Attachment 2. 1305M221QNMAN0023. Schedule.pdf

PDF 1 MB Posted

Attached to
NOAA King Air 350 Maintenance
Solicitation number
1305M221QNMAN0023
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 - CLIN Structure

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 COMPLETE PHASE INSPECTIONS AS REQUIRED

FOR A HAWKER BEECHCRAFT KING AIR

350CER AIRCRAFT IN ACCORDANCE WITH

MANUFACTURER'S MAINTENANCE MANUAL

AND STATEMENT OF WORK. THIS INCLUDES A

SEPARATE DISCREPANCY REPORT FOR EACH

ITEM NEEDING REPAIR. (two of each phase)

PHASE 1 __________ (FLAT RATE)

PHASE 2 __________ (FLAT RATE)

PHASE 3 __________ (FLAT RATE)

PHASE 4 __________ (FLAT RATE)

8.00 EA

NTE NTE

0002 CORRECT OVER & ABOVE DISCREPANCIES FROM

PHASE INSPECTIONS AS WELL AS ANY OTHER

SCHEDULED OR UNSCHEDULED MAINTENANCE,

REPAIRS, MODIFICATIONS, UPGRADES, INCLUDING

PROVIDING PARTS AND TECHNICAL SUPPORT

FOR AIRCRAFT ON GROUND OCCURRENCES,

PARTS AND LABOR. ADDITIONAL OVER-AND-

ABOVE ITEMS FOR SCHEDULED INSPECTION AND

OVERHAUL AS WELL AS SERVICES OUTSIDE

NORMAL ZERO-TIME INSPECTION FOR PT6A-60A

REPLACEMENT ENGINES, LOANER ENGINES,

QEC ENGINE BUILD-UPS FOR PT6A-60A ENGINE

REPLACEMENT, OVERHAUL, REPAIR, UPGRADES,

OR OTHER REPAIRS NOT COVERED UNDER CLIN

0003.

LABOR: $_______ PER HOUR

OVERTIME LABOR: $_______ PER HOUR

PARTS ________ % DISCOUNT OFF

LIST PRICE

LOANER ENGINE $_______ PER HOUR OR PER

DAY (INDICATE WHICH)

1.00 EA

0003 INSPECTION, OVERHAUL, AND REPAIR SERVICES

TO ZERO-TIME A PRATT AND WHITNEY PT6A-60A

ENGINE FOR KING AIR B300C AIRCRAFT TO

INCLUDE REMOVAL AND INSTALLATION OF BOTH

THE LOANER ENGINE AND THE OVERHAULED

ENGINE IN ACCORDANCE WITH STATEMENT OF

WORK.

UNIT PRICE:_________________

4.00 EA

Ordering Period 2

1001 COMPLETE PHASE INSPECTIONS AS REQUIRED

FOR A HAWKER BEECHCRAFT KING AIR

350CER AIRCRAFT IN ACCORDANCE WITH

MANUFACTURER'S MAINTENANCE MANUAL

AND STATEMENT OF WORK. THIS INCLUDES A

SEPARATE DISCREPANCY REPORT FOR EACH

ITEM NEEDING REPAIR. (Two of each phase)

PHASE 1 __________ (FLAT RATE)

8.00 EA

PAGE 1 OF 5 1305M221QNMAN0023

SCHEDULE Continued

PHASE 2 __________ (FLAT RATE)

PHASE 3 __________ (FLAT RATE)

PHASE 4 __________ (FLAT RATE)

NTE NTE

1002 CORRECT OVER & ABOVE DISCREPANCIES FROM

PHASE INSPECTIONS AS WELL AS ANY OTHER

SCHEDULED OR UNSCHEDULED MAINTENANCE,

REPAIRS, MODIFICATIONS, UPGRADES, INCLUDING

PROVIDING PARTS AND TECHNICAL SUPPORT

FOR AIRCRAFT ON GROUND OCCURRENCES,

PARTS AND LABOR. ADDITIONAL OVER-AND-

ABOVE ITEMS FOR SCHEDULED INSPECTION AND

OVERHAUL AS WELL AS SERVICES OUTSIDE

NORMAL ZERO-TIME INSPECTION FOR PT6A-60A

REPLACEMENT ENGINES, LOANER ENGINES,

QEC ENGINE BUILD-UPS FOR PT6A-60A ENGINE

REPLACEMENT, OVERHAUL, REPAIR, UPGRADES,

OR OTHER REPAIRS NOT COVERED UNDER CLIN

1003.

LABOR: $_______ PER HOUR

OVERTIME LABOR: $_______ PER HOUR

PARTS ________ % DISCOUNT OFF

LIST PRICE

LOANER ENGINE $_______ PER HOUR OR PER

DAY (INDICATE WHICH)

1.00 EA

1003 INSPECTION, OVERHAUL, AND REPAIR SERVICES

TO ZERO-TIME A PRATT AND WHITNEY PT6A-60A

ENGINE FOR THE KING AIR B300C AIRCRAFT TO

INCLUDE REMOVAL AND INSTALLATION OF BOTH

THE LOANER ENGINE AND THE OVERHAULED

ENGINE IN ACCORDANCE WITH STATEMENT OF

WORK.

UNIT PRICE:_________________

4.00 EA

Ordering Period 3

2001 COMPLETE PHASE INSPECTIONS AS REQUIRED

FOR A HAWKER BEECHCRAFT KING AIR

350CER AIRCRAFT IN ACCORDANCE WITH

MANUFACTURER'S MAINTENANCE MANUAL

AND STATEMENT OF WORK. THIS INCLUDES A

SEPARATE DISCREPANCY REPORT FOR EACH

ITEM NEEDING REPAIR. (Two of each phase)

8.00 EA

PHASE 1 __________ (FLAT RATE)

PHASE 2 __________ (FLAT RATE)

PHASE 3 __________ (FLAT RATE)

PHASE 4 __________ (FLAT RATE)

UNIT PRICE:_________________

PAGE 2 OF 5 1305M221QNMAN0023

NTE NTE

2002 CORRECT OVER & ABOVE DISCREPANCIES FROM

PHASE INSPECTIONS AS WELL AS ANY OTHER

SCHEDULED OR UNSCHEDULED MAINTENANCE,

REPAIRS, MODIFICATIONS, UPGRADES, INCLUDING

PROVIDING PARTS AND TECHNICAL SUPPORT

FOR AIRCRAFT ON GROUND OCCURRENCES

PARTS AND LABOR. ADDITIONAL OVER-AND-

ABOVE ITEMS FOR SCHEDULED INSPECTION AND

OVERHAUL AS WELL AS SERVICES OUTSIDE

NORMAL ZERO-TIME INSPECTION FOR PT6A-60A

REPLACEMENT ENGINES, LOANER ENGINES,

QEC ENGINE BUILD-UPS FOR PT6A-60A ENGINE

REPLACEMENT, OVERHAUL, REPAIR, UPGRADES,

OR OTHER REPAIRS NOT COVERED UNDER CLIN

2003.

LABOR: $_______ PER HOUR

OVERTIME LABOR: $_______ PER HOUR

PARTS ________ % DISCOUNT OFF

LIST PRICE

LOANER ENGINE $_______ PER HOUR OR PER

DAY (INDICATE WHICH)

1.00 EA

2003 INSPECTION, OVERHAUL, AND REPAIR SERVICES

TO ZERO-TIME A PRATT AND WHITNEY PT6A-60A

ENGINE FOR THE KING AIR B300C AIRCRAFT TO

INCLUDE REMOVAL AND INSTALLATION OF BOTH

THE LOANER ENGINE AND THE OVERHAULED

ENGINE IN ACCORDANCE WITH STATEMENT OF

WORK. THIS CLIN IS ON A FIRM-FIXED-PRICE

BASIS.

UNIT PRICE:_________________

4.00 EA

Ordering Period 3

3001 COMPLETE PHASE INSPECTIONS AS REQUIRED

FOR A HAWKER BEECHCRAFT KING AIR

350CER AIRCRAFT IN ACCORDANCE WITH

MANUFACTURER'S MAINTENANCE MANUAL

AND STATEMENT OF WORK. THIS INCLUDES A

SEPARATE DISCREPANCY REPORT FOR EACH

ITEM NEEDING REPAIR.(Two of each phase)

PHASE 1 __________ (FLAT RATE)

PHASE 2 __________ (FLAT RATE)

PHASE 3 __________ (FLAT RATE)

PHASE 4 __________ (FLAT RATE)

8.00 EA

NTE NTE

3002 CORRECT OVER & ABOVE DISCREPANCIES FROM

PHASE INSPECTIONS AS WELL AS ANY OTHER

SCHEDULED OR UNSCHEDULED MAINTENANCE,

REPAIRS, MODIFICATIONS, UPGRADES, INCLUDING

PROVIDING PARTS AND TECHNICAL SUPPORT

FOR AIRCRAFT ON GROUND OCCURRENCES,

1.00 EA

PAGE 3 OF 5 1305M221QNMAN0023

PARTS AND LABOR. ADDITIONAL OVER-AND-

ABOVE ITEMS FOR SCHEDULED INSPECTION AND

OVERHAUL AS WELL AS SERVICES OUTSIDE

NORMAL ZERO-TIME INSPECTION FOR PT6A-60A

REPLACEMENT ENGINES, LOANER ENGINES,

QEC ENGINE BUILD-UPS FOR PT6A-60A ENGINE

REPLACEMENT, OVERHAUL, REPAIR, UPGRADES,

OR OTHER REPAIRS NOT COVERED UNDER CLIN

3003.

LABOR: $_______ PER HOUR

OVERTIME LABOR: $_______ PER HOUR

PARTS ________ % DISCOUNT OFF

LIST PRICE

LOANER ENGINE $_______ PER HOUR OR PER

DAY (INDICATE WHICH)

3003 INSPECTION, OVERHAUL, AND REPAIR SERVICES

TO ZERO-TIME A PRATT AND WHITNEY PT6A-60A

ENGINE FOR THE KING AIR B300C AIRCRAFT TO

INCLUDE REMOVAL AND INSTALLATION OF BOTH

THE LOANER ENGINE AND THE OVERHAULED

ENGINE IN ACCORDANCE WITH STATEMENT OF

WORK.

UNIT PRICE:_________________

4.00 EA

Ordering Period 4

4001 COMPLETE PHASE INSPECTIONS AS REQUIRED

FOR A HAWKER BEECHCRAFT KING AIR

350CER AIRCRAFT IN ACCORDANCE WITH

MANUFACTURER'S MAINTENANCE MANUAL

AND STATEMENT OF WORK. THIS INCLUDES A

SEPARATE DISCREPANCY REPORT FOR EACH

ITEM NEEDING REPAIR. (Two of each phase)

PHASE 1 __________ (FLAT RATE)

PHASE 2 __________ (FLAT RATE)

PHASE 3 __________ (FLAT RATE)

PHASE 4 __________ (FLAT RATE)

8.00 EA

NTE NTE

4002 CORRECT OVER & ABOVE DISCREPANCIES FROM

PHASE INSPECTIONS AS WELL AS ANY OTHER

SCHEDULED OR UNSCHEDULED MAINTENANCE,

REPAIRS, MODIFICATIONS, UPGRADES, INCLUDING

PROVIDING PARTS AND TECHNICAL SUPPORT

FOR AIRCRAFT ON GROUND OCCURRENCES,

PARTS AND LABOR. ADDITIONAL OVER-AND-

ABOVE ITEMS FOR SCHEDULED INSPECTION AND

OVERHAUL AS WELL AS SERVICES OUTSIDE

NORMAL ZERO-TIME INSPECTION FOR PT6A-60A

REPLACEMENT ENGINES, LOANER ENGINES,

QEC ENGINE BUILD-UPS FOR PT6A-60A ENGINE

REPLACEMENT, OVERHAUL, REPAIR, UPGRADES,

OR OTHER REPAIRS NOT COVERED UNDER CLIN

4003.

1.00 EA

PAGE 4 OF 5 1305M221QNMAN0023

LABOR: $_______ PER HOUR

OVERTIME LABOR: $_______ PER HOUR

PARTS ________ % DISCOUNT OFF

LIST PRICE

LOANER ENGINE $_______ PER HOUR OR PER

DAY (INDICATE WHICH)

4003 INSPECTION, OVERHAUL, AND REPAIR SERVICES

TO ZERO-TIME A PRATT AND WHITNEY PT6A-60A

ENGINE FOR THE KING AIR B300C AIRCRAFT TO

INCLUDE REMOVAL AND INSTALLATION OF BOTH

THE LOANER ENGINE AND THE OVERHAULED

ENGINE IN ACCORDANCE WITH STATEMENT OF

WORK.

UNIT PRICE:_________________

4.00 EA

PAGE 5 OF 5 1305M221QNMAN0023

File details come from the government source that posted it. Updated .