Attachment 2.pdf

PDF 5 MB Posted

Attached to
CMR Bathroom Renovation for US Embassy Ljubljana, Slovenia
Solicitation number
19S16026Q0008
Issued by

About this file

This document is a set of construction drawings for a Chief of Mission Residence bathroom renovation at the U.S. Embassy in Ljubljana, Slovenia, prepared by the Office of Foreign Buildings Operations (OBO) Regional Support Center under the U.S. Consulate General Frankfurt. The project involves renovating bathroom 1-13 (5.19 square meters) on the second floor of the residence. The drawings are classified as "Sensitive But Unclassified" and dated April 28, 2026, with a drawing scale of 1:25 for floor plans and 1:40 for elevations.

The renovation includes installation of new fixtures and finishes: a curbless shower with linear drain and frameless transparent glass enclosure, new ceramic floor tiles (Marca Corona Stonecloud 120x60cm in blue), wall tiles (Johnson Tiles Arctic White 40x15cm), paint finishes, and updated electrical systems including new GFCI receptacles and light fixtures. Key products specified include plumbing fixtures from manufacturers such as Coycama (faucets, sinks), Grohe (thermostatic valve), Concept+ (toilet), Voxort (accessories), and Geberit (towel rail). The design incorporates a 2% floor slope toward the drain for proper water management and requires continuous waterproofing membranes at shower areas. General notes emphasize coordination of existing drain connections on-site prior to installation and alignment of floor and wall grout joints throughout the shower and bathroom spaces.

View the file

Other files

File Type Posted
Attachment 3.pdf PDF
SF-18.pdf PDF
RFQ 19S16026Q0008.pdf PDF
Attachment 1.pdf PDF
Attachment 4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WARNING : This Document is the property of the U.S. Government. Further reproduction and / or distribution outside the contract team is prohibited without express written approval of: Office of Foreign Buildings Operations, U.S. Department of State, Washington, DC, 20522-0620.

Information on this document is not to be altered except with the written approval of the individual whose seal appears hereon.

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC)

U.S. Consulate General Frankfurt

U.S. EMBASSY

LJUBLJANA, SLOVENIA

CHIEF OF MISSION RESIDENCE

BATHROOM RENOVATION

Rev Number Description Date

REVISIONS

KEY PLAN

RELEASE FOR CONSTRUCTION

DRAWING TITLE

COVER

FBO PROJECT NUMBER

CADD FILE NAME

DRAWING SCALE

1:1

CADD PLOT SCALE

1:25

PHASE

CONCEPT 35% 60% 90% 100% FINAL

DATE

DRAWN BY

CHECKED BY

PROJECT NUMBER

CLASSIFICATION

CADD Plot Scale

Ntouneta, M

SENSITIVE BUT UNCLASSIFIED

G00

LJU_CMR_SECOND FLOOR_BATHROOM

for

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC) U.S. Consulate General Frankfurt

U.S. EMBASSY

LJUBLJANA, SLOVENIA

CHIEF OF MISSION RESIDENCE BATHROOM RENOVATION

DRAWING INDEX:

G00 COVER PAGE

A00 PROJECT AREA

A01 BATHROOOM FLOORPLAN

A02 ELEVATIONS - EXISTING

A03 ELEVATIONS 1 & 2 - NEW BATHROOM

A04 ELEVATIONS 3 & 4 - NEW BATHROOM

A05 REFLECTIVE CEILING PLAN & SHOWER DETAILS

A06 PRODUCTS LIST

April 28, 2026

PROJECT AREA

ELECTRICAL

PANEL

BEDROOM

BEDROOM

BEDROOM

STUDY LIVING ROOM

1-7 1-8 1-9

1-11

1-5

1-4

1-13

1-12

1-3

1-6

1-10

1-14

1-11-2

1-15

WARNING : This Document is the property of the U.S. Government. Further reproduction and / or distribution outside the contract team is prohibited without express written approval of: Office of Foreign Buildings Operations, U.S. Department of State, Washington, DC, 20522-0620.

