Attachment 2 - Drawings 648-19-127- Bldg. 100 Update Specialty Clinic Exam Rooms - IFC FINAL SUBMITTAL - 24.03.15.pdf

PDF 21 MB Posted

Attached to
Project 648-19-127 Update Specialty Clinic Exam Rooms
Solicitation number
36C26024R0075
Issued by

About this file

This document is the Attachment 2 - Drawings for Project 648-19-127 Update Specialty Clinic Exam Rooms, a solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.

The scope of work includes renovation of approximately 6,800 SF and requires the contractor to provide demolition, carpentry, electrical, data, HVAC, plumbing, painting, ceiling tile, door access controls, and floor cleaning/finish services. The project drawings provide detailed construction plans and specifications for the renovation. This attachment does not contain information about the response dates, award dates, pricing terms, set asides, or other solicitation details. It is solely the construction drawings for the renovation project.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IF

C

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS

IF

C

F

IN

A L

S U

B M

IT

T

A L

/1

5/

03.15.24

100% DESIGN SUBMITTAL 09/29/202209/12/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS

11 REMOVE ALL SINK CAULKING TO PREPARE FOR NEW. NOTE NOT SHOWN.

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS

13 REMOVE ALL SINK CAULKING TO PREPARE FOR NEW. NOTE NOT SHOWN.

0%

F

IN

A L

D E

S

IG

N

9/

/2

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

F

IN

A L

S U

B M

IT

T

A L

1/

/2

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

1C-103

1C-104

G

G

1C-103

1C-104

Revisions Date

Approved: Service Chief

Approved: Infection Cntrl.

Approved: Chief FMS

Approved: Safety Mgr.

Drawing Title

Dwg. of

Project Title

Building No.

LocationApproved: Director, VAMC

Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.

Project No.

Date

100 PMG/HRN

AD 19173

648-19-127

09.29.22

SCALE:

AS NOTED

0%

S U

B M

IT

TA

L

/2

9/

VA Medical Center Portland, Oregon

Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs

A N D E R S O N

AD R SOB W K I

1430 SE 3rd Ave, Ste 200 Portland, OR 97214

T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com

SCEH T TC IRA

CL L

Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON

PLUMBING DEMOLITION & NEW PLAN -

ROOMS 1C-103 & 1C-157

P1.2

SCALE: 1/2" = 1'-0"

2. NEW PLUMBING PLAN - ROOM 1C-103

SCALE: 1/2" = 1'-0"

4. NEW PLUMBING PLAN - ROOM 1C-157

E/T SPEC. PROC.

1C-103

EXAM / TREAT

1C-157

1/2" HW UP

11/2" V UP

11/2" W DN

1/2" CW UP

SCALE: 1/2" = 1'-0"

1. DEMOLITION PLUMBING PLAN - ROOM 1C-103

E/T SPEC. PROC.

1C-103

SCALE: 1/2" = 1'-0"

3. DEMOLITION PLUMBING PLAN - ROOM 1C-157

EXAM / TREAT

1C-157

1/2" HW UP

11/2" V UP

11/2" W DN

1/2" CW UP

KEY NOTES:

REMOVE EXISTING PLUMBING FIXTURE AS SHOWN AND DISPOSE

OF PROPERLY. TEMPORARILY CAP EXISTING PIPING FOR FUTURE

USE.

SALVAGE EXISTING PLUMBING ACCESSORIES, STORE AS

INDICATED BY OWNER FOR POSSIBLE REUSE AND

REINSTALLATION. OWNER TO VERIFY PIECES TO BE KEPT BEFORE

BEING PUT INTO STORAGE.

EXTEND EXISTING PIPING AND CONNECT TO NEW FIXTURE.

PROVIDE TRAP PROTECTORS

NEW EQUIPMENT - SEE GENERAL NOTE 1.

GENERAL NOTES

1. FIXTURES AND TRIM SALVAGED FROM THIS PROJECT DEMOLITION

ARE TO BE REUSED WHEREVER POSSIBLE AT DISCRETION OF VA.

SALVAGED FIXTURES MUST BE INSPECTED AND REFURBISHED TO

LOOK AND PERFORM AS NEW.

2. CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING FOR ALL

SURFACES DISTURBED BY THIS WORK TO MATCH ADJACENT

SURFACES.

3. ALL DISCONTINUED PIPING TO BE REMOVED BACK TO THE FIRST

ACTIVE BRANCH AND CAPPED. NO DEAD LEGS ALLOWED.

LEGEND

W WASTE (ABOVE GRADE OR FLOOR)

V VENT

CW COLD WATER

HW HOT WATER

P-402

3 4 5 P-402

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

INSTALL AND CONNECT NEW DOMESTIC WATER, SANITARY WASTE AND

VENT LINES, INCLUDING NEW ISOLATION VALVES, TO THE NEW FIXTURE.

EXTEND NEW LINES INTO THE INTERSTITIAL SPACE AND TIE-IN TO THE

TEMPORARILY CAPPED EXISTING PIPING CONNECTIONS. NEW WASTE

PIPING TO BE CONNECTED TO THE NEAREST MAIN. INSTALLATIONS TO

CONFORM TO LATEST PLUMBING CODE AND VA SPECS.

NEW EQUIPMENT - SEE GENERAL NOTE 1.5

PROVIDE TRAP PROTECTORS4

DEMOLISH EXISTING VENT AND DOMESTIC WATER LINES, INCLUDING ISOLATION

VALVES, TO INTERSTITIAL SPACE. TEMPORARILY CAP EXISTING PIPING FOR

FUTURE USE. DEMOLISH WASTE PIPING TO NEAREST MAIN AND CAP.

100% DESIGN SUBMITTAL 09/29/202209/12/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

19 25

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS

Revisions Date

Approved: Service Chief

Approved: Infection Cntrl.

Approved: Chief FMS

Approved: Safety Mgr.

Drawing Title

Dwg. of

Project Title

Building No.

LocationApproved: Director, VAMC

Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.

Project No.

