Attachment 2_Drawings.pdf
PDF 4 MB Posted
- Attached to
- XTLF 26-1017 Repair Roof F826
- Solicitation number
- FA3029-25-R-0009
About this file
The document is a comprehensive set of architectural drawings for the Repair Roof F826 project at Vance AFB in Enid, OK. The project involves a complete roof replacement for a facility, specifically detailing the removal of existing roofing materials including a low-slope ballasted built-up roof and two steep-slope standing seam metal roofs. The scope includes removing all existing roofing materials and support framing, and replacing them with a new fleece-backed single-ply TPO roofing system over cover board and tapered insulation, along with new gutters and downspouts.
The drawings (sheets G-002, AD-101, A-101, A-201, A-501, and A-502) provide detailed technical specifications for the deconstruction and reconstruction process, including precise sections showing roof edge details, expansion joint treatments, equipment curb installations, and ventilation modifications. The project follows Buy American - Construction Materials guidelines (48CFR Subpart 25.2) and includes specific notes about handling existing structures, vents, and drainage systems. The project number is XTLF 26-1017, with an issue date of 12/13/2024, and is being managed by ASRC Federal Field Services for the United States Air Force Education and Training Command.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME:
PROJECT INFORMATION
PROJECT NUMBER:
Project Location:
Project Status: ISSUE DATE:
REFERENCES:
UNITED STATES AIR FORCE
AIR EDUCATION TRAINING COMMAND
ENID OKLAHOMA
140 CHANNEL ST.
VANCE AFB, OK 73705
P: (580) 213-7787
CA# 8716 EXPIRES: 30 JUNE 2024
EXECUTION OF WORK
DESCRIBED WITHIN THIS
PROJECT PLANS AND
SPECIFICATIONS SHALL
OCCUR IAW 48CFR SUBPART
25.2 BUY AMERICAN -
CONSTRUCTION MATERIALS.
IRP REMEDIATION PROGRAM (IRP)
THERE IS KNOWN CONTAMINATION IN
THE PROJECT AREA. SPECIAL
REQUIREMENTS ARE NEEDED.
THERE IS NO KNOWN CONTAMINATION IN
THE PROJECT AREA.
IRP - REMEDIATION PROJECT MANAGER DATE
LEAD BASED PAINT (LBP)
THERE IS NO KNOWN LBP MATERIALS IN THE
PROJECT
THIS FACILITY CONTAINS LBP MATERIALS;
HOWEVER, NOT IN THE AREA OF CONSTRUCTION.
THIS FACILITY CONTAINS LBP MATERIALS THAT
WILL BE ABANDON IN PLACE FOR THIS PROJECT.
THIS FACILITY CONTAINS LBP MATERIALS THAT
WILL BE REMOVED BY ACM/LBP REMOVAL
CONTRACTOR.
THIS FACILITY CONTAINS LBP MATERIALS THAT
WILL BE REMOVED BY THE GOVERNMENT.
THIS FACILITY CONTAINS LBP MATERIALS THAT
WILL BE REMOVED IAW THIS PROJECT PLANS AND
SPECIFICATIONS.
BASE ENVIRONMENTAL ENGINEER DATE
ASBESTOS CONTAINING MATERIAL (ACM) INITIAL APPLICABLE
CONDITION
THERE IS NO KNOWN ACM MATERIALS IN THE
PROJECT
THIS FACILITY CONTAINS ACM MATERIALS;
HOWEVER, NOT IN THE AREA OF CONSTRUCTION.
THIS FACILITY CONTAINS LBP MATERIALS THAT
WILL BE REMOVED BY ACM/LBP REMOVAL
CONTRACTOR.
THIS FACILITY CONTAINS LBP MATERIALS THAT
WILL BE REMOVED BY THE GOVERNMENT.
THIS FACILITY CONTAINS LBP MATERIALS THAT
WILL BE REMOVED IAW THIS PROJECT PLANS AND
SPECIFICATIONS.
