Attachment 2 - (DRAFT) Drawings.pdf

PDF 18 MB Posted

Attached to
Construction / Installation of Interim Dining Facility for 2CAB, USAG Humphreys
Solicitation number
W91QVN25RA040
Issued by

About this file

These are detailed architectural and engineering design drawings for a temporary Dining Facility (DFAC) for 2nd Combat Aviation Brigade (2CAB) at U.S. Army Garrison Humphreys in South Korea. The comprehensive 53-page drawing set includes multiple technical plans and specifications covering architectural, civil, mechanical, electrical, fire protection, and structural aspects of the facility. Key drawing sets include floor plans, site layout, utility plans, lighting plans, HVAC configurations, power system diagrams, foundation details, and equipment schedules. The drawings specify a temporary structure with modular design elements, featuring a large dining area capable of seating multiple groups, associated kitchen facilities, mechanical rooms, and necessary infrastructure connections. Technical details cover everything from building geometry and material specifications to electrical circuitry, fire suppression systems, and precise dimensional measurements for construction implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIM.CHAE

HWA.128958

Digitally signed by

SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:19:31 +09'00'

DEEL.CLAYT

ON.FERRELL.

1201075935

Digitally signed by

DEEL.CLAYTON.FERR

ELL.1201075935

Date: 2025.02.28 16:41:21 +09'00'

INSTALL TEMPORARY DFAC FOR 2CAB

25-008

1 2

A I B I C I D I E I F I G I H

INSTALL TEMPOltARY DFAC FOR 2CAB

VA-300000330349

USAG HUMPHREYS

SCHEDULE OF DRAWINGS

RING NO. REF. NO. DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REMARKS RING NO. REF. NO. DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REMARKS

CIVIL @ E-3 33 OF 51 LIGHTING PLAN

5 © C-1 1 OF 51 EXISTING CONDITION @) E-4 34 OF 51 LIGHTING FIXTURE DETAILS

0 C-2 2 OF 51 REMOVAL PLAN @ E-5 35 OF 51 POWER PLAN(HVAC 1)

© C-3 3 OF 51 SITE LAYOUT PLAN @ E-6 36 OF 51 POWER PLAN(HVAC 2)

© C-4 4 OF 51 GRADING & DRAINAGE PLAN @) E-7 37 OF 51 POWER PLAN{KITCHEN EQUIPMENT}

0 C-5 5 OF 51 UTILITY PLAN @ E-8 38 OF 51 GRADING & DRAINAGE PLAN

© C-6 6 OF 51 PAVEMENT MARKING & DIMEMSION PLAN e E-9 HAVC EQUIPMENT SCHEDULE

® C-7 7 OF 51 SECTION(TYP.) @ E -10 40 OF 51 PANELBOARD SCHEDULE(MDP, P1, P2)

@) C-8 8 OF 51 PROFILES @ E -11 41 OF 51 PANELBOARD SCHEDULE(P3, K1)

® C-9 9 OF 51 GREASE TRAP @ E-12 42 OF 51 PANELBOARD SCHEDULE(K2, K3, P4)

@ C-10 10 OF 51 CONG.PAD DETAILS @ E -13 43 OF 51 POWER SYSTEM, SINGLE LINE DIAGRAM

C -11 11 OF 51 STEEL GRATING(HEAVY DUTY) @ E -14 44 OF 51 EXTERIOR LIGHTING FIXTURE DETAIL

@ C-12 12 OF 51 SEWER MAN-HOLE DETAIL @ E-15 45 OF 51 LIGHTING CONTROL DIAGRAM

@) C-13 13 OF 51 MAN-HOLE FRAME AND COVER DETAIL @ E -16 46 OF 51 PAD MOUNTED TRANSFORMER DETAIL(THREE PHASE)

@ E-17 47 OF 51 ELECTRICAL DUCT DETAIL

@) E -18 48 OF 51 ELECTRICAL MANHOLE DETAIL

ARCHITECTURAL @) E -19 49 OF 51 ELECTRICAL HAND HOLE DETAIL

@ A-1 14 OF 51 PROPOSED TEMPORARY DINING FACILITY FLOOR PLAN, LEGEND, SCOPE OF WORK AND K EY PLAN @ E-51 50 OF 51 TYPICAL SHUNT-TRIP CONNECTION DIAGRAM

® A-2 15 OF 51 LONITUDINAL SECTION, SOUTH SECTION AND NORTH SECTION ® E-21 51 OF 51 FIRE ALARM AND MNS PLAN

@ A-3 16 OF 51 WALL SECTION AND BUILDING SIGNAGE

A-4 17 OF 51 MAT FOUNDATION, CONG STOOP, TRENCH SECTION AND WALL ELEVATION

@ A-5 18 OF 51 DOOR SCHEDULE, INTERIOR FINISH SCHEDULE AND EXTERIOR FINISH SCHEDULE

®> A-6 19 OF 51 PROPOSED MECH.FACILITY FLOOR PLAN, PROPOSED MECH.FACILITY ROOF PLAN, BUILDING SECTION AND ELEVATION, MAT FOUNDATION, MEMBER LIST AND KEY PLAN

MECHANICAL

@ M -1 20 OF 51 ABBREVIATION, GENERAL NOTES, SCOPE OF WORK AND EQUIPMENT SCHEDULE

@ M-2 21 OF 51 EQUIPMENT SCHEDULE

@ M -3 22 OF 51 NEW HAVC PLAN

@) M-4 23 OF 51 NEW HAVC PLAN

@ M-5 24 OF 51 NEW PLUMBING PIPING PLAN

® M -6 25 OF 51 NEW MECH ROOM PLAN

@ M -7 26 OF 51 NEW FIRE PROTECTION SYSTEM PLAN

- @) M-8 27 OF 51 DETAILS I -

@ M-9 28 OF 51 TYPICAL DOMESTIC WATER SYSTEM CONTROL DIAGRAM SYMBOL ZONE DESCRIPTION DATE BY CHK. APVD.

R E V I S I O N S

M -10 29 OF 51 DETAILS II

DEPARTMENT OF THE ARMY

@ M -11 30 OF 51 FIRE MAIN REISER ENTRY DETAIL, TEST PIPE CONNECTION DETAIL AND COMBINED WET� TANTPIPE RI ER DETAIL

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS. UNITED STATES ARMY GARRISON HUMPHREYS

UNIT# 15128, APO AP 96271-5128

SUBMITTED BY

REVIEWED BY

O&M DIV. CI BR.

USAG HUMPHREYS

SECURITY DIV. PM BR.

ELECTRICAL

FIRE SERV. DIV. TS BR. TITLE SHEET - 2

@ E -1 31 OF 51 LEGEND, NOTES, AND SCOPE OF WORK

SAFETYOFC. CHIEF DESIGN BR. PROJECT NO. DRA.WING NO. REF NO.

@ E-2 32 OF 51 SITE PLAN(POWER AND LIGHTINGS) VA-300000272624

MASTER PLAN DIV. USING AGENCY SCALE: T-2AS SHOWN

SHEET OF

I I I I I I I

L _____________________________________________________________________________________________________________________________________________________ J

INSTALL TEMPORARY DFAC FOR 2 CAB

25-008

2 2

HO.SONGSIK.128913

Digitally signed by

HO.SONGSIK.1289131171

Date: 2025.02.28 10:21:33 +09'00'

Digitally signed by

Date: 2025.02.28 09:20:23 +09'00'

HO.SONGSIK.12891311

Digitally signed by

Date: 2025.02.28 09:20:57 +09'00'

HO.SONGSIK.128913117

Digitally signed by

Date: 2025.02.28 09:21:27 +09'00'

Digitally signed by

Date: 2025.02.28 09:21:57 +09'00'

Digitally signed by

Date: 2025.02.28 09:22:27 +09'00'

Digitally signed by

Date: 2025.02.28 09:23:07 +09'00'

HO.SONGSIK.1289131171 Digitally signed by HO.SONGSIK.1289131171 Date: 2025.02.28 09:24:32 +09'00'

Digitally signed by

Date: 2025.02.28 09:25:24 +09'00'

Date: 2025.02.28 09:26:25 +09'00'

Digitally signed by

Date: 2025.02.28 09:27:00 +09'00'

Date: 2025.02.28 09:27:32 +09'00'

Digitally signed by

Date: 2025.02.28 09:28:09 +09'00'

HWA.1289586624

Digitally signed by SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:02:00 +09'00'

Digitally signed by SIM.CHAE

Date: 2025.02.28 14:02:31 +09'00'

HWA.1289586

Digitally signed by

SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:04:25

Digitally signed by

SIM.CHAE HWA.1289586624

Date: 2025.02.28 14:05:12

Digitally signed by SIM.CHAE

Date: 2025.02.28 14:05:37 +09'00'

Digitally signed by SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:11:11

HWA.128958662

Digitally signed by SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:42:18

Digitally signed by SIM.CHAE

Date: 2025.02.28 14:42:49 +09'00'

Digitally signed by SIM.CHAE

Date: 2025.02.28 14:44:44 +09'00'

Digitally signed by SIM.CHAE

Date: 2025.02.28 14:45:23 +09'00'

Digitally signed by SIM.CHAE

Date: 2025.02.28 14:47:03 +09'00'

Digitally signed by SIM.CHAE

Date: 2025.02.28 14:48:24 +09'00'

Digitally signed by

SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:51:55

HWA.1289

586624

Digitally signed by

SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:52:31 +09'00'

Digitally signed by SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:52:55

HWA.12895866

Digitally signed by SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:53:35

HWA.128958

Digitally signed by

SIM.CHAE

HWA.1289586624

14:54:10 +09'00'

Digitally signed by

SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:54:51

HWA.12895

86624

Digitally signed by

SIM.CHAE

HWA.1289586624

14:55:32 +09'00'

HWA.128958662

Digitally signed by SIM.CHAE

HWA.1289586624

Date: 2025.02.28 14:56:21

File details come from the government source that posted it. Updated .