Attachment 2 - Drawings 648-19-127- Bldg. 100 Update Specialty Clinic Exam Rooms - IFC FINAL SUBMITTAL - 24.03.15.pdf
PDF 21 MB Posted
- Solicitation number
- 36C26024R0075
About this file
This document is the Attachment 2 - Drawings for Project 648-19-127 Update Specialty Clinic Exam Rooms, a solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.
The scope of work includes renovation of approximately 6,800 SF and requires the contractor to provide demolition, carpentry, electrical, data, HVAC, plumbing, painting, ceiling tile, door access controls, and floor cleaning/finish services. The project drawings provide detailed construction plans and specifications for the renovation. This attachment does not contain information about the response dates, award dates, pricing terms, set asides, or other solicitation details. It is solely the construction drawings for the renovation project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IF
C
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS
IF
C
F
IN
A L
S U
B M
IT
T
A L
/1
5/
03.15.24
100% DESIGN SUBMITTAL 09/29/202209/12/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS
11 REMOVE ALL SINK CAULKING TO PREPARE FOR NEW. NOTE NOT SHOWN.
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS
13 REMOVE ALL SINK CAULKING TO PREPARE FOR NEW. NOTE NOT SHOWN.
0%
F
IN
A L
D E
S
IG
N
9/
/2
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
F
IN
A L
S U
B M
IT
T
A L
1/
/2
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
1C-103
1C-104
G
G
1C-103
1C-104
Revisions Date
Approved: Service Chief
Approved: Infection Cntrl.
Approved: Chief FMS
Approved: Safety Mgr.
Drawing Title
Dwg. of
Project Title
Building No.
LocationApproved: Director, VAMC
Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.
Project No.
Date
100 PMG/HRN
AD 19173
648-19-127
09.29.22
SCALE:
AS NOTED
0%
S U
B M
IT
TA
L
/2
9/
VA Medical Center Portland, Oregon
Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs
A N D E R S O N
AD R SOB W K I
1430 SE 3rd Ave, Ste 200 Portland, OR 97214
T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com
SCEH T TC IRA
CL L
Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON
PLUMBING DEMOLITION & NEW PLAN -
ROOMS 1C-103 & 1C-157
P1.2
SCALE: 1/2" = 1'-0"
2. NEW PLUMBING PLAN - ROOM 1C-103
SCALE: 1/2" = 1'-0"
4. NEW PLUMBING PLAN - ROOM 1C-157
E/T SPEC. PROC.
1C-103
EXAM / TREAT
1C-157
1/2" HW UP
11/2" V UP
11/2" W DN
1/2" CW UP
SCALE: 1/2" = 1'-0"
1. DEMOLITION PLUMBING PLAN - ROOM 1C-103
E/T SPEC. PROC.
1C-103
SCALE: 1/2" = 1'-0"
3. DEMOLITION PLUMBING PLAN - ROOM 1C-157
EXAM / TREAT
1C-157
1/2" HW UP
11/2" V UP
11/2" W DN
1/2" CW UP
KEY NOTES:
REMOVE EXISTING PLUMBING FIXTURE AS SHOWN AND DISPOSE
OF PROPERLY. TEMPORARILY CAP EXISTING PIPING FOR FUTURE
USE.
SALVAGE EXISTING PLUMBING ACCESSORIES, STORE AS
INDICATED BY OWNER FOR POSSIBLE REUSE AND
REINSTALLATION. OWNER TO VERIFY PIECES TO BE KEPT BEFORE
BEING PUT INTO STORAGE.
EXTEND EXISTING PIPING AND CONNECT TO NEW FIXTURE.
PROVIDE TRAP PROTECTORS
NEW EQUIPMENT - SEE GENERAL NOTE 1.
GENERAL NOTES
1. FIXTURES AND TRIM SALVAGED FROM THIS PROJECT DEMOLITION
ARE TO BE REUSED WHEREVER POSSIBLE AT DISCRETION OF VA.
SALVAGED FIXTURES MUST BE INSPECTED AND REFURBISHED TO
LOOK AND PERFORM AS NEW.
2. CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING FOR ALL
SURFACES DISTURBED BY THIS WORK TO MATCH ADJACENT
SURFACES.
3. ALL DISCONTINUED PIPING TO BE REMOVED BACK TO THE FIRST
ACTIVE BRANCH AND CAPPED. NO DEAD LEGS ALLOWED.
LEGEND
W WASTE (ABOVE GRADE OR FLOOR)
V VENT
CW COLD WATER
HW HOT WATER
P-402
3 4 5 P-402
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
INSTALL AND CONNECT NEW DOMESTIC WATER, SANITARY WASTE AND
VENT LINES, INCLUDING NEW ISOLATION VALVES, TO THE NEW FIXTURE.
EXTEND NEW LINES INTO THE INTERSTITIAL SPACE AND TIE-IN TO THE
TEMPORARILY CAPPED EXISTING PIPING CONNECTIONS. NEW WASTE
PIPING TO BE CONNECTED TO THE NEAREST MAIN. INSTALLATIONS TO
CONFORM TO LATEST PLUMBING CODE AND VA SPECS.
NEW EQUIPMENT - SEE GENERAL NOTE 1.5
PROVIDE TRAP PROTECTORS4
DEMOLISH EXISTING VENT AND DOMESTIC WATER LINES, INCLUDING ISOLATION
VALVES, TO INTERSTITIAL SPACE. TEMPORARILY CAP EXISTING PIPING FOR
FUTURE USE. DEMOLISH WASTE PIPING TO NEAREST MAIN AND CAP.
100% DESIGN SUBMITTAL 09/29/202209/12/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
19 25
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS
Revisions Date
Approved: Service Chief
Approved: Infection Cntrl.
Approved: Chief FMS
Approved: Safety Mgr.
Drawing Title
Dwg. of
Project Title
Building No.
LocationApproved: Director, VAMC
Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.
Project No.