USER / FACILITY
MANAGER
71ST S5X - ATPM
AFFS/CEN
CHIEF ENGINEER
71 ISS/CE
PROJECT NUMBER: PROJECT NAME:
DESIGN APPROVAL
BASE ENVIRONMENTAL ENGINEER DATE
INITIAL APPLICABLE
CONDITION
INITIAL APPLICABLE
CONDITION
VANCE AFB, ENID OK
FOR CONSTRUCTION
ORGANIZATION ORGANIZATION
REPRESENTATIVE
SIGNATURE DATE
Tsgt
XTLFXTLF 26-1017 REPAIR ROOF F826
REPAIR ROOF F826
XTLF 26-1017
12/13/2024
SHEET LIST
SHEET NUMBER SHEET TITLE
G-002 HAUL ROUTE, ABBREVIATIONS, AND COMMON SYMBOLOGY
ARCHITECTURAL
AD-101 DECONSTRUCTION PLAN
A-101 ROOF PLAN
A-201 ELEVATIONS
A-501 DETAIL SECTIONS
A-502 DETAIL SECTIONS
CHRISTOPHER
WHEELER
TSGT ARNOLD MANGUIA
CHRISTOPHER TAYLOR, P.E.
JAMES KITE
20 Dec 24
20 Dec 24
GH
Gail Hamill 20 Dec 2024
8 Jan 2025
10 Jan 2025
13 Jan 2025
13 Jan 2025 charles.snyder Stamp charles.snyder Stamp charles.snyder Date
PRIMARY SITE ACCESS ROUTE
SECONDARY BASE ENTRY
AND ALL VEHICLE EXIT ROUTE
POV BASE ENTRY ONLY
(RESTRICTED HOURS)
PROJECT LOCATION
PRIMARY HAUL ROUTE
SECONDARY HAUL ROUTE TO BE USED ONLY
WHEN PRIMARY GATE IS CLOSED
POV ONLY LANE
PROJECT LOCATION, BUILDING 826
BUILDING 288, CIVIL ENGINEERING INCLUDING
CONSTRUCTION MANAGEMENT
BUILDING 200, CONTRACTING AND LOCAL PURCHASE
BUILDING 72, VISITOR'S CENTER. USE FOR PASS
APPROVAL PRIOR TO BEGINNING WORK
BUILDING 75, COMMERCIAL VEHICLE INSPECTION
9 CONTRACTOR STAGING AREA
ARCHITECTURAL DRAFTING CONVENTIONS
Room name
150 SF
1 View Name
SCALE: 1/8" = 1'-0"
G012
DETAIL VIEW NUMBER
SHEET ON WHICH DETAIL
APPEARS
VIEW NUMBER
NUMBER
DESIGNATION
LETTER/NUMBER
DESIGNATION
A-101
DIRECTION OF VIEW FOR ELEVATION
SHEET ON WHICH ELEVATION APPEARS
ELEVATION VIEW NUMBER
HEIGHT
DESIGNATION
10'-0"
NUMBER
DESIGNATION
HEIGHT DESIGNATION
LETTER/NUMBER
DESIGNATION
NAME DESIGNATION
ROOM NAME/NUMBER SYMBOL
PARTITION TYPE SYMBOL
SPOT/CEILING ELEVATION SYMBOL
DOOR SYMBOL
ELEVATION SYMBOL
GRID SYMBOL
VIEW TITLE
EXTERIOR ELEVATION MARKER
INTERIOR ELEVATION MARKER
BUILDING / WALL SECTION MARKER
DETAIL MARKER
A-101
SIM
8' 4' 0 8'
SCALE: 1/8" = 1'-0"
LEVEL 30
24'-0"
MATCHLINE SYMBOL
1 / A-121
1 / A-122
LETTER/NUMBER
DESIGNATION OF
FLOOR PLAN(S)
DIRECTION OF ELEVATION VIEW
ELEVATION VIEW NUMBER
SHEET ON WHICH ELEVATION APPEARS
A101
SIM SIMILAR (IF APPLICABLE)
CENTERLINE SYMBOL =
DIRECTION OF SECTION VIEW
SECTION VIEW NUMBER
SHEET ON WHICH SECTION APPEARS
A101
SIM SIMILAR (IF APPLICABLE)
GRAPHIC SCALE SYMBOL
NORTH ARROW
SIMILAR (IF APPLICABLE)
PLAN NORTH
ARROW DIRECTION
EXISTING NEW
MILLWORK ELEVATION MARKER
DIRECTION OF ELEVATION VIEW
ELEVATION VIEW NUMBER / SHEET NUMBER1 / A-101
N
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
DESIGN STAGE:
G-002
B DECOCQ
12/13/2024
XTLF 26-1017
CL SNYDER
DATE: 12/13/2024
FOR CONSTRUCTION
REPAIR ROOF F826
LEGEND
KEY NOTES
HAUL ROUTE NOTES
1. APPROVED HAUL AND ACCESS ROUTES ARE NOTED ON THE PLAN.
THE CONTRACTOR SHALL ONLY USE ACCESS ROUTES THAT HAVE
BEEN PREVIOUSLY APPROVED BY CONSTRUCTION MANAGEMENT.
2. CONSTRUCTION MANAGER'S OFFICE IS LOCATED ON THE FIRST
FLOOR, NORTH-WEST CORNER OF BLDG 288.
3. CONTRACTING/LOCAL PURCHASE IS LOCATED ON THE FIRST FLOOR,
SOUTH-WEST CORNER OF BLDG 200.
F826
ABBREVIATIONS
N 1" = 400'-0"G-002 Map1
A
AFF ABOVE FINISH FLOOR
AWP ACOUSTIC WALL PANEL
ACT ACOUSTICAL CEILING TILE
AP ACRYLIC PANEL
ABI ADDITIVE BID ITEM
ADJ ADJACENT, ADJUSTABLE
AGGR AGGREGATE
A/C AIR CONDITIONING
ALT ALTERNATE
ALUM, AL ALUMINUM
AB ANCHOR BOLT
APVD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECT, ARCHITECTURAL
@ AT
AFL ATHLETIC FLOORING
ATTEN ATTENUATOR, ATTENUATION
B
BB BASE BID
BSMT BASEMENT
BRG BEARING
BITUM BITUMINOUS
BLKG BLOCKING
BD BOARD
BOT, BTM BOTTOM
BRK BRICK
BLDG BUILDING
BUR BUILT-UP ROOF
C
CAB CABINET
CPT CARPET
CLG CEILING
CBB CEMENTITIOUS BACKER BOARD
CL CENTER LINE
C TO C CENTER TO CENTER
CT CERAMIC TILE
CO CLEANOUT
CLR CLEAR
CFM COLD-FORMED METAL
COL COLUMN
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CJ CONSTRUCTION CONTROL
JOINT
CONT CONTINUOUS
CC CONTRACTOR CONNECT
CF CONTRACTOR FURNISHED
CI CONTRACTOR INSTALLED
CR CONTRACTOR ROUGH-IN
CG CORNER GUARD
D
DP DAMPPROOFING
DWP DECORATIVE WALL PANEL
DEMO DEMOLITION, DEMOLISH
DTL DETAIL
DIAG DIAGONAL
DIA DIAMETER
DIM DIMENSION
DR DOOR
DB DOUBLE
DN, DWN DOWN
DS DOWNSPOUT
DWR DRAWER
DWG DRAWING
DF DRINKING FOUNTAIN
E
EA EACH
EWC ELECTRIC WATER COOLER
ELEC ELECTRICAL
ELEV ELEVATION
ES EMERGENCY SHOWER
EPC EPOXY COATING
EQ EQUAL
EQPT EQUIPMENT
EF EXHAUST FAN
EXIST EXISTING
EXP JT,
EJ
EXPANSION JOINT
EXP EXPANSION, EXPOSED
EXT EXTERIOR
EIFS EXTERIOR INSULATION & FINISH
SYSTEM
EW EYE WASH
F
FWC FABRIC WALL COVERING
FRP FIBER-REINFORCED PLASTIC
FF FINISH FLOOR
FIN FINISHED
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FHS FIRE HOSE STATION
FH FIRE HYDRANT
FPRF FIREPROOF
FLR FLOOR
FD FLOOR DRAIN
FT FOOT, FEET
FTG FOOTING
FDN FOUNDATION
FURR FURRED, FURRING
G
GALV GALVANIZED
GA GAUGE
GT GLASS TILE
GL GLASS, GLAZING
GB GRAB BAR
GRT GROUT
GYP GYPSUM
GWB GYPSUM WALLBOARD
H
HC HANDICAPPED
HDW HARDWARE
HDWD HARDWOOD
HTR HEATER
HVAC HEATING, VENTILATING, AND
AIR CONDITIONING
HT HEIGHT
HPL HIGH PRESURE LAMINATE
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HMB HORIZONTAL METAL BLINDS
HB HOSE BIB
I
IN INCH
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
J
JT JOINT
JST JOIST
L
LBL LABEL
LAM LAMINATE
LAV LAVATORY
LWT LIGHTWEIGHT
LF LINEAL FEET
LN LINOLEUM
LVR LOUVER
LVT LUXURY VINYL TILE
LB POUND
M
MACH MACHINE
MAINT MAINTENANCE
MH MANHOLE
MFR MANUFACTURE,
MANUFACTURER
MK MARK
MB MARKER BOARD
MSNRY MASONRY
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MC MEDICINE CABINET
MBR MEMBER
MWP MEMBRANE
WEATHERPROOFING
MTL METAL
ML METAL LOCKER
MSP METAL SPLASH PAN
MT METAL THRESHOLD
MEZZ MEZZANINE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOLDING
MTD MOUNTED
MVBL MOVABLE
N
NPRN NEOPRENE
NOM NOMINAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
O
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OZ OUNCE
OD OUTSIDE DIAMETER
OA OVERALL, OUTSIDE AIR
OVHD OVERHEAD
P
PT PAINT
PTD PAINTED
PNL PANEL, PANELBOARD
PTDD PAPER TOWEL DISPENSER /
DISPOSAL
PART PARTIAL
PTN PARTITION
PLAS PLASTIC
PL PLATE, PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PVC POLYVINYL CHLORIDE
PSI POUNDS PER SQ IN
PREFAB PREFABRICATED
PREFIN PREFINISHED
PRJ PROJECTION
PROP PROPERTY
Q
QT QUARRY TILE
QZ QUARTZ MATERIAL
R
RAF RAISED ACCESS FLOORING
RECT RECTANGULAR
REF, RE REFER, REFERENCE
REINF REINFORCE, REINFORCED
REP REPRESENTATIVE
REQD REQUIRED
RA RETURN AIR
RD ROAD, ROOF DRAIN
RH ROBE HOOK
RS ROLLER SHADES
RFG ROOFING
RM ROOM
RND ROUND
RB RUBBER BASE
RFL RUBBER FLOORING
RST RUBBER STAIR TREADS
S
SPECS CONTRACT SPECIFICATIONS
STN NATURAL STONE
SND SANITARY NAPKIN DISPENSER
SCHED SCHEDULE
SC SEALED CONCRETE
SECT SECTION
SEQ SEQUENCE
SHT SHEET
S SIGNAGE
SIM SIMILAR
SD SOAP DISPENSER
SSM SOLID SURFACE MATERIAL
SB SPLASH BLOCK
SQ SQUARE
ST STAIN
SCN STAINED CONCRETE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SJ STUCCO JOINT, SAWN JOINT
SUSP SUSPENDED
SMC SUSPENDED METAL CEILING
SWC SUSPENDED WOOD CEILING
T
TS FLOORING TRANSITION
TZ TERRAZZO
THK THICK
THRU THROUGH
TT TILE TRIM
TP TOILET PARTITION
TTD TOILET TISSUE DISPENSER
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TC TOWEL DISPENSER
TFMR TRANSFORMER
T TREAD
TYP TYPICAL
U
UGND UNDERGROUND
UL UNDERWRITERS
LABORATORIES
UNO UNLESS NOTED OTHERWISE
UR URINAL
V
VP VENT PIPE
VTR VENT THROUGH ROOF
VERT VERTICAL
VB VINYL BASE, VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VF VINYL FLOORING
VWC VINYL WALL COVERING
W
WM WALK-OFF MAT
WR WASTE RECEPTACLE
WC WATER CLOSET
WH WATER HEATER
WP WATERPROOF
WS WEATHERSTRIPPING
WD WIDTH, WINDOW DIMENSION,
WOOD
WDW WINDOW
WT WINDOW TILE
W/ WITH (COMB. FORM)
W/O WITHOUT
WB WOOD BASE
WF WOOD FLOORING
R ev is io n N um be r D es cr ip tio n D at e charles.snyder Stamp charles.snyder Stamp
DECONSTRUCT EXISTING METAL ROOF TO INCLUDE ALL EXISTING
FRAMING. REMOVE EXISTING LOW SLOPE ROOF MATERIAL.
DECONSTRUCT EXISTING BUR ROOF INCLUDING ALL EXISTING
COVERBOARD AND INSULATION, CURBS, AND ASSOCIATED EDGE
FLASHING.
DECONSTRUCT INTAKE VENT, CURB, AND STRUCTURE. PROTECT
INTAKE OPENING FROM DEBRIS DURING CONSTRUCTION.
REMOVE AND STORE POWERED VENT FOR RE-INSTALLATION.
CONTRACTOR TO VERIFY WITH CONSTRUCTION MANAGER THAT FAN
IS OPERATING TO MANUFACTURER STANDARDS PRIOR TO
DISCONNECT.
REMOVE EXISTING AND PREPARE FOR NEW.
DECONSTRUCT ROOF ACCESS LADDER.
REMOVE EXISTING PIPE VENT BOOTS. PROTECT EXISTING PIPES.
REMOVE EXISTING METAL FASCIA.
DECONSTRUCT EXISTING ROOF DRAINS.
DECONSTRUCT EXISTING GUTTER AND DOWN SPOUTS, FOR
DOWNSPOUTS CONNECTED TO STORM WATER INLET, PROTECT
CONNECTION.
NOT IN SCOPE, PROTECT DURING CONSTRUCTION.
REMOVE EXISTING ROOF ACCESS, PREPARE EXISTING METAL DECK
FOR NEW PANEL; RE:
9 9
AD-101
SIM
AD-101
AD-101
KEY NOTE LEGEND
/6 A-50212
DECONSTRUCT
EXPANSION JOINT
PROTECT EXISTING SEPARATION
PROJECT NO.:
CHECKED BY:
AD-101
XTLF 26-1017
CL SNYDER
DATE: 12/13/2024
FOR CONSTRUCTION
REPAIR ROOF F826
3/16" = 1'-0"1 ROOF PLAN DEMO
1 1/2" = 1'-0"2 DECONSTRUCTION METAL ROOF (TYP.)
1 1/2" = 1'-0"3 DECONSTRUCTION AT EXPANSION
0 2'-8" 5'-4" 10'-8"
SCALE: 3/16" = 1'-0"
0 4" 8" 1'-4"
SCALE: 1 1/2" = 1'-0"
PLAN NORTH
R ev is io n N um be r D es cr ip tio n D at e charles.snyder Stamp charles.snyder Stamp
A-201
A-201
59' - 3"
2' - 0"
A-501
A-501
A-501
A-501
A-502
A-502
SIM
A-502
SIM
A-501
SIM
A-501
SIM
A-502
30' - 4"
A-502
A-502
1/ 4"
1'
0"
52' - 10"
7"
/4 A-501
1/4" / 1' - 0"
1/ 4"
1'
0"
1/ 4"
1'
0"
1/4" / 1' - 0"1/4" / 1' - 0"
A-201
A-201
1/ 4"
1'
0"
1/4" / 1' - 0"
1/ 4"
/1 '-0
1/
4" /1
'-0
1/4"/1'-0"
1/4"/1'-0"
5'
3"
1/2" / 1' - 0"
3'
4"
PROJECT NO.:
CHECKED BY:
A-101
XTLF 26-1017
CL SNYDER
DATE: 12/13/2024
FOR CONSTRUCTION
REPAIR ROOF F826
3/16" = 1'-0"1 NEW ROOF TAPER PLAN
TAPER LEGEND
1/4" PER FOOT1
1 RE: A-201
NEW DOWNSPOUT, RECONNECT TO STORM WATER IF PREVIOUSLY
CONNECTED
SMACNA A-STYLE GUTTER BOX
EXPANSION JOINT, RE:
VENT HOOD, REMOVE, STORE, AND REINSTALL
NEW INTAKE HOOD, MATCH EXISTING CFM
NEW EXHAUST VENT, BOTTOM OF FLUE VENT SHALL BE 4' 0" ABOVE
TOP OF INTAKE HOOD
VTR WITH NEW NEOPRENE BOOT
12" SHEET METAL FASCIA RE: A-201
WEIGHTED RUBBER SPLASH BLOCK
NOT IN SCOPE, PROTECT DURING CONSTRUCTION
2:12 CRICKET
CODED NOTES
R ev is io n N um be r D es cr ip tio n D at e
0 2'-8" 5'-4" 10'-8"
SCALE: 3/16" = 1'-0"
PLAN NORTH
4 13
2 2
1/2" PER FOOT
General Note:
TAPER PLAN FOR DESIGN INTENT ONLY, CONTRACTOR TO
PROVIDE FINAL PLAN IN ACCORDANCE WITH SUBMITTAL
REQUIREMENTS.
CONTRACTOR TO INSPECT DECK FOR INTEGRITY OF MATERIAL
TO RECEIVE NEW ROOF MATERIALS. COORDINATE ANY
REQUIRED REPAIRS WITH CONSTRUCTION MANAGER.
charles.snyder Stamp charles.snyder Stamp
3 999
(BEYOND)
4'
0"
3 9
3 9
PROJECT NO.:
CHECKED BY:
A-201
XTLF 26-1017
CL SNYDER
DATE: 12/13/2024
FOR CONSTRUCTION
REPAIR ROOF F826
3/16" = 1'-0"1 NORTH ELEVATION
3/16" = 1'-0"2 SOUTH ELEVATION
3/16" = 1'-0"3 EAST ELEVATION
3/16" = 1'-0"4 WEST ELEVATION
R ev is io n N um be r D es cr ip tio n D at e
FILL LADDER ANCHOR HOLES IN CMU WITH EPOXY MORTAR, REPAIR
EIFS AT LADDER DECONSTRUCTION, PAINT TO MATCH ADJACENT.
NEW DOWNSPOUT, RECONNECT TO STORM WATER INLET IF EXISTING
5" X 5" SMACNA A-STYLE GUTTER BOX
EXPANSION JOINT, RE: 4/A-501
VENT HOOD, REMOVE, STORE, AND REINSTALL
NEW INTAKE HOOD, MATCH EXISTING CFM
NEW EXHAUST VENT, BOTTOM OF FLUE VENT SHALL BE 4' 0" ABOVE
TOP OF INTAKE HOOD
VTR WITH NEW NEOPRENE BOOT
12" SHEET METAL FASCIA RE: A-201
WEIGHTED RUBBER SPLASH BLOCK
NOT IN SCOPE, PROTECT DURING CONSTRUCTION
3:12 CRICKET12
CODED NOTES
charles.snyder Stamp charles.snyder Stamp
EXISTING
STRUCTURE TO
REMAIN
4" THERMOPLASTIC VULCANIZATE
EXPANSION JOINT
SECURE EXPANSION JOINT WITH
HOLD BAR, CONTINUOUS, SECURE
FIELD PLY UNDER BETWEEN HOLD
(TYP.)
HEAT WELD EXPANSION JOINT
INTEGRATED MEMBRANE ROOF
FLAP TO MEMBRANE ROOF,
(TYP.)
HOLD BAR SUPPORT BLOCKING
CONTINUOUS, CUT TO MATCH ROOF
SUPPORT, SECURE TO BASE
BLOCKING WITH DECK SCREWS
WOOD BLOCKING
NOTE THIS VIEW:
TERMINATE EXPANSION
JOINT END AT BRICK
MASONRY SIMILAR TO TURN-
UP DETAIL; RE: 2/A-501
UNFACED MINERAL WOOL, FILL CAVITY
1/2" / 1' - 0"
8"
TPO COUNTER FLASHING,
CENTER OVER FLASHING EDGE
24GA CONTINUOUS CLEAT, DOG LEG
AND SECURE TO EXISTING CMU
GUTTER SUPPORT/DRIP
EDGE, CONTINUOUS ,
OVERLAP SEAMS MIN. 4"
1 X 1/4" DOUBLE SIDED BUTYL TAPE,
SECURE GUTTER THROUGH TAPE
AT 24" O.C. ENSURE TOP EDGE OF
UPPER TAPE ALIGNS WITH TOP
EDGE OF FLASHING
HEAT WELD ADHESIVE
SMACNA A-STYLE GUTTER
FACE BLOCKING
TPO FIELD PLY (TYP.)
PROTECT EXISTING
STRUCTURE
22 GA FLASHING, EXTEND FULL
HEIGHT OF FACE BLOCKING,
OVERLAP SEAMS 6" MIN.
EXISTING EIFS TO REMAIN
BASE LAYER RIGID INSULATION, 2 X
2" (4" TOTAL), EXTEND TOP LAYER 4"
PAST BLOCKING AND START TAPER
1/2" GLASS MAT SHEATHING
GUTTER STRAPS, 36" O.C.
RIGID TAPERED INSULATION
SUPPORT BLOCKING AS
REQUIRED TO SUPPORT
RIGID INSULATION
CONTINUOUS BEAD OF SEALANT
MIN.
3"
8"
GUTTER SUPPORT, CONTINUOUS
CLEAT, OVERLAP SEAMS MIN. 4"
1 X 1/4" DOUBLE SIDED
BUTYL TAPE, SECURE
GUTTER THROUGH TAPE
AT 24" O.C. ENSURE TOP
EDGE OF UPPER TAPE
ALIGNS WITH TOP EDGE OF
FLASHING
HEAT WELD ADHESIVE
SMACNA A-STYLE GUTTER
GUTTER STRAPS, 36" O.C.
24GA CONTINUOUS
CLEAT
22 GA FLASHING
2X12 BLOCKING, CUT AS REQUIRED
1/
2"
6"
1/2" / 1' - 0"
TPO COUNTER FLASHING,
CENTER OVER FLASHING EDGE
TPO FIELD PLY (TYP.)
BASE LAYER RIGID INSULATION, 2 X
2" (4" TOTAL), EXTEND TOP LAYER 8"
PAST BLOCKING AND START TAPER
1/2" GLASS MAT SHEATHING
RIGID TAPERED INSULATION
BLOCKING
EXISTING STRUCTURE
TO REMAIN
PROTECT EXISTING WALL
A-501
TPO COUNTER FLASHING
ADHESIVE
4"
HEAT WELD
4"
TPO FIELD PLY
GLASS MAT GYPSUM
SHEATHING
1/2" / 1' - 0"
R
IG
ID
B
A
SE
4"
(T
YP
RIGID INSULATION
TAPERED
24 GA CONTINUOUS CLEAT
1/
4"C O
N
TI
N U
O U
S
FL
A
SH
IN
G
1'
0"
HEMMED DRIP EDGE,
EXTEND 4" BELOW TOP
BRICK
PACK VOID WITH MINERAL
WOOL, 4" DEPTH
EXISTING STRUCTURE
TO REMAIN
EXISTING ROOF DECK
EXISTING BRICK FACADE
SURFACE MOUNT REGLET RECEIVER;
ATTACH RECEIVER TO BRICK WITH
1 -1/2" MASONRY ANCHORS
1/4" CONTINUOUS THROUGH
VENT BUG SCREEN
CONTINUOUS VAPOR
RELEASE SYSTEM
OFFSET FLASHING RECEIVER;
ATTACH RECEIVER TO BRICK WITH
1 -1/2" MASONRY ANCHORS
THROUGH BUTYL TAPE
DRIP EDGE FLASHING
NOTE THIS VIEW:
ADJUST DEPTH OF UPPER ROOF
FLASHING FROM STANDARD 12"
AS REQUIRED TO
ACCOMMODATE ASSEMBLY.
MINIMUM FLASHING DEPTH
SHALL BE 4".
M
IN
H T.
V A
R
IE
S
SILICONE BASED SEALANT,
CONTINUOUS BEAD
1" X 1/4" BUTYL TAPE
CONTINUOUS
TPO HOLD BAR
PROJECT NO.:
CHECKED BY:
A-501
XTLF 26-1017
CL SNYDER
DATE: 12/13/2024
FOR CONSTRUCTION
REPAIR ROOF F826
3" = 1'-0"4 SECTION AT EXPANSION JOINT
3" = 1'-0"3 SECTION AT LOWER ROOF EDGE (TYP.)
3" = 1'-0"5 SECTION AT LOWER ROOF BRICK FACADE
3" = 1'-0"1 SECTION AT BRICK TO LOWE ROOF
6" = 1'-0"2 ENLARGED SECTION AT MASONRY WALL
R ev is io n N um be r D es cr ip tio n D at e
0 2" 4" 8"
SCALE: 3" = 1'-0"
charles.snyder Stamp charles.snyder Stamp
A-501
CUT BACK EIFS AS
REQUIRED
NEW DOWN SPOUT
WEIGHTED RUBBER
SPLASH BLOCK
SILICONE BASED SEALANT,
CONTINUOUS BEAD
A-501
Sim
RUN BEAD OF
SILICONE SEALANT
ALONG CUT EDGE
TPO FIELD PLY
GLASS MAT GYPSUM
SHEATHING
RIGID INSULATION TAPERED
24 GA CONTINUOUS CLEAT
C O
N
TI
N U
O S
FL
A
SH
IN
G
1'
0"
HEMMED DRIP EDGE,
EXTEND 4" BELOW TOP
BRICKEXISTING BRICK FACADE
0' - 2" / 1' - 0" 2" / 1' - 0"
SHEET METAL STEP FLASHING, EXTEND 1"
UNDER EXISTING EIFS, SECURE TO EXISTING
CMU
SHEET METAL FLASHING
WITH DRIP EDGE
EXTEND FLASHING UNDER EIFS, REPAIR
EIFS AS REQUIRED
NEW GUTTER
EXTEND CRICKET TPO UP HEADWALL AND
SECURE WITH HOLD BAR, ALL EDGES
WALL (BEYOND)
WRAP STEP FLASHING AT
CORNER, EXTEND 6"
EXISTING EIFS TO REMAIN
EXISTING EIFS
(BEYOND) TO REMAINCRICKET
PROVIDE KICK-OUT FLASHING, ANGLE TO
DIVERT RUN-FF INTO NEW GUTTER
NOTE THIS VIEW:
1.
2.
CUT BACK EXISTING EIFS AS REQUIRED TO INSERT
FLASHING. REPAIR CUT EIFS TO COVER FLASHING
AS REQUIRED UTILIZING PERSONNEL AS DESCRIBED
IN SPECIFICATIONS.
STEP FLASHING TO HAVE A 2" MIN. OVERLAP. EMBED
VERTICAL EDGE AT OVERLAP IN 3/4" X 1/8" DOUBLE
SIDED BUTYL TAPE WALL (BEYOND)
NEW GUTTER
3/4" X 1/4" DOUBLE SIDED BUTYL
TAPE, CONTINUOUS (TYP)
DOWNSPOUT BEYOND
EQUIPMENT SUPPORT BASE
1/8" X 1" BUTYL TAPE ALONG
CURB EDGE
4"
COUNTER FLASHING SKIRT, SECURE TO
CURB WITH GROMETTED FASTENER
FULLY ADHERE MEMBRANE UP CURB ON
ALL SIDES, OVERLAP SEAMS 6"
HEAT WELD
4"
HEAT WELD
4"
EXISTING DECKING
SECURE BLOCKING TO DECKOPENING (TYP.)
EXISTING MECHANICAL
REINFORCED MEMBRANE BASE
FLASHING, EXTEND UP CURB 4"
FULLY ADHERED FIELD PLY
B Y
L O
C A
TI
O
N
D
EP
TH
V
A R
IE
S
SINGLE PLY ROOF
MEMBRANE
RAIN HOOD WITH
BUG SCREEN
COLLAR CLAMP
RUN FLASHING MEMBRANE UP
COLLAR AND SECURE WITH
CLAMP, ADHERE TO OUTSIDE OF
COLLAR, 4" OVERLAP ANY
SEAMS
22GA PAN, SET IN SEALANT
AND MECHANICALLY
FASTEN 6" O.C.
BLOCKING TO SET FLUSH (MIN.)
WITH TOP OF INSULATION
D
EP
TH
V
A R
IE
S
6" 4"REINFORCED TPO FLASHING,
EXTEND 4" UP COLLAR
FLUE VENT
R
IG
ID
IN
SU
LA
TI
O
N
EXISTING ROOF
DECK
EXHAUST BASE MUST BE AT LEAST 4'-0"
ABOVE TOP OF ADJACENT INTAKE,
TETHER TO ROOF AS REQUIRED
MIN.
3"
NEW METAL DECK
EXISTING OPENING
MIN. THREE (3) RIBS (E.W.)
SPAN EXISTING DECK
WIRE BRUSH METAL FACING SURFACES , PLACE 2 PART
METAL TO METAL CHEMICAL BONDING AGENT ON
EXISTING METAL DECK TOP FLANGE. PLACE NEW
METAL DECK OVER EXISTING. ENSURE UNIFORM
BONDING.
EXISTING VTR
EXISTING METAL
DECK
SEAL GAP WITH UL
RATED FIRE CAULK
NEOPRENE PIPE BOOT
RUN BEAD OF SEALANT AND
SECURE PIPE BOOT TO PIPE
FULLY EMBED IN SEALANT
AND SECURE TO DECK
FILL GAP WITH
MINERAL WOOL
FIELD PLY TPO
PROJECT NO.:
CHECKED BY:
A-502
XTLF 26-1017
CL SNYDER
DATE: 12/13/2024
FOR CONSTRUCTION
REPAIR ROOF F826
1 1/2" = 1'-0"3 SECT AT UPPER ROOF
1 1/2" = 1'-0"1
SECTION AT LOWER ROOF / UPPER ROOF
CORNER
3" = 1'-0"4 SECTION AT EQUIPMENT CURB (TYP.)
1 1/2" = 1'-0"2 SECTION AT HOT EXHAUST VENT
1 1/2" = 1'-0"6 DETAIL AT ROOF DECK REPAIR (TYP.)
1 1/2" = 1'-0"5 VENT THROUGH ROOF DETAIL (TYP.)
R ev is io n N um be r D es cr ip tio n D at e
0 4'-0" 8'-0" 16'-0"
SCALE: 1/8" = 1'-0"
charles.snyder Stamp charles.snyder Stamp
| G001 - COVER |
| G-002 - HAUL ROUTE, ABBREVIATIONS, AND COMMON SYMBOLOGY |
| AD-101 - DECONSTRUCTION PLAN |
| A-101 - ROOF PLAN |
| A-201 - ELEVATIONS |
| A-501 - DETAIL SECTIONS |
| A-502 - DETAIL SECTIONS |
File details come from the government source that posted it. Updated .