Information on this document is not to be altered except with the written approval of the individual whose seal appears hereon.

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC)

U.S. Consulate General Frankfurt

U.S. EMBASSY

LJUBLJANA, SLOVENIA

CHIEF OF MISSION RESIDENCE

BATHROOM RENOVATION

Rev Number Description Date

REVISIONS

KEY PLAN

RELEASE FOR CONSTRUCTION

DRAWING TITLE

SECOND FLOOR PLAN

PROJECT AREA

FBO PROJECT NUMBER

CADD FILE NAME

DRAWING SCALE

CADD PLOT SCALE

PHASE

CONCEPT 35% 60% 90% 100% FINAL

DATE

DRAWN BY

CHECKED BY

PROJECT NUMBER

CLASSIFICATION

CADD Plot Scale

SENSITIVE BUT UNCLASSIFIED

A00 for

Ntouneta, M

SCALE 1 : 100

A00 SECOND FLOOR PLANPLAN

LJU_CMR_SECOND FLOOR_BATHROOM

1-13

5.19 m2

ELEV

EL 3

EL 1

EL 4 EL 2

A F11b

B F11b

F12a

F11b - A

F11b - B F12aF11b - B

F11bGFCI

HEATING UNIT

FLOOR TILE

AZUVI Terra Sea 30x90 Rc

EXISTING RECEPTACLE

DRAINS EXHAUST FAN

1-13

HEATING UNIT

5.19 m2

ELEV

EL 3

EL 1

EL 4 EL 2

GFCI

Sl op e 2%

FLOOR TILE

MARCA CORONA Stonecloud 60x120

F11b

NEW RECEPTACLE

GFCI

GFCI

F12a

DRAINS EXHAUST FAN

2.93

1.

0.

0.91 0.17 1.00 0.21 0.40 0.24

0.

0.

0.

A F11b

B F11b

F12a

F11b - A

F11b - BF11b - B

F11b

EXISTING RECEPTACLE

SHOWER NISCHE

0.100.30

0.

SCALE 1 : 25

1-13 - EXISTINGPLAN

SCALE 1 : 25

1-13 - NEW BATHROOMPLAN

WARNING : This Document is the property of the U.S. Government. Further reproduction and / or distribution outside the contract team is prohibited without express written approval of: Office of Foreign Buildings Operations, U.S. Department of State, Washington, DC, 20522-0620.

Information on this document is not to be altered except with the written approval of the individual whose seal appears hereon.

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC)

U.S. Consulate General Frankfurt

SINGLE RECEPTACLE

ON - OFF SWITCH (1 POLE)

LIGHT FIXTURE - SURFACE

CEILING

DUPLEX RECEPTACLE - GFCIGFCI

LIGHT FIXTURE - WALL LIGHT

U.S. EMBASSY

LJUBLJANA, SLOVENIA

CHIEF OF MISSION RESIDENCE

BATHROOM RENOVATION

Rev Number Description Date

REVISIONS

KEY PLAN

RELEASE FOR CONSTRUCTION

DRAWING TITLE

BATHROOM 1-13

FLOORPLANS

FBO PROJECT NUMBER

CADD FILE NAME

DRAWING SCALE

1:1

CADD PLOT SCALE

1:25

PHASE

CONCEPT 35% 60% 90% 100% FINAL

DATE

DRAWN BY

CHECKED BY

PROJECT NUMBER

CLASSIFICATION

CADD Plot Scale

Ntouneta, M

SENSITIVE BUT UNCLASSIFIED

A01 for

GENERAL NOTES

1. Verify all existing conditions prior to performing any work.

2. Coordinate all power outage with the government in advance.

3. Coordinate all demolition work prior to beginning work to avoid shutting down adjacent areas.

4. For devices shown as being demolished, remove electrical devices, wiring, and raceway in walls and ceilings back to source or nearest device. Do not abandon any conductors. Where conduits are concealed in walls/floor, remove wiring and cut conduit flushed with walls or floor.

KEYED DEMOLITION NOTES:

1. Remove existing receptacle, box, conduit, and wires to the nearest device. Modify branch feeder as required

2.

0.

3.

0.29 0.28

0.

0.

1.77

0.62 0.44

1.10 1.10

0.68 1.50 0.75

1.481.45

0.80 0.58

0.44

2.

0.

0.

3.

1.

0.

0.10

0.

0.101.101.73

2.93

0.58 2.05

0.63

0.35 0.15

0.15

1.77

EL 1

WARNING : This Document is the property of the U.S. Government. Further reproduction and / or distribution outside the contract team is prohibited without express written approval of: Office of Foreign Buildings Operations, U.S. Department of State, Washington, DC, 20522-0620.

Information on this document is not to be altered except with the written approval of the individual whose seal appears hereon.

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC)

U.S. Consulate General Frankfurt

U.S. EMBASSY

LJUBLJANA, SLOVENIA

SINGLE RECEPTACLE

CHIEF OF MISSION RESIDENCE

BATHROOM RENOVATION

Rev Number Description Date

REVISIONS

KEY PLAN

RELEASE FOR CONSTRUCTION

DRAWING TITLE

BATHROOM 1-13

ELEVATIONS - EXISTING

FBO PROJECT NUMBER

CADD FILE NAME

DRAWING SCALE

1:1

CADD PLOT SCALE

1:40

PHASE

CONCEPT 35% 60% 90% 100% FINAL

DATE

DRAWN BY

CHECKED BY

PROJECT NUMBER

CLASSIFICATION

CADD Plot Scale

SENSITIVE BUT UNCLASSIFIED

A02 for

GROUND WIRE

EXHAUST FAN

Ntouneta, M

EL 2

EL 3 EL 4

SCALE 1 : 40

EXISTING

SCALE 1 : 40

EXISTING

SCALE 1 : 40

EXISTING

SCALE 1 : 40

EXISTING

WALL TILE

JOHNSON TILES

Arctic White – Satin 400x150mm (or similar)

PAINT

BAUFIX Bathroom and Kitchen White - or similar (Color to match wall tiles)

0.89 0.89 1.77

1.30 1.15

SHOWER GLASS WALL

Custom made

2.20

2.80 0.45

SHOWER NISCHE

0.60

0.40

0.27

1.20

WALL TILE

JOHNSON TILES

Arctic White – Satin 400x150mm or similar

PAINT

BAUFIX Bathroom and Kitchen White - or similar

(Color to match wall tiles)

LIGHTS

Reinstall existing

RECEPTACLE

New - GFCI

0.912.02

2.93

0.65

04 SHOWER WALL

Custom made

0.92

1.00

SHOWER NISCHE

0.10

0.40 1.20

WARNING : This Document is the property of the U.S. Government. Further reproduction and / or distribution outside the contract team is prohibited without express written approval of: Office of Foreign Buildings Operations, U.S. Department of State, Washington, DC, 20522-0620.

Information on this document is not to be altered except with the written approval of the individual whose seal appears hereon.

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC)

U.S. Consulate General Frankfurt

U.S. EMBASSY

LJUBLJANA, SLOVENIA

CHIEF OF MISSION RESIDENCE

BATHROOM RENOVATION

Rev Number Description Date

REVISIONS

KEY PLAN

RELEASE FOR CONSTRUCTION

DRAWING TITLE

BATHROOM 1-13

ELEVATIONS 1 & 2

FBO PROJECT NUMBER

CADD FILE NAME

DRAWING SCALE

1:1

CADD PLOT SCALE

1:25

PHASE

CONCEPT 35% 60% 90% 100% FINAL

DATE

DRAWN BY

CHECKED BY

PROJECT NUMBER

CLASSIFICATION

CADD Plot Scale

SENSITIVE BUT UNCLASSIFIED

A03 for

SCALE 1 : 25

NEW BATHROOMEL 1

SCALE 1 : 25

Ntouneta, M

NEW BATHROOMEL 2

DOUBLE RECEPTACLE

GFCI

WALL TILE

JOHNSON TILES

Arctic White – Satin 400x150mm (or similar)

PAINT

BAUFIX Bathroom and Kitchen White - or similar (Color to match wall tiles)

3.25

1.

0.

0.50

0.50

1.77

WALL TILE

JOHNSON TILES

Arctic White – Satin 400x150mm or similar

PAINT

BAUFIX Bathroom and Kitchen White - or similar (Color to match wall tiles)

RECEPTACLE

Existing - GFCI

HEATING UNIT

New

2.

0.

0.

3.

0.90 2.03

0.57 0.22

0.

SHOWER WALL

Custom made

WARNING : This Document is the property of the U.S. Government. Further reproduction and / or distribution outside the contract team is prohibited without express written approval of: Office of Foreign Buildings Operations, U.S. Department of State, Washington, DC, 20522-0620.

Information on this document is not to be altered except with the written approval of the individual whose seal appears hereon.

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC)

U.S. Consulate General Frankfurt

U.S. EMBASSY

LJUBLJANA, SLOVENIA

SINGLE RECEPTACLE

CHIEF OF MISSION RESIDENCE

BATHROOM RENOVATION

Rev Number Description Date

REVISIONS

KEY PLAN

RELEASE FOR CONSTRUCTION

DRAWING TITLE

BATHROOM 1-13

ELEVATIONS 3 & 4

FBO PROJECT NUMBER

CADD FILE NAME

DRAWING SCALE

1:1

CADD PLOT SCALE

1:25

PHASE

CONCEPT 35% 60% 90% 100% FINAL

DATE

DRAWN BY

CHECKED BY

PROJECT NUMBER

CLASSIFICATION

CADD Plot Scale

SENSITIVE BUT UNCLASSIFIED

A04 for

SCALE 1 : 25

NEW BATHROOMEL 3

SCALE 1 : 25

Ntouneta, M

NEW BATHROOMEL 4

GROUND WIRE

EXHAUST FAN

LIGHT

Existing

PAINT

BAUFIX Bathroom and Kitchen White - or similar (Color to match wall tiles)

2.93

1.

F11b - A

FIXED GLASS

Transparent Frameless

GLASS DOOR

Transparent Frameless

Opens inwards

1.77

2.

1.

0.89 0.89

Floor LevelSlope 2%

Floor grout aligns with wall groutLinear Drain

900 cm

WARNING : This Document is the property of the U.S. Government. Further reproduction and / or distribution outside the contract team is prohibited without express written approval of: Office of Foreign Buildings Operations, U.S. Department of State, Washington, DC, 20522-0620.

Information on this document is not to be altered except with the written approval of the individual whose seal appears hereon.

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC)

U.S. Consulate General Frankfurt

LIGHT FIXTURE - SURFACE

CEILING

U.S. EMBASSY

LJUBLJANA, SLOVENIA

CHIEF OF MISSION RESIDENCE

BATHROOM RENOVATION

Rev Number Description Date

REVISIONS

KEY PLAN

RELEASE FOR CONSTRUCTION

DRAWING TITLE

BATHROOM 1-13

REFLECTED CEILING PLAN & SHOWER DETAILS

FBO PROJECT NUMBER

CADD FILE NAME

DRAWING SCALE

1:1

CADD PLOT SCALE

1:25

PHASE

CONCEPT 35% 60% 90% 100% FINAL

DATE

DRAWN BY

CHECKED BY

PROJECT NUMBER

CLASSIFICATION

CADD Plot Scale

SENSITIVE BUT UNCLASSIFIED

A05 for

SCALE 1 : 25

REFLECTED CEILING PLANPLAN

Ntouneta, M

SCALE 1 : 25

SHOWER GLASS WALLELEV SCALE 1 : 10

CURBLESS SHOWER - SCHEMATIC FLOOR SECTIONDET

GENERAL NOTES

1. Curbless shower condition with flush transition to bathroom floor.

2. Floor grout joints shall align with wall grout joints throughout the shower area and bathroom.

3. Shower floor sloped 2% in single plane towards drain.

4. Provide linear drain adjacent to the wall.

5. Provide continuous waterproofing membrane at shower floor and walls, including reinforced corners and transitions per panufacturer requirements.

6. Shower enclosure to be frameless transparent glass with hinged door; locate transition between fixed panel and door at midpoint of shower width.

7. Provide continuous door bottom seal.

8. Connection to existing drain pipe shall be verified and coordinated on site prior to installation.

WARNING : This Document is the property of the U.S. Government. Further reproduction and / or distribution outside the contract team is prohibited without express written approval of: Office of Foreign Buildings Operations, U.S. Department of State, Washington, DC, 20522-0620.

Information on this document is not to be altered except with the written approval of the individual whose seal appears hereon.

UNITED STATES DEPARTMENT OF STATE

OBO Regional Support Center (ORSC)

U.S. Consulate General Frankfurt

U.S. EMBASSY

LJUBLJANA, SLOVENIA

CHIEF OF MISSION RESIDENCE

BATHROOM RENOVATION

Rev Number Description Date

REVISIONS

KEY PLAN

RELEASE FOR CONSTRUCTION

DRAWING TITLE

BATHROOM 1-13

PRODUCTS LIST

FBO PROJECT NUMBER

CADD FILE NAME

DRAWING SCALE

CADD PLOT SCALE

PHASE

CONCEPT 35% 60% 90% 100% FINAL

DATE

DRAWN BY

CHECKED BY

PROJECT NUMBER

CLASSIFICATION

CADD Plot Scale

SENSITIVE BUT UNCLASSIFIED

A06 for

Ntouneta, M

PRODUCTS LIST

PRODUCT NAME PRODUCT NAME MODEL DIMENTIONS COLOR

1 GEBERIT CleanLine20 A06340 90 x 4.7 cm Brushed Steel

2 COYCAMA SUN 20400100 100 x 80 cm Mirror

3 COYCAMA ONIX NEW 55001101 100(70+30) x 46.5 cm White

4 COYCAMA TOSCANA.100 19737100 100 x 45 x 89 cm White matt with black faucet, legs and handles

5 CONCEPT+ ARROW V455588 65 x 78 x 37 cm White 6 VOXORT INGRID V459940 16 x 10 x 8.8 cm Chrome 7 VOXORT 3600 N13106 60 x 6.5 cm Chrome 8 GROHE PROPITERM V451439 113 x 4.12 x 30.4 cm Chrome 9 TERMbad G62290 120 x 60 cm White

TILES LIST

10 FLOOR MARCA CORONA STONECLOUD NATURALE MATT 120 x 60cm Blue

11 WALLS JOHNSON TILES ARCTIC WHITE TNS01A 40 x 15cm White

Sheets and Views
LJU_CMR_SECOND FLOOR_BATHROOM-G00 - Cover
LJU_CMR_SECOND FLOOR_BATHROOM-A00 - PROJECT AREA
LJU_CMR_SECOND FLOOR_BATHROOM-A01 - Floorplans
LJU_CMR_SECOND FLOOR_BATHROOM-A02 - Existing_ELEV
LJU_CMR_SECOND FLOOR_BATHROOM-A03 - NEW_ELEV 1&2
LJU_CMR_SECOND FLOOR_BATHROOM-A04 - NEW_ELEV 3&4
LJU_CMR_SECOND FLOOR_BATHROOM-A05 - REFL. CEILING PLAN & DETAILS
LJU_CMR_SECOND FLOOR_BATHROOM-A06 - PRODUCTS LIST

File details come from the government source that posted it. Updated .