Date
100 PMG/HRN
AD 19173
648-19-127
09.29.22
SCALE:
AS NOTED
0%
S U
B M
IT
TA
L
/2
9/
VA Medical Center Portland, Oregon
Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs
A N D E R S O N
AD R SOB W K I
1430 SE 3rd Ave, Ste 200 Portland, OR 97214
T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com
SCEH T TC IRA
CL L
Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON
HVAC GDR PLAN
ROOMS 1C-170, 1C-171, & 1C
MH1.0
GDR TAG CFM
TYPE
SA
ROOM
1C-170
SA
SA
SA
SA
SA
RA
RA
RA
RA
RA
RA
1C-170
1C-171
1C-171
1C-172
1C-172
1C-173
1C-173
1C-148
1C-148
1C-150
1C-150
NOTES:
1. BASED ON NEUTRAL PRESSURE FOR ALL ROOMS.
2. CEILING HEIGHT - 9 FT.
3. MINIMUM 6 ACH
4. GDR SIZE: 24" x 24"
CEILING GDR SCHEDULE
SCALE: 3/8" = 1'-0"
2. HVAC GDR PLAN - ROOMS 1C-170, 1C-171, 1C-172,& 1C-173
SCALE: 3/8" = 1'-0"
1. HVAC GDR PLAN - ROOMS 1C-148 & 1C-150
EXAM / CONSULT
1C-150
HAC
1C-149
EXAM
1C-148
EXAM ENT
1C-172
SCOPE
STORAGE
1C-170
EXAM ENT
1C-171
EXAM ENT
1C-173
A
B
C
D
E
F
G
H
I
J
K
L
L
K
I
J
F
E
A
B D
C
G
H
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
GRILLES, REGISTERS, AND DIFFUSERS
(GRDs) - ROOMS 1C-148, 1C-150, 1C-170, 1C-171, 1C-172 & 1C-173
GRD
GRD
GRD
GRD
M1.0
SIZE: 24" x 24"
100% DESIGN SUBMITTAL 09/29/202209/12/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
18 25
MH1.0
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
03/15/2024IFC FINAL SUBMITTAL - NOTATION REVISIONS
Revisions Date
Approved: Service Chief
Approved: Infection Cntrl.
Approved: Chief FMS
Approved: Safety Mgr.
Drawing Title
Dwg. of
Project Title
Building No.
LocationApproved: Director, VAMC
Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.
Project No.
Date
100 PMG/HRN
AD 19173
648-19-127
09.29.22
SCALE:
AS NOTED
0%
S U
B M
IT
TA
L
/2
9/
VA Medical Center Portland, Oregon
Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs
A N D E R S O N
AD R SOB W K I
1430 SE 3rd Ave, Ste 200 Portland, OR 97214
T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com
SCEH T TC IRA
CL L
Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON 22
ELECTRICAL NOTES, LEGENDS, SYMBOLS
AND ABBREVIATIONS
E0.0
ELECTRICAL ABBREVIATIONS ELECTRICAL SYMBOLS - POWER PLAN
1PH
1P 2/C 3/C
3PH
4/C 4W
A/C UNIT
A/E
AAP
AC
ACC
ADDL
ADJ
ADO
AF
AFC
AFF
AFG
AH
AHJ
AIC
ALT
AMB OR A
AMP
ARCH
ASC
AT
ATS
AUTO
AV
BAT
BC
BD
BFF
BIL
BLDG
BPIP
BRKR
BYP
C
CAB
CALC
CAP
CAT
CATV
CCR
CCTV
cd
CD
CF
CF/CI
CF/OI
CFE
CHW
CHWP
CKT
CKT BRKR
CLF
CLG
CMU
COAX
COMM
COMPT
CONC
CONT
CONTR
COORD
COTR
CPT
CRI
CT
CTV
CU
CU FT
CUR
DB
DC
DCP
DEG C
DEG F
DEMO
DIAG
DISC
DISTR
DISTR PNL
DMR SW
DN
DPDT
DPST
DRSW
DS
DWG
EC
EG
EL
ELEC
ELEV
EMCP
EMER
EMI
EMT
ENCL
EPO
EPRF
ESMT
EWC
EWH
EXIST
FA
FAAP
FABL
FABX
FACP
FC
FI
FIXT
FLA
FLEX
FLT
FLUOR
FLUOR FIX
FOUTT
FP
FT
FU SW
FVNR
FVR
G OR GND
GEN
GFCI
GTB
HID
HOA
HP
HT
HZ
IESNA
IMC
INCAND
IR
IWH
J-BOX
SINGLE-PHASE
SINGLE POLE
TWO-CONDUCTOR
THREE-CONDUCTOR
THREE-PHASE
FOUR-CONDUCTOR
FOUR-WIRE
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
ALARM ANNUNCIATOR PANEL
ALTERNATING CURRENT OR ARMORED CABLE
ACCESSIBLE
ADDITIONAL
ADJACENT, ADJOINING
AUTOMATIC DOOR OPENER
AMPERE FRAME OR AMP FUSE
ABOVE FINISHED COUNTER, AUTOMATIC FREQUENCY
CONTROL, OR AVAILABLE FAULT CURRENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMPERE HOUR
AUTHORITY HAVING JURISDICTION
AMPERE INTERRUPTING CAPACITY
ALTERNATE
AMBIENT
AMPERE
ARCHITECT
AMPS SHORT CIRCUIT
AMPERE TRIP
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AUDIO VISUAL
BATTERY
BARE COPPER
BOARD
BELOW FINISH FLOOR
BASIC INSULATION LEVEL
BUILDING
BOILER PLANT INSTRUMENTATION PANEL
BREAKER
BY PASS
CONDUIT
CABINET
CALCULATE
CAPACITY
CATALOG
COMMUNITY ANTENNA TELEVISION
CONTROL CONTACTOR
CLOSED CIRCUIT TELEVISION
CANDELA
CONSTRUCTION DOCUMENTS
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
CONTRACTOR FURNISHED EQUIPMENT
CHILLED WATER
CHILLED WATER PUMP
CIRCUIT
CIRCUIT BREAKER
CURRENT LIMITING FUSE
CEILING
CONCRETE MASONRY UNIT
COAX CABLE
COMMUNICATION
COMPARTMENT
CONCRETE
CONTINUE
CONTRACTOR
COORDINATE
CONTRACTING OFFICERS TECHNICAL
REPRESENTATIVE
CONTROL POWER TRANSFORMER
COLOR RENDERING INDEX
CURRENT TRANSFORMER
CABLE TELEVISION
COPPER
CUBIC FEET
CURRENT
DECIBEL OR DIRECT BURIAL
DIRECT CURRENT
DIMMER CONTROL PANEL
DEGREES CELSIUS
DEGREES FAHRENHEIT
DEMOLITION
DIAGRAM
DISCONNECT
DISTRIBUTION
DISTRIBUTION PANEL
DIMMER SWITCH
DOWN
DOUBLE POLE, DOUBLE THROW
DOUBLE POLE, SINGLE THROW
DOOR SWITCH
DISCONNECT SWITCH
DRAWING
EMPTY CONDUIT
EQUIPMENT GROUND
ELEVATION
ELECTRIC OR ELECTRICAL
ELEVATOR
EMERGENCY MONITORING CONTROL PANEL
EMERGENCY
ELECTROMAGNETIC INTERFERENCE
ELECTRICAL METALLIC TUBING
ENCLOSURE
EMERGENCY POWER OFF
EXPLOSION PROOF
EASEMENT
ELECTRIC WATER COOLER
ELECTRIC WATER HEATER
EXISTING
FIRE ALARM
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM BELL
FIRE ALARM BOX
FIRE ALARM CONTROL PANEL
FOOTCANDLE
FILM ILLUMINATOR
FIXTURE
FULL LOAD AMPS
FLEXIBLE METALLIC CONDUIT
FLOODLIGHT
FLUORESCENT
FLUORESCENT FIXTURE
TELEPHONE FLOOR OUTLET
FIRE PROTECTION
FEET OR FOOT
FUSED SWITCH
FULL VOLTAGE NON-REVERSING
FULL VOLTAGE REVERSING
GROUND OR GENERATOR
GENERATOR
GROUND FAULT CIRCUIT INTERRUPTER
GROUND TERMINAL BOX
HIGH INTENSITY DISCHARGE
HAND-OFF-AUTOMATIC
HORSEPOWER
HEIGHT
HERTZ
ILLUMINATION ENGINEERING SOCIETY OF NORTH
AMERICA
INTERMEDIATE METAL CONDUIT
INCANDESCENT
INFRARED
INSTANTANEOUS WATER HEATER
JUNCTION BOX
kV kVA kVAH kVAR kW kWH kWHM
LED
LF
LM
LP
LPS
LRA
LTCP
LT
LTG
LTG PNL
LTNG
LV
MATV
MAX
MC
MCA
MCB
MCC
MDP
MECH
MG
MH
MIN
MOCP
MLO
MT
MTD
MTG
MTS
MV
MVA
MW
NA
NEC
NEMA
NEUT OR N
NFPA
NIC
NL
NO
NS
NTS
OC
OD
OL
P
PA
PB
PBPU
PCB
PEC
PED
PEND
PF
PH
PNL
POD
PT
PTRV
PVC
PWR
RCP
REC
RECPT
RGS
RM
RMS
REQD
SCC
SES
SD
SF
SHT
SI
SPEC
SPST
SURF
SW
SWBD
SWGR
TC
TEL
TMGB
TP
TPS
TTB
TV
TYP
UFAS
UFD
UGND
UL
UON
UPS
UTIL
V
VA
VAR
VFD
VOLT
W
WH
WP
XFER
XFMR
KILOVOLT
KILOVOLT AMPERE
KILOVOLT AMPERE PER HOUR
KILOVOLT AMPERE REACTIVE
KILOWATT
KILOWATT HOUR
KILOWATT HOUR METER
BRANCH CIRCUIT HOMERUN
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LUMEN
LIGHT POLE
LOW PRESSURE SODIUM
LOCKED ROTOR AMPS
LOCAL TEMPERATURE CONTROL PANEL
LIGHT
LIGHTING
LIGHTING PANEL
LIGHTNING
LOW VOLTAGE
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
METAL-CLAD
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MAIN DISTRIBUTION PANEL
MECHANICAL
MOTOR GENERATOR
MANHOLE
MINIMUM
MAXIMUM OVERCURRENT PROTECTION
MAIN LUGS ONLY
MOUNT
MOUNTED
MOUNTING
MANUAL TRANSFER SWITCH
MEDIUM VOLTAGE
MEGAVOLT-AMPERE
MEGAWATT MICROWAVE
NOT APPLICABLE
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NEUTRAL
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NIGHT LIGHT
NORMALLY OPEN
NO SCALE
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OVERLOAD
POLE
PUBLIC ADDRESS
PANELBOARD, PULL BOX, OR PUSHBUTTON
PREFABRICATED BEDSIDE PATIENT UNIT
POLYCHLORINATED BIPHENYL
PHOTOELECTRIC CELL
PEDESTAL
PENDANT
POWER FACTOR
PHASE
PANEL
POWER OPERATED DAMPER
POTENTIAL TRANSFORMER
POWER TYPE ROOF VENTILATION
POLYVINYL CHLORIDE (PLASTIC)
POWER
REFLECTED CEILING PLAN
RECESSED
RECEPTACLE
RIGID GALVANIZED STEEL
ROOM
ROOT MEAN SQUARE
REQUIRED
SHORT CIRCUIT CAPACITY
SERVICE ENTRANCE SECTION
SMOKE DETECTOR
SQUARE FOOT (FEET)
SHEET
INTERNATIONAL SYSTEM OF UNITS
SPECIFICATION
SINGLE POLE, SINGLE THROW
SURFACE
SWITCH
SWITCHBOARD
SWITCHGEAR
TIME CLOCK
TELEPHONE
TELECOMMUNICATIONS MAIN
GROUNDING BUSBAR
TWISTED PAIR
TWISTED PAIR SHIELDED
TELEPHONE TERMINAL BOARD
TELEVISION
TYPICAL
UNIFORM FEDERAL ACCESSIBILITY STANDARDS
UNDERFLOOR DUCT
UNDERGROUND
UNDERWRITERS LABORATORY
UNLESS OTHERWISE NOTED
UNINTERRUPTIBLE POWER SUPPLY
UTILITY
VOLT
VOLT AMPERE
VOLT AMPERE REACTIVE
VARIABLE FREQUENCY DRIVE
VOLTAGE
WATT
WATER HEATER
WEATHERPROOF
TRANSFER
TRANSFORMER
EL ELECTRIC LATCH
WP
ES
WANDER PREVENTION SERVER
ELECTRIC STRIKE
DP
ML
DB
F
MS
RE
DOOR POSITION SWITCH
MAGNETIC LOCK (WANDER PROTECTION SYSTEM)
DURESS BUTTON
IP FIXED CCTV CAMERA (BY OTHERS)
MOTION SENSOR
REQUEST TO EXIT
CR
DC
CCTV
KP
CLOSED CIRCUIT TELEVISION LINE = CCTV. MINIMUM 1" [25MM] CONDUIT
KEY PAD (WANDER PROTECTION SYSTEM)
CARD READER (FIPS 201)
DOOR CONTROLLER
SECURITY SYMBOLS - SECURITY PLAN
X
TS T
K = KEY OPERATED
LM = LOW VOLTAGE MASTER
MC = MOMENTARY CONTACT
RC = REMOTE CONTROL
X = EXPLOSION PROOF
COMMUNICATION SYMBOLS - SYSTEM PLAN
TC ELECTRIC TIMER CONTROL
DISCONNECT SWITCH, UNFUSED
WALL MOUNT EMERGENCY EXIT SIGN WITH BATTERY BACK-UP;
SHADED QUARTER OF SYMBOL INDICATES LIGHTED 'EXIT' ON THAT FACE.
ARROWS INDICATE LIGHTED DIRECTIONAL ARROW ON THAT FACE.
CONNECT TO LOCAL UNSWITCHED LIGHTING CIRCUIT.
CEILING MOUNT EMERGENCY EXIT SIGN WITH BATTERY BACK-UP;
SHADED QUARTER OF SYMBOL INDICATES LIGHTED 'EXIT' ON THAT FACE.
ARROWS INDICATE LIGHTED DIRECTIONAL ARROW ON THAT FACE.
CONNECT TO LOCAL UNSWITCHED LIGHTING CIRCUIT.
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE D1
E1
JUNCTION BOX
OS
RECEPTACLE, DOUBLE DUPLEX
A2
RECEPTACLE, DUPLEX, IN FLUSH FLOOR BOX
A3
LED SLEEK PATIENT ROOM
OVERBED LIGHTS WITH
NIGHT LIGHT
A4
B1
PATIENT ROOM STEPLIGHT
CONTEMPORARY SQUARE
VANITY WITH SWITCHABLE
WHITE COLOR TEMPERATURE
C1 2' x 4' E3X LED RECESSED
TROFFER
UNDER CABINET LED
LITEBARS
CONICAL SUSPENSION
PENDANT
MS
X y
WALL OCCUPANCY SENSOR SWITCH WITH OVERRIDE
CEILING OCCUPANCY SENSOR
UPPER CASE LETTER INDICATES FIXTURE TYPE.
LOWER CASE LETTER INDICATES SWITCH CONTROL. TYPICAL FOR ALL FIXTURES.
A1
A5
6" DOWNLIGHT, SEALED LED
LUMINAIRE, DIMMABLE
PATIENT ROOM STEP LIGHT WET RATED
2' x 2' PATIENT ROOM LUMINAIRE LED, CEILING
MOUNT AMBIENT DIMMING, EXAM NON DIMMING
DISTRIBUTION PANEL
PANELBOARD
ELECTRICAL CABINET N
CONDUIT CONCEALED UNDERGROUND
CONDUIT CONCEALED IN WALL OR CEILING
CONDUIT CONTINUATION
ELECTRICAL SYMBOLS - LIGHTING PLAN
X SWITCH
BLANK = SINGLE POLE
3 = THREE-WAY
D = DIMMER 0-10V
LV= LOW VOLTAGE
LM= LOW VOLTAGE MASTER
PB= PUSH BUTTON STATION
T = TIMER OPERATED
X = EXPLOSION PROOF
HP = HORSEPOWER RATED SWITCH
WITH THERMAL OVERLOADS
SIZED AS REQUIRED BY
EQUIPMENT LABEL RATING.
WALL MOUNTED OCCUPANCY SENSOR MOUNTED 18" AFF
2 = DOUBLE POLE
4 = FOUR-WAY
K = KEY OPERATED
L = LOCK
P = WITH PILOT LIGHT
RC= REMOTE CONTROL
WP= WEATHER PROOF
Mo= OCCUPANCY SENSOR
GENERAL NOTES:
REFERENCES
XX
X
X
MECHANICAL EQUIPMENT REFERENCE
KEYED NOTE
BREAK SYMBOL
X REVISION DELTA
SPECIAL CONNECTION. FURNISH AND INSTALL PER MANUFACTURER'S
RECOMMENDATIONS
RECEPTACLE, SPECIAL PURPOSE
A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.
B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.
C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.
D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.
E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.
F = 208V, 30A, 3 PHASE, 3-POLE, 4W, NEMA 15-30R.
G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.
H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.
I = 208V, 50A, 1 PHASE, 2 POLE, 3W, NEMA 6-50R.
RECEPTACLE, QUADRUPLEX ON EMERGENCY POWER
(MOUNT 18" AFF, UNLESS OTHERWISE NOTED)
RECEPTACLE, DUPLEX WITH GROUND FAULT CIRCUIT INTERRUPTER
(MOUNT 18" AFF, UNLESS OTHERWISE NOTED)
RECEPTACLE, DUPLEX ON EMERGENCY POWER
(MOUNT 18" AFF, UNLESS OTHERWISE NOTED)
RECEPTACLE, DUPLEX
(MOUNT 18" AFF, UNLESS OTHERWISE NOTED)
THERMOSTAT OR TEMPERATURE SENSOR: SEE MECHANICAL DRAWINGS FOR
LOCATIONS FURNISH AND INSTALL BACKBOX AND 1"C TO ABOVE ACCESSIBLE
CEILING. COORDINATE INSTALLATION WITH MECHANICAL
SWITCH
F = FUSED SWITCH
L = LOCK
M = MANUAL MOTOR STARTING
MP = MOTOR SNAP WITH PILOT LIGHT
P = WITH PILOT LIGHT
(THERMAL TYPE)
PB = PUSH BUTTON STATION
WP = WEATHER PROOF
OUTLET TELEPHONE; LETTER INDICATES AS FOLLOWS:
J = JACK TYPE W = WALL TYPE, MTD 48" [1,218mm] AFF
1. DRAWINGS ARE BASED ON THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION. CONTRACTOR SHALL FIELD
VERIFY ALL CONDITIONS ONSITE.
2. ALL CONTRACT DOCUMENTS ARE PART OF THE ELECTRICAL WORK AS THEY APPLY, AS IF REFERRED TO IN FULL. SEE CONTRACT DOCUMENTS OF ALL OTHER DISCIPLINES FOR WORK TO BE PERFORMED BY THE ELECTRICAL CONTRACTOR.
3. DO NOT SCALE ELECTRICAL DRAWINGS. DEVICES AND EQUIPMENT ARE SHOWN IN THEIR APPROXIMATE LOCATION, UNLESS SPECIFICALLY DIMENSIONED. VERIFY ALL DIMENSIONS ON THE PROJECT. REFER TO CONTRACT DOCUMENTS OF ALL
OTHER DISCIPLINES FOR DIMENSIONS.
4. MATERIALS, DIMENSIONS, WALL THICKNESS, ROUGH OPENINGS, PATTERNS, AND THE LIKE SHALL BE FIELD VERIFIED BY THE CONTRACTOR. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE COTR AND ENGINEER PRIOR TO
COMMENCING WITH THE WORK.
5. PRIOR TO ROUGH-IN OF ANY ELECTRICAL EQUIPMENT THE CONTRACTOR SHALL COORDINATE WITH ALL CONSTRUCTION DOCUMENTS AND ALL OTHER TRADES TO PREVENT ANY INTERFERENCES. PREPARE COORDINATION DRAWINGS AS REQUIRED IN CONJUNCTION WITH OTHER TRADES TO PREVENT INTERFERENCES. ANY MODIFICATIONS TO WORK
INSTALLED DUE TO LACK OF COORDINATION SHALL BE FULLY BORNE BY THE CONTRACTOR.
6. CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF AS-BUILT DRAWINGS. AS-BUILT SET OF DRAWINGS SHALL BE UPDATED DAILY AND SHALL DOCUMENT THE ACTUAL INSTALLED CONDITION OF THE ENTIRE ELECTRICAL INSTALLATION. AS-BUILT SET OF DRAWINGS SHALL BE AVAILABLE AT ALL TIMES ON THE SITE FOR INSPECTION BY CODE OFFICIALS, OWNER, ARCHITECT, AND ENGINEER.
7. OBTAIN ALL PERMITS, COORDINATE, FURNISH, INSTALL, CONNECT AND TEST ALL ELECTRICAL EQUIPMENT REQUIRED FOR ALL THE SYSTEMS INSTALLED UNDER THIS CONTRACT TO INSURE COMPLETE AND FULLY OPERATIONAL SYSTEMS.
8. INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS.
9. ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING FIXTURES SHALL BE OBTAINED FROM THE ARCHITECTURAL
REFLECTED CEILING PLAN.
10. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH SINGLE POLE BRANCH CIRCUIT SHALL HAVE AN INDEPENDENT NEUTRAL. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED
EQUIPMENT GROUNDING CONDUCTOR.
11. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH WIRING DEVICES
SHALL HAVE DIVIDERS BETWEEN DEVICES.
12. ALL ELECTRICAL WORK SHALL BE COMPLETED WITH ALL PROXIMATE ELECTRICAL CIRCUITS DE-ENERGIZED (I.E. A NEW BREAKER OR CIRCUIT CANNOT BE ADDED TO A PANEL UNLESS THE PANEL IS COMPLETELY DE-ENERGIZED), OR THE CONTRACTOR MUST COMPLY WITH NFPA 70E FOR WORK ON ENERGIZED SERVICE. THE VA WILL DETERMINE IF THE ELECTRICAL SERVICE CAN BE SHUTDOWN OR IT WILL HAVE TO BE WORKED HOT DEPENDING ON THE CRITICALITY OF THE AREA BEING AFFECTED. IF THE WORK MUST BE DONE WITH THE SERVICE LIVE, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED PROTECTIVE TOOLS, EQUIPMENT, AND CLOTHING, AND MUST FOLLOW THE JOB SPECIFIC WORK PLAN PREPARED BY THE VA. WORK THAT REQUIRES SHUTTING DOWN ELECTRICAL SERVICE MAY HAVE TO BE
ACCOMPLISHED DURING OTHER THAN NORMAL DUTY HOURS.
13. ALL ELECTRICAL FEEDERS, POWER AND LIGHTING CONDUCTORS SHALL BE ROUTED IN CONDUIT. CONDUIT SIZE SHALL BE
3/4" MINIMUM.
14. EMERGENCY POWER ELECTRICAL DEVICES SHALL BE RED IN COLOR AND HOSPITAL GRADE. NORMAL POWER ELECTRICAL DEVICES SHALL BE GRAY HOSPITAL GRADE. DEVICE COVER PLATES IN FINISHED AREAS SHALL BE STAINLESS STEEL.
15. VERIFY JUNCTION BOXES ARE ACCESSIBLE FROM ACCESSIBLE CEILINGS OR ARCHITECTURALLY NOTED ACCESS PANELS.
DO NOT ADD ACCESS PANELS IN HARD CEILINGS.
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
S, SYMBOLS
100% DESIGN SUBMITTAL 09/29/202209/12/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
20 25
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
CLEAN
UTILITY
1C-164
Elevator
Elevator
Elevator
Elevator
Elevator
C10
EXAM / TREAT
1C-146
C6
EXAM / TREAT
1C-137
UV / TREAT
1C-148
C9
EXAM / TREAT
1C-143
C8
EXAM
1C-142
10.610.6
DD
EE
FF
GG
HH
J J
C5
EXAM / TREAT
1C-139
RESIDENT
WORK AREA
1C-150
OFFICE
1C-151
CORRIDOR
C1-38
CORRIDOR
C1-37
CORRIDOR
C1-36
CORRIDOR
C1-35
CORRIDOR
C1-34
CORRIDOR
C1-32
CORRIDOR
C1-31
EXAM / TREAT
1C-157
EXAM / TREAT
1C-158
TOILET
1C-157a
TOILET
1C-158a
HAC
1C-149
C11
EXAM / TREAT
1C-147
OFFICE
1C-145
C12
EXAM
1C-141
TOILET
1C-144
VITALS
1C-135
C7
EXAM
1C-132
TOILET
1C-136
VITALS
1C-117
VITALS
1C-107
B14
EXAM
1C-123
B7
EXAM
1C-115
A8
VITALS
1C-105
TOILET
1C-118
TOILET
1C-108
C1
EXAM
1C-133
B8
EXAM
1C-124
B1
EXAM
1C-114
WAITING ROOM
C1-44
74.53 SF
SCOPE
STORAGE
1C-170
EXAM ENT
1C-172 EXAM ENT
1C-173
EXAM ENT
1C-171
E/T SPEC. PROC.
1C-104
E/T SPEC. PROC.
1C-103
B13
EXAM / TREAT
1C-128
C3
EXAM / TREAT
1C-138
B12
EXAM / TREAT
1C-130
C4
EXAM / TREAT
1C-140
B5
EXAM / TREAT
1C-121
B11
EXAM / TREAT
1C-131
A6
EXAM / TREAT
1C-112
B4
EXAM / TREAT
1C-122
A5
EXAM / TREAT
1C-111
B10
EXAM / TREAT
1C-129 B6
EXAM / TREAT
1C-119
B3
EXAM / TREAT
1C-120
A7
EXAM / TREAT
1C-110
C2
EXAM / TREAT
1C-134
B9
EXAM / TREAT
1C-125 B2
EXAM / TREAT
1C-116
EXAM /
VITALS
1C-126
A3
EXAM / TREAT
1C-106
EXAM
1C-100
NC
(E
SCOPE
CAB
BOOTH
SC
O
PE
C
AB
SCOPE
CAB
SCOPE
CAB
EXAM ENT
1C-169
EXAM ENT
1C-167
OFFICE
1C-163
103.61 SF
STAFF
OFFICE
1C-165
WAITING
C1-27
VITALS
C1-46
CORRIDOR
C1-43a
VITALS
C1-45
CORRIDOR
C1-43
RECEPTION
C1-26
CHECK-IN
1C-201
S S
S
S S
SS
S
S S
S
SS
S S
S
SS
S
S S
S
SS
S
SS
S
S S
S
SSS
S S
SS
S S
SS
S
S
S
S S
S
S S
S S
S
S
S
NC
NC
NC
NC
NC
NC
NC
(E) (E)
(E)(E) (E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E) (E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E) (E)
(E) (E)
(E)(E)
(E) (E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E) (E)
(E)(E)
(E)
(E) (E)
(E)
(E) (E)
(E)
(E)
(E)
(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
NC
(E)
(E)
(E)
NC
(E)
(E)
(E) (E)
(E)
(E)(E)
NC
(E)(E)
(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
1313 1212 1111
Revisions Date
Approved: Service Chief
Approved: Infection Cntrl.
Approved: Chief FMS
Approved: Safety Mgr.
Drawing Title
Dwg. of
Project Title
Building No.
LocationApproved: Director, VAMC
Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.
Project No.
Date
100 PMG/HRN
AD 19173
648-19-127
09.29.22
SCALE:
AS NOTED
0%
S U
B M
IT
TA
L
/2
9/
VA Medical Center Portland, Oregon
Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs
A N D E R S O N
AD R SOB W K I
1430 SE 3rd Ave, Ste 200 Portland, OR 97214
T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com
SCEH T TC IRA
CL L
Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON
LIGHTING DEMOLITION PLAN
ED1.0
SCALE: 1/8" = 1'-0"
1. LIGHTING DEMOLITION PLAN
DEMOLITION LIGHTING LAYOUT GENERAL NOTES
ALL EXISTING CEILING LIGHT FIXTURES TO REMAIN IN THE SAME POSITION AND BE REPLACED WITH LITHONIA LIGHTING PANEL
LED FIXTURES.
INSTRUCTIONS TO REMOVE FLUORESCENT LAMPS:
1. ELECTRICAL CONTRACTOR SHALL SHUT OFF OR DISCONNECT POWER TO THE FLUORESCENT FIXTURE BY FOLLOWING SITE
LOCK-OUT/TAG-OUT GUIDELINES.
2. ELECTRICAL CONTRACTOR SHALL REMOVE FLUORESCENT LAMPS OR TUBES AND BALLAST COVER. DISPOSE OF THE LAMPS IN ACCORDANCE WITH VA, OREGON STATE AND FEDERAL REGULATIONS. FLUORESCENT LAMPS CONTAIN HAZARDOUS
MATERIALS.
3. DISCONNECT OR SEVER THE WIRING FROM THE BALLAST TO THE FLUORESCENT LAMP SOCKETS.
4. REMOVE THE FLUORESCENT LAMP SOCKETS AND ANY WIRING THAT MAY STILL BE ATTACHED.
5. DISCONNECT OR SEVER THE WIRING FROM THE AC POWER INPUT TO THE FLUORESCENT BALLAST. IF SPACE IS LIMITED, REMOVE THE BALLAST.
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
Revisions Date
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
IF
C
S U
B M
IT
T
A L
/3 0/
10.30.23
PROVIDE COMPLETE DEMOLITION OF ALL LIGHT FIXTURES.
IF
C
F
IN
A L
S U
B M
IT
T
A L
1/
/2
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
21 25
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
CLEAN
UTILITY
1C-164
NO. 3
STAIR
NO. P1
NO. P2
NO. S1
NO. S2
NO. S3
OXY. STOR.
OFFICEOFFICE
CLOSET, TELE.
CORRIDOR
ELEC. ROOM
HAND CLINIC
EMG EMG
CORRIDOR
TREATMENT RT OFFICE
CORRIDOR
TUB ROOM
EQUIP. ROOM
OFFICE STOR
BREAK ROOM
STORAGE
VEST. H.A.C. VEST.
TOILET, M. TOILET, F.
ADL KIT
EQUIPMENT RM
EXAM
EXAM
EXAM
UTILITY, SOILED
TEAM ROOM
CART LIFT
CORRIDOR
TRASH COLLECTION
METHADONE
CORRIDOR
CART LIFT
SENDING
MEDICATIONWORK ROOMTEAM ROOM
CLOSET, TELE.
MECH. RM. SERV. BAY No. 2
HALLWAY
CORRIDOR
OFFICE
TOILET
TOILET
BREAK ROOM
MULTI-PURPOSE ROOM
WAITING
TRIAGESOILED LINEN
CORRIDOR
CART LIFT
BREAK ROOM
EXAM
CORRIDOR
TEAM
CLEAN UTILITY
SOILED UTILITY
EXAM
EXAM
EXAM
SOILED HOLD
EXAMEXAM
TEAM ROOM
Elevator
Elevator
Elevator
Elevator
Elevator
C10
EXAM / TREAT
1C-146
C6
EXAM / TREAT
1C-137
UV / TREAT
1C-148
C9
EXAM / TREAT
1C-143
C8
EXAM
1C-142
10.610.6
DD
EE
FF
GG
HH
J J
C5
EXAM / TREAT
1C-139
RESIDENT
WORK AREA
1C-150
OFFICE
1C-151
CORRIDOR
C1-38
CORRIDOR
C1-37
CORRIDOR
C1-36
CORRIDOR
C1-35
CORRIDOR
C1-34
CORRIDOR
C1-32
CORRIDOR
C1-31
EXAM / TREAT
1C-157
EXAM / TREAT
1C-158
TOILET
1C-157a
TOILET
1C-158a
HAC
1C-149
C11
EXAM / TREAT
1C-147
OFFICE
1C-145
VITALS
1C-145
C12
EXAM
1C-141
TOILET
1C-144
VITALS
1C-135
C7
EXAM
1C-132
TOILET
1C-136
VITALS
1C-117
VITALS
1C-107
B14
EXAM
1C-123
B7
EXAM
1C-115
A8
VITALS
1C-105
TOILET
1C-118
TOILET
1C-108
C1
EXAM
1C-133
B8
EXAM
1C-124
B1
EXAM
1C-114
WAITING ROOM
C1-44
CLEAN UTILITY /
SCOPES
1C-164
74.53 SF
SCOPE
STORAGE
1C-170
EXAM ENT
1C-172 EXAM ENT
1C-173
EXAM ENT
1C-171
E/T SPEC. PROC.
1C-104
E/T SPEC. PROC.
1C-103
B13
EXAM / TREAT
1C-128
C3
EXAM / TREAT
1C-138
B12
EXAM / TREAT
1C-130
C4
EXAM / TREAT
1C-140
B5
EXAM / TREAT
1C-121
B11
EXAM / TREAT
1C-131
A6
EXAM / TREAT
1C-112
B4
EXAM / TREAT
1C-122
A5
EXAM / TREAT
1C-111
B10
EXAM / TREAT
1C-129 B6
EXAM / TREAT
1C-119
B3
EXAM / TREAT
1C-120
A7
EXAM / TREAT
1C-110
C2
EXAM / TREAT
1C-134
B9
EXAM / TREAT
1C-125 B2
EXAM / TREAT
1C-116
EXAM /
VITALS
1C-126
A3
EXAM / TREAT
1C-106
EXAM
1C-100
NC
(E
LINEN
MAXI
CAB
MAXI
CAB
M
AX
I C
AB
CART
CART
CART
CART
CART
LINEN
SC
AL
E
MED
CART
SCOPE
CAB
MED
CART
MED
CART
C
AR
T
OMNI
OMNI
OMNI
SCALE
BOOTH
SC
O
PE
C
AB
SCOPE
CAB
SCOPE
CAB
OMNI
EXAM ENT
1C-169
EXAM ENT
1C-167
MAXI
CAB
CART
CART
MAXI
CAB
LINEN
LINEN
OFFICE
1C-163
103.61 SF
TA
BL
E
TRSH
TRSH TRSH
TABLE
TABLE
TABLE
SCL
SCL SCL
LI
N
SC
L
SCL
SCL
SCL
SCL
STAFF
OFFICE
1C-165
180.88 SF
EXAM ENT
1C-170
SHLF
SHLF
SHLF
SHLF
SHLF
WAITING
C1-27
VITALS
C1-46
CORRIDOR
C1-43a
VITALS
C1-45
CORRIDOR
C1-43
LINEN
MAXI
CAB
SCOPE
CAB
CART
MAXI
CAB
SCOPE
CAB
CART
LINEN
RECEPTION
C1-26
CHECK-IN
1C-201
BOOTH
MAXI
CAB
SCOPE
CAB
C
AR
T
LI
N
EN
MAXI
CAB
SCOPE
CAB
C
AR
T
LI
N
EN
MAXI
CAB SCOPE
CAB
C
AR
T
LI
N
EN
LI
N
EN
MAXI
CAB SCOPE
CAB
C
AR
T
LI
N
EN
S
T
S
B
S
B
S S
B B
B
B
BB
SS
T
B
ST
S S
V
T
S
B B
B
S
B
TS
B B
S
B
S
S
SS
NC
S
B
S S
S
T
B
SS
S
S
B
S S
B
S S
B
S
B
NC
O VA
SS
B
S
ST
S
NC
SS
NC S
S
S
NC
S
B B
S
T
S
S
S S
B
NC
S
S
ST
S S
S
SB T
V
S
NC
O VA
B
1313 1212 1111
Revisions Date
Approved: Service Chief
Approved: Infection Cntrl.
Approved: Chief FMS
Approved: Safety Mgr.
Drawing Title
Dwg. of
Project Title
Building No.
LocationApproved: Director, VAMC
Approved: Chief M&RApproved: Chief P&O Checked/Project Mngr. Drawing No.
Project No.
Date
100 PMG/HRN
AD 19173
648-19-127
09.29.22
SCALE:
AS NOTED
0%
S U
B M
IT
TA
L
/2
9/
VA Medical Center Portland, Oregon
Bldg. 100 First Floor - Upgrade Specialty Clinic Exam RmsU.S. Department of Veterans Affairs
A N D E R S O N
AD R SOB W K I
1430 SE 3rd Ave, Ste 200 Portland, OR 97214
T: (503) 239-7377 F: (503) 239-7327 www.ADarchitects.com
SCEH T TC IRA
CL L
Planate Management Group, LLC 1800 Diagonal Road, Suite 600 Alexandria, Virginia, 22314 PORTLAND, OREGON
ELECTRICAL DEMOLITION PLAN
ED1.1
SCALE: 1/8" = 1'-0"
1. ELECTRICAL DEMOLITION PLAN
GENERAL NOTES:
1. SEE GENERAL NOTES E0.0
KEY NOTES:
01 UNPLUG OR REMOVE ANY ELECTRICAL CONNECTION TO EXISTING WALL HUNG X-RAY VIEW BOX.
REMOVE AND SALVAGE FOR RE-INSTALLATION. VERIFY WITH VA PERSONNEL FOR STORAGE.
01 0101
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
REMOVE AND RETURN TO VA FOR EXCESSING EQUIPMENT. VERIFY WITH VA PERSONNEL FOR
STORAGE.
100% DESIGN SUBMITTAL 09/29/202209/12/2023
0%
F
IN
A L
D E
S
IG
N
9/
/2
22 25
IF
C
F
IN
A L
S U
B M
IT
T
A
5/
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
10% DESIGN SUBMITTAL 06/19/2020
35% DESIGN SUBMITTAL 07/24/2020
60% DESIGN SUBMITTAL 08/17/2020
95% DESIGN SUBMITTAL 08/08/2022
100% DESIGN SUBMITTAL 09/29/2022
100% DESIGN SUBMITTAL 09/29/202209/12/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023
IFC SUBMITTAL 10/30/2023
100% DESIGN SUBMITTAL 09/29/202209/12/2023100% DESIGN SUBMITTAL 09/29/202209/12/2023IFC SUBMITTAL 10/30/2023
IFC FINAL SUBMITTAL 11/28/2023
100% DESIGN SUBMITT100% DESIGN SUBMITTIFC SUBMITTALIFC FINAL SUBMITTAL 09/29/202209/12/202309/29/202209/12/202310/30/202311/28/2023
Elevator
Elevator
Elevator
Elevator
Elevator
10.610.6
DD
EE
FF
GG
HH
J J
NC
(E
SP WI SP SD
SP
SP
SP
SP SD
(E) (E)
(E)(E) (E) (E)
SP
SD
SD
SP
(E)
SP
SD
SP SP
(E)
SD
(E)
SP
SD
(E)
SPSP
(E)
SD
SP
SD
SP
SD
SP
SD
SD
SP
SD
SDSP
SD
SP
SD
SP
SD
SD
SP
SP
SD
SD
SD
SP
(E)
OS
OS
(E)
(E)
SP
(E)
(E)
SP
RTLS
RTLS
RTLS
RTLS
RTLS RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
RTLS RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
RTLS
(E)
(E)
RTLS
(E)
RTLS
(N) (N)
(N)
(N)
(N)
(N)
(N)
(N) (N)
(N)
(N) (N)
(N)
(N)(N)
(N) (N)
(N) (N)
(N)
(N)
(N)
(N)
(N)
(N) (N)
(N)
(N)
(N) (N)
(N)
(N)
(N)
(N)
RTLS
RTLS
(N) (N)
(N)
RTLS
RTLS
RTLS
RTLS
(N)
(N)
SP
SP
SD
SD
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N) (N)
(N) (N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N) (N)(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)(N)
(N) (N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N) (N)
(N)
(N)
(N)
(N)
(N)
(N)
(N) (N)
(N) (N)
(N) (N)
(N)
(N)
RTLS
(N)
(N)
(N)
(N)
(N)
(N)
(N)(N)
(N)
(N)
(N)
(N)
(N)
(N)
SP WI SP SD
SP
SP
SP
SP SD
(E) (E)
(E)(E) (E) (E)
SP
(E)
(E)
(E)SD
SD
(E)
SP
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E) SP
SD
SP
(E)
SP
SD
(E) SP
(E)
SD
(E)
SPSP
(E)(E)
SD
SP
SD
(E)
(E)
SP
SD
(E)
SP
SD
(E)
SD
(E)
(E)
SP
(E)SD
SDSP
(E)
SD
(E)
SP
SD
(E)
SP
(E)
(E)
SD
(E)
(E)SD
SP
(E)
SP
(E)
SD
SD
(E)
SD
SP
(E) (E)
OS
OS
(E) (E)(E)
(E)
(E)
SP
(E)
(E)
(E) (E)
SP (E)
(E)
RTLS
(E)
RTLS
RTLS
(E)
(E)
(E)
RTLS
(E)
RTLS
(E)
RTLS
(E)
RTLS
(E)
RTLS
(E)
RTLS
(E)
RTLS
RTLS
(E)
(E)
RTLS
(E)
RTLS RTLS
(E)
(E)
RTLS
(E)
RTLS
(E)
RTLS
(E)
(E)
(E)
RTLS
(E)
RTLS
(E)
RTLS
(E)
RTLS (E)
RTLS
(E)
RTLS
(E)
(E)(E)
RTLS
RTLS
(E)
(E)
RTLS
(E)
(E)
(E)
RTLS
(E)
1313 1212 1111
Revisions Date
Approved: Service Chief
Ap…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .