Attachment 2 DRAFT Performance Work Statement Phoenix Federal Building.docx

DOCX document 628 KB Posted

Attached to
Sources Sought Notice for Operations and Maintenance And VTE at the Phoenix Federal Building
Solicitation number
EQ9PMF250027
Issued by

About this file

This document is a Draft Performance Work Statement (PWS) for Operations and Maintenance (O&M) services for the Phoenix Federal Building and associated parking lot in Phoenix, Arizona. The contract requires the contractor to provide comprehensive management, supervision, labor, materials, equipment, and supplies for efficient, effective, and economical operation, scheduled and unscheduled maintenance, and repair of all equipment and systems within the property lines, including vertical transportation systems.

Key requirements include maintaining building systems such as HVAC, electrical, plumbing, fire protection, building automation systems, and cooling towers, with specific emphasis on energy efficiency, environmental sustainability, and tenant comfort. The contractor must implement a detailed preventive maintenance plan, conduct regular tours and inspections, manage work orders, maintain comprehensive documentation, and comply with numerous federal regulations and safety standards. The contract includes provisions for additional services, repair management, and performance monitoring, with a focus on partnering with GSA to optimize building operations and asset management. The solicitation is associated with a Sources Sought Notice seeking potential 8(a) contractors interested in providing these services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 2023

National Operations & Maintenance Specification

SOLICITATION NUMBER: G S - P - - - -

SERVICE: OPERATIONS & MAINTENANCE AND RELATED SERVICES

LOCATION: Phoenix Federal Building (AZ0052ZZ) and N 2nd St Parking Lot

(AZ0051ZZ)

PERIOD OF PERFORMANCE:

SOLICITATION ISSUE DATE: xxx xx, 20xx

OFFER RECEIPT DATE/TIME: xxx xx, 20xx

Table of Contents

Change log:2
Section 1 General Contract Requirements7
C.1.0 GENERAL7
C.1.1 Scope of Work8
C.1.2 Personnel9
C.1.3 Quality Control Program17
C.1.4 Quality Assurance19
C.1.5 Physical Security20
C.1.6 Safeguarding Sensitive Data and Information Technology Resources21
C.1.7 Hours of Operation24
C.1.8 Conservation of Utilities25
C.1.9 Use of NCMMS25
C.1.10 Documentation and Records28
C.1.11 Ordinances, Taxes, Permits, and Licenses28
C.1.12 Other Contractors29
C.1.13 Government Forms29
C.1.14 Contractor Maintenance Performance Plans29
SECTION 2 DEFINITIONS30
C.2.0 General30
C.2.1 Above-Standard Services30
C.2.2 Acceptance30
C.2.3 Additional Services30
C.2.4 Advanced Meters30
C.2.5 Advanced Metering Systems30
C.2.6 Annual Child Care Facility Survey30
C.2.7 Architectural and Structural30
C.2.8 Basic Services31
C.2.9 Building Automation System (BAS)31
C.2.10 Building Operating Plan31
C.2.11 Building Monitoring and Control (BMC) System31
C.2.12 Building Recovery Plan31
C.2.13 National Computerized Maintenance Management System (NCMMS)31
C.2.14 Consumable Parts32
C.2.15 Contracting Officer (CO)32
C.2.16 Contracting Officer's Representative (COR)32
C.2.17 Contractor32
C.2.18 Core Coverage Hours32
C.2.19 Corrective Maintenance32
C.2.20 Demand Response Program32
C.2.21 Emergency Callback33
C.2.22 Energy Conservation Measure (ECM)33
C.2.23 Energy Savings Performance Contract (ESPC)33
C.2.24 Environmentally Sustainable Products and Services33
C.2.25 Exterior33
C.2.26 Fire Protection and Life Safety Systems33
C.2.27 GSAlink34
C.2.28 Green Procurement Compilation (GPC)34
C.2.29 Indefinite Quantity34
C.2.30 Initial Deficiency Report34
C.2.31 Miscellaneous Work34
C.2.32 Modification of Contract34
C.2.33 Non-Reimbursable Repairs34
C.2.34 Normal Working Hours35
C.2.35 Occupant Emergency Plan (OEP)35
C.2.36 Ongoing Commissioning35
C.2.37 Open Protocol Systems35
C.2.38 Operations35
C.2.39 Overtime Utilities35
C.2.40 Partnering35
C.2.41 Performance Work Statement (PWS)36
C.2.42 Predictive Maintenance36
C.2.43 Preventive Maintenance36
C.2.44 Quality Assurance Surveillance Plan (QASP)36
C.2.45 Quality Control Plan36
C.2.46 Rapid Building Assessment Program36
C.2.47 Repair36
C.2.48 Reimbursable Repair36
C.2.49 Tour37
C.2.50 Utility Energy Service Contract (UESC)37
C.2.51 Vertical Transportation Systems37
C.2.52 Watch37
C.2.53 Water Conservation Measure (WCM)37
C.2.54 Work Order37
SECTION 3 GOVERNMENT-FURNISHED PROPERTY39
C.3.0 General39
C.3.1 Electric Power39
C.3.2 Water Source39
C.3.3 Contractor Office Space and Furnishings39
C.3.4 Storage Space39
C.3.5 Network Equipment and Computer Hardware40
SECTION 4 CONTRACTOR- FURNISHED PROPERTY SUPPLIES/MATERIAL/EQUIPMENT41
C.4.0 General41
C.4.1 Specific Requirements41
SECTION 5 OPERATIONS-SPECIFIC REQUIREMENTS42
C.5.0 General42
C.5.1 Tenant Environment42
C.5.2 Building Operating Plan42
C.5.3 Equipment Inventory45
C.5.4 Safety Management48
C.5.5 Environmental Management51
C.5.6 Energy and Water Efficiency58
C.5.7 Advanced Metering Systems60
C.5.8 Building Automation Systems and IT Controls62
C.5.9 Fire Protection and Life Safety Equipment and Systems67
C.5.10 TOURS72
C.5.11 Repairs74
C.5.12 Work Orders77
C.5.13 Additional Services Indefinite Quantity Provisions80
C.5.14 Building Management and Support Services82
C.5.15 Monthly Progress Report84
C.5.16 Reference Library85
SECTION 6 MAINTENANCE SPECIFIC REQUIREMENTS86
C.6.0 General86
C.6.1 Maintenance Standard86
C.6.2 Boiler Systems87
C.6.3 Air Distribution Equipment88
C.6.4 Chiller Systems91
C.6.5 Cooling Towers92
C.6.6 HVAC Water Management93
C.6.7 Domestic Plumbing Systems98
C.6.8 Lighting Systems99
C.6.9 Electrical Switchgear and Switchboards102
C.6.10 Emergency Power Equipment102
C.6.11 Oil Analysis and Oil Changes104
C.6.12 Vertical Transportation Systems105
C.6.13 Architectural and Structural Systems106
C.6.14 Physical Access Control Systems (Security fixtures)108
C.6.15 Child Care Center109
C.6.16 Photo Voltaic Systems and Electrical Vehicle Support Systems109
SECTION 7 ADMINISTRATIVE INSTRUCTIONS111
C.7.0 Initial Inspection111
C.7.1 Initial Deficiency Inspection/Initial Deficiency Report111
C.7.2 Startup Phase/Transition Phase112
C.7.2 Startup Phase (New or Modernized Facility)113
C.7.2 Transition Phase114
C.7.3 Phase-out Transition Period115
C.7.4 Contract Closeout Examination and Withholding of Final Payment115
SECTION 8 PUBLICATIONS AND CITED STANDARDS117
C.8.0 Publications117

Section 1 General Contract Requirements

C.1.0 GENERAL

This is a Performance Work Statement (PWS) for Facilities Engineering: Operations, Maintenance, and Related Services defined under the scope of this contract. This PWS describes the minimum requirements of the U.S. General Services Administration (GSA) and acceptable outcomes to be performed by the Operations and Maintenance Contractor (known from here on as Contractor). All, or part of, the successful offeror’s various required maintenance and management plans shall be incorporated into the contract.

GSA seeks to establish a partnering relationship with the Contractor to accomplish the program objectives in this contract. The objective of the partnering process is to provide an effective problem-finding/problem-solving management team composed of personnel from both parties, thus creating a single culture with one set of goals and objectives. Partnering requires that both parties recognize and address those opportunities and challenges that shall be confronted to help maintain the health of the Contractor/GSA relationship. The relationship is based on trust, dedication to common goals, and an understanding of each other's individual expectations and values. The team shall consider utilizing a facility engineering and systems thinking approach to provide solutions from a global perspective. The outcome of this initiative is for GSA to leverage Contractor expertise to assist GSA in accomplishing these goals and objectives.

GSA intends to purchase Contractor provided technical and managerial expertise to assist in the holistic management of assets over the long term. This program strategy has taken the name “facilities engineering” and has proven to be a successful model resulting in efficient and effective management of assets while maintaining a lower overall cost of operations. The facilities engineering model is dependent upon an effective partnership with a highly skilled Contractor whose objectives are based on mutual understanding of the stated requirements and objectives. A higher level of effective communication between the Government and Contractor is essential for partnering and for this performance-based service contract to succeed, whereas the success of this contract is shared between the Government and the Contractor. More emphasis is placed on the Contractor’s self-management of quality, not the usual inspection by Government inspectors, although that is a part of this contract as well. All parties shall act proactively to reduce service cost.

To establish a standard of facilities engineering practices, thought processes and problem solving throughout the model, GSA established a program philosophy rooted in “systems thinking” whereby the means and methods for providing building operations and maintenance are established through investigations, metrics, and feedback loops, and by establishing a partnership between the Government and Contractor to achieve joint performance objectives. The goal of applying systems thinking to facility management is to see that every action or decision in operating, maintaining, and retrofitting a building shall result in an impact (financial, environmental or, human resource, or any combination thereof), and to evaluate the “full circle” implications. Long term application of systems thinking throughout GSA has resulted in both Contractor and Government joint command of short-term and long-term cohesive management of real property assets.

GSA is committed to Federal leadership in the design, construction, and operation of high-performance and sustainable buildings. A major element of this strategy is the implementation of common strategies for operating and maintaining buildings. As a result, this contract requires the Contractor to participate and partner with the Government in the initiative of obtaining high performance and sustainable operations, inclusive of initiatives to conserve energy and water consumption, recycling programs, meeting or exceeding specific environmental, regulatory, or performance standards, and the utilization of green products and services. The following sections detail the GSA minimum requirements and acceptable outcomes. The Contractor shall closely monitor all aspects of the work, identify deficiencies and implement corrective action, without reliance on Government oversight.

To the extent possible and consistent with EO 13788, the Contractor shall maximize the use of goods, products and materials that are produced in the United States.

C.1.1 Scope of Work The Contractor shall provide management, supervision, labor, materials, equipment, and supplies (shipping & handling) and shall be responsible for the efficient, effective, economical, and satisfactory operation, scheduled and unscheduled maintenance, repair of equipment and systems, including vertical transportation and all related systems/ services located within the property line of the following locations and buildings:

Phoenix Federal Building (AZ0052ZZ) 230 N 1st Avenue, Phoenix, AZ

Federal Parking Lot (AZ0051ZZ) 314 N 2nd Avenue, Phoenix, AZ

Additional services may be ordered at the discretion of GSA for work relating to the operations, maintenance and repair or upgrade of the facilities listed above, but not covered in the basic services of the contract. Government furnished items are specifically excluded in this contract, except as specified in Section 3.

The Phoenix Federal Building (AZ0052ZZ) has active ESPC projects including building-wide sink aerators, BAS controls, and Trane Chiller replacements. The Contractor shall operate and maintain these locations in compliance with the ESPC/UESC to ensure to the greatest extent possible that energy savings targets are satisfied or exceeded.

C.1.1.1 Discrepancy in the Specifications In any cases of discrepancy in the specifications, the matter shall be immediately submitted to the Contracting Officer (CO). The decision of the CO as to the proper interpretation of the specifications shall be final in accordance with the Disputes Clause of this Contract.

C.1.2 Personnel The Contractor shall adhere to the submitted staffing plan and subcontracting plan that was submitted prior to award as part of the bid proposal. The Contractor shall submit staffing/subcontractor plan that provides sufficient numbers of staff at the various levels of expertise to ensure all scheduled and unscheduled services are performed and conditions are maintained to avoid any disruption to the tenant. Any changes to the proposed staffing levels, qualifications of proposed staff or key personnel, or the areas of expertise or disciplines of the proposed staff shall be submitted for review and approval from the CO or their designee.

C.1.2.1 Contractor Key Personnel The Contractor shall designate a Contract Project Manager in writing and provide the name and contact information to the CO. The Contract Project Manager is considered essential to the work being performed under this Contract. Before removing, replacing, or diverting the Contract Project Manager, the Contractor shall (1) notify the CO two weeks in advance and (2) submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this Contract.

The Contract Project Manager shall possess at least five years of recent (within the past seven years) experience in the management and supervision of building mechanical operations and maintenance for buildings of the approximate size, complexity and characteristics of the buildings to be covered by this Contract. A detailed resume shall be submitted to the CO or their designee for approval prior to the assignment of the project manager to the Contract. Both new and replacement project managers shall meet these qualification standards. Minimally, the resume shall contain:

a. The full name of the proposed project manager.

b. A detailed description of the proposed project manager’s employment history for the previous five years. The names and addresses of the companies for whom the proposed project manager worked for the past five years, along with the names and telephone numbers of the immediate supervisors.

C.1.2.1.1 Key Personnel List Within the first seven days of the contract, the Contractor shall provide a list of key personnel, including the Project Manager and/or on-site supervisor, for all shifts, with their contact phone numbers to the Contracting Officer’s representative. This list shall be maintained and updated as necessary throughout the contract period of performance.

C.1.2.2 Authority

The Contract Project Manager shall have complete authority to act for the Contractor in every detail during the term of the Contract and shall have the authority to exercise financial expenditures and controls, accept notices of deductions, inspection reports and all other correspondence on behalf of the Contractor. This Contract requires onsite managerial supervision. The Contractor can fulfill this requirement by having the Contract Project Manager located onsite or having an additional onsite Supervisor. If the Contractor decides that the requirement is to be filled with an onsite supervisor, the above requirements for Contract Project Manager shall be the same.

C.1.2.3 Communication Equipment The Contractor shall provide key operational personnel (Managers, Supervisors, and Mechanical Engineers, Mechanical Supervisors, Operating Engineers, Heating, Ventilation and Air Conditioning (HVAC) Mechanics) with portable electronic means to communicate with GSA for all work covered under this Contract (Work Orders, emergencies, status of projects). Outside of normal working hours, the Contractor shall maintain some designated form of communication with on-call staff to allow the CO or their designee to contact such on-call staff at any time for emergency response.

Electronic communication methods are the following:

· Phone/Emails/Text messaging smartphone or tablet devices. The Contractor is responsible for all initial and monthly costs associated with the device(s). In areas where cellular service is unavailable, or unreliable, special exceptions shall be made by the CO or designee on a case-by-case basis. Such devices shall be on the list of GSA- approved devices and are to be processed through GSA’s procedures for remote mobile management. This shall allow for mobile access to GSA email, the National Computerized Maintenance Management System (NCMMS) mobile environment and Building Automation Systems (BAS) alarms. The process for this and the list of currently approved devices is available upon request. Contractor personnel under this Contract must obtain and maintain an official GSA ENT account (this is your enterprise account for signing into systems administered by GSA) and monitor their GSA email account for all notifications.

· Fax. Receiving and sending faxes is acceptable as a secondary communication method for locations that have problems with wireless device signal strength. However, delaying faxes because of combined usage of voice and fax on the same line is not acceptable.

C.1.2.3.1 CIO 2100 IT Security Policy The Contractor shall ensure compliance with GSA Order CIO 2100.1M. Contractor core personnel under this Contract must obtain an official GSA email account. Employees must have clearance before they access GSA email, NCMMS, or other Government systems. The GSA Order CIO 2100 prohibits an employee or Contractor supporting GSA from creating or sending information using a non-official GSA electronic messaging account (i.e., company or personal email account). The Contractor shall ensure compliance with the Department of Homeland Security ICS-CERT cyber security guidance and recommendations.

C.1.2.4 Language On-site personnel and the Contractor’s Point of Contact (POC) for GSA need to be proficient in English, and must be able to read, write, speak, and understand English.

C.1.2.5 Employee Suitability The GSAR 552.237-71 Qualifications of Employees (1989) clause shall be followed at all times during the performance of this Contract.

a. All Contract employees requiring routine unescorted access to federally controlled facilities or information systems, or both, for more than six months (Regular Employees) shall be required to undergo a suitability determination before a personal identification verification (PIV) card is issued. After the request for suitability determination is sent to the determining authority, requested personnel may not enter the facility for work associated with the contract. They may enter to attend training or indoctrination activities only. After their initial favorable suitability determination is received, Contractor personnel may enter for work and shall comply with normal facility access control procedures, including recording presence, temporary badging, and escorted entry, as applicable. When a favorable final suitability determination is received and PIV card issued, entry will allowed by presenting the PIV card.

b. Failure of a Regular Employee to receive a favorable suitability determination shall be cause for removal of the employee from the work site and from other work in connection with the Contract.

c. Contract employees working for less than six months (Temporary Employees) shall, at the Government's option, be required to undergo a lesser form of suitability determination. Prior to the time that an identification card is issued, if at all, such Temporary Employees shall be required to comply with normal facility access control procedures, including recording presence, temporary badge, and escorted entry, as applicable.

d. The Government, at its sole discretion, may grant temporary suitability determinations to Regular or Temporary Employees. However, the granting of a temporary suitability determination to any such employee shall not be considered as assurance that a favorable suitability determination shall follow.

e. The CO or designee shall provide the Contractor with the required clearance procedures for obtaining necessary clearances. The Contractor shall comply with these clearance procedures.

f. The Contractor shall be responsible for planning and scheduling its work in such a manner as to account for facility access issues. Difficulties encountered by the Contractor in gaining access to facilities by its employees and subcontractors shall not be an excuse for any lack of Contractor performance under the Contract.

C.1.2.6 Employee Technical Qualifications Employees or subcontractors performing Contract work involving the operation, maintenance or repair, inspection, or testing of any piece of equipment or system shall be trained and possess the knowledge, experience and skills pertinent to the equipment or system as demonstrated by a current training certificate from an equipment manufacturer or a certificate by an organization acceptable to the CO or designee. The Contractor shall identify all necessary qualifications required by this performance work statement and ensure all personnel have obtained these at no additional cost to the Government. Any exceptions or delays in obtaining the required qualifications must have written approval from the CO or designee before proceeding with any work by the affected employee. Contractor personnel shall have proficiency in NCMMS sufficient for “Use of NCMMS” as described in C.1.9 and this subsection. Contractor personnel shall have Building Automation System skills sufficient for operating the building as described in section C.5.8 of this document. All personnel or subcontractor personnel shall possess all certifications and licenses required by Federal, state and local jurisdictions, NETA, and National Fire Protection Association (NFPA) 72, National Fire Alarm Code, section 10.5, for equipment that they shall be operating, maintaining, repairing, inspecting or testing. All personnel under the team leader or subcontractor personnel shall have the experience and skill set knowledge as described in the Service Contract Act (SCA) Directory of Occupations, Fifth Edition or later. For example, HVAC mechanics that need to be as proficient as dictated by the 23410 and 23411 series and general maintenance mechanic shall be as proficient as dictated by the 23370 series.

C.1.2.6.1 Technical Qualification Documentation All training, licenses, and certifications required for Contractor employees or subcontractors shall be entered into NCMMS, or placed in a drive folder as directed by the CO or designee prior to the employees or subcontractors performing work on this contract unless a waiver is obtained from the CO or designee. The Contractor shall inform the CO or designee as new qualifications are required or obtained and maintain the qualification documentation throughout the performance of the contract.

C.1.2.7.1 Qualifications of Fire Alarm System Technicians

a. Technicians performing contract work involving the inspection, testing, and preventive maintenance or repair of fire alarm systems shall be certified by the National Institute for Certification in Engineering Technologies (NICET) and possess at least a NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering Technology, Fire Alarm Systems. The Contractor shall submit to the CO or designee the NICET level certification number and expiration date for each field technician and inspector responsible for performing fire alarm system preventive maintenance and repair services required under the terms of this Contract.

b. Technicians modifying the programming software of the fire alarm system shall also be factory trained and certified by the system manufacturer for the specific type and brand of fire alarm system being serviced. The Contractor shall submit to the CO or designee the factory trained certification number and expiration date for each specific manufacturer’s equipment for each technician responsible for performing programming of the fire alarm system.

C.1.2.7.2 Qualifications of Water-Based Fire Suppression System Technicians Technicians performing contract work involving the inspection, testing, and preventive maintenance or repair of water-based fire suppression systems shall be certified by the National Institute for Certification in Engineering Technologies (NICET) and possess at least a NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering Technology, Inspection, and Testing of Water-Based Systems. The Contractor shall submit to the CO or designee the NICET level certification number and expiration date for each field technician and inspector responsible for performing water-based fire suppression system PM and repair services required under the terms of this Contract.

C.1.2.7.3 Qualifications of Technicians Technicians shall be trained and possess a current training certificate for inspecting, testing, and maintaining these components from an equipment manufacturer or a certificate by an organization acceptable to the CO. The Contractor shall submit to the CO or designee the certification document and expiration date, issued by the equipment manufacture or organization confirming the technician has been trained, for each field technician and inspector responsible for performing the inspection, testing, and maintenance of such systems/equipment under the terms of this Contract.

C.1.2.7.4 Qualifications for Electrical Technician Technicians performing Sub-Contract work involving inspections, testing, and maintenance for the electrical switchgear shall meet the qualifications by the American National Standards Institute/International Electrical Testing Association ETT-2015, Standard for Certification of Electrical Testing Technicians or qualifications by the National Institute for Certification in Engineering Technologies (NICET) and hold at least a Level 3 certification.

The Contractor shall provide documentation to the CO or designee on qualifications identified in this standard. Certification can be obtained through; the ANSI/NETA Certification program or Electrical Testing Technician Certification Institute.

Alternate certifications presenting evidence of equal or greater skills and qualification may be substituted; however, the burden to evidence the quality of such certification falls fully upon the vendor.

C.1.2.7.5 Qualifications of a BAS Technician Personnel involved in the operation, adjustment and maintenance of all BAS, AMS, and EMS systems must be trained and qualified for the control system currently operating the building equipment. The Contractor must provide to the CO or their designee documentation of the level of experience, including any certificates of training, for all employees who will be involved in this function. Technicians modifying AMS, BAS, and EMS systems must be factory trained and currently certified for the operating system, including software version, of the particular BAS and AMS systems and must provide documentation of this certification to the CO or designee. Technicians shall be familiar with the procedure for logging GSA IT Help Desk tickets and following up to ensure tickets are being worked by the assigned party.

C.1.2.8 Employee Training Program The Contractor shall submit a detailed training program to ensure employees working in a Federal building have the experience, knowledge, skills and abilities to perform the work required by this Contract. The training program will be submitted to the CO or designee by the end of the transition phase. The Contractor’s program shall, at a minimum, list all required training for each respective position, the name of employee(s) engaged in each position, along with their level of progress in attaining the required training.

C.1.2.8.1 Asbestos Awareness Training The Contractor shall ensure that all employees, including replacement workers, receive asbestos training and refresher training in accordance with 40 C.F.R part 763 and 29 C.F.R. part 1910. The Contractor shall follow all instructions for each asbestos class job as outlined in 29 C.F.R. part 1910. The training shall be conducted, at no additional expense to the Government, within 90 calendar days of the Contract start date. The Contractor shall submit written certification to the CO or designee and record into NCMMS within five business days of the completion of training.

C.1.2.8.2 Re-Tuning Training

RESERVED

C.1.2.8.3 HVAC Education Requirements and Certifications All HVAC personnel designated to operate, maintain, or repair, or any combination of HVAC equipment or systems shall possess one or more of the following certifications:

a. North American Technician Excellence (NATE) HVAC Service Technician Certification

b. HVAC Excellence Professional Level Certification

c. UA Star HVAC Mastery Certification

d. Local Union Journeyman Commercial HVAC certification

All HVAC personnel designated, to operate, maintain, and or repair, or any combination of HVAC equipment or systems shall maintain a minimum of 16 hours of continuing education per year from either NATE, HVAC Excellence, or UA Star recognized provider program.

The Contractor shall submit copies of certification annually to the CO or designee.

C.1.2.8.4 NCMMS Training The Contractor shall ensure that all staff using NCMMS complete Government provided new user training at a minimum. New user basic training curriculum, which takes approximately 6 hours, covers the following at a minimum:

· Basic Navigation

· Work Order Tracking

· Asset Management

· Preventive Maintenance

· Reports The Contractor shall identify and designate staff responsible for performing specific administrative tasks within NCMMS. In addition to NCMMS New User Training, designated staff shall complete NCMMS Contract Administration Training for Contractors which takes approximately 3 hours and covers the following at a minimum:

· Account Management

· People Records

· Labor Records

· Location Records

· Preventive Maintenance Work Orders

· Conduct Quality Control Inspections

· Generate Monthly Progress Reports

· Hazards and Precautions Management

Training will be provided via webinar by Regional or National NCMMS staff. The Contractor shall work with COR to schedule and facilitate training during the start-up or transition phase of the contract. The Contractor shall request new user training for replacement staff from COR. Training shall be completed at no additional cost to the Government. The Contractor may request a waiver for staff that have previously completed NCMMS training and can demonstrate knowledge and proficiency using the system. The Contractor shall identify all previously trained staff and provide supporting documentation and records to the COR for waiver consideration. The Contractor shall submit written certification to the CO or designee within five (5) business days of completing training.