Date

100 PMG/HRN

AD 19173

648-19-127

09.29.22

SCALE:

AS NOTED

0%

S U

B M

IT

TA

L

/2

9/

VA Medical Center Portland, Oregon

Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs

A N D E R S O N

AD R SOB W K I

1430 SE 3rd Ave, Ste 200 Portland, OR 97214

T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com

SCEH T TC IRA

CL L

Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON

HVAC GDR PLAN

ROOMS 1C-170, 1C-171, & 1C

MH1.0

GDR TAG CFM

TYPE

SA

ROOM

1C-170

SA

SA

SA

SA

SA

RA

RA

RA

RA

RA

RA

1C-170

1C-171

1C-171

1C-172

1C-172

1C-173

1C-173

1C-148

1C-148

1C-150

1C-150

NOTES:

1. BASED ON NEUTRAL PRESSURE FOR ALL ROOMS.

2. CEILING HEIGHT - 9 FT.

3. MINIMUM 6 ACH

4. GDR SIZE: 24" x 24"

CEILING GDR SCHEDULE

SCALE: 3/8" = 1'-0"

2. HVAC GDR PLAN - ROOMS 1C-170, 1C-171, 1C-172,& 1C-173

SCALE: 3/8" = 1'-0"

1. HVAC GDR PLAN - ROOMS 1C-148 & 1C-150

EXAM / CONSULT

1C-150

HAC

1C-149

EXAM

1C-148

EXAM ENT

1C-172

SCOPE

STORAGE

1C-170

EXAM ENT

1C-171

EXAM ENT

1C-173

A

B

C

D

E

F

G

H

I

J

K

L

L

K

I

J

F

E

A

B D

C

G

H

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

GRILLES, REGISTERS, AND DIFFUSERS

(GRDs) - ROOMS 1C-148, 1C-150, 1C-170, 1C-171, 1C-172 & 1C-173

GRD

GRD

GRD

GRD

M1.0

SIZE: 24" x 24"

100% DESIGN SUBMITTAL 09/29/202209/12/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

18 25

MH1.0

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS

Revisions Date

Approved: Service Chief

Approved: Infection Cntrl.

Approved: Chief FMS

Approved: Safety Mgr.

Drawing Title

Dwg. of

Project Title

Building No.

LocationApproved: Director, VAMC

Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.

Project No.

Date

100 PMG/HRN

AD 19173

648-19-127

09.29.22

SCALE:

AS NOTED

0%

S U

B M

IT

TA

L

/2

9/

VA Medical Center Portland, Oregon

Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs

A N D E R S O N

AD R SOB W K I

1430 SE 3rd Ave, Ste 200 Portland, OR 97214

T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com

SCEH T TC IRA

CL L

Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON 22

ELECTRICAL NOTES, LEGENDS, SYMBOLS

AND ABBREVIATIONS

E0.0

ELECTRICAL ABBREVIATIONS ELECTRICAL SYMBOLS - POWER PLAN

1PH

1P 2/C 3/C

3PH

4/C 4W

A/C UNIT

A/E

AAP

AC

ACC

ADDL

ADJ

ADO

AF

AFC

AFF

AFG

AH

AHJ

AIC

ALT

AMB OR A

AMP

ARCH

ASC

AT

ATS

AUTO

AV

BAT

BC

BD

BFF

BIL

BLDG

BPIP

BRKR

BYP

C

CAB

CALC

CAP

CAT

CATV

CCR

CCTV

cd

CD

CF

CF/CI

CF/OI

CFE

CHW

CHWP

CKT

CKT BRKR

CLF

CLG

CMU

COAX

COMM

COMPT

CONC

CONT

CONTR

COORD

COTR

CPT

CRI

CT

CTV

CU

CU FT

CUR

DB

DC

DCP

DEG C

DEG F

DEMO

DIAG

DISC

DISTR

DISTR PNL

DMR SW

DN

DPDT

DPST

DRSW

DS

DWG

EC

EG

EL

ELEC

ELEV

EMCP

EMER

EMI

EMT

ENCL

EPO

EPRF

ESMT

EWC

EWH

EXIST

FA

FAAP

FABL

FABX

FACP

FC

FI

FIXT

FLA

FLEX

FLT

FLUOR

FLUOR FIX

FOUTT

FP

FT

FU SW

FVNR

FVR

G OR GND

GEN

GFCI

GTB

HID

HOA

HP

HT

HZ

IESNA

IMC

INCAND

IR

IWH

J-BOX

SINGLE-PHASE

SINGLE POLE

TWO-CONDUCTOR

THREE-CONDUCTOR

THREE-PHASE

FOUR-CONDUCTOR

FOUR-WIRE

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

ALARM ANNUNCIATOR PANEL

ALTERNATING CURRENT OR ARMORED CABLE

ACCESSIBLE

ADDITIONAL

ADJACENT, ADJOINING

AUTOMATIC DOOR OPENER

AMPERE FRAME OR AMP FUSE

ABOVE FINISHED COUNTER, AUTOMATIC FREQUENCY

CONTROL, OR AVAILABLE FAULT CURRENT

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AMPERE HOUR

AUTHORITY HAVING JURISDICTION

AMPERE INTERRUPTING CAPACITY

ALTERNATE

AMBIENT

AMPERE

ARCHITECT

AMPS SHORT CIRCUIT

AMPERE TRIP

AUTOMATIC TRANSFER SWITCH

AUTOMATIC

AUDIO VISUAL

BATTERY

BARE COPPER

BOARD

BELOW FINISH FLOOR

BASIC INSULATION LEVEL

BUILDING

BOILER PLANT INSTRUMENTATION PANEL

BREAKER

BY PASS

CONDUIT

CABINET

CALCULATE

CAPACITY

CATALOG

COMMUNITY ANTENNA TELEVISION

CONTROL CONTACTOR

CLOSED CIRCUIT TELEVISION

CANDELA

CONSTRUCTION DOCUMENTS

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

CONTRACTOR FURNISHED EQUIPMENT

CHILLED WATER

CHILLED WATER PUMP

CIRCUIT

CIRCUIT BREAKER

CURRENT LIMITING FUSE

CEILING

CONCRETE MASONRY UNIT

COAX CABLE

COMMUNICATION

COMPARTMENT

CONCRETE

CONTINUE

CONTRACTOR

COORDINATE

CONTRACTING OFFICERS TECHNICAL

REPRESENTATIVE

CONTROL POWER TRANSFORMER

COLOR RENDERING INDEX

CURRENT TRANSFORMER

CABLE TELEVISION

COPPER

CUBIC FEET

CURRENT

DECIBEL OR DIRECT BURIAL

DIRECT CURRENT

DIMMER CONTROL PANEL

DEGREES CELSIUS

DEGREES FAHRENHEIT

DEMOLITION

DIAGRAM

DISCONNECT

DISTRIBUTION

DISTRIBUTION PANEL

DIMMER SWITCH

DOWN

DOUBLE POLE, DOUBLE THROW

DOUBLE POLE, SINGLE THROW

DOOR SWITCH

DISCONNECT SWITCH

DRAWING

EMPTY CONDUIT

EQUIPMENT GROUND

ELEVATION

ELECTRIC OR ELECTRICAL

ELEVATOR

EMERGENCY MONITORING CONTROL PANEL

EMERGENCY

ELECTROMAGNETIC INTERFERENCE

ELECTRICAL METALLIC TUBING

ENCLOSURE

EMERGENCY POWER OFF

EXPLOSION PROOF

EASEMENT

ELECTRIC WATER COOLER

ELECTRIC WATER HEATER

EXISTING

FIRE ALARM

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM BELL

FIRE ALARM BOX

FIRE ALARM CONTROL PANEL

FOOTCANDLE

FILM ILLUMINATOR

FIXTURE

FULL LOAD AMPS

FLEXIBLE METALLIC CONDUIT

FLOODLIGHT

FLUORESCENT

FLUORESCENT FIXTURE

TELEPHONE FLOOR OUTLET

FIRE PROTECTION

FEET OR FOOT

FUSED SWITCH

FULL VOLTAGE NON-REVERSING

FULL VOLTAGE REVERSING

GROUND OR GENERATOR

GENERATOR

GROUND FAULT CIRCUIT INTERRUPTER

GROUND TERMINAL BOX

HIGH INTENSITY DISCHARGE

HAND-OFF-AUTOMATIC

HORSEPOWER

HEIGHT

HERTZ

ILLUMINATION ENGINEERING SOCIETY OF NORTH

AMERICA

INTERMEDIATE METAL CONDUIT

INCANDESCENT

INFRARED

INSTANTANEOUS WATER HEATER

JUNCTION BOX

kV kVA kVAH kVAR kW kWH kWHM

LED

LF

LM

LP

LPS

LRA

LTCP

LT

LTG

LTG PNL

LTNG

LV

MATV

MAX

MC

MCA

MCB

MCC

MDP

MECH

MG

MH

MIN

MOCP

MLO

MT

MTD

MTG

MTS

MV

MVA

MW

NA

NEC

NEMA

NEUT OR N

NFPA

NIC

NL

NO

NS

NTS

OC

OD

OL

P

PA

PB

PBPU

PCB

PEC

PED

PEND

PF

PH

PNL

POD

PT

PTRV

PVC

PWR

RCP

REC

RECPT

RGS

RM

RMS

REQD

SCC

SES

SD

SF

SHT

SI

SPEC

SPST

SURF

SW

SWBD

SWGR

TC

TEL

TMGB

TP

TPS

TTB

TV

TYP

UFAS

UFD

UGND

UL

UON

UPS

UTIL

V

VA

VAR

VFD

VOLT

W

WH

WP

XFER

XFMR

KILOVOLT

KILOVOLT AMPERE

KILOVOLT AMPERE PER HOUR

KILOVOLT AMPERE REACTIVE

KILOWATT

KILOWATT HOUR

KILOWATT HOUR METER

BRANCH CIRCUIT HOMERUN

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LUMEN

LIGHT POLE

LOW PRESSURE SODIUM

LOCKED ROTOR AMPS

LOCAL TEMPERATURE CONTROL PANEL

LIGHT

LIGHTING

LIGHTING PANEL

LIGHTNING

LOW VOLTAGE

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

METAL-CLAD

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MAIN DISTRIBUTION PANEL

MECHANICAL

MOTOR GENERATOR

MANHOLE

MINIMUM

MAXIMUM OVERCURRENT PROTECTION

MAIN LUGS ONLY

MOUNT

MOUNTED

MOUNTING

MANUAL TRANSFER SWITCH

MEDIUM VOLTAGE

MEGAVOLT-AMPERE

MEGAWATT MICROWAVE

NOT APPLICABLE

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NEUTRAL

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NIGHT LIGHT

NORMALLY OPEN

NO SCALE

NOT TO SCALE

ON CENTER

OUTSIDE DIAMETER

OVERLOAD

POLE

PUBLIC ADDRESS

PANELBOARD, PULL BOX, OR PUSHBUTTON

PREFABRICATED BEDSIDE PATIENT UNIT

POLYCHLORINATED BIPHENYL

PHOTOELECTRIC CELL

PEDESTAL

PENDANT

POWER FACTOR

PHASE

PANEL

POWER OPERATED DAMPER

POTENTIAL TRANSFORMER

POWER TYPE ROOF VENTILATION

POLYVINYL CHLORIDE (PLASTIC)

POWER

REFLECTED CEILING PLAN

RECESSED

RECEPTACLE

RIGID GALVANIZED STEEL

ROOM

ROOT MEAN SQUARE

REQUIRED

SHORT CIRCUIT CAPACITY

SERVICE ENTRANCE SECTION

SMOKE DETECTOR

SQUARE FOOT (FEET)

SHEET

INTERNATIONAL SYSTEM OF UNITS

SPECIFICATION

SINGLE POLE, SINGLE THROW

SURFACE

SWITCH

SWITCHBOARD

SWITCHGEAR

TIME CLOCK

TELEPHONE

TELECOMMUNICATIONS MAIN

GROUNDING BUSBAR

TWISTED PAIR

TWISTED PAIR SHIELDED

TELEPHONE TERMINAL BOARD

TELEVISION

TYPICAL

UNIFORM FEDERAL ACCESSIBILITY STANDARDS

UNDERFLOOR DUCT

UNDERGROUND

UNDERWRITERS LABORATORY

UNLESS OTHERWISE NOTED

UNINTERRUPTIBLE POWER SUPPLY

UTILITY

VOLT

VOLT AMPERE

VOLT AMPERE REACTIVE

VARIABLE FREQUENCY DRIVE

VOLTAGE

WATT

WATER HEATER

WEATHERPROOF

TRANSFER

TRANSFORMER

EL ELECTRIC LATCH

WP

ES

WANDER PREVENTION SERVER

ELECTRIC STRIKE

DP

ML

DB

F

MS

RE

DOOR POSITION SWITCH

MAGNETIC LOCK (WANDER PROTECTION SYSTEM)

DURESS BUTTON

IP FIXED CCTV CAMERA (BY OTHERS)

MOTION SENSOR

REQUEST TO EXIT

CR

DC

CCTV

KP

CLOSED CIRCUIT TELEVISION LINE = CCTV. MINIMUM 1" [25MM] CONDUIT

KEY PAD (WANDER PROTECTION SYSTEM)

CARD READER (FIPS 201)

DOOR CONTROLLER

SECURITY SYMBOLS - SECURITY PLAN

X

TS T

K = KEY OPERATED

LM = LOW VOLTAGE MASTER

MC = MOMENTARY CONTACT

RC = REMOTE CONTROL

X = EXPLOSION PROOF

COMMUNICATION SYMBOLS - SYSTEM PLAN

TC ELECTRIC TIMER CONTROL

DISCONNECT SWITCH, UNFUSED

WALL MOUNT EMERGENCY EXIT SIGN WITH BATTERY BACK-UP;

SHADED QUARTER OF SYMBOL INDICATES LIGHTED 'EXIT' ON THAT FACE.

ARROWS INDICATE LIGHTED DIRECTIONAL ARROW ON THAT FACE.

CONNECT TO LOCAL UNSWITCHED LIGHTING CIRCUIT.

CEILING MOUNT EMERGENCY EXIT SIGN WITH BATTERY BACK-UP;

SHADED QUARTER OF SYMBOL INDICATES LIGHTED 'EXIT' ON THAT FACE.

ARROWS INDICATE LIGHTED DIRECTIONAL ARROW ON THAT FACE.

CONNECT TO LOCAL UNSWITCHED LIGHTING CIRCUIT.

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE D1

E1

JUNCTION BOX

OS

RECEPTACLE, DOUBLE DUPLEX

A2

RECEPTACLE, DUPLEX, IN FLUSH FLOOR BOX

A3

LED SLEEK PATIENT ROOM

OVERBED LIGHTS WITH

NIGHT LIGHT

A4

B1

PATIENT ROOM STEPLIGHT

CONTEMPORARY SQUARE

VANITY WITH SWITCHABLE

WHITE COLOR TEMPERATURE

C1 2' x 4' E3X LED RECESSED

TROFFER

UNDER CABINET LED

LITEBARS

CONICAL SUSPENSION

PENDANT

MS

X y

WALL OCCUPANCY SENSOR SWITCH WITH OVERRIDE

CEILING OCCUPANCY SENSOR

UPPER CASE LETTER INDICATES FIXTURE TYPE.

LOWER CASE LETTER INDICATES SWITCH CONTROL. TYPICAL FOR ALL FIXTURES.

A1

A5

6" DOWNLIGHT, SEALED LED

LUMINAIRE, DIMMABLE

PATIENT ROOM STEP LIGHT WET RATED

2' x 2' PATIENT ROOM LUMINAIRE LED, CEILING

MOUNT AMBIENT DIMMING, EXAM NON DIMMING

DISTRIBUTION PANEL

PANELBOARD

ELECTRICAL CABINET N

CONDUIT CONCEALED UNDERGROUND

CONDUIT CONCEALED IN WALL OR CEILING

CONDUIT CONTINUATION

ELECTRICAL SYMBOLS - LIGHTING PLAN

X SWITCH

BLANK = SINGLE POLE

3 = THREE-WAY

D = DIMMER 0-10V

LV= LOW VOLTAGE

LM= LOW VOLTAGE MASTER

PB= PUSH BUTTON STATION

T = TIMER OPERATED

X = EXPLOSION PROOF

HP = HORSEPOWER RATED SWITCH

WITH THERMAL OVERLOADS

SIZED AS REQUIRED BY

EQUIPMENT LABEL RATING.

WALL MOUNTED OCCUPANCY SENSOR MOUNTED 18" AFF

2 = DOUBLE POLE

4 = FOUR-WAY

K = KEY OPERATED

L = LOCK

P = WITH PILOT LIGHT

RC= REMOTE CONTROL

WP= WEATHER PROOF

Mo= OCCUPANCY SENSOR

GENERAL NOTES:

REFERENCES

XX

X

X

MECHANICAL EQUIPMENT REFERENCE

KEYED NOTE

BREAK SYMBOL

X REVISION DELTA

SPECIAL CONNECTION. FURNISH AND INSTALL PER MANUFACTURER'S

RECOMMENDATIONS

RECEPTACLE, SPECIAL PURPOSE

A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.

B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.

C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.

D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.

E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.

F = 208V, 30A, 3 PHASE, 3-POLE, 4W, NEMA 15-30R.

G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.

H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.

I = 208V, 50A, 1 PHASE, 2 POLE, 3W, NEMA 6-50R.

RECEPTACLE, QUADRUPLEX ON EMERGENCY POWER

(MOUNT 18" AFF, UNLESS OTHERWISE NOTED)

RECEPTACLE, DUPLEX WITH GROUND FAULT CIRCUIT INTERRUPTER

(MOUNT 18" AFF, UNLESS OTHERWISE NOTED)

RECEPTACLE, DUPLEX ON EMERGENCY POWER

(MOUNT 18" AFF, UNLESS OTHERWISE NOTED)

RECEPTACLE, DUPLEX

(MOUNT 18" AFF, UNLESS OTHERWISE NOTED)

THERMOSTAT OR TEMPERATURE SENSOR: SEE MECHANICAL DRAWINGS FOR

LOCATIONS FURNISH AND INSTALL BACKBOX AND 1"C TO ABOVE ACCESSIBLE

CEILING. COORDINATE INSTALLATION WITH MECHANICAL

SWITCH

F = FUSED SWITCH

L = LOCK

M = MANUAL MOTOR STARTING

MP = MOTOR SNAP WITH PILOT LIGHT

P = WITH PILOT LIGHT

(THERMAL TYPE)

PB = PUSH BUTTON STATION

WP = WEATHER PROOF

OUTLET TELEPHONE; LETTER INDICATES AS FOLLOWS:

J = JACK TYPE W = WALL TYPE, MTD 48" [1,218mm] AFF

1. DRAWINGS ARE BASED ON THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION. CONTRACTOR SHALL FIELD

VERIFY ALL CONDITIONS ONSITE.

2. ALL CONTRACT DOCUMENTS ARE PART OF THE ELECTRICAL WORK AS THEY APPLY, AS IF REFERRED TO IN FULL. SEE CONTRACT DOCUMENTS OF ALL OTHER DISCIPLINES FOR WORK TO BE PERFORMED BY THE ELECTRICAL CONTRACTOR.

3. DO NOT SCALE ELECTRICAL DRAWINGS. DEVICES AND EQUIPMENT ARE SHOWN IN THEIR APPROXIMATE LOCATION, UNLESS SPECIFICALLY DIMENSIONED. VERIFY ALL DIMENSIONS ON THE PROJECT. REFER TO CONTRACT DOCUMENTS OF ALL

OTHER DISCIPLINES FOR DIMENSIONS.

4. MATERIALS, DIMENSIONS, WALL THICKNESS, ROUGH OPENINGS, PATTERNS, AND THE LIKE SHALL BE FIELD VERIFIED BY THE CONTRACTOR. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE COTR AND ENGINEER PRIOR TO

COMMENCING WITH THE WORK.

5. PRIOR TO ROUGH-IN OF ANY ELECTRICAL EQUIPMENT THE CONTRACTOR SHALL COORDINATE WITH ALL CONSTRUCTION DOCUMENTS AND ALL OTHER TRADES TO PREVENT ANY INTERFERENCES. PREPARE COORDINATION DRAWINGS AS REQUIRED IN CONJUNCTION WITH OTHER TRADES TO PREVENT INTERFERENCES. ANY MODIFICATIONS TO WORK

INSTALLED DUE TO LACK OF COORDINATION SHALL BE FULLY BORNE BY THE CONTRACTOR.

6. CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF AS-BUILT DRAWINGS. AS-BUILT SET OF DRAWINGS SHALL BE UPDATED DAILY AND SHALL DOCUMENT THE ACTUAL INSTALLED CONDITION OF THE ENTIRE ELECTRICAL INSTALLATION. AS-BUILT SET OF DRAWINGS SHALL BE AVAILABLE AT ALL TIMES ON THE SITE FOR INSPECTION BY CODE OFFICIALS, OWNER, ARCHITECT, AND ENGINEER.

7. OBTAIN ALL PERMITS, COORDINATE, FURNISH, INSTALL, CONNECT AND TEST ALL ELECTRICAL EQUIPMENT REQUIRED FOR ALL THE SYSTEMS INSTALLED UNDER THIS CONTRACT TO INSURE COMPLETE AND FULLY OPERATIONAL SYSTEMS.

8. INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS.

9. ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING FIXTURES SHALL BE OBTAINED FROM THE ARCHITECTURAL

REFLECTED CEILING PLAN.

10. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH SINGLE POLE BRANCH CIRCUIT SHALL HAVE AN INDEPENDENT NEUTRAL. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED

EQUIPMENT GROUNDING CONDUCTOR.

11. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH WIRING DEVICES

SHALL HAVE DIVIDERS BETWEEN DEVICES.

12. ALL ELECTRICAL WORK SHALL BE COMPLETED WITH ALL PROXIMATE ELECTRICAL CIRCUITS DE-ENERGIZED (I.E. A NEW BREAKER OR CIRCUIT CANNOT BE ADDED TO A PANEL UNLESS THE PANEL IS COMPLETELY DE-ENERGIZED), OR THE CONTRACTOR MUST COMPLY WITH NFPA 70E FOR WORK ON ENERGIZED SERVICE. THE VA WILL DETERMINE IF THE ELECTRICAL SERVICE CAN BE SHUTDOWN OR IT WILL HAVE TO BE WORKED HOT DEPENDING ON THE CRITICALITY OF THE AREA BEING AFFECTED. IF THE WORK MUST BE DONE WITH THE SERVICE LIVE, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED PROTECTIVE TOOLS, EQUIPMENT, AND CLOTHING, AND MUST FOLLOW THE JOB SPECIFIC WORK PLAN PREPARED BY THE VA. WORK THAT REQUIRES SHUTTING DOWN ELECTRICAL SERVICE MAY HAVE TO BE

ACCOMPLISHED DURING OTHER THAN NORMAL DUTY HOURS.

13. ALL ELECTRICAL FEEDERS, POWER AND LIGHTING CONDUCTORS SHALL BE ROUTED IN CONDUIT. CONDUIT SIZE SHALL BE

3/4" MINIMUM.

14. EMERGENCY POWER ELECTRICAL DEVICES SHALL BE RED IN COLOR AND HOSPITAL GRADE. NORMAL POWER ELECTRICAL DEVICES SHALL BE GRAY HOSPITAL GRADE. DEVICE COVER PLATES IN FINISHED AREAS SHALL BE STAINLESS STEEL.

