUM

10"ø

10"ø

RETURN

PLENUM

AIR

HANDLING

UNIT

ZONE 5

SUPPLY

DUCT

EXISTING

FLOOR

DRAIN

LINETYPE LEGEND

NEW DUCT

DEMO DUCT

EXISTING DUCT

CONDENSATE LINE

MECH ROOM

ELECT. ROOM

AA&E

ELECTRICAL

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

M-101

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

M E

C H

A N

IC

A

L P

L A

N

EDGAR

ESTRADA

09/15/2023

XTLF15-1018

CHARLES

SNYDER

DATE: 09/15/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

1/4" = 1'-0"1

MECHANICAL FLOOR PLAN

SHEET NOTES

1. CONFIGURE THE CONTROLS TO LIMIT THE RELATIVE HUMIDITY TO NO GREATER THAN 40%.

2. ALWAYS MAINTAIN A CONSTANT DOWNWARD SLOPE FROM THE DEHUMIDIFIER

CONDENSATE DRAIN TO FLOOR DRAIN AND DO NOT ALLOW SOFT TUBING TO CURL UP

WHICH MAY RESULT IN AIR LOCK.

3. PROVIDE EXTERIOR INSULATION ON ALL NEW DUCTWORK IN THE MECHANICAL ROOM AND

NEW SUPPLY DUCTWORK ABOVE THE OCCUPIED SPACE.

4. IN THE AREA OF WORK, DISASSEMBLE AND REINSTALL DUCTWORK SHOWN AS

"EXISTING". IN THE EVENT OF DAMAGE DURING DISASSEMBLY OR REINSTALLATION,

REPLACE DAMAGED COMPONENTS WITH LIKE KIND AND QUALITY. PROVIDE THE PORTIONS

OF DUCTWORK SHOWN AS "NEW".

5. DUCTS MUST BE INSTALLED IN ACCORDANCE WITH "SMACNA - HVAC DUCT CONSTRUCTION

STANDARDS - METAL AND FLEXIBLE, 4TH EDITION".

6. PROVIDE CONDENSATE DRAIN PIPING IN ACCORDANCE WITH MANUFACTURER'S

INSTRUCTIONS.

1/4" = 1'-0"2

SOUTH ELEVATION AT AHU

1/4" = 1'-0"3

EAST ELEVATION AT AHU

DH

KEY NOTES

THIS AIR SUPPLY SUBJECT TO TAB (TESTING, ADJUSTING, AND BALANCING).

PROVIDE FLOOR-ANCHORED PLATFORM FOR DEHUMIDIFIER. PLATFORM MUST HAVE A

MINIMUM HEIGHT OF 4 INCHES FOR CONDENSATE DRAINAGE. CAP THE DEHUMIDIFIER'S

OUTSIDE AIR INTAKE AS IT IS NOT USED IN THIS APPLICATION.

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

KEY PLAN

N

M

F

J

H

D

J

H

F

M G

F C

I

STO

OFFICE

OFFICE

MECH ROOM

ELECT. ROOM

OFFICE

RECEPTION

GUARD MOUNT

AA&E

CORRIDOR

ADV

MDP

PANEL PPB

ADV

WALL PENETRATION

MOTION SENSOR

CAMERAS

QUADPLEX RECEPTACLE

DUPLEX RECEPTACLE

EMERGENCY LIGHT

DEMOLISHED 2' x 4'

FLUORESCENT LIGHT

NEW 2' x 2' LED LIGHT

SINGLE POLE LIGHT SWITCH

DIMMER LIGHT SWITCH

ELECTRICAL PANEL

ADVANTOR CAMERA

SYSTEM BOX

EXISTING TELEPHONE

JUNCTION BOX

DUPLEX RECEPTACLE,

GFCI

HEAT DETECTOR

FIRE ALARM - HORN STROBE

CEILING MOUNT

WIRING CONCEALED IN CEILING

OR WALLS. ALL WIRES ARE #12

AWG MINIMUM

EXPOSED RACEWAY

MECH ROOM

ELECT. ROOM

AA&E

ELECTRICAL

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

ED-101

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

E L

E C

T R

IC

A

L D

E C

O N

S T

R U

C T

IO

N

P L

A N

S A

N D

D E

T A

IL

S

MICHAEL

JORDAN

09/15/2023

XTLF15-1018

RYAN

SUDLOW

DATE: 09/15/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

DETAIL ELECTRICAL NOTES FOR DEMOLITION

DECONSTRUCT EXISTING ELECTRICAL PANEL PPB IN AA&E ROOM AS SHOWN IN PICTURE 2.

DECONSTRUCT EXISTING FLUORESCENT LIGHTING IN AA&E ROOM AS SHOWN IN PICTURE 3.

EXISTING LOCATION OF ADVANTOR SYSTEM FOR REFERENCE ONLY.

COORDINATE WITH AFFS CONSTRUCTION MANAGER ON THE REMOVAL AND STORAGE OF

THE CAMERAS WITHIN AA&E ROOM AS SHOWN IN PICTURE 4.

DECONSTRUCT EXISTING RECEPTACLES AND LIGHT SWITCHES IN AA&E ROOM.

DECONSTRUCT EXISTING EMERGENCY LIGHT IN AA&E ROOM AS SHOWN IN PICTURE 5.

TELEPHONE MUST BE REMOVED AND STORED.

DECONSTRUCT EXISTING "OUTSIDE HALL LIGHTS" SWITCH. NEW LIGHT SWITCH MUST BE

RECONNECTED TO "OUTSIDE HALL LIGHTS" AND ROUTED THROUGH PENETRATION DETAIL,

REFERENCE A-101 SHEET.

NTS2

DECONSTRUCT EXISTING PANEL PPB

NTS3

DECONSTRUCT CEILING LIGHTS

NTS4

REMOVE AND STORE ADVANTOR SYSTEM

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

EXISTING ADVANTOR LOCATION, FOR

REFERENCE ONLY.

GENERAL NOTES

1. CONTRACTOR MUST VERIFY LOCATION AND DISTANCE OF EQUIPMENT AND

WIRING ON THIS SHEET IN THE FIELD.

DECONSTRUCT LIGHTING

DECONSTRUCT LIGHTING

DECONSTRUCT LIGHTING

DECONSTRUCT EXISTING PANEL PPB

NTS5

DECONSTRUCT EMERGENCY LIGHT

NTS6

DECONSTRUCT LIGHTING SWITCHES

DECONSTRUCT BOTH

LIGHTING SWITCHES

1/4" = 1'-0"1

ELECTRICAL DECONSTRUCTION AA&E 128

DECONSTRUCT EMERGENCY LIGHT

DECONSTRUCT RECEPTACLE

ELECTRICAL SYMBOLS:

N

KEY PLAN

COORDINATE THE REMOVAL AND

STORAGE OF CAMERA SYSTEM WITH AFFS

CONSTRUCTION MANAGER

GFCI

DD

M

M

18"

18"

18"

PANEL PPB - 2

RADIO SHELF 2

RADIO SHELF 1

RADIO SHELF 3

RADIO SHELF 4

DUPLEX

DUPLEX

DUPLEX

STO

OFFICE

OFFICE

MECH ROOM

ELECT. ROOM

OFFICE

OFFICE

RECEPTION

OFFICE

120A

GUARD MOUNT

AA&E

CORRIDOR

DUTY DESK

LOBBY

ADV

CONNECT TO

BASE STATION RADIO

TO RADIO

TELEPHONE LINE

PENETRATION

COMMUNICATION

PENETRATION

TO

COMMUNICATION

FIRE ALARM

PENETRATION

ADVANTOR SYSTEM

TO CAMERA

SYSTEM

4 x 1 1/4" 4 x 3/4"

MULTIPLE PENETRATIONS

FOR MULTIPLE SYSTEMS

STO

OFFICE

OFFICE

MECH ROOM

ELECT. ROOM

OFFICE

OFFICE

RECEPTION

OFFICE

120A

GUARD MOUNT

AA&E

CORRIDOR

DUTY DESK

LOBBY

TO OUTSIDE

HALL LIGHTING

MECH ROOM

ELECT. ROOM

AA&E

ELECTRICAL

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

E-101

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

E

LE

C

TR

IC

A

L P

O W

E R

A N

D L

IG

H

T

IN

G P

LA

N

S

MICHAEL

JORDAN

09/15/2023

XTLF15-1018

RYAN

SUDLOW

DATE: 09/15/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

ELECTRICAL NOTES

PROVIDE AND INSTALL NEW SURFACE MOUNTED PANEL PPB FOR

SUPPORTING AA&E ROOM (ROOM 128) EQUIPMENT ONLY.

ADDITIONALLY, PROVIDE AND INSTALL NEW SURFACE MOUNTED PANEL

PPD FOR SUPPORTING REMAINING CIRCUITS OUTSIDE OF AA&E ROOM.

CIRCUITS OUTSIDE AA&E ROOM MUST BE MOVED TO NEW PANEL PPD

LOCATED (ROOM 144). PICTURE 3 SHOWS LOCATION OF SURFACE

MOUNTED NEW PANEL PPD.

PROVIDE AND INSTALL NEW SURFACE MOUNTED QUADPLEX

RECEPTACLES IN AA&E ROOM (ROOM 128). COORDINATE LOCATIONS

OF QUADPLEX WITH SECURITY FORCES.

PROVIDE 4 x WALL PENETRATION FOR CONDUIT THAT IS 1 1/4". FOR

WALL PENETRATION DETAILS REFER TO A-101.

PROVIDE AND INSTALL DEDICATED GFCI RECEPTACLE FOR

DEHUMIDIFIER IN MECHANICAL ROOM (ROOM 107). COORDINATE

LOCATION WITH CONSTRUCTION MANAGER TO ENSURE OUTLET IS

WITHIN REACH TO POWER DEHUMIDIFIER. REFER TO PICTURE 4 FOR

LOCATION.

PROVIDE AND INSTALL NEW CIRCUIT BREAKERS IN MDP FOR NEW

PANEL PPD (ROOM 144), FOR MECHANICAL ROOM'S DEHUMIDIFIER

(ROOM 107) AND MAIN CIRCUIT BREAKER.

PROVIDE AND INSTALL NEW EMERGENCY LIGHT SURFACE MOUNTED IN

AA&E ROOM (ROOM 128) AND DUPLEX RECEPTACLE TO POWER

EMERGENCY LIGHT.

RECEPTACLES NEXT TO RADIOS, MUST HAVE THREE (3) DUPLEX

OUTLETS SURFACE MOUNTED PROVIDED, INSTALLED AND ALIGNED

VERTICALLY WITH EACH RADIO SHELF. REFER TO PICTURE 5.

UTILIZE EXISTING WALL PENETRATION TO POWER NEW PANEL PPB.

REFER TO SHEET A-101 DETAILS ON WALL PENETRATION. CONDUIT IS

FOR 3 AWG ELECTRICAL LINES IN 2" CONDUIT.

ENSURE WALL PENETRATION IS PROVIDED FOR RADIOS. REFER TO

SHEET A-101 DETAILS ON WALL PENETRATION. CONDUIT IS FOR 1 1/4"

CONDUIT.

PROVIDE 4 x WALL PENETRATION AND REINSTALL TELEPHONE AND

ROUTE TELEPHONE LINE THROUGH ONE WALL PENETRATION. CONDUIT

SIZE IS 3/4". FOR WALL PENETRATION DETAILS REFER TO SHEET A-101.

PROVIDE WALL PENETRATION FOR CAMERA SYSTEM. REFER TO SHEET

A-101 DETAILS ON WALL PENETRATION. CONDUIT IS FOR 1 1/4"

CONDUIT. COORDINATE WITH AFFS CONSTRUCTION MANAGER ON THE

INSTALLATION OF THE CAMERA SYSTEM.

PROVIDE WALL PENETRATION FOR COMMUNICATION LINES. BASE

COMMUNICATION TO RECONNECT COMMUNICATION LINES.

CONTRACTOR TO PROVIDE CONDUIT AND SURFACE MOUNTED BOX

FOR COMMUNICATION LINE. REFER TO SHEET A-101 DETAILS ON WALL

PENETRATION. CONDUIT IS FOR 3/4" CONDUIT.

REFER TO FA-101 FOR FIRE ALARM PENETRATION.

NTS4

INSTALLATION RECEPTACLE IN MECH. ROOM

NTS5

DUPLEX RECEPTACLES FOR RADIOS

10'6'0 2'

SCALE 3/16" = 1'-0"

N

NEW PPD PANEL

NEW

GFCI

PPB - 9

PPB - 7

3/16" = 1'-0"1

ELECTRICAL CONSTRUCTION AA&E 128

PPB PANEL

MDP

PANEL PPB

MDP

ELECTRICAL LIGHTING NOTES

PROVIDE AND INSTALL NEW RECESSED MOUNTED 2' x 2' LED PANELS

IN AA&E ROOM (ROOM 128). INSTALL NEW SURFACE MOUNTED DIMMER

SWITCH AND LIGHT SWITCH FOR OUTSIDE LIGHTS.

PROVIDE AND INSTALL SURFACE MOUNTED DIMMER LIGHT SWITCH FOR

AA&E ROOM (ROOM 128).

PROVIDE AND INSTALL OUTSIDE HALL LIGHTS SWITCH, ROUTE WIRING

THROUGH WALL PENETRATION. WALL PENETRATION DETAILS CAN BE

FOUND ON SHEET A-101.

PROVIDE AND INSTALL WALL MOUNTED DUPLEX TO SUPPORT LED EMERGENCY

LIGHT.

PROVIDE AND INSTALL LED EMERGENCY LIGHT AND CONNECT TO NEW

DUPLEX.

PPB - 1

PPB - 3 PPB - 5

PPB - 8

MDP - 3

MDP - 18

MDP - 24

PANEL PPD

PANEL PPD

A

B

C

D

A

A

A A

A

A A

A

A

B

C

E

3/16" = 1'-0"2

ELECTRICAL LIGHTING AA&E 128

PPB - 2

POWER EXISTING

PENETRATION

GENERAL NOTES

1. CONTRACTOR MUST VERIFY LOCATION, DISTANCE OF EQUIPMENT AND

WIRING ON THIS SHEET IN THE FIELD.

2. ALL CONDUITS THAT PENETRATE THE WALL MUST BE RIGID.

3. STEEL PLATES FROM A-101 MUST BE BONDED AND GROUNDED.

8 9 10

TO CAMERAS

COMMUNICATION

LINES

E

D

NTS3

ROOM 144 PANEL LOCATION

MDP DEMOLISHED

PANEL PPB

NOTE: THIS RISER DOES NOT REPRESENT THE FULL RISER DIAGRAM. Refer to AS-BUILT FOR A FULL RISER DIAGRAM.

RATED 800 AMPS

208Y/120

3 PH / 4 WIRE

TRANSFORMER

EXISTING

225 kVA

208Y/120

3.34% IZ

EXISTING

METER

EXISTING18,000

NOTE: DEMOLISH WIRE BACK TO MDP, DEMOLISH CONDUIT ONLY IN AA&E ROOM.

MDP NEW PANEL PPB NEW PANEL PPD

208Y/120

100 AMPS

3 PH/4 WIRE

100 AMP MCB

30 CIRCUIT

208Y/120

800 AMPS

3 PH/4 WIRE

TRANSFORMER

EXISTING

225 kVA

208Y/120

3.34% IZ

18,000

1 AWG, 100 AMPS

METER

10,000 10,000

NOTE: THIS RISER DOES NOT REPRESENT THE FULL RISER DIAGRAM. Refer to AS-BUILT FOR A FULL RISER DIAGRAM.

1 AWG, 100 AMPS

208Y/120

100 AMPS

3 PH/4 WIRE

100 AMP MCB

30 CIRCUIT

SPD SPD

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

E-601

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

E L

E C

T R

IC

A

L P

L A

N S

R

IS

E

R A

N D

S C

H E

D U

L E

MICHAEL

JORDAN

09/15/2023

XTLF15-1018

RYAN

SUDLOW

DATE: 09/15/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

NTS3

FEEDER SCHEDULE

NTS1

PARTIAL RISER DEMOLITION DIAGRAM

NTS2

PARTIAL RISER CONSTRUCTION DIAGRAM

FEEDER SCHEDULE NOTES

1. CONDUIT SIZED BASED ON CONDUCTOR PROPERTIES LISTED IN THE CURRENT NEC EDITION, CHAPTER 9, TABLES 5 AND 5A. CONDUIT AREAS LISTED CHAPTER 9, TABLE 4 FOR EMT WITH 40% FILL. OTHER CONDITIONS MAY REQUIRE

A LARGER CONDUIT, SUCH AS UNDERGROUND PVC, SIZED FOR NEC.

2. GROUND SIZES: EQUIPMENT GROUNDING CONDUCTOR BASED ON NEC TABLE 250.122 - COPPER / GROUNDING

ELECTRODE CONDUCTOR BASED ON NEC TABLE 250.66 - COPPER.

3. CONDUCTOR SIZES BASED ON NEC TABLE 310.15 - COPPER 75°C

ARC FLASH NOTES

1. ALL SWITCHBOARDS AND PANELBOARDS SHALL HAVE A LABEL APPLIED TO WARN OF POTENTIAL ARC FLASH HAZARDS.

2. LABEL SHALL BE USED AS SHOWN:

FAULT CURRENT NOTES

1. SYMBOL BELOW REPRESENTS THE AVAILABLE FAULT CURRENT IN RMS SYMMETRICAL AMPS AT THE RESPECTIVE

TRANSFORMER, PANEL, OR EQUIPMENT.

2. FAULT CURRENT CALCULATIONS ARE BASED ON AVAILABLE FAULT CURRENT OF 22,853 AMPS AT THE TRANSFORMER'S

SECONDARY SIDE.

XX,XXX

DRAWING SIZE INTENDED TO BE

24" x 36"

1 1/2"(ACTUAL SIZE)

UNITED STATES AIR FORCE

AIR EDUCATION

TRAINING COMMAND

VANCE AIR FORCE BASE

ENID, OKLAHOMA

140 Channel St., Suite 205 Vance AFB, OK 73705

(580) 213−7772

CA# 8716

30 JUNE 2024

DRAWN BY:

DATE:

PROJECT NO.:

CHECKED BY:

DESIGN STAGE:

E-602

−1

R E

P A

IR

S

F S

A A

E

S T

O R

A G

E , B

E L

E C

T R

IC

A

L P

L A

N S

R

IS

E

R A

N D

S C

H E

D U

L E

MICHAEL

JORDAN

09/15/2023

XTLF15-1018

RYAN

SUDLOW

DATE: 09/15/2023

100%

15-1018 REPAIR SFS AA&E STORAGE, B527

R e v is io n

N u m b e r

D e s c ri p ti o n

D a te

NTS2

NEW PPB PANEL SCHEDULE

NTS3

NEW PPD PANEL SCHEDULE

NTS1

MDP PANEL SCHEDULE

AA&E_CentModel_detached_BDecocqCVNN4
G-001 - COVER
G-002 - HAUL ROUTE, ABBREVIATIONS, AND COMMON SYMBOLOGY
A-101 - FLOOR PLAN, DETAILS, AND DECONSTRUCTION NOTES
S-101 - STRUCTURAL RCP, STRUCTURAL WALL SECTIONS, AND STRUCTURAL NOTES
FA-101 - FIRE ALARM - PLAN
M-101 - MECHANICAL PLAN
ED-101 - ELECTRICAL DECONSTRUCTION PLANS AND DETAILS
E-101 - ELECTRICAL POWER AND LIGHTING PLANS
E-601 - ELECTRICAL PLANS - RISER AND SCHEDULE
E-602 - ELECTRICAL PLANS - RISER AND SCHEDULE