C.1.2.8.5 Lead Awareness Training The Contractor shall ensure that all employees, including replacement workers, receive lead awareness training and refresher training in accordance with 29 CFR 1910.1025(l) (1) (i). The training shall be conducted, at no additional expense to the Government, within 90 calendar days of Contract start date. The Contractor shall submit written certification to the CO or designee within five (5) business days of the completion of training.

C.1.2.9 Appearance Contractor personnel shall present a neat appearance and be easily recognized. This shall be accomplished by wearing uniforms bearing the name of the company and employee name. Uniforms shall be regularly laundered, consistent among personnel classifications, and maintained presentable to tenant personnel during all working hours.

C.1.2.10 Standards of Conduct The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity and shall be responsible for taking disciplinary action with respect to its employees, as necessary. The Contractor is responsible for ensuring that its employees maintain a standard of common courtesy, ensuring respectful, professional communication and conduct with building tenants and all partners involved in this contract, including telephone, email, and in-person interactions, while demonstrating professional behavior in the workplace. The Contractor shall ensure its employees do not disturb papers on desks, open desk drawers or cabinets, or use Government telephones, except as authorized. Each employee must adhere to standards of behavior that reflect favorably on his or her employer and the Federal Government. Smoking is only allowed in designated areas on the property and no smoking is allowed within the Facility.

C.1.2.11 Recording Presence Each Contract employee shall sign in when arriving and departing the facility daily and follow card access requirements as directed by the CO or designee. The Contractor shall accumulate GSA Form 139 (Record of Time of Arrival and Departure from Building) or other designated form for use in recording presence each calendar week, and certify in writing on each form that the information shown is true and correct within 7 business days of the end of the work week. The Contractor shall provide copies of these records to the CO or designee upon request.

C.1.2.12 Personal Identity Verification Requirements Contractor employees that require access to GSA-controlled facilities or information systems to perform Contract requirements shall comply with GSA personal identity verification requirements. The Contractor shall insert this clause in all subcontracts when the subcontractor is required to have access to a GSA-controlled facility or access to a GSA-controlled information system.

C.1.2.13 Credentials and Identification Contractor personnel with credentials shall be required to comply with all access security screening procedures applicable to Government or other personnel possessing similar credentials, or as determined by the building practices as defined by the Facility Security Committee. All Contractor personnel possessing credentials (PIV or otherwise) shall visibly display their credentials at all times while in the building(s) where work is being performed.

The Contractor shall be responsible for ensuring that all identification credentials are returned to the CO or designee whenever its employees leave the Contract (i.e., when the Contract has been completed, employees leave the company, employees are dismissed or terminated or the Government determines that the employee is to be removed from the contract). The Contractor shall notify the CO or designee whenever employee badges are lost.

The Contractor shall be responsible for paying the Government for replacement credentials at the current cost per badge.

C.1.2.14 Escorting Temporary contract employees who do not have favorable preliminary or final suitability determinations and need to work in non-public federally controlled space must be escorted. In those cases, the Contractor shall comply with the security clearance procedures for Escort Only Contractors. All uncleared contract employees shall be escorted in non-public space by a Government employee or another responsible cleared contract employee who is approved by the CO or designee. Other Government agencies shall have specific agency security requirements for their own space that shall only allow escort by Government employees or those designated by their agency. Government employees or approved cleared contract employees who provide escorts for uncleared contract employees shall always be within eyesight of the uncleared contract employees. The Contract Government escort shall watch uncleared employees and remain with uncleared contract employees for the entire time they are in non-public federally controlled space. Any security violation of escort requirements by a cleared and approved contract employee shall result in the immediate removal from the Contract of all contract employees involved, i.e., escorts and uncleared escorted contract employees. Also, violations of escort requirements by subcontract employees in accordance with security requirements shall be grounds for loss of facility access for those individuals or grounds for termination of Contract, or both.

C.1.3 Quality Control Program A Quality Control Program (QCP) shall be developed and implemented by the Contractor. The Contractor’s QCP shall ensure Contract compliance, and act to ensure that potential problems with building services, equipment and systems are identified, documented, and resolved prior to failure. The Contractor shall create and implement data collection and analysis plans to continually monitor and improve efficiency in operations, resource consumption, environmental impact and tenant satisfaction. In the event the Government Quality Assurance Program identifies deficiencies the Contractor shall implement progressively responsive quality control measures commensurate with the severity of the Government's deficiencies. Deficiencies identified by the QCP or QASP shall be recorded in NCMMS as described in the ADVANCED GSA Process Flows Procedures Manual.

C.1.3.1 Quality Control Plan The “Quality Control Plan” (QC plan) is the Contractor’s complete written system for identifying and correcting deficiencies and monitoring and improving efficiencies to continually improve the quality of services provided. Preparation of the QC plan is the responsibility of the Contractor and is due with the Contractor’s proposal.

The QC plan, revisions or updates shall be submitted for approval by the CO or designee. A review of the QC Plan can be initiated by direction of the CO or designee.

C.1.3.2 Quality Control Plan Contents The QC plan shall detail the Contractor’s methods, frequencies, documentation, and remedies for ensuring that all aspects of contract work performed is of the highest quality. It shall describe procedures for correcting problems, data gathering, improving efficiencies, and addressing quality assurance findings by the Government. The Contractor shall further customize the QC plan to meet facility specific conditions, including ESPC projects listed in C.1.1 above. The QC plan shall describe the Contractor’s overall approach, methods, roles and responsibilities relating to Quality Control of all areas of contract work including service calls, preventive maintenance/inspection schedules, and operating data collection and analysis. The revised QC plan is to be submitted for review and approval to the CO or designee within 30 calendar days of Contract start date.

C.1.3.2.1 Inspection and Data collection Program The Contractor shall develop an inspection and data collection and analysis programs that ensure a safe, secure and efficient level of operation of all equipment and services required in this PWS. The inspection program shall specify the areas to be inspected on a scheduled or unscheduled basis, how frequently inspections shall be accomplished, and the title of the individual(s) (third party or corporate) who shall perform the inspections. The inspection program shall provide for a written record of inspections and results. The inspection program plan shall be planned, scheduled, tracked, and reported via NCMMS.

C.1.3.2.2 Methods The Contractor shall identify its methods for identifying, correcting, and preventing deficiencies in the quality of service performed before the level of performance becomes unacceptable.

C.1.3.3.1 Data Collection and Analysis Program The Contractor shall collect and analyze any and all operational data including BAS, NCMMS, Utility bills, installed meters, infrared scans, vibration analysis, and meteorological data to implement or recommend any operational changes to increase the buildings operational efficiency, reduce resource use, lower environmental impact, reduce costs and improve tenant satisfaction. The Contractor will verify expected results and report expected vs. actual results at least annually.

C.1.3.3.2 Methods The Contractor shall use NCMMS to the maximum extent possible to create and store analytic data. Meters used for analysis shall be asset based in NCMMS with meter readings recorded in NCMMS.

Partnering Meeting / Quality Control Meeting: While the Government does not seek to be prescriptive, it is noted that live, interactive meetings, including updates, reports and trend analysis on the varying contract programs areas have been shown to hold significant value in meeting the Government's desired performance levels in this area. Additionally, the use of electronic media and mobile platforms (such as google docs, Meeting Space and teleconferencing) function well with GSA’s mobile workforce.

The written minutes of these meetings will be prepared by the Contractor and delivered to the CO or their designee no later than 3 business days after the meeting(s.)

C.1.4 Quality Assurance GSA’s role in quality assurance is to ensure that the Contractor is achieving the quality levels established in the operation and maintenance services contract and focuses on the Contractors’ QC plan. GSA periodically validates the execution of the Contractor's QCP by reviewing such areas as the Contractor's inspection forms, service request logs, tenant reports, tenant satisfaction surveys, NCMMS surveys, and the timeliness of corrective actions.

As part of the Government’s quality assurance program, the Government may:

a. Review and, if warranted, reject any reports or other submittals required from the Contractor.

b. Review performance and service records, including monthly progress reports, BAS data, NCMMS data, and any computerized or hard copy records maintained by the Contractor documenting performance under this Contract, and require correction of any unsatisfactory conditions noted.

c. Determine the adequacy of the Contractor’s QCP and documentation and the overall success of this program. The Government shall order improvements, if it determines the program is insufficient or ineffective.

d. Obtain tenant satisfaction and NCMMS survey information and require improvements in service on the basis of such information to the extent such results correlate with deficiencies in Contract requirements.

e. Conduct physical inspections of facility equipment and systems, including programs and files maintained on computers in Contractor onsite offices and work areas, and require correction of deficiencies noted.

f. Perform inspections with Government personnel or independent third-party inspectors.

g. Review compliance or changes made to O&M procedures established by an ESPC/UESC, if applicable, and require correction of any O&M deficiencies.

C.1.4.1 Contracting Officer's Representative (COR) Contracting Officer's Representatives (COR’s) shall be appointed to monitor Contractor performance, and they have the right to inspect and accept or reject defective services. The COR has the authority to recommend deductions based on findings in the Quality Assurance Report. The name and telephone number of each COR under the Contract shall be furnished to the Contractor in writing by the CO.

C.1.4.2 Government Monitoring The Government shall inspect the Contractor’s performance using a quality assurance program (QASP) through random inspections, scheduled inspections, or any other method of inspection by the COR or designee that the Government determines reflects the actual performance of this Contract. Contractor performance shall be evaluated on the basis of the performance success or deficiencies, success or failure in meeting contract requirements, and the Contractor’s record of correcting deficiencies when noted. While corrective actions shall be noted, a record of significant performance deficiencies shall lead to a performance evaluation that is less than satisfactory even if the Contractor takes corrective action. The Contractor shall meet with the CO or designee and other Government representatives at least monthly to review Contract performance.

C.1.4.3 Performance Evaluations Contractor performance shall be evaluated on the basis of the performance success or deficiencies, success or failure in meeting contract requirements, and the Contractor’s record of correcting deficiencies when noted. A mutual good faith effort shall be made by all parties to resolve all issues. GSA uses the Contractor Performance Assessment Reporting System (CPARS) to evaluate the Contractor's performance. Evaluations are generally conducted annually on or about the anniversary date of the Contract and also at the end of the Contract period, but may be conducted more frequently if CO or designee determines it is needed.

C.1.5 Physical Security The Contractor shall be responsible for safeguarding all Government property provided for Contractor use in accordance with the Government Property (GP) clause, Federal Acquisition Regulation (FAR) 52.245-1. Any loss of integrity in the lock and keying system shall be immediately reported to the COR.

C.1.5.1 Key Control The Contractor shall follow the building’s key control program; refer to Policy 5900.1ADM, Physical Access Control Systems in U.S. General Services Administration Controlled Space. Keys issued to the Contractor or the Contractor’s personnel, or subcontractors shall be signed for and not transferred to other personnel unless recorded in the key control log. All new locks shall be incorporated into existing grand master key system. The Contractor shall develop procedures covering key control that shall be included in the QC plan. Providing keys for tenants is reimbursable. The Contractor shall be financially liable and shall furnish locksmith services and key blanks for installation and removal of locksets and tumblers, and costs associated with re-keying due to the loss of a master key by Contractor or subcontractor. The Contractor shall also be financially responsible for duplication of keys, replacement of locksets, opening doors in the event of lost keys by employees or subcontractors, and replacement of keys and locksets, due to keys not being recovered from terminated employees or subcontractors.

C.1.5.2 Lock Combinations The Contractor shall establish and implement methods of ensuring all lock combinations are not revealed to unauthorized persons. These procedures shall be included in the Contractor's QC plan.

C.1.6 Safeguarding Sensitive Data and Information Technology Resources C.1.6.1 General The Contractor is responsible to safeguard sensitive Government data, personal information and the integrity of Government information technology resources. This subsection applies to all users of sensitive data and information technology (IT) resources, including awardees, Contractors, subcontractors, lessors, suppliers and manufacturers. Contractor personnel requiring access to GSA’s Network shall comply with all Federal Information Technology regulations regarding Trusted Internet Connection (TIC) in conjunction with Public Buildings Service (PBS) and GSA Chief Information Officer (CIO) IT policies, i.e., all PBS IT systems needing network connectivity shall reside on the GSA network. The following GSA policies shall be followed:

a. 2100.1M CIO, GSA Information Technology (IT) Security Policy

b. 2100.2C CIO, GSA Wireless Local Area Network (LAN) Security

c. CIO 2104.1A, GSA Information Technology IT General Rules of Behavior

d. CIO 2105.1 C, GSA Section 508: Managing Electronic and Information Technology for Individuals with Disabilities

e. CIO 2106.2, GSA Social Media Policy

f. CIO 2107.1, Implementation of the Online Resource Reservation Software

g. CIO 2160.4A, Provisioning of Information Technology (IT) Devices

h. CIO 2162.2, Digital Signatures

i. CIO P 2165.2, GSA Telecommunications Policy

j. CIO P 2180.1, GSA Rules of Behavior for Handling Personally Identifiable Information (Pll)

k. 2181.1 ADM, Homeland Security Presidential Directive-12, Personal Identity Verification and Credentialing, and Background Investigations for Contractors

l. CIO P 1878.3, Conducting Privacy Impact Assessments (PIAs) in GSA

m. CIO 2231.1, CIO GSA Data Release Policy

n. 9732.1E ADM, Suitability and Personnel Security. The Contractor and subcontractors must insert the substance of this order in all subcontracts.

C.1.6.2 Safeguarding and Dissemination of Controlled Unclassified Information C.1.6.2.1 General This subsection applies to all recipients of Controlled Unclassified Information (CUI), including offerors, bidders, awardees, contractors, subcontractors, lessors, suppliers and manufacturers. Dissemination of sensitive but unclassified paper and electronic building information shall be made on a need-to-know basis in accordance with GSA Order PBS P 3490.2, a copy of which shall be made available upon request.

C.1.6.2.2 Marking CUI Contractor-generated documents that contain building information shall be reviewed by the CO/COR to identify any CUI content, before the original or any copies are disseminated to any other parties. If CUI content is identified the CO or designee shall direct the Contractor, as specified elsewhere in this Contract, to imprint or affix CUI document markings to the original documents and all copies, before any dissemination.

C.1.6.2.3 Authorized Recipients Building information designated CUI shall be protected and controlled by strictly limiting access to those individuals having a legitimate business need to know such information. Those with a need to know shall include Federal, state and local Government entities, and non-Government entities engaged in the conduct of business on behalf of or with GSA. Non-Government entities shall include architects, engineers, consultants, contractors, subcontractors, suppliers, utilities, and others submitting an offer or bid to GSA, or performing work under a GSA contract or subcontract. Recipient contractors shall be registered as “active” in the System for Award Management (SAM) online database. If a subcontractor is not registered in the SAM and has a need to possess CUI building information, the subcontractor shall provide to the Contractor its DUNS number or its tax ID number, a copy of its business license and a valid state driver’s license with photograph or other valid IDs with photograph. The Contractor shall keep this information related to the subcontractor for the duration of the Contract and subcontract.

All GSA personnel and Contractors shall be provided with CUI building information when needed for the performance of official Federal, state, and local Government functions, such as for code compliance reviews and for the issuance of building permits. Public safety entities such as fire and utility departments shall require access to CUI building information on a need-to-know basis. This clause shall not prevent or encumber the dissemination of CUI building information to public safety entities.

C.1.6.2.4 Dissemination of CUI Building Information C.1.6.2.4.1 By Electronic Transmission Electronic transmission of CUI information outside of the GSA network shall use session encryption (or alternatively, file encryption). Encryption shall be via an approved NIST algorithm with a valid certification, such as Advanced Encryption Standard (AES) or Triple Data Encryption Standard (3DES), in accordance with Federal Information Processing Standards…

This is the start of the file's text. The full file is on GovTribe.