15. VERIFY JUNCTION BOXES ARE ACCESSIBLE FROM ACCESSIBLE CEILINGS OR ARCHITECTURALLY NOTED ACCESS PANELS.

DO NOT ADD ACCESS PANELS IN HARD CEILINGS.

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

S, SYMBOLS

100% DESIGN SUBMITTAL 09/29/202209/12/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

20 25

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

CLEAN

UTILITY

1C-164

Elevator

Elevator

Elevator

Elevator

Elevator

C10

EXAM / TREAT

1C-146

C6

EXAM / TREAT

1C-137

UV / TREAT

1C-148

C9

EXAM / TREAT

1C-143

C8

EXAM

1C-142

10.610.6

DD

EE

FF

GG

HH

J J

C5

EXAM / TREAT

1C-139

RESIDENT

WORK AREA

1C-150

OFFICE

1C-151

CORRIDOR

C1-38

CORRIDOR

C1-37

CORRIDOR

C1-36

CORRIDOR

C1-35

CORRIDOR

C1-34

CORRIDOR

C1-32

CORRIDOR

C1-31

EXAM / TREAT

1C-157

EXAM / TREAT

1C-158

TOILET

1C-157a

TOILET

1C-158a

HAC

1C-149

C11

EXAM / TREAT

1C-147

OFFICE

1C-145

C12

EXAM

1C-141

TOILET

1C-144

VITALS

1C-135

C7

EXAM

1C-132

TOILET

1C-136

VITALS

1C-117

VITALS

1C-107

B14

EXAM

1C-123

B7

EXAM

1C-115

A8

VITALS

1C-105

TOILET

1C-118

TOILET

1C-108

C1

EXAM

1C-133

B8

EXAM

1C-124

B1

EXAM

1C-114

WAITING ROOM

C1-44

74.53 SF

SCOPE

STORAGE

1C-170

EXAM ENT

1C-172 EXAM ENT

1C-173

EXAM ENT

1C-171

E/T SPEC. PROC.

1C-104

E/T SPEC. PROC.

1C-103

B13

EXAM / TREAT

1C-128

C3

EXAM / TREAT

1C-138

B12

EXAM / TREAT

1C-130

C4

EXAM / TREAT

1C-140

B5

EXAM / TREAT

1C-121

B11

EXAM / TREAT

1C-131

A6

EXAM / TREAT

1C-112

B4

EXAM / TREAT

1C-122

A5

EXAM / TREAT

1C-111

B10

EXAM / TREAT

1C-129 B6

EXAM / TREAT

1C-119

B3

EXAM / TREAT

1C-120

A7

EXAM / TREAT

1C-110

C2

EXAM / TREAT

1C-134

B9

EXAM / TREAT

1C-125 B2

EXAM / TREAT

1C-116

EXAM /

VITALS

1C-126

A3

EXAM / TREAT

1C-106

EXAM

1C-100

NC

(E

SCOPE

CAB

BOOTH

SC

O

PE

C

AB

SCOPE

CAB

SCOPE

CAB

EXAM ENT

1C-169

EXAM ENT

1C-167

OFFICE

1C-163

103.61 SF

STAFF

OFFICE

1C-165

WAITING

C1-27

VITALS

C1-46

CORRIDOR

C1-43a

VITALS

C1-45

CORRIDOR

C1-43

RECEPTION

C1-26

CHECK-IN

1C-201

S S

S

S S

SS

S

S S

S

SS

S S

S

SS

S

S S

S

SS

S

SS

S

S S

S

SSS

S S

SS

S S

SS

S

S

S

S S

S

S S

S S

S

S

S

NC

NC

NC

NC

NC

NC

NC

(E) (E)

(E)(E) (E) (E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E) (E)

(E)

(E)

(E)

(E) (E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E)

(E)

(E)

(E) (E)

(E) (E)

(E)(E)

(E) (E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E)

(E) (E)

(E)(E)

(E)

(E) (E)

(E)

(E) (E)

(E)

(E)

(E)

(E)(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E)

(E)

(E) (E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

NC

(E)

(E)

(E)

NC

(E)

(E)

(E) (E)

(E)

(E)(E)

NC

(E)(E)

(E)

(E)(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E)

(E)

(E)

(E)

(E)

1313 1212 1111

Revisions Date

Approved: Service Chief

Approved: Infection Cntrl.

Approved: Chief FMS

Approved: Safety Mgr.

Drawing Title

Dwg. of

Project Title

Building No.

LocationApproved: Director, VAMC

Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.

Project No.

Date

100 PMG/HRN

AD 19173

648-19-127

09.29.22

SCALE:

AS NOTED

0%

S U

B M

IT

TA

L

/2

9/

VA Medical Center Portland, Oregon

Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs

A N D E R S O N

AD R SOB W K I

1430 SE 3rd Ave, Ste 200 Portland, OR 97214

T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com

SCEH T TC IRA

CL L

Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON

LIGHTING DEMOLITION PLAN

ED1.0

SCALE: 1/8" = 1'-0"

1. LIGHTING DEMOLITION PLAN

DEMOLITION LIGHTING LAYOUT GENERAL NOTES

ALL EXISTING CEILING LIGHT FIXTURES TO REMAIN IN THE SAME POSITION AND BE REPLACED WITH LITHONIA LIGHTING PANEL

LED FIXTURES.

INSTRUCTIONS TO REMOVE FLUORESCENT LAMPS:

1. ELECTRICAL CONTRACTOR SHALL SHUT OFF OR DISCONNECT POWER TO THE FLUORESCENT FIXTURE BY FOLLOWING SITE

LOCK-OUT/TAG-OUT GUIDELINES.

2. ELECTRICAL CONTRACTOR SHALL REMOVE FLUORESCENT LAMPS OR TUBES AND BALLAST COVER. DISPOSE OF THE LAMPS IN ACCORDANCE WITH VA, OREGON STATE AND FEDERAL REGULATIONS. FLUORESCENT LAMPS CONTAIN HAZARDOUS

MATERIALS.

3. DISCONNECT OR SEVER THE WIRING FROM THE BALLAST TO THE FLUORESCENT LAMP SOCKETS.

4. REMOVE THE FLUORESCENT LAMP SOCKETS AND ANY WIRING THAT MAY STILL BE ATTACHED.

5. DISCONNECT OR SEVER THE WIRING FROM THE AC POWER INPUT TO THE FLUORESCENT BALLAST. IF SPACE IS LIMITED, REMOVE THE BALLAST.

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

Revisions Date

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

IF

C

S U

B M

IT

T

A L

/3 0/

10.30.23

PROVIDE COMPLETE DEMOLITION OF ALL LIGHT FIXTURES.

IF

C

F

IN

A L

S U

B M

IT

T

A L

1/

/2

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

21 25

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

CLEAN

UTILITY

1C-164

NO. 3

STAIR

NO. P1

NO. P2

NO. S1

NO. S2

NO. S3

OXY. STOR.

OFFICEOFFICE

CLOSET, TELE.

CORRIDOR

ELEC. ROOM

HAND CLINIC

EMG EMG

CORRIDOR

TREATMENT RT OFFICE

CORRIDOR

TUB ROOM

EQUIP. ROOM

OFFICE STOR

BREAK ROOM

STORAGE

VEST. H.A.C. VEST.

TOILET, M. TOILET, F.

ADL KIT

EQUIPMENT RM

EXAM

EXAM

EXAM

UTILITY, SOILED

TEAM ROOM

CART LIFT

CORRIDOR

TRASH COLLECTION

METHADONE

CORRIDOR

CART LIFT

SENDING

MEDICATIONWORK ROOMTEAM ROOM

CLOSET, TELE.

MECH. RM. SERV. BAY No. 2

HALLWAY

CORRIDOR

OFFICE

TOILET

TOILET

BREAK ROOM

MULTI-PURPOSE ROOM

WAITING

TRIAGESOILED LINEN

CORRIDOR

CART LIFT

BREAK ROOM

EXAM

CORRIDOR

TEAM

CLEAN UTILITY

SOILED UTILITY

EXAM

EXAM

EXAM

SOILED HOLD

EXAMEXAM

TEAM ROOM

Elevator

Elevator

Elevator

Elevator

Elevator

C10

EXAM / TREAT

1C-146

C6

EXAM / TREAT

1C-137

UV / TREAT

1C-148

C9

EXAM / TREAT

1C-143

C8

EXAM

1C-142

10.610.6

DD

EE

FF

GG

HH

J J

C5

EXAM / TREAT

1C-139

RESIDENT

WORK AREA

1C-150

OFFICE

1C-151

CORRIDOR

C1-38

CORRIDOR

C1-37

CORRIDOR

C1-36

CORRIDOR

C1-35

CORRIDOR

C1-34

CORRIDOR

C1-32

CORRIDOR

C1-31

EXAM / TREAT

1C-157

EXAM / TREAT

1C-158

TOILET

1C-157a

TOILET

1C-158a

HAC

1C-149

C11

EXAM / TREAT

1C-147

OFFICE

1C-145

VITALS

1C-145

C12

EXAM

1C-141

TOILET

1C-144

VITALS

1C-135

C7

EXAM

1C-132

TOILET

1C-136

VITALS

1C-117

VITALS

1C-107

B14

EXAM

1C-123

B7

EXAM

1C-115

A8

VITALS

1C-105

TOILET

1C-118

TOILET

1C-108

C1

EXAM

1C-133

B8

EXAM

1C-124

B1

EXAM

1C-114

WAITING ROOM

C1-44

CLEAN UTILITY /

SCOPES

1C-164

74.53 SF

SCOPE

STORAGE

1C-170

EXAM ENT

1C-172 EXAM ENT

1C-173

EXAM ENT

1C-171

E/T SPEC. PROC.

1C-104

E/T SPEC. PROC.

1C-103

B13

EXAM / TREAT

1C-128

C3

EXAM / TREAT

1C-138

B12

EXAM / TREAT

1C-130

C4

EXAM / TREAT

1C-140

B5

EXAM / TREAT

1C-121

B11

EXAM / TREAT

1C-131

A6

EXAM / TREAT

1C-112

B4

EXAM / TREAT

1C-122

A5

EXAM / TREAT

1C-111

B10

EXAM / TREAT

1C-129 B6

EXAM / TREAT

1C-119

B3

EXAM / TREAT

1C-120

A7

EXAM / TREAT

1C-110

C2

EXAM / TREAT

1C-134

B9

EXAM / TREAT

1C-125 B2

EXAM / TREAT

1C-116

EXAM /

VITALS

1C-126

A3

EXAM / TREAT

1C-106

EXAM

1C-100

NC

(E

LINEN

MAXI

CAB

MAXI

CAB

M

AX

I C

AB

CART

CART

CART

CART

CART

LINEN

SC

AL

E

MED

CART

SCOPE

CAB

MED

CART

MED

CART

C

AR

T

OMNI

OMNI

OMNI

SCALE

BOOTH

SC

O

PE

C

AB

SCOPE

CAB

SCOPE

CAB

OMNI

EXAM ENT

1C-169

EXAM ENT

1C-167

MAXI

CAB

CART

CART

MAXI

CAB

LINEN

LINEN

OFFICE

1C-163

103.61 SF

TA

BL

E

TRSH

TRSH TRSH

TABLE

TABLE

TABLE

SCL

SCL SCL

LI

N

SC

L

SCL

SCL

SCL

SCL

STAFF

OFFICE

1C-165

180.88 SF

EXAM ENT

1C-170

SHLF

SHLF

SHLF

SHLF

SHLF

WAITING

C1-27

VITALS

C1-46

CORRIDOR

C1-43a

VITALS

C1-45

CORRIDOR

C1-43

LINEN

MAXI

CAB

SCOPE

CAB

CART

MAXI

CAB

SCOPE

CAB

CART

LINEN

RECEPTION

C1-26

CHECK-IN

1C-201

BOOTH

MAXI

CAB

SCOPE

CAB

C

AR

T

LI

N

EN

MAXI

CAB

SCOPE

CAB

C

AR

T

LI

N

EN

MAXI

CAB SCOPE

CAB

C

AR

T

LI

N

EN

LI

N

EN

MAXI

CAB SCOPE

CAB

C

AR

T

LI

N

EN

S

T

S

B

S

B

S S

B B

B

B

BB

SS

T

B

ST

S S

V

T

S

B B

B

S

B

TS

B B

S

B

S

S

SS

NC

S

B

S S

S

T

B

SS

S

S

B

S S

B

S S

B

S

B

NC

O VA

SS

B

S

ST

S

NC

SS

NC S

S

S

NC

S

B B

S

T

S

S

S S

B

NC

S

S

ST

S S

S

SB T

V

S

NC

O VA

B

1313 1212 1111

Revisions Date

Approved: Service Chief

Approved: Infection Cntrl.

Approved: Chief FMS

Approved: Safety Mgr.

Drawing Title

Dwg. of

Project Title

Building No.

LocationApproved: Director, VAMC

Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.

Project No.

Date

100 PMG/HRN

AD 19173

648-19-127

09.29.22

SCALE:

AS NOTED

0%

S U

B M

IT

TA

L

/2

9/

VA Medical Center Portland, Oregon

Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs

A N D E R S O N

AD R SOB W K I

1430 SE 3rd Ave, Ste 200 Portland, OR 97214

T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com

SCEH T TC IRA

CL L

Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON

ELECTRICAL DEMOLITION PLAN

ED1.1

SCALE: 1/8" = 1'-0"

1. ELECTRICAL DEMOLITION PLAN

GENERAL NOTES:

1. SEE GENERAL NOTES E0.0

KEY NOTES:

01 UNPLUG OR REMOVE ANY ELECTRICAL CONNECTION TO EXISTING WALL HUNG X-RAY VIEW BOX.

REMOVE AND SALVAGE FOR RE-INSTALLATION. VERIFY WITH VA PERSONNEL FOR STORAGE.

01 0101

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

REMOVE AND RETURN TO VA FOR EXCESSING EQUIPMENT. VERIFY WITH VA PERSONNEL FOR

STORAGE.

100% DESIGN SUBMITTAL 09/29/202209/12/2023

0%

F

IN

A L

D E

S

IG

N

9/

/2

22 25

IF

C

F

IN

A L

S U

B M

IT

T

A

5/

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

10% DESIGN SUBMITTAL 06/19/2020

35% DESIGN SUBMITTAL 07/24/2020

60% DESIGN SUBMITTAL 08/17/2020

95% DESIGN SUBMITTAL 08/08/2022

100% DESIGN SUBMITTAL 09/29/2022

100% DESIGN SUBMITTAL 09/29/202209/12/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023

IFC SUBMITTAL 10/30/2023

100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023

IFC FINAL SUBMITTAL 11/28/2023

100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023

Elevator

Elevator

Elevator

Elevator

Elevator

10.610.6

DD

EE

FF

GG

HH

J J

NC

(E

SP WI SP SD

SP

SP

SP

SP SD

(E) (E)

(E)(E) (E) (E)

SP

SD

SD

SP

(E)

SP

SD

SP SP

(E)

SD

(E)

SP

SD

(E)

SPSP

(E)

SD

SP

SD

SP

SD

SP

SD

SD

SP

SD

SDSP

SD

SP

SD

SP

SD

SD

SP

SP

SD

SD

SD

SP

(E)

OS

OS

(E)

(E)

SP

(E)

(E)

SP

RTLS

RTLS

RTLS

RTLS

RTLS RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

RTLS RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

RTLS

(E)

(E)

RTLS

(E)

RTLS

(N) (N)

(N)

(N)

(N)

(N)

(N)

(N) (N)

(N)

(N) (N)

(N)

(N)(N)

(N) (N)

(N) (N)

(N)

(N)

(N)

(N)

(N)

(N) (N)

(N)

(N)

(N) (N)

(N)

(N)

(N)

(N)

RTLS

RTLS

(N) (N)

(N)

RTLS

RTLS

RTLS

RTLS

(N)

(N)

SP

SP

SD

SD

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N) (N)

(N) (N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N) (N)(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)(N)

(N) (N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N)

(N) (N)

(N)

(N)

(N)

(N)

(N)

(N)

(N) (N)

(N) (N)

(N) (N)

(N)

(N)

RTLS

(N)

(N)

(N)

(N)

(N)

(N)

(N)(N)

(N)

(N)

(N)

(N)

(N)

(N)

SP WI SP SD

SP

SP

SP

SP SD

(E) (E)

(E)(E) (E) (E)

SP

(E)

(E)

(E)SD

SD

(E)

SP

(E)

(E)

(E)

(E)

(E)

(E)

(E)(E) SP

SD

SP

(E)

SP

SD

(E) SP

(E)

SD

(E)

SPSP

(E)(E)

SD

SP

SD

(E)

(E)

SP

SD

(E)

SP

SD

(E)

SD

(E)

(E)

SP

(E)SD

SDSP

(E)

SD

(E)

SP

SD

(E)

SP

(E)

(E)

SD

(E)

(E)SD

SP

(E)

SP

(E)

SD

SD

(E)

SD

SP

(E) (E)

OS

OS

(E) (E)(E)

(E)

(E)

SP

(E)

(E)

(E) (E)

SP (E)

(E)

RTLS

(E)

RTLS

RTLS

(E)

(E)

(E)

RTLS

(E)

RTLS

(E)

RTLS

(E)

RTLS

(E)

RTLS

(E)

RTLS

(E)

RTLS

RTLS

(E)

(E)

RTLS

(E)

RTLS RTLS

(E)

(E)

RTLS

(E)

RTLS

(E)

RTLS

(E)

(E)

(E)

RTLS

(E)

RTLS

(E)

RTLS

(E)

RTLS (E)

RTLS

(E)

RTLS

(E)

(E)(E)

RTLS

RTLS

(E)

(E)

RTLS

(E)

(E)

(E)

RTLS

(E)

1313 1212 1111

Revisions Date

Approved: Service Chief

Ap…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .